Yazaki AROACE CH-MG150 Manuals

2 pdf manual(s) Yazaki AROACE CH-MG150 for free download (Document Types: Operating instructions manual, Installation instructions manual)

Document Preview & Text Transcription

GAS-FIRED DOUBLE-EFFECT ABSORPTION CHILLER-HEATER FOR YOUR SAFETY If you smell gas: 1. Open windows (only if installed indoors) 2. Don’t touch electrical switches 3. Extinguish any open flame 4. DO NOT SMOKE! 5. Immediately call your gas supplier FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other equipment. CONTENTS GENERAL Page  ABSORPTION PRINCIPLE 2  COOLING OPERATION 3  HEATING OPERATION 4 CONTROLS  GENERAL INFORMATION 5  CONTROL ADJUSTMENTS 8  CONTROL SEQUENCE 12 OPERATION  COOLING 13  PRECAUTIONS 13  HEATING 13  REMOTE CONTROL 13 Page  SAFETY CONTROLS 13  WINTER SHUTDOWN 14 MAINTENANCE  GENERAL INFORMATION 14  MAINTENCE SCHEDULE 14  ROUTINE MAINTENANCE 15  EVACUATION OVERVIEW 15  CHEMICAL MAINTENANCE 17  WINTERIZING 17  TROUBLESHOOTING 17  WATER QUALITY 18  ERROR CODES 19 OPERATING INSTRUCTIONS CH-MG150 CH-MG200 2 This product is a gas-fired absorption unit which provides chilled water for cooling or hot water for heating in central plant-type air conditioning systems. Units with nominal refrigeration capacities of 150 and 200 tons are complete with operating and safety controls. The chiller-heater is fitted with a low NOx burner, automatic spark ignition systems, power combustion blower and proportional firing control. When this equipment has been applied correctly, installed in accordance with Yazaki INSTALLATION INSTRUCTIONS (supplied with the chiller-heater), and with proper maintenance on the chiller-heater itself and accompanying support items such as pumps, cooling tower, etc., it can provide many years of trouble free operation. GENERAL These instructions are intended to acquaint the Owner/End User with the operation and general maintenance requirements of Yazaki Gas-Fired Double-Effect Absorption Chiller-Heater units. Please read ALL instructions carefully and observe precautions. Failure to operate and properly maintain this equipment in accordance with the OPERATING INSTRUCTIONS may affect the equipment performance and product Warranty. If the equipment does not operate as expected, check the Troubleshooting Guide in these instructions BEFORE calling your Yazaki Authorized Service Provider (ASP). This approach will not only save cost but also helps to avoid any unnecessary down time. THE ABSORPTION PRINCIPLE Yazaki absorption chiller-heaters use a solution of lithium bromide and water, under vacuum, as the working fluid. Water is the refrigerant and lithium bromide is the absorbent. During cooling operation, refrigerant liquid boils under the influence of a deep vacuum in the evaporator and creates a refrigerating effect which removes heat from the chilled water circuit. The double-effect absorption cycle has two generators – one heated by a gas burner and another heated by superheated refrigerant vapor. The resulting refrigerant is passed through to the condenser, and is then metered into the evaporator. Lithium bromide solution leaving the generators flows into the absorber. Heat from the cycle is removed by cooling water flowing inside the condenser and absorber tubing bundles. Heat from the cooling water is rejected most typically to a cooling tower, but may also be rejected by alternative methods, including ground loops. 3 COOLING OPERATION High-Temperature Generator (HGE) The gas burner heats a dilute lithium bromide solution in the High- Temperature Generator resulting in a release of superheated refrigerant vapor. The dilute solution becomes more concentrated due to this release. Gravity, temperature, and pressure differences push the more concentrated solution through Heat Exchangers to recycle heat before the concentrated solution is sent to the Absorber (ABS). After release, the superheated refrigerant vapor flows through the Low- Temperature Generator (LGE) tubing bundle and is used as the heat source for the dilute solution that the LGE contains. Most, if not all, of the refrigerant vapor will condense into liquid refrigerant during this process. Ultimately, this tubing dumps the liquid refrigerant into the Condenser (COND). Low-Temperature Generator (LGE) After release, the superheated refrigerant vapor heats dilute lithium bromide solution in the Low-Temperature Generator. The refrigerant vapor liberated from this solution flows into the Condenser while the lithium bromide solution becomes more concentrated. Gravity, temperature, and pressure differences push this more concentrated solution through Heat Exchangers to recycle heat before the concentrated solution is sent to the Absorber. Condenser (COND) In the Condenser, refrigerant vapor is condensed on the outer surface of the condenser tubing bundle. Latent heat is removed by the cooling water that flows inside this tubing bundle. The heat absorbed by the cooling water is rejected to a cooling tower or alternative system. The liquid refrigerant that drips off the tubing bundle joins the liquid refrigerant that resulted from the operation of the LGE and accumulates in the condenser sump. Liquid refrigerant is routed from the condenser sump through an electronic expansion valve which meters the liquid refrigerant as required into the Evaporator (EVA). Evaporator (EVA) In the Evaporator, liquid refrigerant is exposed to a substantially deeper vacuum than in the Condenser due to the influence of the Absorber. As the liquid refrigerant flows over the surface of the Evaporator tubing bundle, it boils and removes heat from the chilled water flowing inside the Evaporator tubing bundle. The heat removed from the chilled water circuit is equal to the latent heat of the refrigerant, roughly 1000 BTU per pound of liquid refrigerant boiling into refrigerant vapor. Absorber (ABS) The Evaporator and the Absorber share the same space. A deep vacuum in the ABS is maintained by the affinity of the concentrated solution for refrigerant vapor. The concentrated solution flows over the outside of the Absorber tubing bundle where it is cooled by the cooling water flowing inside the Absorber tubing bundle. When the concentrated solution is cooled, it develops an even greater affinity for the refrigerant vapor. The heat absorbed by the cooling water is rejected to a cooling tower or alternative system. The deep level of vacuum in the ABS section is maintained by the action of the concentrated solution absorbing the refrigerant vapor that is being generated by the EVA during its normal operation. 4 This action dilutes the concentrated solution back to the same concentration level as it was when the cycle began. The dilute solution gathers in the Absorber sump before being pumped back into the Generators to start the cycle anew. Fig. 1 – DOUBLE-EFFECT ABSORPTION CYCLE (COOLING) HEATING OPERATION High-Temperature Generator (HGE) Dilute lithium bromide solution is heated in the HGE by the gas burner in the same manner as in the cooling cycle. The solution boils vigorously, releasing superheated refrigerant vapor and leaving a more concentrated solution. The refrigerant vapor flows through a changeover valve into the Evaporator section. The concentrated solution flows through another changeover valve into the Absorber sump. Low-Temperature Generator (LGE) Although solution does flow through the LGE, since the superheated refrigerant vapor is not flowing in any meaningful amount through the LGE, the solution does not release any refrigerant vapor and the solution simply flows back into the Absorber sump in essentially a still- diluted state. The lack of this generator operation in heating mode is why the heating capacity is lower than the cooling capacity in these chiller-heaters.

Document Preview & Text Transcription

GAS-FIRED DOUBLE-EFFECT ABSORPTION CHILLER-HEATER This product is a gas-fired double-effect absorption unit which provides chilled water for cooling or hot water for heating in central plant-type air conditioning systems. Units with nominal refrigeration capacities of 150 and 200 tons are complete with operating and safety controls. The chiller-heater is fitted with a low NOx burner, automatic ignition system, power combustion blower, and proportional firing control. CONTENTS GENERAL Page  GENERAL 2  MODEL DESIGNATION 2  STANDARD SPECIFICATIONS 3  EQUIPMENT DIMENSIONS 4  INTERNAL WIRING DIAGRAM 6 INSTALLATION  RECEIVING 9  RIGGING 10  CENTER OF GRAVITY 11  INSTALLATION CLEARANCES 12  LOCATION 13  FOUNDATION 13 Page  LEVELING 14  COMBUSTION AIR SUPPLY 14  VENTING 15  PIPING 17  TYPICAL SYSTEM DESIGN 18  CHILLED/HOT WATER PIPING 19  COOLING WATER PIPING 19  FREEZE PROTECTION 20  GAS SUPPLY PIPING 21  ELECTRICAL 22  TYPICAL FIELD WIRING DIAGRAM 24  WATER QUALITY 26  INSTALLATION CHECK & REQUEST FOR STARTUP 26 INSTALLATION INSTRUCTIONS CH-MG150 CH-MG200 2 GENERAL This equipment should only be installed by trained and qualified personnel who are familiar with absorption chillers. All precautions in these instructions, as well as on tags and labels attached to the unit, must be observed to ensure the safety of the personnel and maintain warranty validation. Each Yazaki absorption chiller-heater has been evacuated, charged with lithium bromide and water solution, and run tested prior to leaving the factory. Field wiring connections are located on the right side of the unit when facing the front of the unit. Piping connections, including gas piping, are all located at the rear of the unit. After the equipment has been installed, a Yazaki Authorized Service Provider (ASP) must check the installation and supervise or conduct the initial startup and operation of the unit. CAUTION THE YAZAKI WARRANTY WILL BE VOIDED IF THE FOLLOWING RESTRICTIONS ARE NOT OBSERVED: 1. DO NOT OPEN ANY VACUUM VALVES WITHOUT A PROPER EVACUATION ASSEMBLY ATTACHED TO THEM AS SUCH ACTION WILL RESULT IN LOSS OF VACUUM AND INTRODUCTION OF GASES TO THE INTERIOR OF THE MACHINE WHICH COULD CAUSE CORROSION. 2. ALWAYS HANDLE THE EQUIPMENT WITH CARE AND MAINTAIN IN A NEAR- VERTICAL POSITION DURING RIGGING. 3. DISCONNECT GAS PIPING FROM EQUIPMENT WHEN PRESSURE TESTING AT 0.5 PSI OR GREATER IN ORDER TO AVOID DAMAGE TO THE GAS VALVES. 4. DO NOT ATTEMPT TO START THE SYSTEM WITHOUT SUPERVISION FROM A YAZAKI AUTHORIZED SERVICE PROVIDER (ASP). MODEL DESIGNATION CH-MG ### Double-Effect Absorption Chiller-Heater (MG Series) Cooling Capacity: 150 = 150 ton, 200 = 200 ton 3 STANDARD SPECIFICATIONS SPECIFICATIONS English (Metric) CH-MG150 CH-MG200 Capacity Cooling MBTU/hr (kW/hr) 1,800 (527.5) 2,400 (703.4) Heating MBTU/hr (kW/hr) 1,245 (364.9) 1,660 (486.5) Chilled/Hot Water Chilled Water Temperature Inlet °F (°C) 53.6 (12) Outlet °F (°C) 44.6 (7) Hot Water Temperature Inlet °F (°C) 132.8 (56) Outlet °F (°C) 140.0 (60) Evaporator Pressure Loss PSI (kPa) 10.5 (72.4) 9.2 (63.4) Maximum Operating Pressure PSI (kPa) 113.9 (785) Rated Water Flow GPM (l/s) 399.4 (25.2) 532.6 (33.6) Water Retention Volume Gal (liters) 48 (181.7) 69 (261.2) Cooling Water Heat Rejection MBTU/hr (kW/hr) 3,045 (892.4) 4,060 (1189.9) Cooling Water Temperature Inlet °F (°C) 85.1 (29.5) Outlet °F (°C) 94.3 (34.6) Abs/Cond Pressure Loss PSI (kPa) 7.5 (57.1) 7.2 (49.6) Maximum Operating Pressure PSI (kPa) 113.9 (785) Rated Water Flow GPM (l/s) 658.6 (41.6) 878.1 (55.4) Water Retention Volume Gal (liters) 114 (431.5) 153 (579.2) Fuel Type of Fuel Natural Gas Consumption MBTU/hr (kW/hr) 1,500 (439.6) 2,000 (586.1) Electrical Power Source 208v or 230v / 60Hz / 3-phase Consumption kW 2.9 3.3 Minimum Circuit Amps Amps 24.4 29.0 Maximum Overcurrent Protection Amps 30 35 Capacity Control Cooling 30-100% Proportional Heating 30-100% Proportional Combustion Burner Type Low NOx Forced Draft (Proportional) Flame Detection Flame Rod Ignition Type Pilot w/ Intermittent Spark Sound dB(A) 74 Dimension Width Inches (mm) 77.0 (1957) 80.9 (2057) Depth Inches (mm) 144.2 (3665) 147.0 (3735) Height (without vent cap) Inches (mm) 88.2 (2240) 97.6 (2480) Height (including vent cap) Inches (mm) 108.8 (2775) 118.1 (3000) Piping Chilled/Hot Water Inches 4 (Flange) 5 (Flange) Cooling Water Inches 5 (Flange) 6 (Flange) Gas Piping Inches 2 NPT Weight Dry lbs (kg) 12,346 (5600) 14,330 (6500) Operating lbs (kg) 13,698 (6213) 16,183 (7340) Note: All metric values are calculated from the Imperial values and are only approximate values. 1. Fuel Input is based on the high heat value of gas. Burner efficiency = 83%. Allowable supply gas pressure is 7”-10.5” wc. 2. Power consumption does not include external pumps or cooling tower fan motors. 3. “Width” dimension does not include Junction Box. 4. Specifications are all based upon water in all fluid circuits and fouling factor of 0.0005 ft²-hr-°F/Btu. 5. Pressure Loss ratings are +/- 10%. 6. Minimum Cooling Water flow is 100%. Table 1 – Specifications 4 EQUIPMENT DIMENSIONS Figure 1 – MG150 Dimensions