-
INDUSTRIAL AIR COMPRESSOR
1
-
AIR CARE SEMINAR TRAINING
2
-
TABLE OF CONTENTS
6
-
OPERATOR IS REQUIRED TO READ
7
-
1.6 HOT SURFACES, SHARP EDGES
9
-
Your new Sullair flood-lubricated rotary screw air
11
-
022 50155- 601 2_1
12
-
2.2 DESCRIPTION OF COMPONENTS
14
-
COOLING / LUBRICATION
15
-
2.4 COMPRESSOR COOLING AND
17
-
2.6 CONTROL SYSTEM,
18
-
Full Load Mode - 50 to 100
19
-
2.7 AIR INLET SYSTEM,
20
-
Air Inlet Filter
21
-
THIS PAGE INTENTIONALLY LEFT BLANK
22
-
3.3 COMPRESSOR SPECIFICATIONS
25
-
3.4 LUBRICATION GUIDE
26
-
3.7 IDENTIFICATION, AIR-COOLED, STANDARD AND VSD
28
-
Alternate Incoming Power Supply Location
29
-
3.8 IDENTIFICATION, WATER-COOLED
30
-
3.9 PIPING AND INSTRUMENTATION, AIR-COOLED
32
-
filter, air 9" plastic
33
-
Part varies by model.
35
-
3.10 PIPING AND INSTRUMENTATION, WATER-COOLED
36
-
Tank pressure — blue color
39
-
3.11 WIRING DIAGRAM, MFV AIR-COOLED
40
-
Figure 3-8: Wiring Diagram, MFV Air-Cooled
41
-
3.12 WIRING DIAGRAM, MFV WATER-COOLED
42
-
Figure 3-9: Wiring Diagram, MFV Water-Cooled
43
-
3.13 WIRING DIAGRAM, WYE-DELTA AIR-COOLED
44
-
Figure 3-10: Wiring Diagram, Wye-Delta Air-Cooled
45
-
3.14 WIRING DIAGRAM, WYE-DELTA WATER-COOLED
46
-
3.15 WIRING DIAGRAM, VSD AIR-COOLED
48
-
Figure 3-12: Wiring Diagram, VSD Air-Cooled
49
-
3.16 WIRING DIAGRAM, VSD WATER-COOLED
50
-
Figure 3-13: Wiring Diagram, VSD Water-Cooled
51
-
4.1 MOUNTING OF COMPRESSOR
57
-
TABLE 4-2 VENTILATION REQUIREMENTS
59
-
TABLE 4-3 WATER TESTS
60
-
4.4 COUPLING ALIGNMENT CHECK
62
-
5.1 CONTROLLER LAYOUT
63
-
5.3 LCD DISPLAY
64
-
The large Emergency Stop button located near the
65
-
6.4 MAINTENANCE EVERY 2000
68
-
Air Filter Element Replacement
69
-
6.10 TROUBLESHOOTING GUIDE
72
-
6.10 TROUBLESHOOTING GUIDE (CONTINUED)
73
-
7.1 DESCRIPTION OF COMPONENTS
75
-
With a Sullair compressor, there is no
76
-
8.1 PROCEDURE FOR ORDERING PARTS
77
-
8.2 RECOMMENDED SPARE PARTS LIST
79
-
8.5 COMPRESSOR, FRAME AND DRIVE, 4500 MODEL
84
-
8.7 AIR INLET SYSTEM, 10 SERIES 3000
88
-
8.7 AIR INLET SYSTEM, 10 SERIES 3000 (CONTINUED)
89
-
8.8 AIR PIPING, AIR-COOLED
90
-
8.8 AIR PIPING, AIR-COOLED (CONTINUED)
91
-
8.9 AIR PIPING, WATER-COOLED
92
-
8.9 AIR PIPING, WATER-COOLED (CONTINUED)
93
-
8.10 FLUID PIPING, AIR-COOLED
94
-
8.10 FLUID PIPING, AIR-COOLED (CONTINUED)
95
-
8.11 FLUID PIPING, WATER-COOLED
96
-
8.11 FLUID PIPING, WATER-COOLED (CONTINUED)
97
-
8.13 FLUID COOLING SYSTEM, WATER-COOLED
100
-
8.16 MOISTURE DRAIN
110
-
8.16 MOISTURE DRAIN (CONTINUED)
111
-
8.18 CONTROL SYSTEM AND ELECTRIC PARTS, MFV
114
-
8.19 CONTROL SYSTEM AND ELECTRIC PARTS, WYE-DELTA
118
-
8.20 CONTROL SYSTEM AND ELECTRIC PARTS, VSD
122
-
8.21 ENCLOSURE, AIR-COOLED
126
-
8.21 ENCLOSURE, AIR-COOLED (CONTINUED)
127
-
8.22 ENCLOSURE, WATER-COOLED
128
-
8.22 ENCLOSURE, WATER-COOLED (CONTINUED)
129
-
8.23 DECAL LOCATIONS, AIR-COOLED
130
-
8.23 DECAL LOCATIONS, AIR-COOLED (CONTINUED)
131
-
8.24 DECAL LOCATIONS, WATER-COOLED
134
-
8.24 DECAL LOCATIONS, WATER-COOLED (CONTINUED)
135
-
8.25 DECAL GROUP
138
-
8.25 DECAL GROUP (CONTINUED)
139
-
WORLDWIDE SALES AND SERVICE
146