-
Hardware Installation Guide
1
-
Regulatory Compliance Information
4
-
BSMI EMC Statement — Taiwan
5
-
Supplement to Product Instructions
6
-
Class 1 Laser Transceivers
7
-
Declaration of Conformity
8
-
About This Guide
13
-
Chapter 3: Troubleshooting
14
-
Enterasys G-Series Hardware Installation Guide
17
-
PoE (Power over Ethernet) Support
24
-
Unpacking the G-Series Switch
28
-
Order of Installation Steps
29
-
Mounting the Switch
30
-
Power Supply Installation Considerations
31
-
Installing a Power Supply
34
-
Removing a Power Supply
35
-
Installing and Removing an IOM
36
-
Connecting Power to the Switch
39
-
Connecting to the Console Port
40
-
Connecting to the Network
42
-
Completing the Installation
48
-
Enterasys G-Series Hardware Installation Guide 3-1
51
-
Checking the LEDs
52
-
Using the Password Reset Button
54
-
Removing the Switch from a Rack
55
-
MPC8245, 400 MHz processor
58
-
Power Supply Specifications
59
-
PoE Daughter Card Specifications
62
-
100Base-FX Transceiver (SFP)
69