User manual manual [PDF] (34 pages)
- Updated: 01.04.2026
Document Preview & Text Transcription
DL-Systeme für Messtechnik GmbH, Steinbeisstraße 32, 73614 Schorndorf
www.dl-systeme.de
Page -1-
Leakage tester LTG 750
Instructions for use
Instructions for use
LTG 750
DL-Systeme für Messtechnik GmbH, Steinbeisstraße 32, 73614 Schorndorf
www.dl-systeme.de
Page -2-
Leakage tester LTG 750
Instructions for use
Contents
Switching-on and start
Page 3 - 6
Entering a manufacturing number or a serial number
Page 7
Selecting, defining the test program,
Page 8
and other settings
Selecting the test program
Page 9
Redefining or reprocessing the test program
Page 10 - 12
Import and export of programs
Page 13
The expert pages
Page 14
Setting-up the IP-address
Page 15-16
Setting the date and time
Page 17
Settings for saving the measured values on
Page 18
a network drive/ shared network folder
Version 1.4 onwards
Saving measured values USB and
Page 19 - 20
network folder
The web interface
Page 21 – 22
The socket interface port 1401 and 1402
Page 23 – 25
The socket interface port 23
Page 26 – 28
Installation of an SW-Update in LTG750
Page 29 - 31
Declaration of conformity
Page 32
Pin assignment/ adapter connector
Page 33
Power supply/ air supply
Page 34
DL-Systeme für Messtechnik GmbH, Steinbeisstraße 32, 73614 Schorndorf
www.dl-systeme.de
Page -3-
Leakage tester LTG 750
Instructions for use
Switch on
The leakage tester is switched on with the On/Off button. The switch engages in the On
position and the diode glows in blue when the 24 V DC operating voltage is available.
The following is shown on the display one by one upon start:
-
at first white display
approx. 5s
-
Windows interface
approx. 15 s
-
Logo DL systems
approx. 5s
-
Operational view
The display
The display is a resistive touch-screen display. Inputs can be made by lightly tapping with
the finger or with a plastic stylus on the surface. Although the surface is made of scratch-
resistant glass, input helps like a ball pen or other metallic objects are to be avoided. No
input is necessary at the display for operating the test sequences.
The operational view
The view is divided in
five areas from top to
bottom.
- Specifications for
testing
- Measured value display
and date / time
- Bar graph display of the
results of measurement
and testing
- Bar graph display of the
test sequence
- Message window
Pages Preview: