Fluke PK-PPC-BG-CVU PN 3070389 DVU Manuals
1 pdf manual(s) Fluke PK-PPC-BG-CVU PN 3070389 DVU for free download (Document Types: Installation)
Fluke PK-PPC-BG-CVU PN 3070389 DVU Installation [PDF] (2 pages)
- Identifier: id-297581
- Brand: Fluke
- Device: PK-PPC-BG-CVU PN 3070389 DVU Other
- Type: PDF
- Key Aspects: Additional Modules and Accessories Guide, Common Issue Diagnostic Flows, Best Practices for Everyday Use
- UPD Date: 10.07.2026
- Source File: 260708.pdf
- Pages: 2
- Description: Product setup manual for the Fluke PK-PPC-BG-CVU PN 3070389 DVU.
Pages Preview:
Document Preview & Text Transcription (Main Page)
Click to expand and read text
PK-PPC-BG-CVU Dual Volume Unit and Interconnections Kit P/N 3070389 Interconnections Kit, P/N 3070389, includes: DESCRIPTION QTY FIGURE CALLOUT PART NO. Dual Volume Unit (DVU) 1 N/A 3119872 Tubing, PFA, 1/4 in. x 160 cm 1 1 3232378 Adaptor, 1/4 in. tube x O- seal 1/8 in. NPT M 2 2 3140484 Adaptor, 1/4 in. tube x 1/4 in. NPT M 2 3 3134427 Union, 4P 2 4 3135104 Tee, 1/4 in. tube 2 5 3134453 Adaptor, 1/4 in. tube x 1/4 in. NPT F 2 6 3134430 Set, 6 each, Rubber Shoes 1 N/A 3125710 To Install the Dual Volume Unit (DVU) Identify a location for the DVU™ that minimizes the length of tubing between the DVU connections and the PPC BG15K™ TEST(+) and TEST(-) ports. The PPC BG15K and the DVU are designed to stack one on top of the other. The DVU may be rack mounted using the rack mount kit (P/N 3069019). Recommended configurations are for the PPC and DVU to be stacked directly one on top of the other or with their rear panels face to face. For PPC4 attach rubber shoe set to the legs of the DVU. To Connect the DVU and PPC BG15K Note You will be making and connecting two identical assemblies, one for the TEST(+) port and one for the TEST(-) port. Install a union (4) into a 1/4 in. tube x 1/4 in. NPT M adaptor (3) (do this twice). Screw the 1/4 in. NPT M end of the adaptors into the two ports of the DVU using Teflon® tape as a sealer. Figure 1: Interconnections Kit Install a 1/4 in. tube tee (5) onto each of the union/adaptor assemblies that were just installed into the DVU ports in Step . Orient the tee considering the connection to the PPC BG15K (schematic above is for PPC stacked on top of the DVU). Install the 1/4 in. tube x O-seal 1/8 in. NPT M (2) into the PPC BG15K TEST(+) and TEST(-) port. Cut lengths of PFA tubing as needed to connect the 1/4 in. tube tee to the adaptors on the PPC TEST ports. Take care that the cut is at a right angle to the tube and only cut the length needed. Optional for a connection “For DUT” of 1/4 in. NPT M rather than 1/4 in. tube: • Cut a small length of PFA tubing to use as a union between the 1/4 in. tube tee (5) and the 1/4 in. tube x 1/4 in. NPT F adaptor (6) (see schematic above).