Operation manual [PDF] (40 pages)
- Updated: 16.07.2026
Document Preview & Text Transcription
TX5012 Series Operation Manual
Ver1.0
◇1
OPERATION MANUAL
TX5012 series
Withstanding Voltage/Insulation
Resistance Tester
DAE KWANG T&M CO.,LTD
http://www.kdk.co.kr
TEL :02)2617-0787
TX5012 Series Operation Manual
Ver1.0
◇2
Content
CHAPTER 1 SETUP...........................................................................................................................4
1.1 UNPACKING.................................................................................................................................4
1.2 PRECAUTIONS FOR INSTALLATION ...............................................................................................4
1.3 PRECAUTIONS FOR MOVING.......................................................................................................6
1.4 CHECK POWER SUPPLY AND FUSE..............................................................................................6
1.4.1 Switch power voltage .......................................................................................................6
1.4.2 Checking and replacing fuse...........................................................................................7
1.5 CONNECTING THE AC POWER CORD.........................................................................................7
1.6 GROUNDING................................................................................................................................7
1.7 CHECKING OPERATIONS.............................................................................................................8
1.8 OTHER SPECIFICATIONS .............................................................................................................9
CHAPTER 2 PRECAUTIONS ON HANDLING...........................................................................10
2.1 PROHIBITED OPERATIONS ........................................................................................................10
2.2 ACTION WHEN IN EMERGENCY.................................................................................................11
2.3 PRECAUTIONS ON TESTING ......................................................................................................11
2.4 DANGEROUS STATES OF FAILED TESTER................................................................................12
2.5 DAILY CHECKING ......................................................................................................................12
CHAPTER 3 INTRODUCTION......................................................................................................13
3.1 INSTRUCTION OF FRONT PANEL ................................................................................................13
3.2 INSTRUCTION OF REAR PANEL ..................................................................................................15
CHAPTER 4 BASIC OPERATION.................................................................................................16
4.1 GENERAL PARAMETER SETTING................................................................................................16
4.2 DISPLAYED INFORMATION .........................................................................................................25
TX5012 Series Operation Manual
Ver1.0
◇3
4.3 OPERATION PROCEDURE AND STEP..........................................................................................29
4.4 KEYBOARD LOCK.......................................................................................................................31
CHAPTER 5 PARAMETER INSTRUCTION ...............................................................................32
5.1 WITHSTANDING VOLTAGE TEST PARAMETER.............................................................................32
5.2 INSULATION RESISTANCE PARAMETER......................................................................................33
5.3 INTERFACE INSTRUCTION..........................................................................................................35
CHAPTER 6 CALIBRATION AND DAILY MAINTENANCE......................................................37
6.1 CLEAN .......................................................................................................................................37
6.2 CHECK.......................................................................................................................................37
6.3 MAINTENANCE...........................................................................................................................37
6.3.1 Calibration ........................................................................................................................38
TX5012 Series Operation Manual
Ver1.0
◇4
Chapter 1Setup
This chapter describes the procedures from unpacking to installation to
operation checking.
1.1 Unpacking
Upon receiving the product, confirm that the necessary accessories are included and
have not been damaged in transit. Should any damage or shortage be found, please
contact DAE KWANG T&M distributor/agent.
Items
Quantity
TX5012/D/DI withstand voltage/insulation tester
1
TX90003B withstanding-voltage test lead wires
1
TX90004 withstanding-voltage ground lead wires
1
3A Fuse
2
AC Power cord
1
Operation Manual
1
Test Report
1
Servicing card
1
Accessories ordered by customer
1
1.2 Precautions for Installation
Be sure to observe the following precautions when installing the tester.
■ Do not use the tester in a flammable atmosphere.
To prevent explosion or fire, do not use the tester near alcohol, thinner, or other
combustible materials, or in an atmosphere containing such vapors.
■ Avoid locations where the tester is exposed to high temperatures
or direct sunlight.
Do not locate the tester near a heater or in areas subject to drastic temperature
changes.
Operating temperature range: 5 °C to +35 °C
Storage temperature range: -20 °C to +70 °C
■ Avoid humid environments.
Pages Preview: