-
Trace back information:
2
-
IRB 660 - 180/3.15
3
-
Table of contents
5
-
This page is intentionally left blank
8
-
Overview of this manual
9
-
Changes made in:
11
-
This revision includes following updates:
12
-
This revision includes the following updates:
13
-
How to read the product manual
18
-
1.1 Safety information
19
-
1.1.2 Requirements on personnel
20
-
1.2 Safety signals and symbols
21
-
1.2.2 Safety symbols on manipulator labels
23
-
See user documentation
24
-
Tip risk when loosening bolts
25
-
Brake release buttons
27
-
No mechanical stop
28
-
1.3 Robot stopping functions
29
-
1.4 Installation and commissioning
30
-
Pneumatic or hydraulic related hazards
32
-
1.5.1 Unexpected movement of robot arm
33
-
1.6 Maintenance and repair
34
-
Make sure not to overfill the
35
-
Unexpected movement of robot arm
36
-
1.6.2 Emergency release of the robot axes
37
-
1.6.3 Brake testing
38
-
See section Decommissioning on page 333.
40
-
2 Installation and commissioning
41
-
2.2.1 Pre-installation procedure
42
-
Max. load (emergency stop)
44
-
Maximum ambient temperature
45
-
2.2.2 Working range and type of motion
46
-
Type of motion
47
-
2.2.3 Risk of tipping/stability
48
-
2.2.4 The unit is sensitive to ESD
49
-
2.3 On-site installation
50
-
Fork lift set, 3HAC023044-001
51
-
Lifting robot with fork lift
52
-
The fork lift pocket weighs 60 kg!
53
-
Secure fork lift pocket to robot with two vertical
54
-
2.3.2 Lifting robot with roundslings
55
-
Note! No sharp edges!
57
-
2.3.3 Lifting robot with lifting slings
58
-
Includes user instructions 3HAC15971-2
59
-
2.3.4 Manually releasing the brakes
60
-
Release the holding brake on a particular robot
61
-
2.3.5 Lifting the base plate
62
-
2.3.6 Securing the base plate
63
-
Base plate, orienting grooves and leveling bolts
65
-
Base plate, guide sleeve holes
66
-
The base plate weighs 353 kg! All lifting
67
-
2.3.7 Orienting and securing the robot
68
-
Securing the robot
69
-
Hole configuration, base
70
-
2.3.8 Fitting equipment on robot
71
-
Illustration, fitting on turning disk
73
-
Mounting flange in bottom view
74
-
2.3.9 Signal lamp (option)
75
-
2.4 Restricting the working range
77
-
Installation, mechanical stops axis 1
79
-
Plate customer connections, at base
83
-
Remove the rear cover (A) from the robot base.
84
-
The system parameters that must be
85
-
Illustration, adjust and secure cams
86
-
2.5 Robot in cold environments
87
-
2.6 Electrical connections
88
-
Robot cable, signals
89
-
Structure of this chapter
91
-
3.2.2 Maintenance schedule
93
-
First change when DTC ii reads:
94
-
3.2.3 Expected component life
95
-
3.3 Inspection activities
96
-
These procedures include refer-
97
-
3.3.2 Inspecting, oil level gearbox axes 2 - 3
98
-
Gearbox, axis 3
99
-
Turn off all:
100
-
3.3.3 Inspecting, oil level gearbox axis 6
101
-
Inspection, oil level axis-6 gearbox
102
-
Remove the protection hood from the
105
-
Inspecting, piston rod guide ring
106
-
3.3.5 Inspecting, cable harness
107
-
Visual inspection, no tools are needed.
108
-
Check the metal clamps holding the cable
109
-
3.3.6 Inspecting the information labels
110
-
Instruction label concerning lifting the robot
111
-
3.3.7 Inspecting the axis-1 mechanical stop pin
112
-
Inspect the axis-1 mechanical stop pin.
113
-
3.3.8 Inspecting the additional mechanical stops
114
-
Shown in figure Location of
115
-
3.3.9 Inspection, dampers
116
-
See Spare part lists on To be replaced if damaged.
117
-
3.3.10 Inspection, position switch axis 1
118
-
Inspection, position switch
119
-
3.3.11 Inspecting the signal lamp (option)
120
-
3.4 Replacement/changing activities
122
-
3.4.2 Changing oil, axis-1 gearbox
123
-
Content is defined in section
124
-
Draining is time-consuming. Elapsed
125
-
3.4.3 Changing oil, gearbox axes 2 and 3
126
-
The figure shows position of gearbox, axis 3.
127
-
Draining, axes 2 and 3
128
-
Shown in Location of oil plugs on
129
-
3.4.4 Changing oil, gearbox axis 6
130
-
3.4.5 Replacing the SMB battery
132
-
Battery pack with a 3-pole battery contact (RMU)
133
-
Spare part no.
134
-
Use this procedure to refit the SMB battery.
135
-
3.5 Lubrication activities
136
-
Shell Gadus S2
137
-
Check play between support washer and bearings at
138
-
3.6 Cleaning activities
139
-
4.2 General procedures
142
-
4.2.2 Mounting instructions for bearings
143
-
4.2.3 Mounting instructions for sealings
145
-
Mount the sealing correctly with a mounting tool.
146
-
Check the o-ring grooves.
147
-
4.3 Complete robot
150
-
Metal clamp, frame
151
-
Replacing motor, axis 1 on
154
-
Gently pull the cable harness out from the base
155
-
Pull out the cables and connectors of the SMB
156
-
Secure the SMB cover with its attachment
157
-
Metal clamp, tilthouse
159
-
Remove the metal clamp that holds the
161
-
Refitting cable harness, upper end
162
-
Push the axis 6 motor cables carefully
163
-
4.3.3 Replacing the base, including axis 1 gearbox
164
-
Used to guide the complete
165
-
Follow the instructions given in the refer-
166
-
Block for calibration
167
-
Serrated lock washer
168
-
The robot arm system weighs 245 kg.
169
-
Look through the empty mounting hole of the
170
-
4.4 Upper and lower arm
172
-
Refitting, turning disk
174
-
Make sure all safety requirements are met when
175
-
4.4.2 Replacement of tilthouse unit
176
-
Location of axes 2 and 3 sides of the robot
177
-
Axis 2 side
178
-
Press tool premounting bearing
179
-
Press tool mounting axis 6
180
-
Deciding calibration routine
181
-
Secure the tilthouse with a roundsling in an
182
-
Remove one of the M6 screws and washer at
183
-
Remove the screw that locks the shaft.
184
-
Art.no. is specified in Required equip-
185
-
Check that the tilthouse is secured in a over-
186
-
Shown in the figure Cut away view of
187
-
Refitting, tilt house
188
-
Art. no. is specified in Required
189
-
4.4.3 Replacement of upper arm
191
-
View of the assembly of the upper arm components
192
-
For spare part part num-
193
-
If the robot is to be calibrated with fine
194
-
Shown in the figure View of the assembly
195
-
Preparations before refitting, upper arm
196
-
Art. no. is specified Required equipment
197
-
Lift the upper arm with an overhead crane
198
-
Make sure all safety requirements are met
200
-
4.4.4 Replacement of linkage - upper rod
201
-
Remove the lock nuts and support washers
203
-
Specified in Required equipment on
204
-
4.4.5 Replacing the linkage - lower rod
205
-
Replace if damaged.
206
-
The link weighs .
208
-
4.4.6 Replacement of linkage - link
209
-
For spare part no. see:
210
-
Remove screw and washer in the hole for
212
-
Remove the lock nut (KM8).
213
-
Art.no. is specified in Required equipment
215
-
4.4.7 Replacing the parallel rod
216
-
Art. no. is specified in Required equipment
218
-
Refitting, parallel rod
219
-
Art. no. is specified in Required equip-
220
-
4.4.8 Replacing the complete lower arm
221
-
Move the parallel arm and secure it to the lower
225
-
Refitting, lower arm
226
-
Dimension is specified in Required
228
-
4.4.9 Replacement of parallel arm
229
-
Lifting accessory, lower arm 3HAC8446-1
230
-
Refitting, parallel arm
233
-
Apply rust preventive on the highlighted areas.
234
-
4.5 Frame and base
236
-
For fitting the inner rings of the bearings
237
-
Remove the upper and lower lock nuts and
239
-
With the help of the ball bearing puller carefully
240
-
Refit the inner sealing rings and support
241
-
Adjust the length between the upper and lower
242
-
Tightening torque: 120 Nm
243
-
4.5.2 Replacing the SMB unit
244
-
See chapter Circuit diagrams on
245
-
Refitting, SMB unit
246
-
4.5.3 Replacing the brake release board
247
-
Removing, brake release board
248
-
Remove the brake release board from the
249
-
Press the push buttons 1 to 6, one at a time,
250
-
4.6.1 Replacing motor, axis 1
251
-
24 VDC, max. 1,5 A
252
-
Always use removal screws and tools
254
-
Refitting motor axis 1
255
-
Secure the motor with its four attachment
256
-
4.6.2 Replacing motors, axes 2 and 3
258
-
24 VDC, 1.5 A
259
-
Removing motors axes 2 and 3
260
-
Remove the motor cover.
261
-
Unscrew attachment screws and washers of
262
-
M12x70, fully threaded.
263
-
Disconnect the brake release voltage!
264
-
Use the rotation tool in order to rotate the motor
266
-
Refit the cable gland cover at the cable exit with
267
-
Pendulum Calibration is described in
268
-
4.6.3 Replacing motor, axis 6
269
-
Connect to connector R2.MP6
272
-
Refitting, motor axis 6
273
-
Refit the cable gland with its attachment screw.
275
-
4.7.1 Replacing the axis 1 gearbox
276
-
Complete kit that also includes op-
277
-
Removal, gearbox axis 1
278
-
Attach the lifting accessory, base and gear
279
-
Remove the bottom plate from underneath
280
-
Remove the cable guide in the center of
281
-
Refitting, gearbox axis 1
282
-
Make sure the small o-ring around the oil hole
283
-
Lift the gearbox.
284
-
18 pcs, M16 x 70, 12.9 quality UN-
285
-
1 screw: M6 x 8.
286
-
4.7.2 Replacing the gearbox, axes 2- 3
287
-
Decide which calibration routine to use, and
289
-
Fit the lock screw in the lower arm to secure
290
-
See the previous figure!
291
-
Remove the gearbox cover by removing its
292
-
Remove the gearbox axis 2-3 using an
293
-
Refitting, axis-2 / axis-3 gearbox
294
-
Apply rust preventive on the highlighted
296
-
Clean the gearbox of residual grease.
297
-
See Filling, axes 2 and 3 on page 128
298
-
4.7.3 Replacing gearbox axis 6
299
-
Always use guide pins in
300
-
Remove gearbox axis 6 carefully without
302
-
For art. no. see: Required equipment on
303
-
Pendulum Calibration is described in Op-
304
-
5.1 Introduction to calibration
305
-
5.1.2 Calibration methods
306
-
5.1.3 When to calibrate
308
-
5.2.2 Calibration movement directions for all axes
310
-
5.3 Updating revolution counters
311
-
This step is valid for RobotWare 6.02 and later.
313
-
Tap Update Revolution Counters....
314
-
5.4 Calibrating with Axis Calibration method
315
-
Routines in the calibration procedure
316
-
5.4.2 Calibration tools for Axis Calibration
318
-
Periodic check of the calibration tool
319
-
All mechanical units connected to the system are
324
-
Remove the calibration tool, if it is installed,
325
-
Reinstall the protective plug and sealing in the
326
-
5.4.5 Reference calibration
327
-
5.5 Calibrating with Calibration Pendulum method
329
-
5.6 Verifying the calibration
330
-
5.7 Checking the synchronization position
331
-
6.1 Environmental information
333
-
Also note that:
334
-
6.2 Scrapping of robot
335
-
6.3 Decommissioning of balancing device
336
-
There is stored energy built up by high
338
-
7 Reference information
339
-
7.2 Applicable standards
340
-
7.3 Unit conversion
342
-
7.4 Screw joints
343
-
Tightening torque (Nm)
345
-
7.5 Weight specifications
346
-
7.6 Standard tools
347
-
7.7 Special tools
348
-
Oil exchange equipment
349
-
7.8 Lifting accessories and lifting instructions
351
-
8 Spare part lists
353
-
9 Circuit diagrams
355
-
Article numbers for circuit diagrams
356
-
additional mechanical stop location, 114
357
-
location of, 122
358
-
risk of tipping, 48
359
-
ABB AB, Robotics
362