Installation adjustment service [PDF] (4 pages)
- Updated: 30.05.2026
Document Preview & Text Transcription
Bulletin G-269
August, 2018
1360 Elmwood Avenue, Cranston, RI 02910 USA
Phone: 401.461.1200 Fax: 401.941.5310
Email: [email protected]
Web Site: http://www.leonardvalve.com
INSTALLATION, ADJUSTMENT, SERVICE
MODEL 269-LF, 369-LF
THERMOSTATIC / POINT OF USE MIXING VALVES
369-LF (3/4” NPT)
ASSE 1069 CERTIFIED
WARNING!!
WATER TEMPERATURES IN EXCESS OF 110°F (43°C) MAY CAUSE SCALDING, SEVERE
INJURY, OR DEATH!!
Maximum Operating Pressure: 125 PSI (860 KPA)
IMPORTANT! These thermostatic water mixing valves can be adjusted to deliver water at temperatures
exceeding 110°F (43°C). After installation, the installer must check the outlet water temperature and adjust
the temperature setting to ensure delivery of a safe water temperature not exceeding 110°F (43°C). See
“Temperature Adjustment” next page.
1. Valve should be installed where it can be easily cleaned,
adjusted or repaired.
2. Inlets
are
furnished
with
NPT
connections.
When
soldering close to this unit, DO NOT OVERHEAT,
internal components may become damaged.
3. Leonard recommends that unions and shutoffs
are
installed on the inlets and outlet.
4. Use solder or pipe cement sparingly. Supply pipes should
be flushed before the valve is connected. Flush outlet
pipe and valve as soon as it is connected.
269-LF & 369-LF WARNING:
When using flex hoses be careful, swivel connectors may damage inlet checks and / or
element on outlet on 269-LF and 369-LF models. Coupling fittings may be needed if swivel
connectors have a brass protruding tube or any protrusion that may damage the valve.
269-LF (1/2” NPT)
ASSE 1069 CERTIFIED
ECO-MIX ™
These products are certified to meet Low Lead requirements of
wetted surface area containing less than 0.25% lead by weight
WARNING:
This
product
can
expose
you
to
chemicals including lead, which is known to the State
of California to cause cancer. For more information, go
to www.P65Warnings.Ca.gov
!
all-guides.co
m
ADJUSTMENT AND SERVICE
TEMPERATURE ADJUSTMENT
1. Open hot and cold water supply valves to mixing valve.
2. Open mixed water outlet.
3. With the fixture in the full open position, calibrate the
mixed water outlet temperature by placing a thermometer
in the mixed water stream. Loosen knob set screw with
5/64” allen wrench. Adjust the setting of the valve to
obtain the desired temperature (counterclockwise, to
increase temperature-clockwise to decrease temperature.)
4. Tighten knob set screw to lock temperature setting.
WARNING
WARNING!
This
thermostatic
mixing
valve’s
temperature
setting
MUST
be
checked.
If
the
temperature is too high (above 110ºF, 43ºC), the
temperature
knob
must
be
adjusted
immediately.
Excessively hot water is DANGEROUS AND MAY
CAUSE SCALDING!!
PRESSURE-TEMPERATURE:
Minimum Flow: 1.0 GPM (3.8 l/Min)
Maximum Pressure: 125 PSI (8.6 BAR)
Maximum Hot Water temperature: 200F- (93°C)
Approach Temperature 5°F (2.8°C) above set
point.
TROUBLESHOOTING INSTRUCTIONS
GASKET KIT
Leaking water under knob.
Leaking water between valve cover and body.
GASKET KIT
Model 269-LF
1/WX
Model 369-LF
1/WX
REBUILDING KIT
Valve will not control temperature after
cleaning.
REBUILDING KIT
Model 269-LF
R/269
Model 369-LF
R/269
CHECKSTOP KIT
Hot water by-pass into cold line.
Cold water by-pass into hot line.
CHECK KIT
Model 269-LF
4/220
Model 369-LF
4/320
SEE PAGE 3 FOR COMPLETE PARTS BREAKDOWN
SEE PAGE 4 FOR PIPING IN RECIRCULATED OR NON-RECIRCULATED WATER SYSTEMS
IMPORTANT!! THIS IS A CONTROL SYSTEM WHICH MUST BE CLEANED AND MAINTAINED ON A
REGULAR BASIS (SEE MAINTENANCE GUIDE AND RECORD MGR-1001).
1360 Elmwood Avenue, Cranston, RI 02910 USA
Phone: 401.461.1200 Fax: 401.941.5310
Email: [email protected]
WEB: http://www.leonardvalve.com
2
369-LF
269-LF
1/2"
1/2"
(12.7mm) (12.7mm)
3.8
1.0
13.2
3.5
26.5
7.0
20.1
5.3
23.8
6.3
29.5
7.8
32.2
8.5
GPM
L/MIN
35.2
9.3
37.9
10.0
43.5
40.9
10.8
11.5
3.8
1.0
15.1
4.0
28.4
7.5
21.0
5.8
25.7
6.8
31.4
8.3
34.1
9.0
GPM
L/MIN
37.1
9.8
39.7
10.5
45.4
42.8
11.3
12.0
3/4"
3/4"
(19.1mm) (19.1mm)
MODEL
IN
OUT
MINIMUM
FLOW
GPM
L/MIN
PSI
BAR
5
20
10
15
25
30
35
40
45
50
0.3
1.4
0.7
1.0
1.7
2.1
2.4
2.8
3.1
3.4
PRESSURE DROP
VALVE PARTS LIST
MODEL 269-LF
1/WX Gasket Kit
Shuttle O-ring
Stem assembly O-ring
Cover O-ring
R/269 Complete Rebuild Kit
Return spring
Shuttle assembly
Shuttle O-ring
Stem assembly O-ring
Cover O-ring
4/220 Check valve Kit
2 Check valves
2 Check clips
MODEL 369-LF
1/WX Gasket Kit
Shuttle O-ring
Stem assembly O-ring
Cover O-ring
R/269 Complete Rebuild Kit
Return spring
Shuttle assembly
Shuttle O-ring
Stem assembly O-ring
Cover O-ring
4/320 Check valve Kit
2 Check valves
2 Check clips
DISMANTLING & CLEANING
TROUBLESHOOTING
1. Shut off hot and cold water to the valve as well as the valve
outlet port.
2. Loosen lock screw on side of knob with 5/64” allen wrench.
3. Remove the knob screw on top of knob.
4. Remove temperature adjustment knob.
5. Remove valve cover, which includes the stem assembly.
6. The shuttle assembly can now be removed, cleaned and
inspected. Be sure to check the condition of the shuttle o-ring
and replace if necessary.
7. Lubricate the shuttle o-ring before installing the shuttle
assembly.
8. Install the cover assembly including o-ring back onto valve
and tighten.
9. Replace knob and knob screw.
10. Valve temperature must be reset after any repairs or
cleaning!! See Page 2. Temperature Adjustment
1. Leaking water under knob, order gasket kit, replace stem
assembly o-ring. Remove knob screw and knob, remove
retaining clip, thread out the stem assembly and replace o-ring.
Lubricate o-ring, thread stem into cover, replace retaining ring,
knob and screw. Valve temperature must be reset after any
repairs or cleaning!! See page 2.
2. Leaking water between cover and body, order gasket kit,
replace cover o-ring. Remove knob screw and knob and remove
valve cover and replace o-ring. Replace valve cover, knob and
knob screw. Valve temperature must be reset after any
repairs or cleaning!! See page 2.
3. Hot water bypass into cold line, order checkstop kit and replace
checks within inlets of valve.
4. Valve not controlling temperature even after cleaning, order
complete rebuild kit. Remove knob screw and knob and remove
valve cover. Replace shuttle assembly and return spring being
sure to lubricate shuttle o-ring. Replace valve cover, knob and
knob screw. Valve temperature must be reset after any
repairs or cleaning!! See page 2.
1360 Elmwood Avenue, Cranston, RI 02910 USA
Phone: 401.461.1200 Fax: 401.941.5310
Email: [email protected]
WEB: http://www.leonardvalve.com
3
MODEL 269-LF, 369-LF
RETURN SPRING
CHECK
CHECK CLIP
SHUTTLE ASSEMBLY
SHUTTLE O'RING
STEM ASSEMBLY
STEM ASSEMBLY O'RING
COVER O'RING
COVER
RETAINING CLIP
KNOB
SCREW
KNOB SET SCREW
DIAL PLATE
DO NOT REMOVE
SNAP RING ON
STEM - INJURY MAY
OCCUR
Pages Preview: