User instructions [PDF] (12 pages)
- Updated: 30.04.2026
Document Preview & Text Transcription
GB
Dewy HE WM
User instructions
PLEASE LEAVE THIS INSTRUCTION
WITH THE USER
1
BOILER IGNITION (fig. 1)
Ensure the gas supply is turned on lower
the control panel cover and activate the boi-
ler by rotating the selector knob to the sum-
mer positio (
).
The lighting-up of the green led (
) will
indicate that the apparatus is switched-on
and ready.
– With the rotary switch in the summer
position (
) the boiler will start-up
upon demand for domestic hot water,
and run at full power to reach the selec-
ted temperature.
The gas feeding pressure will then auto-
matically vary to ensure that the requi-
red temperature is kept constant.
– With the rotary switch in the winter
position (
) once the boiler has rea-
ched the value set on the heating poten-
tiometer, it will start to modulate in auto-
matically in order to supply the required
power output to the system. The opera-
tion of the boiler will be stopped through
the intervention of the thermostat or
“Logica Remote Control”.
TEMPERATURE ADJUSTMENT (fig. 2)
– The D.H.W. temperature can be adju-
sted by turning the knob of the D.H.W.
potentiometer (
). When there is a
demand for hot water, the set tempera-
ture is displayed on the red led scale
from 35÷80°C and the yellow domestic
hot water led lights-up at the same time
(
). When there is no request for hea-
ting or D.H.W. production (the leds
and
are off), the tank unit maintenan-
ce temperature will appear on the red
led scale 35÷80°C.
– The C.H. temperature can be adjusted
by turning the knob of the C.H. potentio-
meter (
). The set temperature is indi-
cated on the red led scale from
35÷80°C and the yellow heating led
lights up at the same time (
).
If the temperature of the C.H. return
water is lower than around 55° C, con-
densation of the combustion by-products
is obtained, further increasing the effi-
cency of thew thermal exchange.
TURNING THE BOILER OFF (fig. 1)
To turn the boiler off place the selector
knob on the OFF position. If the boiler is
not going to be used for a lengthy
period it is advised to turn off the elec-
tricity supply, close the gas cock, and if
the temperatures foreseen are low,
empty the boiler and the hydraulic
LIGHTING AND OPERATION
SPIA VERDE
Fig. 1
GREEN LED
SPIA GIALLA
SPIA ROSSA
Fig. 2
RED LED
YELLOW LED
USER INSTRUCTIONS
VERY IMPORTANT!
PLEASE MAKE SURE YOUR LOG BOOK ENCLOSED IS FILLED IN CORRECTLY.
ALL CORGI REGISTERED INSTALLERS CARRY A CORGI ID CARD.
BOTH SHOULD BE RECORDED IN YOUR CENTRAL HEATING LOG BOOK.
YOU CAN CHECK YOUR INSTALLER IS CORGI REGISTERED
BY CALLING ON 01256 372300
FAULT FINDING
– Ignition lock-out (fig. 3)
If the burners do not ignite, the red led
will light-up (
).
To attempt a boiler restart, rotate the
selector knob to position (
) and relea-
se it immediately, placing it in the sum-
mer (
) or winter (
)operation posi-
tion.
If the boiler lock-out re-occurs, contact
an authorised Service Centre.
– Insufficient water pressure (fig. 4)
If the red "0.5" bar led starts flashing,
the boiler will not function.
To restore functioning fill the system
until the green “1 bar” led lights up.
If all the leds are off, call the local autho-
rised technical staff.
2
system to avoid avoid frost damage.
GAS CONVERSION
Should it be necessary to convert the
appliance to a different gas from the one
for which the boiler has been equipped,
approach the technical staff.
CLEANING AND MAINTENANCE
Preventive maintenance and checking of
the efficient operation of the equipment
and safety devices must be carried out
exclusively by the authorized technical
staff. The boiler is supplied with an elec-
tric cable. Should this require replace-
ment, contact exclusively with the autho-
rized technical staff.
SPIA ROSSA
Fig. 3
RED LED
Fig. 4
SPIA ROSSA INTERMITTENTE
IN CONDIZIONE DI SICUREZZA
FLASHING RED LED
IN SAFETY CONDITION
Pages Preview: