-
Feather Duster V2
1
-
Trace back information:
2
-
Table of contents
5
-
Overview of this manual
7
-
Document name of ABB products
8
-
How to read the product manual
11
-
This page is intentionally left blank
12
-
1.1 General safety information
13
-
1.1.2 Protective stop and emergency stop
15
-
1.2 Safety actions
16
-
1.3 Safety risks
18
-
1.3.2 Moving equipment is potentially lethal
20
-
1.3.3 First test run may cause injury or damage
21
-
1.3.4 Work inside the working range of the Product
22
-
1.3.6 Risks associated with live electric parts
24
-
1.3.7 Hot parts may cause burns
26
-
1.3.8 Brake testing
27
-
1.4 Safety signals and symbols
28
-
Describes important facts and conditions.
29
-
1.4.2 Safety symbols on product labels
30
-
See user documentation
31
-
Risk of crush injuries.
32
-
Chain sling with shortener
33
-
Shut off with handle
34
-
2 About Feather Duster V2
35
-
ABB IRC5, used to control the robot
36
-
2.1.2 Process diagram
38
-
2.2 Main components
39
-
2.2.2 Feather roller
40
-
2.2.3 Ionization unit
42
-
Ionizing air knife
44
-
2.2.4 Exhaust system
45
-
2.2.5 Compressed air system
46
-
3 Installation and commissioning
47
-
3.2 Technical specification
48
-
Continues on next page
49
-
3.3 On-site installation
51
-
Correct feather rotation
52
-
1 pcs, lifting capacity: > 120 kg
54
-
Fit the lifting accessories
55
-
Raise the overhead crane to lift the
56
-
3.3.3 Installing the Feather Duster V2
57
-
Convert adapter for IRB
58
-
Preparations on the Feather Duster V2
59
-
Screw: M4x16 (14 pcs)
60
-
Remove the exhaust pipe covers by removing
61
-
Fit the round-slings to the lifting screws at
62
-
Move the Feather Duster V2 under the axis
63
-
Insert the locating pin to locate the steel
64
-
Screw: M6x12 (4 pcs)
65
-
Refitting the PDCPD cover
66
-
3.3.4 Connecting exhaust hose and cables
67
-
Separate the two halves of the hose holder by
70
-
Routing and connecting the external cabling
71
-
3.4 Electrical connection
72
-
Harting part number
74
-
3.5 System start-up
75
-
Start-up of the Feather Duster V2 motor
76
-
Structure of this chapter
79
-
4.2 Maintenance schedule
80
-
4.2.2 Maintenance schedule
81
-
Every 16,000 hours
82
-
4.3 Cleaning activities
83
-
Separate and remove the 2 covers re-
84
-
Clean the ionizer unit and its support frame.
85
-
4.4 Inspection activities
86
-
4.4.2 Inspecting the ionization unit
87
-
Adjusting the ionizing air knife
88
-
4.4.3 Inspecting the cabling and exhaust hose
89
-
Inspection, cabling and exhaust hose
90
-
4.4.4 Inspecting the timing belt
91
-
Inspecting the timing belt
92
-
Checking the timing belt
93
-
If any damage or wear is detected, the part
94
-
5.2 Repairing activities
96
-
Feather roller support
97
-
Removing the feather roller
98
-
Rotate the feather roller manually, and
99
-
Replacing the feather brushes
100
-
Refitting the feather roller
101
-
5.2.2 Replacing the cable chain
103
-
Required tools and equipment
104
-
Remove the PDCPD cover.
105
-
Disconnect the cable between slider and
108
-
Removing the controller box
109
-
Release the nut on connector base, and
110
-
Remove the cable harness on the tunnel
111
-
Refitting the cable chain
112
-
Refit the nuts on cable base.
113
-
Refitting the tunnel covers
114
-
Connect the able between slider and the
115
-
Refitting the socket
116
-
Insert the connectors to the cable plug.
118
-
5.2.3 Replacing the timing belt
119
-
Removing the timing belt
120
-
Removing the tunnel covers at the motor side
121
-
Remove the timing belt.
122
-
Distance between two belt sides should be
123
-
Screws: M5x25 (1 pcs)
124
-
5.2.4 Replacing the bearing housing
126
-
Removing the bearing housings
127
-
Removing the bearing housing at the motor side
131
-
Remove the screws and washers.
132
-
Remove the shaft end slice.
134
-
Refitting the bearing housings
135
-
Refit the lower timing belt pulley.
136
-
Refit the tentacle and secure it with screws.
138
-
Refitting the timing belt
139
-
Refit the other side of the feather roller in
141
-
5.2.5 Replacing the ionization unit
143
-
Replacing the ionizing air knife
144
-
Removing the ionizing air knife
145
-
Connect the connectors.
146
-
Removing the PDCPD cover
147
-
Removing the ionizing bar
148
-
Refitting the ionizing air knife
149
-
5.2.6 Replacing the safety edge sensor
151
-
Remove the optional safety edges sensor
153
-
5.2.7 Replacing the motor
155
-
Removing the motor
156
-
Removing the upper timing belt pulley
159
-
Remove the pulley hub from the motor.
161
-
Tightening torque: M6x20
162
-
Screw: M8x25 (4 pcs)
163
-
Refitting the upper timing belt pulley
164
-
Refitting the tunnel covers at the motor side
167
-
6.2 Environmental information
170
-
Disassembly of the Feather Duster V2
171
-
7 Reference information
173
-
7.2 Unit conversion
174
-
7.3 Screw joints
175
-
Tightening torque (Nm)
177
-
7.4 Standard toolkit
178
-
7.5 Special tools
179
-
8 Spare parts
181
-
8.2 Spare part list and illustration
182
-
Spare part number
183
-
9 Circuit diagrams
187
-
assessment of hazards and risks, 14
189
-
ABB AB, Robotics
192