Leonard ECO-MIX 269-LF Manuals

1 pdf manual(s) Leonard ECO-MIX 269-LF for free download (Document Types: Installation adjustment service)

Document Preview & Text Transcription

Bulletin G-269 August, 2018 1360 Elmwood Avenue, Cranston, RI 02910 USA Phone: 401.461.1200 Fax: 401.941.5310 Email: [email protected] Web Site: http://www.leonardvalve.com INSTALLATION, ADJUSTMENT, SERVICE MODEL 269-LF, 369-LF THERMOSTATIC / POINT OF USE MIXING VALVES 369-LF (3/4” NPT) ASSE 1069 CERTIFIED WARNING!! WATER TEMPERATURES IN EXCESS OF 110°F (43°C) MAY CAUSE SCALDING, SEVERE INJURY, OR DEATH!! Maximum Operating Pressure: 125 PSI (860 KPA) IMPORTANT! These thermostatic water mixing valves can be adjusted to deliver water at temperatures exceeding 110°F (43°C). After installation, the installer must check the outlet water temperature and adjust the temperature setting to ensure delivery of a safe water temperature not exceeding 110°F (43°C). See “Temperature Adjustment” next page. 1. Valve should be installed where it can be easily cleaned, adjusted or repaired. 2. Inlets are furnished with NPT connections. When soldering close to this unit, DO NOT OVERHEAT, internal components may become damaged. 3. Leonard recommends that unions and shutoffs are installed on the inlets and outlet. 4. Use solder or pipe cement sparingly. Supply pipes should be flushed before the valve is connected. Flush outlet pipe and valve as soon as it is connected. 269-LF & 369-LF WARNING: When using flex hoses be careful, swivel connectors may damage inlet checks and / or element on outlet on 269-LF and 369-LF models. Coupling fittings may be needed if swivel connectors have a brass protruding tube or any protrusion that may damage the valve. 269-LF (1/2” NPT) ASSE 1069 CERTIFIED ECO-MIX ™ These products are certified to meet Low Lead requirements of wetted surface area containing less than 0.25% lead by weight WARNING: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer. For more information, go to www.P65Warnings.Ca.gov ! all-guides.co m ADJUSTMENT AND SERVICE TEMPERATURE ADJUSTMENT 1. Open hot and cold water supply valves to mixing valve. 2. Open mixed water outlet. 3. With the fixture in the full open position, calibrate the mixed water outlet temperature by placing a thermometer in the mixed water stream. Loosen knob set screw with 5/64” allen wrench. Adjust the setting of the valve to obtain the desired temperature (counterclockwise, to increase temperature-clockwise to decrease temperature.) 4. Tighten knob set screw to lock temperature setting. WARNING WARNING! This thermostatic mixing valve’s temperature setting MUST be checked. If the temperature is too high (above 110ºF, 43ºC), the temperature knob must be adjusted immediately. Excessively hot water is DANGEROUS AND MAY CAUSE SCALDING!! PRESSURE-TEMPERATURE: Minimum Flow: 1.0 GPM (3.8 l/Min) Maximum Pressure: 125 PSI (8.6 BAR) Maximum Hot Water temperature: 200F- (93°C) Approach Temperature 5°F (2.8°C) above set point. TROUBLESHOOTING INSTRUCTIONS GASKET KIT Leaking water under knob. Leaking water between valve cover and body. GASKET KIT Model 269-LF 1/WX Model 369-LF 1/WX REBUILDING KIT Valve will not control temperature after cleaning. REBUILDING KIT Model 269-LF R/269 Model 369-LF R/269 CHECKSTOP KIT Hot water by-pass into cold line. Cold water by-pass into hot line. CHECK KIT Model 269-LF 4/220 Model 369-LF 4/320 SEE PAGE 3 FOR COMPLETE PARTS BREAKDOWN SEE PAGE 4 FOR PIPING IN RECIRCULATED OR NON-RECIRCULATED WATER SYSTEMS IMPORTANT!! THIS IS A CONTROL SYSTEM WHICH MUST BE CLEANED AND MAINTAINED ON A REGULAR BASIS (SEE MAINTENANCE GUIDE AND RECORD MGR-1001). 1360 Elmwood Avenue, Cranston, RI 02910 USA Phone: 401.461.1200 Fax: 401.941.5310 Email: [email protected] WEB: http://www.leonardvalve.com 2 369-LF 269-LF 1/2" 1/2" (12.7mm) (12.7mm) 3.8 1.0 13.2 3.5 26.5 7.0 20.1 5.3 23.8 6.3 29.5 7.8 32.2 8.5 GPM L/MIN 35.2 9.3 37.9 10.0 43.5 40.9 10.8 11.5 3.8 1.0 15.1 4.0 28.4 7.5 21.0 5.8 25.7 6.8 31.4 8.3 34.1 9.0 GPM L/MIN 37.1 9.8 39.7 10.5 45.4 42.8 11.3 12.0 3/4" 3/4" (19.1mm) (19.1mm) MODEL IN OUT MINIMUM FLOW GPM L/MIN PSI BAR 5 20 10 15 25 30 35 40 45 50 0.3 1.4 0.7 1.0 1.7 2.1 2.4 2.8 3.1 3.4 PRESSURE DROP VALVE PARTS LIST MODEL 269-LF 1/WX Gasket Kit Shuttle O-ring Stem assembly O-ring Cover O-ring R/269 Complete Rebuild Kit Return spring Shuttle assembly Shuttle O-ring Stem assembly O-ring Cover O-ring 4/220 Check valve Kit 2 Check valves 2 Check clips MODEL 369-LF 1/WX Gasket Kit Shuttle O-ring Stem assembly O-ring Cover O-ring R/269 Complete Rebuild Kit Return spring Shuttle assembly Shuttle O-ring Stem assembly O-ring Cover O-ring 4/320 Check valve Kit 2 Check valves 2 Check clips DISMANTLING & CLEANING TROUBLESHOOTING 1. Shut off hot and cold water to the valve as well as the valve outlet port. 2. Loosen lock screw on side of knob with 5/64” allen wrench. 3. Remove the knob screw on top of knob. 4. Remove temperature adjustment knob. 5. Remove valve cover, which includes the stem assembly. 6. The shuttle assembly can now be removed, cleaned and inspected. Be sure to check the condition of the shuttle o-ring and replace if necessary. 7. Lubricate the shuttle o-ring before installing the shuttle assembly. 8. Install the cover assembly including o-ring back onto valve and tighten. 9. Replace knob and knob screw. 10. Valve temperature must be reset after any repairs or cleaning!! See Page 2. Temperature Adjustment 1. Leaking water under knob, order gasket kit, replace stem assembly o-ring. Remove knob screw and knob, remove retaining clip, thread out the stem assembly and replace o-ring. Lubricate o-ring, thread stem into cover, replace retaining ring, knob and screw. Valve temperature must be reset after any repairs or cleaning!! See page 2. 2. Leaking water between cover and body, order gasket kit, replace cover o-ring. Remove knob screw and knob and remove valve cover and replace o-ring. Replace valve cover, knob and knob screw. Valve temperature must be reset after any repairs or cleaning!! See page 2. 3. Hot water bypass into cold line, order checkstop kit and replace checks within inlets of valve. 4. Valve not controlling temperature even after cleaning, order complete rebuild kit. Remove knob screw and knob and remove valve cover. Replace shuttle assembly and return spring being sure to lubricate shuttle o-ring. Replace valve cover, knob and knob screw. Valve temperature must be reset after any repairs or cleaning!! See page 2. 1360 Elmwood Avenue, Cranston, RI 02910 USA Phone: 401.461.1200 Fax: 401.941.5310 Email: [email protected] WEB: http://www.leonardvalve.com 3 MODEL 269-LF, 369-LF RETURN SPRING CHECK CHECK CLIP SHUTTLE ASSEMBLY SHUTTLE O'RING STEM ASSEMBLY STEM ASSEMBLY O'RING COVER O'RING COVER RETAINING CLIP KNOB SCREW KNOB SET SCREW DIAL PLATE DO NOT REMOVE SNAP RING ON STEM - INJURY MAY OCCUR