DL-Systeme LTG 750 Manuals

1 pdf manual(s) DL-Systeme LTG 750 for free download (Document Types: User manual manual)

Document Preview & Text Transcription

DL-Systeme für Messtechnik GmbH, Steinbeisstraße 32, 73614 Schorndorf www.dl-systeme.de Page -1- Leakage tester LTG 750 Instructions for use Instructions for use LTG 750 DL-Systeme für Messtechnik GmbH, Steinbeisstraße 32, 73614 Schorndorf www.dl-systeme.de Page -2- Leakage tester LTG 750 Instructions for use Contents Switching-on and start Page 3 - 6 Entering a manufacturing number or a serial number Page 7 Selecting, defining the test program, Page 8 and other settings Selecting the test program Page 9 Redefining or reprocessing the test program Page 10 - 12 Import and export of programs Page 13 The expert pages Page 14 Setting-up the IP-address Page 15-16 Setting the date and time Page 17 Settings for saving the measured values on Page 18 a network drive/ shared network folder Version 1.4 onwards Saving measured values USB and Page 19 - 20 network folder The web interface Page 21 – 22 The socket interface port 1401 and 1402 Page 23 – 25 The socket interface port 23 Page 26 – 28 Installation of an SW-Update in LTG750 Page 29 - 31 Declaration of conformity Page 32 Pin assignment/ adapter connector Page 33 Power supply/ air supply Page 34 DL-Systeme für Messtechnik GmbH, Steinbeisstraße 32, 73614 Schorndorf www.dl-systeme.de Page -3- Leakage tester LTG 750 Instructions for use Switch on The leakage tester is switched on with the On/Off button. The switch engages in the On position and the diode glows in blue when the 24 V DC operating voltage is available. The following is shown on the display one by one upon start: - at first white display approx. 5s - Windows interface approx. 15 s - Logo DL systems approx. 5s - Operational view The display The display is a resistive touch-screen display. Inputs can be made by lightly tapping with the finger or with a plastic stylus on the surface. Although the surface is made of scratch- resistant glass, input helps like a ball pen or other metallic objects are to be avoided. No input is necessary at the display for operating the test sequences. The operational view The view is divided in five areas from top to bottom. - Specifications for testing - Measured value display and date / time - Bar graph display of the results of measurement and testing - Bar graph display of the test sequence - Message window