NuTone HEAT-A-VENTLITE 9965 Manuals
1 pdf manual(s) NuTone HEAT-A-VENTLITE 9965 for free download (Document Types: Installation instructions manual)
NuTone HEAT-A-VENTLITE 9965 Installation instructions manual [PDF] (6 pages)
- Identifier: id-595374
- Brand: NuTone
- Device: NuTone HEAT-A-VENTLITE 9965 Air Conditioner
- Type: Installation instructions manual, PDF
- Key Aspects: Safety Recommendations and Warnings, Package Contents and Accessories List, System Limitations and Considerations
- UPD Date: 29.03.2026
- Source File: 587871.pdf
- Pages: 6
- Description: Step-by-step user manual for the NuTone HEAT-A-VENTLITE 9965.
Pages Preview:
Document Preview & Text Transcription (Main Page)
Click to expand and read text
INSTALLATION INSTRUCTIONS READ & SAVE THESE INSTRUCTIONS! Heat-A-Ventlite ® (with Night Light) MODEL: 9965 FOR BEST RESULTS In a new construction site, install the housing (complete with heater and ventilator) during rough-in construction of the building. The light assembly and the grille should be installed when the finished ceiling is in place. Installation in an existing, finished building requires an accessible area (attic or crawl space) above the planned location. See “INSTALLATION IN EXISTING CONSTRUCTION.” Do not install closer than 12 inches to a vertical surface. Do not install over tub or shower enclosure. UNIT DIMENSIONS Refer to Figure 1 for housing's dimensions. NOTE: If there will be a finished second floor above, the Model 9965 housing requires a minimum of 2" x 8" joist construction for mounting. WIRING AND DUCTWORK 1. Run the required wiring during rough-in stage of construction. 2. Total connected load: 1730 watts. 3. Plan to run 120vAC, 60 Hz wiring (with ground) on a separate 20 Amp circuit from a power source, through the provided wall switch, to the housing's junction box. See wiring diagram. 4. Use 4" round duct. INSTALLATION IN NEW CONSTRUCTION PREPARATION 1. Install hanger bar brackets in slots in housing. (See Fig. 3) Do not tighten completely to allow bars to be inserted. 2. Refer to Figure 2. Insert hanger bars into brackets. 3. Refer to Figure 3. Slide hanger bar brackets down to end of slot closest to outside edge of housing. Tighten brackets in this position. 4. Refer to Figure 4. Remove junction box cover by removing one screw. 5. Refer to Figure 4. Remove appropriate wiring knockout(s) and install approved box connector(s). FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 73⁄4" 14" HANGER BARS ADJUSTMENT SLOT JUNCTION BOX COVER KNOCKOUTS 93⁄4"
Similar Manuals in the Air Conditioner Category
| Device Model | Type of Document | Pages | Size | Views | Downloads | Updated | All Manuals for Device |
|---|---|---|---|---|---|---|---|
Defy AH09HG |
User Guide: Defy AH09HG (4P9O35, Upd.06-07-2026) |
11 | 0.51 Mb | 348 | 67 | 06-07-2026 | view all manuals |
Mitsubishi Electric PCA-RP·GA |
User Manual: Mitsubishi Electric PCA-RP·GA (7VU23R, Upd.02-07-2026) |
15 | 670 | 101 | 02-07-2026 | view all manuals | |
Carrier 39E/ER |
#LYZ6Y6: 39E/ER Air Conditioner Application data |
15 | 0.88 Mb | 244 | 37 | 19-08-2026 | view all manuals |
Techibel MCAF94R5IAA |
Air Conditioner #QZ9S4O |
50 | 399 | 72 | 10-05-2026 | view all manuals | |
Carrier 38AUZ |
Heat Pump #547N53 |
36 | 756 | 189 | 30-08-2026 | view all manuals | |
GE APFD06 |
APFD06 Owner's manual and installation instructions - R6MLS6 |
32 | 564 | 125 | 30-06-2026 | view all manuals |