Assembly instructions and owner's manual [PDF] (6 pages)
- Updated: 15.04.2026
Document Preview & Text Transcription
1
**For U.S. and Canada Customers ONLY:**
IF ASSISTANCE IS NEEDED,
DO NOT CONTACT THE STORE!!!
CALL OUR CUSTOMER SERVICE DEPARTMENT at 1 (800) 225-3865
HOURS: 7:00 a.m. to 5:00 p.m. Monday through Friday, 7:00 a.m. to 12 noon Saturday (Mountain Standard Time)
**Call, or visit our Web site for Saturday hours**
**Customers outside the U.S. or Canada, please contact the store.**
®
10/01/2006
VISIT THE LIFETIME WEB SITE:
WWW.LIFETIME.COM
4” SQUARE GROUND SLEEVE
MODEL #0040
ASSEMBLY INSTRUCTIONS
AND OWNER’S MANUAL
Save this instruction in the event that the manufacturer has to be contacted for replacement parts.
WARNING
INSTRUCTION #1019202
Failure to comply with any of the warnings
in these instructions may result in serious
personal injuries such as cuts, broken
bones, nerve damage, paralysis, brain
injury, or death. Failure to comply may also
result in property damage. Please heed
all warnings and cautions. To ensure your
safety, do not attempt to assemble this
system without reading and following all
instructions carefully. Identify and inventory
the parts using the Parts List.
Copy
Copy
2
PARTS LIST
ID
Part #
Description
Qty
A
1018911
Ground Sleeve
1
B
500113
4 1/2” Cap
1
C
CF01700
Pole Cap
1
D
800054
Ground Sleeve Wedge 1
E
500231
3/4” x 6” Tape
1
TOOLS AND MATERIALS
REQUIRED FOR ASSEMBLY
(Not Included)
1. Concrete mix
(Six 90-lb. bags)
2. Water supply
3. Wheelbarrow
4. Shovel
5. 30” rebar
6. Carpenter’s level
WARNING
Choose the location of your pole carefully! Avoid putting
the pole near overhead power or utility lines. Be sure to
contact the appropriate agency to determine the location
of any underground utilities before digging.
NOTE: This Ground Sleeve is for use with inground poles only. Poles are not included with this product. Use the pole from
your purchased Lifetime® system.
NOTE: If you have a one-piece pole system, your pole will be significantly longer than the poles pictured. If you have a three-piece pole system, use
only the Bottom Pole Section.
a. Slide the round Ground Sleeve Cap (B) over the bottom of the Ground Sleeve (A). You may have to push fairly hard on the Cap
to slide it over the end of the Sleeve.
b.� Insert�the�lower�end�of�the�pole�(the�end�with�the�dimple)�into�the�Ground�Sleeve.�Make�sure�the�pole�fits�into�the�Ground�Sleeve�
and slides all the way to the bottom of the Sleeve.
Identification
dimple
STEP1A
B
A
A
3
a. Dig a hole 24” deep and 21” in diameter. Stack bricks in the bottom of the hole for the ground sleeve to stand on. Stack enough
bricks in the hole so that the top of the ground sleeve is even with the top edge of the playing surface. If the ground sleeve is not
exactly even with the playing surface, dig the hole deeper or add more bricks as necessary. Position the bricks close to the front
edge of the hole, near the playing surface. The correct distance from the basketball court to the front of the pole is 4 inches.
b.� Mix�all�6�bags�of�concrete,�except�1/3�of�a�bag�which�will�be�used�later�to�fill�the�inside�of�the�bottom�pole�section.
c. Fill the hole half full with concrete. Insert the Ground Sleeve and bottom pole section into the cement, making sure the Ground
Sleeve rests on the bricks at the bottom of the hole. The correct distance from the basketball court to the front of the pole is
4�inches.�The�top�of�the�Ground�Sleeve�should�be�flush�with�the�basketball�court.�The�bottom�of�the�Sleeve�should�be�resting�
on the bricks in the bottom of the hole. The Wedge between the Sleeve and pole section should be at the back side of the pole,
away from the playing surface.
PLAYING
SURFACE
Bricks
STEP 2
WEDGE
D
E
E
a. Peel off the short piece of the Tape backing and apply the Tape (E) to the inside of the Wedge (D) as shown. Cut the Tape at
the top edge of the Wedge, then remove the backing and apply the remainder to the other side of the Wedge. Cut off the excess
at�the�top�edge�of�the�Wedge.�Make�sure�the�Tape�is�firmly�applied�and�can�not�fold�backward.
b. Insert the Wedge into one corner of the Sleeve and tap it down until it is all the way in. The Wedge helps to stabilize the pole,
and must be used whenever the pole is inserted into the Sleeve.
STEP 1B
WEDGE
D
A
B
A
E
D
4
a. Carefully remove the pole from the Ground Sleeve.
b. Mix the remaining 1/3 bag of concrete, making sure to keep the concrete dry enough to be handled. Push the concrete into the
bottom�of�the�pole�so�there�is�enough�to�fill�the�bottom�30�inches�of�the�pole.
c.� Insert�the�30”�rebar�into�the�middle�of�the�pole�until�the�end�is�flush�with�the�end�of�the�pole.
d. Bend the tabs on the Pole Cap (C) and insert it into the bottom of the pole. You may need to hold the Cap in place with some
tape. Leave the pole standing in an upright position until the concrete sets.
e. Continue with step 6.
STEP 5
C
2ND
POURING
PLAYING
SURFACE
4”
a.� Finish�filling�the�hole�with�concrete.�Make sure the
Ground Sleeve is flush with the basketball court and is
not sunk into or positioned above the concrete. If the
top of the Ground Sleeve is not flush with the playing
surface, the system will not be at the regulation
height. Do not allow any concrete to cover the top
edge of the Ground Sleeve or contact the pole.
b. Form the concrete into an upward slope, toward the
Ground�Sleeve.�This�will�allow�any�water�buildup�to�flow�
away from the Ground Sleeve. Failure to do so may result
in premature rusting of the Ground Sleeve.
a.� Using�a�level,�check�the�pole�several�times�within�the�first�hour�to�make�sure�all�
sides are vertical and that the top of the Sleeve is level with the playing surface.
Readjust�if�necessary�before�the�concrete�begins�to�firm.
b. Allow at least four hours for the concrete to set up before continuing assembly.
STEP 4
STEP 3
FOR ONE-PIECE POLES ONLY:
Pages Preview: