Reliable C88 Manuals

4 pdf manual(s) Reliable C88 for free download (Document Types: Instruction manual, Assembly instructions)

Document Preview & Text Transcription

The C81 & C88 Professional Ironing Tables INSTRUCTION MANUAL GUIDE D’UTILISATION MANUAL DE INSTRUCCIONES ENGLISH 01 FRANÇAIS 10 ESPAÑOL 19 01 THE C81 & C88 PROFESSIONAL IRONING TABLES INSTRUCTION MANUAL ENGLISH

Document Preview & Text Transcription

C88 Professional Vacuum Table C81 Vacuum + Up-Air Table Instruction Manual USER INSTRUCTIONS C88 Thank you for purchasing the Reliable™ C88 vacuum pressing table. Please follow the instructions carefully. With proper care and maintenance, your ironing table will provide years of dependable service. The C88 is equipped with a powerful and fast vacuum motor. The strong vacuum will give you a clean-crisp finish to your garments, guaranteeing professional results. The fast start up time means you won’t be waiting for the motor to rev up to speed. 1. Unfolding: Hold the ironing board in a vertical position with the tip downwards; press the handle (5) placed underneath the board and lift up the working surface by pulling with the foot outwards until the desired height is reached. 2. Unfold the boiler support (3) and place the steam generator on the shelf. 3. Insert the electrical plug into an electrical outlet. 4. Place the pedal (1) near the working area. 5. Push the on/off switch (2) on the “I” position. 6. Wait for a few minutes until the working surface is warmed up. 7. Start ironing. 8. The vacuum function is controlled by the pedal (1) 9. You can use the vacuum function at the same time as you are ironing, or you can use it after the ironing (for very light fabrics this may be the preferred way). 10. At the end of the ironing we suggest you leave the on/off switch (2) on for a few minutes to ensure the inside of the table is dry and free of condensation. 11. Folding: turn the on/off switch (2) off, remove the plug from the outlet. Take the boiler and the iron off of the boiler support (3), fold the boiler support (3), and make sure there is no garment on the working surface and/or on the catch tray (4). 12. As soon as the working surface is cool, position the ironing board vertically with the tip downwards, press the handle (5) placed under the working surface and at the same time pull the legs (6) inward. COMPONENTS 1. Pedal 5. Handle 2. On/off switch 6. Legs 3. Boiler support 7. Working surface cover 4. Catch tray 8. Motor MAINTENANCE We suggest checking the ironing board cover (7) periodically and, if it is necessary, replacing it with an original one (part #C81CR). TECHNICAL DATA Voltage: 120V 60 Hz Power of heating element: 600 Working power: 650 W Working surface: cm 125 SPARE PARTS LIST CODE DESCRIPTION Q.TY AST100 PEDAL PML WITH CORD 1 AST105 SCREW FIXING BOARD NET 19 AST109/2 WIRING 1 AST112/3 HEATING ELEMENT 600 WATT 120V UL 1 AST113 FLAT WASHER 3 AST115 ROD 1 AST116 NET 1 AST119/1 WHITE INTERNA LEG 1 AST120/1 WHITE EXTERNAL LEG 1 AST121 SMALL FOOT 4 AST122 PLASTIC SPACER 2 AST122/1 PLASTIC THIN SPACER 8 AST124 WHITE PLASTIC TUBE 2 AST130 TIE ROD 1 AST131 SCREW FIXING LEGS 2 AST132 SELFBLOCKING NUT 4 AST135/110 MOTOR V115/60 1 AST136 THERMOSTAT WITH SMALL CABLES 1 AST138 BOILER SUPPORT 1 AST139 LINENCARRIER 1 AST140 RUBBER SPACER FOR LEGS 1 AST141 TOP 1 AST142 IRON ELECTRIC BOX 1 AST143 SCREW FIXING BOILERCARRIER 2 AST144 SILICONE TUBE 6X9 X45 FOR ELEMENT 2 AST146 PLAQUE 1 CD349 BIPOLAR SWITCH 1 CD360 FAIRLEAD-BLOCK 6W-1 2 CD361 FAILEAD-BLOCK 6N3-4 1 CD377 SELF-THREADNG SCREW 3,5X9,5 TC+NCL 2 CD487 POWER CORD 110V 2 FASTON PLUG 16AWG 1 FS018 SCREW BLOCKING TERMINAL BLOCK 4 C88CR COVER+THICK FLANNEL PAD 1

Document Preview & Text Transcription

C88 Professional Vacuum Table C81 Vacuum + Up-Air Table Instruction Manual USER INSTRUCTIONS C88 Thank you for purchasing the Reliable™ C88 vacuum pressing table. Please follow the instructions carefully. With proper care and maintenance, your ironing table will provide years of dependable service. The C88 is equipped with a powerful and fast vacuum motor. The strong vacuum will give you a clean-crisp finish to your garments, guaranteeing professional results. The fast start up time means you won’t be waiting for the motor to rev up to speed. 1. Unfolding: Hold the ironing board in a vertical position with the tip downwards; press the handle (5) placed underneath the board and lift up the working surface by pulling with the foot outwards until the desired height is reached. 2. Unfold the boiler support (3) and place the steam generator on the shelf. 3. Insert the electrical plug into an electrical outlet. 4. Place the pedal (1) near the working area. 5. Push the on/off switch (2) on the “I” position. 6. Wait for a few minutes until the working surface is warmed up. 7. Start ironing. 8. The vacuum function is controlled by the pedal (1) 9. You can use the vacuum function at the same time as you are ironing, or you can use it after the ironing (for very light fabrics this may be the preferred way). 10. At the end of the ironing we suggest you leave the on/off switch (2) on for a few minutes to ensure the inside of the table is dry and free of condensation. 11. Folding: turn the on/off switch (2) off, remove the plug from the outlet. Take the boiler and the iron off of the boiler support (3), fold the boiler support (3), and make sure there is no garment on the working surface and/or on the catch tray (4). 12. As soon as the working surface is cool, position the ironing board vertically with the tip downwards, press the handle (5) placed under the working surface and at the same time pull the legs (6) inward. COMPONENTS 1. Pedal 5. Handle 2. On/off switch 6. Legs 3. Boiler support 7. Working surface cover 4. Catch tray 8. Motor MAINTENANCE We suggest checking the ironing board cover (7) periodically and, if it is necessary, replacing it with an original one (part #C81CR). TECHNICAL DATA Voltage: 120V 60 Hz Power of heating element: 600 Working power: 650 W Working surface: cm 125 SPARE PARTS LIST CODE DESCRIPTION Q.TY AST100 PEDAL PML WITH CORD 1 AST105 SCREW FIXING BOARD NET 19 AST109/2 WIRING 1 AST112/3 HEATING ELEMENT 600 WATT 120V UL 1 AST113 FLAT WASHER 3 AST115 ROD 1 AST116 NET 1 AST119/1 WHITE INTERNA LEG 1 AST120/1 WHITE EXTERNAL LEG 1 AST121 SMALL FOOT 4 AST122 PLASTIC SPACER 2 AST122/1 PLASTIC THIN SPACER 8 AST124 WHITE PLASTIC TUBE 2 AST130 TIE ROD 1 AST131 SCREW FIXING LEGS 2 AST132 SELFBLOCKING NUT 4 AST135/110 MOTOR V115/60 1 AST136 THERMOSTAT WITH SMALL CABLES 1 AST138 BOILER SUPPORT 1 AST139 LINENCARRIER 1 AST140 RUBBER SPACER FOR LEGS 1 AST141 TOP 1 AST142 IRON ELECTRIC BOX 1 AST143 SCREW FIXING BOILERCARRIER 2 AST144 SILICONE TUBE 6X9 X45 FOR ELEMENT 2 AST146 PLAQUE 1 CD349 BIPOLAR SWITCH 1 CD360 FAIRLEAD-BLOCK 6W-1 2 CD361 FAILEAD-BLOCK 6N3-4 1 CD377 SELF-THREADNG SCREW 3,5X9,5 TC+NCL 2 CD487 POWER CORD 110V 2 FASTON PLUG 16AWG 1 FS018 SCREW BLOCKING TERMINAL BLOCK 4 C88CR COVER+THICK FLANNEL PAD 1

Document Preview & Text Transcription

ASSEMBLY INSTRUCTIONS C8S, C8B, C8SB C81 AND C88 PRESSING TABLES If your table is produced before January 1, 2009 (please refer to the data label under the black metal box with the switches) please follow these instructions. • Remove the ironing board cover. • Using the bracket as a template, drill 5 holes of 3.5 mm at the base of the ironing board, at a distance of 20 cm from the steam station tray. • Place the support bracket in the right position and screw in the 5 screws. • Replace the cover on the board. • Fix the bottle holder C8B with the washer and screw and fix the wand perpendicular to the bottle holder tube with washers and nuts, as indicated in the drawing. • Fix the nut to the support using the screw and the washer; insert the rotating S- tube and finally the sleeve arm board in the tube. If your table is produced after January 1, 2009 (please refer to the data label under the black metal box with the switches) please follow these instructions. • Remove the ironing board cover and unscrew the 5 screws below the board. • Place the support bracket in the right position and screw in the 5 screws. • Replace the cover on the board. • Fix the bottle holder C8B with the washer and screw and fix the wand perpendicular to the bottle holder tube with washers and nuts, as indicated in the drawing. • Fix the nut to the support using the screw and the washer; insert the rotating S- tube and finally the sleeve arm board in the tube.