-
MACH 5, AS-950C, HJ950C
1
-
TABLE OF CONTENTS
3
-
BEFORE YOU BEGIN
7
-
SECTION 3 – Troubleshooting
9
-
Color Mixing Issues:
12
-
Direction of transport
13
-
The Ink Tank(s)
16
-
The Printhead Cartridge (continued)
18
-
Power (Power-Up) Problems
20
-
Service Station Problems
21
-
Interface Communication Problems
22
-
Media Support Wedge not us
23
-
Feeding Problems (continued)
24
-
Error’s and Warnings
25
-
Toolbox System Status Messages
26
-
Toolbox System Status Messages (continued)
27
-
Ink Accumulating in the Wrong Areas of the Printer
31
-
Jams in the Printer
32
-
TOOLBOX SERVICE FEATURES
34
-
MEASUREMENTS & ADJUSTMENTS
41
-
DISASSEMBLY AND ASSEMBLY
53
-
Section 6 – Service Maintenance
135
-
6. Click “Continue” on the Confirm
137
-
2. Open the Ink Tank Door, release the Ink Tank
138
-
Cleaning the Printhead Cartridge
139
-
Replacing the Printhead Cartridge
140
-
Printhead Storage & Shelf Life
141
-
Cleaning Pen Driver Printed Circuit Board Contacts
142
-
Inspecting the Wiper Roller
144
-
Cleaning/Replacing Service Station Items
145
-
3. Power-up the printer.
146
-
Cleaning the Service Station
147
-
Wiper Motor Assembly Removal and Cleaning
148
-
Installing the Service Station
150
-
Wiper Roller end of
151
-
You don’t need to open the Print Engine.
152
-
Waste Ink Tray
154
-
Replacing the Sheet Separators
155
-
Cleaning the Printer Body
156
-
Cleaning the Feed Sensor
157
-
Cleaning the Ink Revolver Couplings
158
-
Cleaning the Lift Arm Sensor
159
-
Cleaning the Encoder Wheel on the Lift Motor
160
-
Cleaning Other Items inside the Print Engine
161
-
Preparing Printer for Transport
163
-
Lubricating the Service Station Friction Points
165
-
Lubricate the Worm Gear on the Lifting Arm Motor
166
-
Lubricate Service Station Guide
167
-
Lubricate Lifting Arm Pivot Points
168
-
Lubricating the Grit Roller Ground Clips/Springs
169
-
Reinstalling or Replacing the Service Station
170
-
6. Power up the unit, then press “Install
172
-
Appendix A –Specifications
174
-
Appendix B – Supplies and Optional Hardware
175
-
REMOVE THE SERVICE STATION
177
-
INSTALL THE SERVICE STATION GUIDE
178
-
Appendix D – Ink Delivery System (IDS)
182
-
DPV: OPEN AIR
183
-
Appendix E – Z2i Wiring Diagram
184
-
Appendix F – Z3/Z4/MR Wiring Diagram
185
-
Appendix I –Side Frame Modification
188
-
Copyright © 2014 All rights reserved
192