Chaffoteaux & Maury Flexiflame 140 Manuals

1 pdf manual(s) Chaffoteaux & Maury Flexiflame 140 for free download (Document Types: Installation and servicing instructions)

Document Preview & Text Transcription

Flexiflame 140 OPEN FLUE BOILER GAS SAFETY (INSTALLATION AND USE) REGULATIONS It is the law that all gas appliances are installed by a competant person in accordance with the above regulations (For use on natural gas only. G20) G.C. No 41 980 64 FROM SERIAL N” Installation and Servicing Instructions (Leave these instructions with the user) CONTENTS Health and Safety Information Page No 1 1. INTRODUCTION 1. General description, Special features, Guarantee 1.1 Dimensions 2. TECHNICAL DATA 2.1 Input, Output, Burner setting pressure, Gas rate 2.2 Clearances 2.3 Flue connection 2.4 Gas connection 2.5 Water connection 2.6 Water flow rates and static head 2.7 Electrical connections 2.8 Weight 2.9 Water capacity 2.10 Injector sizes 2.11 Piezo ignitor 2.12 Electrode 2.13 Gas pressure test point 2.14 Boiler thermostat 2.15 Thermocouple and thermoelectric valve 3. INSTALLATION REQUIREMENTS 3.1 General information 3.2 Location 3.3 Gas supply 3.4 Flueing 3.5 Air supply 3.5. I Room or internal space air supply 3.5.2 Cupboard or compartment air supply 35.3 Effect of extractor fan 3.6 Water circulation systems 3.7 Electrical supply 4. INSTALLATION OF BOILER 4.1 General 4.2 Control schemes Figs. 1, 2, 3,4,5,6,7 4.3 Boiler packaging 4.4 Mounting the boiler 4.5 Water connections 4.6 Gas connections and pipe sizes 4.7 Electrical connections 5. WATER CIRCULATING SYSTEM 5.1 General 5.1. I Strainers 5.2 Control schemes 5.3 Isolating valves 5.3.1 Electrical components Fig. 8, Fig. 9, Fig. 10 5.3.2 Pump positions Fig. 11, Fig. 12, Fig. 13, Fig. 14 5.3.3 Air separator Fig. 15 5.4 Circulating pump 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 5.5 Inhibitors 5.6 Automatic air separator 5.7 Open systems 5.7.1 Cold feeds and open vents 5.7.2 Hot water storage cylinder 5.7.3 Feed and expansion tank 5.8 Sealed system Fig. 15A 5.8.1 Safety valve 5.8.2 Pressure gauge 5.8.3 Hot water storage cylinder 5.8.4 Make-up system 5.8.5 Mains connection 5.8.6 Filling point 5.8.7 Pipework 6. COMMISSIONING AND TESTING 6.1 Electrical installation 6.2 Gas installation 6.3 Water circulation system 6.3.1 Open system 6.3.2 Sealed system Fig. 16 6.4 Lighting the boiler 6.5 Gas rate adjustment 6.6 Flushing 6.7 Fitting the casting Fig. 18, Fig. 19, Fig. 20 (Page 9) 6.8 Thermostat adjustment 6.9 To drain boiler 6.10 Users instructions 7. ROUTINE SERVICING General 7.1 Remove casing 7.2 Annual service 7.2.1 To clean the burner Fig. 2 1 7.2.2 To clean the heating body 7.2.3 To clean the pilot assembly 7.2.4 To remove the gas section Fig. 22 (Page 10) 7.2.5 To clean and grease bearing plate spindle Fig. 23 7.2.6 To clean thermocouple and electrode Fig. 24 7.3 General service 7.3.1 To clean burner, heating body, pilot assembly and thermocouple 7.3.2 To remove electrical control module 7.3.3 To replace diahragm 7.3.4 To clean gas valve 8. 8.1 8.2 8.3 8.4 8.5 8.6 8.7 REPLACING COMPONANTS To replace thermoelectric valve To replace overheat thermostat To replace piezo unit To replace pump To replace pump and volute To replace heat exchanger To replace boiler thermostat 7 7 7 7 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8 9 9 9 9 9 9 9 9 9 9 10 10 10 10 10 10 10 10 10 10 10 10 11 11 12 13 9. FAULT FINDING 10. SHORT SPARE PART LIST i i