-
TPE2 (D), TPE3 (D)
1
-
1. Symbols used in this document
3
-
2. Abbreviations and definitions
4
-
5. Receiving the product
5
-
6.1 Pumped liquids
6
-
Twin-head pumps installed in horizontal pipes must
7
-
7.2 Terminal box positions
8
-
If for some reason the pump head has been lifted
9
-
8. Electrical installation
11
-
8.3 Mains supply
12
-
Mains connection, three-phase motors
13
-
8.5.1 Connection terminals, advanced functional
14
-
Signal relay 1
15
-
8.6 Signal cables
16
-
9.1 Flushing the pipe system
17
-
10. Operating conditions
18
-
10.10 Installation altitude
19
-
11. User interfaces
20
-
12.1 Setpoint setting
21
-
Pump set to maximum curve.
22
-
13. Advanced control panel
23
-
14. Home display
24
-
14.2 Menu overview for advanced control panel
25
-
System operating status
26
-
Motor bearing monitoring
27
-
15. Grundfos GO
28
-
15.2 Menu overview for Grundfos GO main menus
29
-
16.38 "Recall settings" (Recall
31
-
16. Description of functions
32
-
All operating modes are illustrated in the figure
33
-
The AUTOADAPT control mode continuously adapts
34
-
16.6.3 "Proportional pressure"
35
-
16.6.5 "Constant temperature"
36
-
"Constant differential pressure"
37
-
"Constant differential temperature"
38
-
16.6.9 "Constant level"
39
-
16.6.11 "Constant curve"
40
-
You can combine the FLOWLIMIT function with the
41
-
16.10.1 Setting two sensors for differential
43
-
Select the activation delay, T1.
45
-
16.15 "Signal relays 1 and 2" (Relay
47
-
Guidelines for setting of PI controller
49
-
Rules of thumb
50
-
Example with constant curve with linear
51
-
The setpoint is influenced by a curve made out of
52
-
16.21 "Temperature influence"
53
-
Here you set the measured parameter to be
54
-
The ramps determine how quickly the motor can
55
-
"Time until next service" (Motor bearing service)
56
-
16.31 "Date and time" (Set date and time)
57
-
16.35 Define Home display
58
-
16.41 "Connection code"
59
-
16.44 Warning log
60
-
16.48 Setting of date and time
61
-
16.49.3 Cascade operation
62
-
Grundfos GO and wired pump connection
63
-
Advanced control panel and wired pump
64
-
17. Selecting control mode
65
-
18. Bus signal
67
-
19. Priority of settings
68
-
20. Grundfos Eye
69
-
21. Signal relays
70
-
22. Installing a communication
71
-
6. Make the electrical connections to the CIM
72
-
23. Identification of functional module
73
-
25. Changing the position of the
74
-
26.2.2 Blanking flanges
76
-
In twin-head pump installations, the backup
77
-
30. Technical data, single-phase
78
-
32. Inputs and outputs
79
-
LiqTec sensor inputs
80
-
Standard: IP55 (IEC 34-5).
81
-
34. Factory settings
82
-
Some pumps are fitted with a Grundfos
83
-
Installation in the USA and Canada
84
-
Location of identification numbers
85
-
Bombas GRUNDFOS de Argentina S.A.
88
-
GRUNDFOS Pumps Sdn. Bhd.
89