Congratulations on your choice.
2
-
system and/or a hot water supply system,
3
-
Boiler installation and commissioning tips
4
-
TABLE OF CONTENTS
5
-
Case front panel
6
-
Instructions for use
8
-
For reasonably economical service install a room
11
-
10 C.h. return valve
13
-
Unit 3A, Thornton Road Ind. E
14
-
Fig. 4.3 model M110B.24SR/...
15
-
Flue pipe diameter
17
-
Biasi UK Ltd support the Benchmark initiative.
18
-
The minimum acceptable spacing from the ter-
19
-
Connection of condensate drainage pipe to in-
20
-
The appliance has an integral sealed expansion
21
-
The use of gas appliances is subject to
22
-
A --- air intake/flue outlet pipe (co---axial)
23
-
an horizontal sloping not less than 1.5 deg. (25
24
-
Flue outlet pipe
25
-
Remove the front panel of the case (see the
26
-
To fused spur
27
-
Switched 3 Amp fused,
29
-
The commissioning of this boiler and system
31
-
Purge theair fromthe pump by unscrewing the
32
-
The boiler will now go through an ignition se-
33
-
plete the Certificate of Exemption section of the
34
-
Tochangethe setting turn theknob 8on a posi-
35
-
The commissioning of this boiler and sys-
37
-
Gas setting --- first step
38
-
number of times corresponding to the setting of
39
-
The procedures detailed in this chapter must
40
-
Combustion analysis check
41
-
Biasi UK Ltd
48