Molift Rail System Manuals

2 pdf manual(s) Molift Rail System for free download (Document Types: Handbook, Project planning and installation)

Molift Rail System Handbook Main Page Preview

Handbook [PDF] (72 pages)

  • Updated: 05.08.2026

Document Preview & Text Transcription

MRS19201 Rev C 2014-06-25 Molift Rail System EN - Handbook 2 Molift Rail System / www.molift.com 3 Molift Rail System / www.molift.com English Manual Content Molift Rail System (MRS) – Introduction..................4 General...........................................................................4 1 How to use this handbook......................................5 2 Installation criteria – Principles...............................6 2.1 Site survey – Design criterias............................6 2.2 Lifting points.......................................................6 2.3 Mounting Molift Rail system............................7 2.4 Point loads.........................................................8 3 System Overview.......................................................9 3.1 Single rail system...............................................10 3.1.1 Ceiling mounted Straight rail system......11 3.1.2 Ceiling mounted Curve rail system.........13 3.1.3 Wall mounted Straight rail system..........14 3.2 Traverse rail system...........................................15 3.2.1 Ceiling mounted traverse system............16 3.2.2 Wall mounted traverse system................18 3.3 Combination of rail systems...........................20 3.3.1 Switch systems...........................................21 3.3.2 Climbing systems......................................23 4. Component Overview...........................................26 4.1 Attachment........................................................27 4.1.1 Ceiling Mounted System..........................27 4.1.2 Wall mounted System..............................29 4.2 Rails and Curves...............................................30 4.3 End Stops and End Caps................................32 4.4 Traverse Trolleys................................................33 4.5 Lift Motor Trolleys............................................35 4.6 Switches.............................................................36 4.7 Battery Charging..............................................37 4.8 Installation tools..............................................40 5. Design Conditions..................................................42 5.1 Lifting heights and lifting area.......................42 5.2 Design conditions – Attachments.................44 5.2.1 Ceiling mounted........................................44 5.2.2 Wall mounted............................................45 5.2.3 Attachments for curves...........................47 5.2.4 Side Support positioning.........................48 6 Installation methods...............................................54 7 Final Installation Procedure....................................56 7.1 Load test: Straight Rail System.......................56 7.2 Load test: Traverse Rail System......................56 7.3 Identification......................................................57 7.4 Installation Certification..................................57 8. System combinations – Case studies.................58 8.1 Single Rail system.............................................59 8.2 Traverse Rail system.........................................62 9. Installation instructions.........................................67 10. Maintenance.........................................................68 Service log...................................................................69 Checklist for installation of Molift Rail System......70 Periodic inspection for Molift Rail System..............71 Important This User Manual contains important safety instructions and information regarding the use of the lifter and accessories. In this manual the user is the person being lifted. The assistant is the person operating the lifter. Warning! This symbol indicates important information related to safety. Follow these instructions carefully. Visit www.molift.net for download of documen- tation to ensure you have the latest version. Revision table Revision A. 2013-12-09 First release Revision B. 2014-02-18 Updated illustrations and miscellaneous details. New front page. Revision C. 2014-06-25 Removed IRC components and room-to- room transfer Molift Air. Added boxed traverese trolley. 4 Molift Rail System / www.molift.com Molift Rail System (MRS) Introduction Molift Overhead Systems consist of a rail system, Molift Rails System (MRS) combined with the lift motor choices Molift AIR or Molift Nomad which give innovative and efficient solutions when it comes to lifting needs for disabled persons. Molift Overhead Systems are easy and safe to use and can solve most lifting situations. The func- tional and user friendly design provides greater access to the user and increases assistant and user safety. Molift solution gives a highly flexible, inno- vative, cost effective and profitable investment. This handbook provides support and guidance to installation performance of Molift overhead lift systems and contains important information about the design criteria and installation solutions. It is important to thoroughly understand the content of the handbook. Conditions of Performing Installation Lift and transfer of a person will always pose a certain risk and only certified personnel are allowed to install the equipment and accessories covered by this technical manual. Only personnel authorized by Etac can perform installation of the Molift overhead system and issue the installation certificate, all in accordance with Etac’s installation instructions and this handbook. The lifter is not intended to be operated by the person being lifted. If a hoist is to be used by a disabled person living on their own, then some form of communication device shall be installed in the area of use of the hoist so that in the event of an emergency the disabled person is able to summon assistance. This may, for example, be the fitting of an alarm system or the supply of a conveniently placed telephone, etc. General Declaration of conformity The Molift Rail System and related accessories described in this handbook are CE marked in accordance with EU Council Directive 93/42/EEC concerning medical devices, class 1, and is manufactured in conformity with standards IEC 60601-1, IEC 60601-1-2 and NS-EN ISO 10535:2006. Components made by other manufacturers We recommend only using Etac Molift components. Etac shall not be liable for faults or accidents that can occur when using components made by other manufacturers. System should consist of only original MRS components. If not Decalaration of conformity is not valid and Etac is not responisble for warranty of the system

Document Preview & Text Transcription

Efficient project planning and installation of Molift Rail System designed for life molift rail system handbook MOLIFT RAIL SYSTEM - HANDBOOK PART.NO TM19101 - REVISION E /09/2011 Table of content How to use this manual..............................................................................................2 The expert in moving and handling..................................................................................3 Explanation of symbols....................................................................................................4 Responsibility...................................................................................................................4 Chapter 1 – Ceiling hoist systems.............................................................................5 Why choose a ceiling hoist system..................................................................................5 Definitions........................................................................................................................6 Chapter 2 – Specification of ceiling hoist system..................................................13 How to plan and mount a rail system?...........................................................................13 Choosing Rail system and hoist.....................................................................................22 Chapter 3 - Choice of parts and ordering................................................................25 Structure of the Molift Rail System (MRS).....................................................................25 Description of the elements of MRS...............................................................................26 Schedule of rail profiles..................................................................................................27 Schedule of curves.........................................................................................................30 Schedule of telescope brackets.....................................................................................33 Schedule of wall and rafters securing devices...............................................................36 MRS tool........................................................................................................................38 Schedule of MRS mounting screws...............................................................................39 Schedule of end stops for MRS profiles.........................................................................41 Schedule of MRS trolleys...............................................................................................42 Transition coupling.........................................................................................................45 Switch systems..............................................................................................................46 Standard securing devices to be used for MRS:............................................................49 Chapter 4 – Mounting of Molift Rail System...........................................................53 Safety regulations..........................................................................................................53 General information on MRS fitting:...............................................................................53 Mounting procedure for drop-in anchor..........................................................................54 Mounting procedure for chemical anchor in ceiling........................................................56 Mounting procedure for chemical anchor with mesh sleeve in wall...............................58 Mounting in concrete with lowered ceiling......................................................................60 Mounting directly in concrete (directly in ceiling)............................................................63 Mounting in rafters layer with lowered ceiling................................................................66 Mounting directly in rafters layer....................................................................................70 Mounting procedure for rafted bracket...........................................................................72 Mounting procedure for wall bracket..............................................................................74 Mounting procedure for joining of rails...........................................................................77 Rev E 10/2011  Page  of 100  How to use this manual This manual is primarily intended for persons who are to sell, mount and maintain Molift Rail Sys- tem (MRS). Molift Rail System may only be mounted by Molift authorised staff who have received the re- quired training by Molift Group AS. Molift Group AS will only be responsible for the system provided that the motor has been supplied by Molift. Molift Rail system has been CE-marked according to directive 92/42/EEC. The manual is divided into five main chapters: Chapter 1 – Ceiling hoist system Describes solutions and options offered by a ceiling hoist. Chapter 2 – Specification of ceiling hoist system Descriptions of requirements and conditions for mounting of a ceiling hoist system in a building, whether new or old. Chapter 3 - Choice of parts and ordering Description of Molift Rail System and all parts of the system, to be used for ordering, etc. Chapter 4 – Mounting of Molift Rail System Describes mounting details for different systems and buildings, with check lists included for each system. Chapter 5 - Maintenance Annual checks of Molift Rail System are recommended Enclosure 1 Survey form, MRS Installation Mounting procedure for traverse....................................................................................78 Traverse combinations...................................................................................................79 Assembly of wall rail for traverse .................................................................................86 Assembly procedure for transition coupling ..................................................................89 Mounting of Switch.........................................................................................................92 Procedure for cleaning of profiles after mounting..........................................................97 Checklist for fitting Molift Rail System ........................................................................100 Chapter 5 - Maintenance.........................................................................................103 Page 2 of 106 How to use this manual Rev E 10/2011