TO BE RETAINED
1
-
Design principles and operating sequence
2
-
Fig.1 General Layout
3
-
DESIGN PRINCIPLES AND OPERATING SEQUENCE
4
-
Ref. Condition 15 °C , 1013,25 mbar, dry gas
5
-
Fig. 3 shows the flow rate available – after
6
-
This appliance must be installed by a competent
7
-
LOW PRESSURE SEALED SYSTEM
8
-
MOUNTING ON A COMBUSTIBLE SURFACE
9
-
The following notes are intended for general
10
-
The appliance is delivered in a heavy-duty card-
11
-
Carefully measure the distance from the centre of
12
-
When cutting the horizontal flue terminal or an
13
-
4.5.3.2 INSTALLATION OF CONDENSATE DRAIN KIT
14
-
4.5.3.3 HORIZONTAL TERMINATION (fig. 11)
15
-
FLOW & RETURN (fig. 6)
16
-
CONNECTING THE MAINS (230V) INPUT (fig.
17
-
GAS SUPPLY INSTALLATION
18
-
FINAL FLUSHING OF THE HEATING SYSTEM
19
-
SECTION 6 SERVICING INSTRUCTIONS
20
-
AUTOMATIC AIR RELEASE VALVE (AAV, fig.
21
-
PRINTED CIRCUIT BOARD (PCB, fig. 22)
22
-
FLUE FAN (fig. 24 & 28)
23
-
CHECKING APPLIANCE OPERATION
24
-
SETTING THE MAXIMUM DHW GAS
25
-
Any electrical checks must be carried out by a
26
-
7.12.2 FAULT FINDING TEST ‘A’
28
-
7.12.3 FAULT FINDING TEST ‘A1’
29
-
7.12.5 TEST ‘B’ CONT’D
31
-
7.12.7 TEST ‘C’ CONT’D
33
-
CONNECTION OF A ROOM THERMOSTAT
34
-
NOTE: L-N-E CONNECTION IS ADVISABLE
35
-
Back insulating panel
41
-
The gas supply must be connected to the appliance
42
-
FITTING THE FLUE (see fig. 33)
43
-
Cod. 10023942 - 38/02 - Ed. 2
44