Installation instructions manual [PDF] (31 pages)
- Updated: 11.06.2026
Document Preview & Text Transcription
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected] www.froeling.com
Installation Instructions
Turbomatic TMC 28-55
Be sure to read and comply with the operating instructions and safety
instructions.
Subject to technical change.
Introduction
Page 2
M1010108_en
s
I
Dear customer,
The FRÖLING Turbomatic wood chip boiler features a state-of-the-art
design that conforms to all currently applicable standards and testing
guidelines.
Please read and follow the installation instructions. They contain safety
instructions and comprehensive information relating to transporting,
setting up and assembling the boiler.
The constant further development of our products means that there may
be minor differences from the pictures and content. If you discover any
errors, please let us know.
Subject to technical change.
Delivery Certificate
Keeping a record that the delivery was received correctly and collecting
customer-specific data relating to the system allows us to respond
quickly should problems arise.
We would therefore ask you to confirm that you have received the
product in good condition.
Please send Fröling a copy of the delivery certificate, filled in and signed
by the customer.
Introduction
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen
Page 3
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected] www.froeling.com
M1010108_en
I
Guarantee Conditions
Our sale and delivery conditions generally apply. These conditions have
been made available to customers, and customers have been made
aware of them at the time of order completion.
You can also find the guarantee conditions in the enclosed guarantee
certificate.
Address of manufacturer
FRÖLING
Heizkessel- und Behälterbau GesmbH
Industriestraße 12
A-4710 Grieskirchen
AUSTRIA
TEL +43 (0)7248 606 0
FAX +43 (0)7248 606 600
E-MAIL [email protected]
WEBSITE www.froeling.com
Contents
Page 4
M1010108_en
s
C
1 General Information
6
1.1 Notes on Standards
6
1.2 Design Information
7
1.2.1 Approval and obligation to report...................................................................... 7
1.2.2 Requirements for central heating water ............................................................. 7
1.2.3 Ventilation of boiler room ................................................................................ 7
1.2.4 Installing the heating system / Standards .......................................................... 8
Combination with storage tank ......................................................................... 8
Return feed lift............................................................................................... 8
1.2.5 Chimney connection/chimney system ................................................................ 9
Draught limiter............................................................................................... 9
Boiler data for constructing the flue gas system:................................................. 9
2 Technology
10
2.1 Turbomatic TMC 28-55 dimensions
10
2.2 Components and Connections
11
2.3 Technical specifications
12
Test data for operation with wood chips........................................................... 12
Test data for operation with pellets ................................................................. 13
3 Installation
14
3.1 Transport
14
3.1.1 Positioning................................................................................................... 14
3.1.2 Temporary storage ....................................................................................... 14
3.2 Setting up in the boiler room
14
3.2.1 Removing the boiler from the pallet ................................................................ 14
3.2.2 Moving the boiler in the boiler room ................................................................ 14
3.2.3 Minimum distances in the boiler room.............................................................. 15
3.2.4 General information for boiler room................................................................. 15
3.3 Assembly work
16
3.3.1 Installing the chamber in the boiler ................................................................. 16
3.3.2 Installing the stoker...................................................................................... 19
Installing the burn back flap drive (only with burn back flap) .............................. 20
3.3.3 Installing the induced draught fan................................................................... 21
3.3.4 Installing the WOS Drive ............................................................................... 22
3.3.5 Fitting the automatic heat exchanger ash removal (optional) .............................. 23
Conversion for ashcan on right ....................................................................... 23
Assembly work on boiler................................................................................ 24
3.3.6 Installing the combustion chamber overpressure sensor..................................... 26
3.3.7 Fitting switch cabinet and cable ducts.............................................................. 26
3.4 Electrical connection
28
3.4.1 Laying the cable ........................................................................................... 28
3.5 Connecting the thermal discharge safety device
29
3.5.1 Thermal discharge safety device sensor ........................................................... 29
Pages Preview: