Technical instructions [PDF] (4 pages)
- Updated: 20.07.2026
Document Preview & Text Transcription
Technical instructions
WEX30
Underwater LED lighting
Réf : PF10R200
Table of Contents
1. Technical features ..................................................................................................................... 1
2. Packaging Contents ................................................................................................................... 2
3. Compatibility - Control .............................................................................................................. 2
4. Use - Autonomous mode ........................................................................................................... 2
5. Safety ...................................................................................................................................... 2
6. Electrical Connections ............................................................................................................... 3
7. Projector Protection ................................................................................................................... 4
8. Cable section ............................................................................................................................ 4
A. Connection schematic ............................................................................................................. 4
B. Declaration of conformity ....................................................................................................... 4
1. Technical features
Sizes
Standard PAR-56
Installation
In standard PAR-56 niche
Power supply
12 V ~ (AC) 50Hz/60Hz
Power consumed
40W maximum (according to colour)
LED type
9 powerful monochrome LEDs (3R/3G/3B)
+ 6 MidPower cool white LEDs 6000°K
Risk group 1 (low risk) according to IEC62471:2006
Protection index
IP-68 (after installation)
Max. luminous flux
According to colour/1150 lm maxi (white)
Color control
RC+, RC+ BT or by toggle switch
Read these instructions carefully before installing, commissioning and using this product.
MPNT0326 v40EN (15/03/2017)
Technical instructions
WEX30
v40EN
Lights must never be turned on outside of water.
2. Packaging Contents
1 BRIO WEX30 bulb with
• 2 stainless steel screws + washers for connection
• Technical manual (this document)
3. Compatibility - Control
The BRIO WEX30 LED bulbs can operate autonomously with simple power cuts applied to the on/off switch,
or be controlled remotely using an RC+ system (Brio RC+, MOD Brio RC+ or MeteoR2), or a RC+ BTsystem
(Brio RC+, MeteoR2).
To get all lights synchronized in your pool you have to combine with RC+ and RC+ BT system compatible
lights. All after November 2016 manufactured CCEI lights (all X30 models) are compatible.
4. Use - Autonomous mode
In the absence of a control unit, the bulbs operate autonomously and the user can choose between 18 modes:
11 set colours and 7 programmes (with shorts cutting power supply).
Change of mode
• A small cut of power supply (less than 1s) switches to the next colour / sequence. Once all the colours are
displayed, the light goes back to the first colour (pure white).
• A cut of supply (2s) resets the light synchronization and switches them to second colour (blue)
• After a long stop (more than 4s) the lights show the last displayed colour.
Fixed colours and availables sequences
Colours and sequences are displayed in this order :
• 1 to 11 : fixed colours. 1.Pure white | 2.Blue | 3.Blue Lagoon |4.Cyan | 5.Violet | 6.Magenta | 7.Pink |
8.Red | 9.Orange | 10.Green | 11.See green
• 12 to 18 : sequences. 12.Fast gradient | 13.Slow rainbow | 14.Colours parade | 15.Techno rhythm | 16.Blue
variations | 17.Random parade | 18. Ramdom colours
5. Safety
If the temperature inside the WEX30 is abnormaly high, a safety device shuts off the lighting and produces
a red flashing light. As soon as the normal temperature returns, the bulbs return to normal working order.
www.c-
cei.fr
2
Technical instructions
WEX30
v40EN
6. Electrical Connections
Installation of this product involves a hazard of electric shocks. We strongly recommend you
contract a professional installer. Incorrect installation places you in danger and may irre-
versibly damage the product and the equipment connected to it. In compliance with the NF C
15-100 standard, pool lights installed in Volume 0 must always be powered with SELV (Safety
Extra Low Voltage). Always cut off the power upstream before handling the electrical instal-
lation.
Risk of electric shock. Only connect to a circuit which is protected by a ground-fault circuit
interrupter. If you are not sure if these types of devices are fitted, contact a qualified electrician.
A. standard PAR56 niche
B. PAR56 bulb support
C. Seal to crush during light installation. This guarantees the tightness of the electrical connection.
D. 12V AC Power supply. The cable must be equipped with "eye" or "fork" terminal plugs for a proper
connection (Ø 4 mm)
Refer to the user guide of the niche to replace the bulb.
The arrow in front of the bulb must be placed on top during installation.
www.c-
cei.fr
3
Technical instructions
WEX30
v40EN
7. Projector Protection
Independent protection is necessary for each WEX30. Protection must be ensured in the secondary of the
transformer using fuses or breakers at 4A.
8. Cable section
SECTION (mm²)
2.5
4
6
10
The drop in voltage in the power supply cable of the WEX30
must be limited so that the colours are not altered.
Respect the table opposite (one projector per cable);
Max. length (m) 10.0
17.0
25.6
42.6
A. Connection schematic
B. Declaration of conformity
Bleu Electrique SAS (FR47403521693) declares that product WEX30 is compliant with the safety
and electromagnetic compatibility requirements of European directives 2006/95/CE and 2004/108/CE.
Emmanuel Baret
Marseilles, on 15/03/2017
Distributor's stamp
Date of sale: . . . . . . . . . . . . . . . . . . . . . . . Batch N°: . . . . . . . . . . . . . . . . . . . . . . . . . . .
www.c-
cei.fr
4
Pages Preview: