-
Trace back information:
2
-
Document ID: 3HAC052983-001
3
-
Table of contents
5
-
This page is intentionally left blank
8
-
Overview of this manual
9
-
The following updates are done in this revision:
11
-
Product documentation, IRC5
12
-
How to read the product manual
14
-
1.1 Introduction to safety information
17
-
1.2 General safety information
18
-
1.2.2 Safety in the robot system
19
-
1.2.3 Safety in collaborative operation
20
-
Design of work pieces and end effectors
21
-
1.2.4 Safety risks
22
-
1.2.4.2 CAUTION - Hot parts may cause burns!
24
-
1.2.4.3 Safety risks related to tools/work pieces
25
-
1.2.4.4 Safety risks related to pneumatic systems
26
-
1.2.4.5 Safety risks with pressure relief valve
27
-
1.2.4.7 Risks associated with live electric parts
29
-
1.2.4.8 Safety risks for collaborative robots
31
-
1.2.5 Safety actions
32
-
1.2.5.2 Emergency release of the robot arm
33
-
1.2.5.3 Manually stopping or overriding the arm
34
-
1.2.5.4 Brake testing
35
-
1.2.5.6 Handling of the FlexPendant
37
-
1.2.5.7 Work inside the working range of the robot
39
-
1.2.5.8 Signal lamp (optional)
40
-
1.2.6 Safety stops
41
-
1.2.6.2 What is a safety stop or protective stop?
42
-
1.2.6.3 What is Cartesian speed supervision?
43
-
1.3 Safety signals and symbols
44
-
Describes important facts and conditions.
45
-
1.3.2 Safety symbols on product labels
46
-
See user documentation
47
-
Tip risk when loosening bolts
48
-
The robot can move unexpectedly.
49
-
Chain sling with shortener
50
-
1.4 Safety related instructions
52
-
1.4.4 WARNING - The unit is sensitive to ESD!
55
-
Make sure not to overfill the
58
-
2 Installation and commissioning
59
-
2.2.1 Pre-installation procedure
60
-
The table shows the weight of the robot.
61
-
Max. load (emergency stop)
62
-
Protection classes, robot
63
-
Dimensions IRB 14000
64
-
2.2.3 Working range
65
-
Degree of motion
67
-
2.2.4 Risk of tipping/stability
68
-
2.3 On-site installation
69
-
Move the robot to the appropriate lifting posi-
70
-
Raise the overhead crane to lift the robot.
71
-
2.3.2 Lifting the robot by two persons
72
-
Lift the robot with one person on each side of
73
-
2.3.3 Orienting and securing the robot
74
-
Level surface requirements
76
-
2.3.4 Manually releasing the brakes
77
-
Releasing the brakes
78
-
2.3.5 Loads fitted to the robot
79
-
2.3.6 Installing the signal lamp
80
-
Required tools and equipment
81
-
Remove the back screws of the lower body
82
-
Fit the lamp to the signal lamp base.
83
-
Screws: 3HAC050367-005 (2 pcs).
84
-
Screws: M3x6 (4 pcs).
85
-
2.3.7 Electrical connections
86
-
Controller interface, left side
88
-
Controller interface, right side
89
-
2.4.2 Connecting power and the FlexPendant
90
-
Connecting power to the controller
91
-
2.4.3 Connecting a PC and Ethernet based options
92
-
2.4.3.1 Connectors on the computer unit
93
-
2.4.4 Connecting I/O signals
97
-
Digital inputs and outputs
98
-
2.4.5 Connecting fieldbuses
99
-
Expansion board for fieldbus adapters
100
-
Slot for AnybusCC fieldbus adapters
101
-
2.4.6 Connecting safety signals
102
-
Safety when connected to external devices
103
-
RT6 safety relay (option 1526-X)
104
-
2.4.7 Memory functions
105
-
2.4.7.2 Connecting an USB memory
106
-
Structure of this chapter
107
-
3.2 Maintenance schedule
108
-
3.2.2 Maintenance schedule
109
-
Activities and intervals, optional equipment
110
-
3.3 Inspection activities
111
-
Caution label, Risk of tipping
112
-
Collaborative Robot System
113
-
3.3.2 Inspecting, signal lamp
115
-
Turn off all:
116
-
3.3.3 Inspecting, cable harness
117
-
Inspecting the cable harness
118
-
3.3.4 Inspecting, plastic and padding
119
-
Spare part numbers and replace-
120
-
3.4 Replacement/changing activities
121
-
Battery includes protection cir-
122
-
Flange screw (10 pcs)
123
-
Refitting the battery pack
124
-
Tightening torque: 0.2 Nm.
125
-
3.5 Cleaning activities
126
-
4.2 General procedures
128
-
Flange seals and static seals
129
-
4.3 Arm and arm covers
130
-
Complete arm assembly, in-
131
-
Removing the arm
132
-
Remove the body cover.
133
-
Remove the upper axis-1 cover.
134
-
Turn the lower axis-1 cover in order to ac-
135
-
Loosen the cable bracket from the arm by
136
-
Disconnecting the arm cabling from the controller
137
-
Cut necessary cable ties.
138
-
Screw: 3HAB3409-233. (2 pcs)
139
-
Screw with flange: M3x6 (10 pcs)
140
-
Refitting the axis-1 covers
141
-
Screws: 3HAC050368-005. (4 pcs)
142
-
4.3.2 Replacing the encapsulation and covers
145
-
Covers that need to
146
-
4.4.1 Replacing the axis-1 motor
148
-
4.4.2 Replacing the axis-2 motor
149
-
Covers to be removed for access
151
-
Removing the motor
152
-
Remove the body cover top screws.
153
-
Remove the front and lower body cover.
154
-
Remove the upper screws of the lower axis-
155
-
Removing the axis-2 covers
157
-
The gravity will cause the arm to suddenly
158
-
Removing the wave generator from the motor
159
-
Fit a new o-ring in the groove.
160
-
Fit the wave generator to the motor shaft, place
161
-
Tighten the set screw.
162
-
Type of grease and total amount is
163
-
Motor orientation: orient the motor accord-
165
-
Refitting the axis-2 covers
166
-
4.4.3 Replacing the axis-7 motor
171
-
4.4.4 Replacing the axis-3 motor
172
-
Disconnect the motor connectors.
176
-
Motor orientation: orient the motor so that
183
-
Refitting the covers
184
-
4.4.5 Replacing the axis-4 motor
185
-
Used to lubricate o-rings.
186
-
Remove the axis-3 body cover.
188
-
Whenever parting/mating motor and gear-
189
-
Place the wave generator on a clean workbench,
190
-
Place the fixture tool on the new motor.
191
-
Route and secure the cabling according to
197
-
Screws: 3HAC050368-005 (4 pcs).
198
-
4.4.6 Replacing the axis-5 motor
199
-
Remove the screws and lift the motor out
202
-
4.4.7 Replacing the axis-6 motor
211
-
Remove the upper axis-4 cover.
214
-
Remove the inner part of the cooling flange.
215
-
Refitting the motor
217
-
See Calibration on page 417.
225
-
4.5 Hall sensors
226
-
Removing the body covers
228
-
Removing the remaining covers
232
-
Release the brakes and rotate axis 1 in or-
233
-
Move the cabling to access the hall sensor
234
-
Connect the hall sensor connector P3.
235
-
Screws: 4 pcs.
236
-
4.5.2 Replacing the axis-2 hall sensor
241
-
Remove the axis-7 cover.
243
-
Remove the axis-2 cable cover.
244
-
Refitting the hall sensor
245
-
Screws: 3HAC050367-005 (4 pcs).
247
-
4.5.3 Replacing the axis-7 hall sensor
248
-
Gently pull out the hall sensor interface
251
-
Make sure all safety requirements are met
254
-
4.5.4 Replacing the axis-3 hall sensor
255
-
Remove the axis-3 cover.
257
-
Removing the axis-3 hall sensor
258
-
Screws: 3HAC050367-005 (3 pcs).
261
-
4.5.5 Replacing the axis-4 hall sensor
262
-
Remove the lower axis-4 cover.
264
-
Release the latch that holds the two halves
265
-
Remove the hall sensor by removing the
266
-
Screws: 3HAC050367-005 (1 pc).
268
-
4.6 Mechanical stops
270
-
Removing the axis-1 covers
272
-
Removing the axis-1 mechanical stop
275
-
Refitting the mechanical stop
276
-
4.6.2 Replacing the axis-2 mechanical stop
281
-
Removing the axis-2 mechanical stop
285
-
Refitting the axis-2 cable collar
286
-
4.6.3 Replacing the axis-7 mechanical stop
289
-
Remove the mechanical stop by removing
292
-
Screws: 3HAC050368-005 (2 pcs).
293
-
4.6.4 Replacing the axis-3 mechanical stop
294
-
Removing the axis-3 cable collar
297
-
Release the brakes and rotate axis 3 in or-
298
-
Screws: 3HAC050368-005 (3 pcs).
301
-
4.7.1 Replacing the computer
302
-
Remove the attachment screws that fasten the
304
-
Separate the cabling in front of the computer, cut
305
-
Refitting the computer
306
-
Pushing the controller in and fastening it
307
-
Screws: 3HAC052487-001 (6 pcs).
308
-
Screws: M3x6 8.8-A2F (2 pcs).
309
-
4.7.2 Replacing the controller fan
310
-
Removing the fan
311
-
Replacing the fan
312
-
Screws: M3x6 8.8-A2F (4 pcs).
313
-
4.7.3 Replacing the capacitor bank
314
-
Removing the capacitor bank
315
-
Disconnect the grounding cable.
316
-
Remove the bottom cover.
317
-
Screws: M3x6 8.8-A2F (7 pcs).
318
-
Screws: 3HAC16446-4 (10 pcs).
319
-
4.7.4 Replacing the power supply
321
-
Removing the power supply
322
-
Refit the plastic covers over the connectors on
324
-
4.7.5 Replacing the power distribution board
325
-
Removing the power distribution board
326
-
Loosen the left attachment screw and remove the
328
-
Removing the external power distribution board
333
-
Refitting the external power distribution board
335
-
Connect the grounding cable.
336
-
4.7.7 Replacing the axis computer
338
-
Removing the axis computer
339
-
Disconnect the connectors:
341
-
DSQC1013 Axis computer:
342
-
4.7.8 Replacing the left arm's drive board
345
-
Removing the left arm's drive board
346
-
Remove two attachment screws.
348
-
DSQC 462 Drive board:
350
-
Refitting the SMB board
351
-
4.7.9 Replacing the right arm's drive board
354
-
Removing the right arm's drive board
355
-
Refit the ethernet switch bracket.
358
-
4.7.10 Replacing the I/O board
361
-
Removing the I/O board
362
-
ELECTROSTATIC DISCHARGE (ESD)
363
-
Refitting the I/O connectors
364
-
4.7.11 Replacing the SMB boards
366
-
Removing the SMB board
367
-
Carefully snap the I/O board loose (it is rail
368
-
Remove two attachment screws on the side.
369
-
4.7.12 Replacing the EtherNet switch
372
-
Removing the EtherNet switch
373
-
Refitting the body cover
375
-
4.7.13 Replacing the mass memory card
376
-
Removing the mass memory card
377
-
Refitting the mass memory card
378
-
4.7.14 Replacing the expansion board complete
379
-
Removing the computer
380
-
Removing the expansion board complete
383
-
Grip the loosened attachment screws and gently
384
-
Connect the fan connector.
387
-
Fit the fieldbus adapter by pushing it along the
388
-
Slide the computer downwards to fit the latches
389
-
4.7.15 Replacing the DeviceNet master
393
-
Removing the DeviceNet master
397
-
DeviceNet master board
398
-
(Depending on which connection is installed)
400
-
Connect the connectors:
401
-
4.7.16 Replacing the fieldbus adapter
404
-
Removing the fieldbus adapter
406
-
Refitting the fieldbus adapter
407
-
4.8 Brake release harness
409
-
Remove the nut.
412
-
Refit the nut.
413
-
5.2 Calibration method
418
-
5.3 Calibration scale and correct axis position
419
-
5.4 Calibrating the robot
420
-
Selecting the function Fine calibration
422
-
Tap to select which joint(s) to fine calibrate.
423
-
Running the fine calibration procedure
424
-
Refit any tools or customer cables previously re-
427
-
5.5 Updating revolution counters
428
-
Step 4 - Storing the revolution counter setting
431
-
5.6 Calibration movement directions for all axes
434
-
5.7 Verifying the calibration position
435
-
6.2 Environmental information
438
-
6.3 Scrapping of robot
439
-
7 Reference information
441
-
7.2 Applicable safety standards
442
-
7.3 Unit conversion
444
-
7.4 Specification of screws
445
-
Dimension, class and treatment
446
-
7.5 Screw joints
447
-
7.6 Weight specifications
448
-
7.7 Standard toolkit
449
-
7.8 Special tools
450
-
Tools and equipment with spar
451
-
7.9 Lifting accessories and lifting instructions
452
-
storage conditions, 62
455
-
Discrete Automation and Motion
458