Acer RM900 Installation Manual

Specifications

Brand: Acer
Category: Server
Model: RM900 (Installation Manual)
File Type: PDF
File Size: 1.87 Mb
Pages: 52

Read Online

Read the Acer RM900 Installation Manual online using the built-in PDF viewer.

Text of the manual

Acer Altos RM900

Installation Guide 1 1 Getting Started Unpack the rack and check the packing list that came with it. Make sure that you have all components. The unit of measurement used in this document is "U" (1U = 1.75 inches or 44.45 mm). The total sum of the heights of all components in the rack measured in "U" cannot exceed the height of the rack. 1.1 Standard Components The standard rack consists of the following: • Removable vented front and rear doors • Removable side panels • Stabilizing feet • Leveling feet • Casters • Cable management brackets • M6 washer-face screws • M6 cage nuts

Acer Altos 1100, 11000, 12000, and 21000 server rackmount kit

• Fixed monitor shelf • One 19-inch keyboard/touchpad with sliding shelf • 4-port keyboard/mouse/monitor switch box • Blanking panel kit (one 1U, one 2U, and one 3U) • Acer Altos storage subsystem 1.3 Screw Types Used The following screws are used in the assembly of the Acer Altos RM900 and other rack-mountable components: Screw Type Figure Usage M4 metal screw Securing the component rail to the mounting rail. See section 8.1 M5 metal screw Securing the system components and the mounting brackets to the rack M6 washer-face metal screw Securing the system components to the rack M6 thumbscrew Securing the server system to the rack (for Acer Altos 1100 server)

Installing the front panel to

the server system (for Acer Altos 11000, 12000, and 21000 server) #6-32 thumbscrew Securing the server and front panel to the rack (for Acer Altos 11000, 12000, and 21000 server) M5 metal tapping screw Securing the cable bracket to the rack (comes with the cable bracket package) Cage Nut Supports the M6 metal screws for securing system components to the rack

The following figure shows the front view of the Acer Altos RM900:

Figure 1 The Acer Altos RM900 (42U Rack) - Front View Vents Front Door Side Panel Handle with Lock Stand and Stabilizing Foot

The following figure shows the rear view of the Acer Altos RM900:

Figure 2 The Acer Altos RM900 (42U Rack) - Rear View Rear door Handle Leveling foot (beside caster) Fan

The following figure shows the different components that can be

installed in the Acer Altos RM900: Figure 3 A Typical Acer Altos RM900 Enclosure Monitor Blanking panel Blanking panel Storage subsystems Switchbox Keyboard/touchpad with sliding shelf Server Server UPS

Vertical Mounting Hole Pattern

The four vertical rails of the Acer Altos RM900 contain square mounting holes arranged in a manner shown in this figure: Figure 4 Vertical Square Mounting Hole Spacing The distance from the center of two holes with closer spacing to the center of the next pair is equivalent to 1U. When installing components, you must start your measurement from the center of the two holes with closer spacing. Otherwise, the screw holes on the component may not match with those on the rack. 1U 1U 2U 0.25” 0.625” 0.625 0.5” 0.625” 0.625” 0.5”

Positioning the Rack

The rack comes with casters to help you move it easily from one place to another. To position the rack: 1. Allow the following minimum clearances: For operation: Leave at least 46 cm (1.5 ft) of clearance in front of the rack and 31 cm (1 ft) behind the rack to allow adequate airflow. For servicing: Allow 61 cm (2 ft) of space behind the rack and 165 cm (65 inches) in front of the rack. 2. After you have positioned the rack, locate the two stabilizing feet and the two leveling feet placed just next to each caster. These feet are used for support to ensure that the rack is stable and to compensate for uneven floors when leveling the rack. See step 2 of Figure 5. 3. Pull out the two stabilizing feet. See step 3 of Figure 5. 4. Rotate each foot to adjust it. Continue adjusting the feet until the rack is level. See step 4 of Figure 5. Make sure the rack is stable.

Opening and Closing the Door

The rack has one front door and one rear door. Both doors are vented and can be opened easily. To open the rack's front or rear door: 1. Slide the keylock cover as far as it will go, press the keylock button to automatically release the handle. If the door is locked, unlock it using the key. 2. Rotate the handle 90 degrees counter-clockwise until the latch releases, and then pull open the door. Step 1 Step 2 Figure 6 Opening the Rack Door To close the rack's front or rear door: 1. Shut the door and rotate the handle clockwise to its original position. 2. Push the handle until it clicks.

Removing and Reinstalling the Door

You may need to remove the front and rear doors when installing components into the rack or when servicing. To remove the front or rear door: 1. Open the door. See section 4. 2. Locate the release lever in the upper-right corner of the front door or in the upper-left corner of the rear door. 3. Using your finger, pull down the release lever. This releases the upper door holder. 4. When the upper holder is released, slightly lift the door to remove the lower holder from its slot. Figure 7 Removing the Rack Door To reinstall the front or rear door: 1. Place the lower holder into its slot. 2. Using your finger, pull down the release lever while fitting the upper holder into its slot. Step 3 Step 4 Release lever

Removing and Replacing the Side

Panels The rack comes with 4 side panels. When installing components or when servicing, you may need to remove all side panels for quick and easy access to the components. To remove the side panels: 1. Each side panel has two screws. Using a coin or any flat-head tool, rotate each screw 90 degrees clockwise (for the right panels) or counter-clockwise (for the left panels) to release the side panel. See A of Figure 8. 2. Use one hand to push the side panel (see B1 of Figure 8) and another hand to support it at the bottom (see B2 of Figure 8). 3. When the side panel is released, pull it out to totally detach it from the rack. Repeat the steps until all side panels are removed. See C of Figure 8. Figure 8 Removing the Side Panel A B1 B2 C

To replace the side panels:

1. Locate the side of the panel that does not contain the screws. 2. Align the groove on that side of the panel with the edge of the rack, then insert it. See A of Figure 9. 3. Push the other side until it is completely inserted. See B of Figure 9. 4. Using a coin or any flat-head tool, rotate the two screws on the panel 90 degrees counter-clockwise (for the right panels) or clockwise (for the left panels) to secure the panel to the rack. See C of Figure 9. Figure 9 Replacing the Side Panel A B C

The following sections include instructions for installing UPS, server

monitors. 7.1 Cage nuts are use to secure systems and other components to the vertical rails in the rack. 1. at the back of a rail. 2. Insert the small end of the cage-nut installation tool through the opening in the rail and hook the tool over the top lip of the cage 3. back toward you until the top lip of the cage nut snaps into position. Repeat this process to install the other cage nuts in the 7.2 Loading an APC Uninterrupted Power Supply The UPS protects the equipment from being damaged due to power fluctuations. Since the UPS is extremely heavy, it should always be

To load an APC UPS:

1. Unpack the mounting brackets that came with the APC UPS. 2. Adjust the mounting brackets to fit into the rack and then use two M4 screws to afix them. Figure 10 Adjusting the Mounting Brackets 1. Attach the mounting brackets to the rack using four M5 screws. Figure 11 Attaching the Mounting Brackets to the Rack 4. Load the APC UPS into the rack.

To avoid damage to the equipment or personal

injury, load the APC UPS at the bottom of the rack only. 5. Secure the APC UPS at the front with four M5 washer-face screws. Figure 12 Loading the APC UPS

Loading an Acer Altos 1100 Server

7.3.1 Installing the Mounting Rails The rails allow the system to slide in and out of the rackmount for maintenance purposes. Follow these steps to install the mounting rails: 1. Extend the component rails from the mounting rails until the component rail release latches click. Then hold down the latches and slip the component rails out of the mounting rails. See Figure 13. Figure 13 Removing the Component Rail from the Mounting Rail (for Acer Altos 1100 Server) 2. Put the component rails to one side. 3. Attach the mounting rails to the mounting brackets: i. Notice that each mounting rail consists of: • a fixed outer piece that screws into the mounting bracket • an inner sliding piece controlled by a steel ball gearing movement. This inner sliding piece is not detachable. latch component rail mounting rail

ii. Align the screw holes on the mounting bracket and the

mounting rail. iii. Extend the inner sliding piece of the mounting rail. iv. Align the three holes on the mounting rail with the holes on the mounting bracket. v. Fasten the mounting rail to the mounting bracket with three M5 screws. See Figure 14. Figure 14 Aligning and Fastening the Mounting Rail to the Mounting Bracket (for Acer Altos 1100 Server) vi. Adjust the inner sliding piece to align the two holes on the other end of the mounting bracket with the mounting rail. To adjust the inner sliding piece, press the latch located at the end of it and then push back the inner sliding piece. You can only align one hole at a time. Continue moving the inner sliding piece until you align one of the holes. See Figure 15. Be careful when pressing the latch. Use a screwdriver or any similar tool. step iii steps iv and v mounting rail mounting bracket

Adjusting the Inner Sliding Piece to Align the Holes

(for Acer Altos 1100 Server) vii. When you have aligned one of the holes, then insert one M5 screw into it. See A of Figure 16. viii. Adjust the inner sliding piece until you align the other hole on the end part of the mounting bracket, then insert one M5 screw. This securely fastens the mounting rail to the mounting bracket. See B of Figure 16. inner sliding piece mounting bracket latch mounting rail mounting bracket hole inner sliding piece A

Aligning the Bracket Hole and Fastening the Mounting

Rail to the Mounting Bracket (for Acer Altos 1100 Server) 5. Attach the mounting brackets with rail to the rack using four M5 screws. Make sure that the holes on the mounting brackets are aligned with the holes on the rack. See the following figure: Figure 17 Attaching the Mounting Brackets to the Rack (for Acer Altos 1100 Server) mounting bracket mounting rail hole inner sliding piece B

The Acer Altos 1100 server occupies 6U. Count the U positions and

hole numbers from the bottom up. Secure the mounting bracket on the 1st and the 3rd holes of the 1st U using two M5 screws. Make sure that both of the mounting brackets are at the same level. Take note of the vertical rail hole pattern. For more information on the vertical rail hole pattern and spacing, see section 2.4. 7.3.2 Installing the Component Rails The component rails align the system housing to the mounting rail. For more information about the mounting rail, please refer to section 7.3.1. 1. Attach the handle to the drawer using two M5 screws. See the figure below. Figure 18 Attaching the Handle to the Drawer

2. Attach a component rail on each side of the drawer with five M5

screws. See the following figure: Figure 19 Attaching Component Rails to the Drawer 3. Load the server on the drawer. i. Check the stand-off brackets that came with your Acer Altos 1100 server rackmount kit. Each stand-off bracket is marked as follows: REAR-L REAR-R FRONT-L FRONT-R Figure 20 Stand-off Brackets

Attach the stand-off brackets to the drawer using M5

screws. Figure 21 Attaching the Stand-off Brackets to the Drawer iii. Remove the original front panel of the Acer Altos server. Refer to your server manual for instructions on how to remove the original front panel. iv. Place the server on the drawer and secure it to the drawer and brackets using four M5 screws. Figure 22 Securing the Server to the Drawer FRONT-L REAR-L FRONT-R REAR-R

Installing the Acer Altos Server into the Acer Altos

RM900 You may need to apply some pressure the first time you slide the component into the rack. After some time, the ball bearings in the slide will move easily. 1. Extend the inner sliding piece of the mounting rails forward until it clicks. Figure 23 Extending the Inner Sliding Piece (For Acer Altos 1100 Server) 2. Carefully align the drawer's component rails with the mounting bracket's rail, then push the drawer into the rack until it clicks. 3. Depress the component rail release latch on either side of the drawer, then slide the drawer into the rack. To avoid personal injury, care should be taken when pressing the component rail release latches and sliding the component into the rack.

Loading the Acer Altos 1100 Server

4. Remove the two screws on the upper edge of the server. See A of Figure 25. 5. Cut the clip that holds the handle on the upper edge of the server. See B of Figure 25. 6. Depress the handle. See C of Figure 25. Figure 25 Removing the Screws and Clip and Depressing the Handle A B C A

7. Attach the front panel that came with the rackmount kit to the

server. See the following figure: Figure 26 Attaching the Front Panel (For Acer Altos 1100 Server) 8. Attach the cable carrier. The cable carrier allows you to tie-wrap all cables to and from the server. As you slide the server in and out of the rack, the cable carrier collapses and extends, keeping the cables untangled and attached to the server. To attach the cable carrier: i. Attach one end of the cable carrier to the drawer using two M5 screws. See step i of Figure 27. ii. Install two cage nuts on the inside of the rack and then attach the other end of the cable carrier on the outside of the rear brace opposite the cage nuts with two M5 screws. See step ii of Figure 27. See section 7.1 for the installation of the cage nuts.

Attaching the Cable Carrier (For Acer Altos 1100

Server) iii. Extend the cable carrier. iv. Bundle all cables to the cable carrier with cable clamps. See Figure 28. v. Route all cables from the cable carrier to the cable management bracket located on the rear of the rack. For details on cabling, refer to section 7.6.3 - Cabling the Switch Box and section 7.6.4 - Completing the Cabling. Figure 28 Bundling the Cable using the Cable Clamps (For Acer Altos 1100 Server) step i step ii

9. Secure the server to the rack using four M5 thumbscrews.

Figure 29 Securing the Acer Altos 1100 Server to the Rack

Loading an Acer Altos 11000, 12000, or 21000

Server 7.4.1 Installing the Mounting Rails The rails allow the system to slide in and out of the rackmount for maintenance purposes. Follow these steps to install the mounting rails: 1. Extend the component rails from the mounting rails until the component rail release latches click. Then hold down the latches and slip the component rails out of the mounting rails. See Figure 30. Figure 30 Removing the Component Rail from the Mounting Rail (for Acer Altos 11000, 12000, or 21000) 2. Put the component rails to one side. 3. Attach each mounting rail to the mounting bracket: i. Notice that the mounting rail consists of: • a fixed outer piece that screws into the mounting bracket • an inner sliding piece controlled by a steel ball gearing movement. This inner sliding piece is not detachable. latch component rail mounting rail

ii. Align the screw holes on the mounting bracket and the

mounting rail. iii. Extend the inner sliding piece of the mounting rail. iv. Align the two holes on the mounting rail with the holes on the mounting bracket. v. Fasten the mounting rail to the mounting bracket with two M5 screws. See Figure 31. Figure 31 Aligning and Fastening the Mounting Rail to the Mounting Bracket (for Acer Altos 11000, 12000, or 21000) vi. Adjust the inner sliding piece to align the two holes on the other end of the mounting bracket with the mounting rail. To adjust the inner sliding piece, press the latch located at the end of it and then push back the inner sliding piece. You can only align one hole at a time. Continue moving the inner sliding piece until you align one of the holes. See Figure 32. Be careful when pressing the latch. Use a screwdriver or any similar tool. step iii steps iv and v mounting rail mounting bracket Follow the path of the arrows when installing the mounting rail to the mounting bracket Left Right

Adjusting the Inner Sliding Piece to Align the Holes

(for Acer Altos 11000, 12000, or 21000) vii. When you have aligned one of the holes, then insert one M5 screw into it. See A of Figure 33. viii. Adjust the inner sliding piece until you align the other hole on the middle part of the mounting bracket, then insert one M5 screw. See B of Figure 33. ix. Adjust the inner sliding piece again until you align the last hole on the end part of the mounting bracket, then insert one M5 screw. This securely fastens the mounting rail to the mounting bracket. See C of Figure 33. inner sliding piece mounting bracket latch mounting rail mounting bracket hole inner sliding piece A

Aligning the Bracket Hole and Fastening the Mounting

Rail to the Mounting Bracket (for Acer Altos 11000, 12000, or 21000) C B mounting bracket mounting rail hole inner sliding piece mounting bracket mounting rail hole inner sliding piece

5. Attach the mounting bracket with rail to the rack using four M5

screws. Make sure that the holes on the mounting bracket are aligned with the holes on the rack. See the following figure: Figure 34 Attaching the Mounting Bracket to the Rack (for Acer Altos 11000, 12000, or 21000) The Acer Altos 11000, 12000, and 21000 servers occupies 7U. Count the U positions and hole numbers from the bottom up. Secure the mounting bracket on the 2nd and 3rd holes of the 1st U and the 1st hole of the 2nd U using four M5 screws. Make sure that both of the mounting brackets are at the same level. Take note of the vertical rail hole pattern. For more information on the vertical rail hole pattern and spacing, see section 2.4. 7.4.2 Installing the Component Rails To install the component rails: 1. Insert the key into the lock and turn it clockwise until it points to the unlocked icon. 2. Open it to more than a 45° angle.

3. Lift it up a little and then move it away from the server.

Figure 35 Removing the Front Bezel 4. Remove the lock bracket. Figure 36 Removing the Lock Bracket 5. Replace the front metal cover with the one supplied in the rackmount kit or rearrange the LCD Display module.

For Acer Altos 11000 or 12000

Remove the screw from the metal cover and replace the metal cover using the same screw. Figure 37 Replacing the Metal Cover with the Rackmount Kit Cover For Acer Altos 21000 The front panel of the Acer Altos 21000 has an LCD display module installed. Simply rearrange the position of the LCD display module as shown below. Figure 38 Rearranging the LCD Display Module 6. Place the server side ways on a steady surface with the support panel facing up. 7. Remove the screw located at the back of the server and then gently pull back and lift up the support panel to detached.

Removing the Support Panel

8. Remove the remaining wheels and keep the screws and the wheels in a safe place for future use. Figure 40 Removing the Wheels

9. Attach the component rails to the server with ten M4 screws.

Figure 41 Attaching Component Rails to the server 10. Attach the cable carrier bracket to the server with two M4 screws. Figure 42 Attaching the Cable Carrier Bracket to the Server

11. Attach the front panel that came with the rackmount kit to the

server using six #6-32 screws. See the following figure: Figure 43 Attaching the Front Panel (for Acer Altos 11000, 12000, or 21000) 7.4.3 Installing the Acer Altos Server into the Acer Altos RM900 You may need to apply some pressure the first time you slide the component into the rack. After some time, the ball bearings in the slide will move easily.

1. Extend the inner sliding piece of each mounting rail forward until

it clicks. Figure 44 Extending the Inner Sliding Pieces 2. Carefully align the server’s rails with the mounting bracket's rail, and then push the server into the rack until it clicks. 3. Depress the component rail release latch on either side of the drawer and then slide the drawer into the rack. To avoid personal injury, care should be taken when pressing the component rail release latches and sliding the component into the rack.

Loading the Acer Altos 11000, 12000, or 21000

Server 4. Attach the cable carrier. The cable carrier allows you to tie-wrap all cables to and from the server. As you slide the server in and out of the rack, the cable carrier collapses and extends, keeping the cables untangled and attached to the server. To attach the cable carrier: i. Attach one end of the cable carrier to the server using two M5 screws. See step i of Figure 46. ii. Install two cage nuts on the inside of the rack and then attach the other end of the cable carrier on the outside of the rear brace opposite the cage nuts with two M5 screws. See step ii of Figure 46. See section 7.1 for the installation of the cage nuts. Figure 46 Attaching the Cable Carrier (for Acer Altos 11000, 12000, or 21000) iii. Extend the cable carrier. iv. Bundle all cables to the cable carrier with cable clamps. See Figure 47. step i step ii

v. Route all cables from the cable carrier to the cable

management bracket located on the rear of the rack. For details on cabling, refer to section 7.6.3 - Cabling the Switch Box and section 7.6.4 - Completing the Cabling. Figure 47 Bundling the Cable using the Cable Clamps (for Acer Altos 11000, 12000, or 21000) 9. Secure the server to the rack using four M5 thumbscrews. Figure 48 Securing the Acer Altos 11000, 12000, or 21000 Server to the Rack

Loading an Acer Altos RS700-RM101/102 into

the Acer Altos RM900 The Acer Altos RS700-RM101/102 storage subsystem enclosure occupies 4U in the Acer Altos RM900. Count the U positions and hole numbers from the bottom up. To install the RS700-RM101/102 into the rack: 1. Locate an unoccupied spot in the rack. 2. Secure the angular steel bars on the 2nd and 3rd holes of the 2nd U using four M5 screws. Please refer to the previous section for more information. Make sure that both of the angular bars are at the same level. Figure 49 Attaching the Angular Bars to the Rack (for Acer Altos RS700)

3. Install four cage nuts on the inside of the rail (see section 7.1) and

slide in the RS700-RM101/102 storage subsystem enclosure. Secure it with four M5 screws as shown below. Figure 50 Securing the Acer Altos RS700-RM101/102 Storage Subsystem Enclosure to the Rack When you slide in the enclosure make sure that the lower part of the support bar is resting on the angular bar. Support Bar

Loading a Keyboard/Mouse/Monitor Switch

Box To load the switch box: 1. Extend the cable support bracket on the rear of the switch box. Refer to the switch box’s manual for detailed instructions. 2. Install four cage nuts on the inside of the rail (see section 7.1) and then align the switch rack with the cage nuts. Secure it with four M5 washer-face screws. See the following figure: Figure 51 Loading the Switch Box Take note of the vertical rail hole pattern. For more information on the vertical rail hole pattern and spacing, see section 2.4.

Loading a Keyboard

To load a keyboard: 1. Insert the keyboard shelf into the rack. 2. Install four cage nuts on the inside of the rail (see section 7.1) and then align the keyboard shelf to the cage nuts. Secure it with four M5 washer-face screws. 3. For cabling details, refer to section 7.6.3 - Cabling the Switch Box and section 7.6.4 - Completing the Cabling. Figure 52 Loading the Keyboard Shelf Take note of the vertical rail hole pattern. For more information on the vertical rail hole pattern and spacing, see section 2.4.

Loading a Monitor

To load a monitor: 1. Before you start, check the height of your monitor. Make sure that it will fit into the desired location in the rack. 2. Insert the monitor shelf into the rack. 3. Install eight cage nuts on the inside of the rail (see section 7.1) and then align the monitor shelf to the cage nuts. Secure it with eight M5 washer-face screws. Figure 53 Attaching the Monitor Shelf Take note of the vertical rail hole pattern. For more information on the vertical rail hole pattern and spacing, see section 2.4.

Load the monitor into the rack.

Figure 54 Loading the Monitor 5. Plug the power cable into the monitor.

Route the cables from the monitor to the cable management

bracket located on the rear of the rack. For cabling details, refer to section 7.6.3 - Cabling the Switch Box and section 7.6.4 - Completing the Cabling. Figure 55 Cabling the Monitor

Cabling the Switch Box

Before you proceed, make sure that the server and all peripherals are turned off. To connect the components to the switch box: 1. Plug the monitor and keyboard cables into the ports marked VGA monitor, PS/2 or AT keyboard, and PS/2 mouse on the switch box, respectively. Refer to Figure 50. The keyboard/touchpad cable has two connectors: one for keyboard and one for mouse. The keyboard connector is marked with a keyboard icon ( ), while the mouse connector is marked with a mouse icon ( ). 2. Using the switch box cable, attach the 25-pin connector to any 25-pin port on the switch box back panel. Refer to Figure 54. 3. Plug the cable's video, keyboard, and mouse connectors into their corresponding ports on the server. Refer to Figure 54. Figure 56 Cabling the Switch Box For details on how to operate the switch box, refer to the manual that came with your switch box.

Completing the Cabling

The cable management brackets helps you organize the wires and cables dangling inside the rack. To install a cable management backet: 1. Install a cage nut on the outside of the rail. 2. Attach the support bracket to the cable management bracket and then align it with the cage nut. Secure it with an M5 screw. To arrange the cabling inside the rack: 1. Connect any remaining cables such as network cables, SCSI cables, etc. 2. Route all cables to the cable management bracket located on the left column of the rack. The cable management brackets are designed to hold bundles of cables. Figure 57 Cable Management Brackets Location Cable management brackets

Attaching the Blanking Panels

The rack may come with a blanking kit that includes three blanking panels: one 1U, one 2U, and one 3U. You may need to install these blanking panels to fill the empty spaces at the front of the rack. To attach a blanking panel: 1. Place the blanking panel across the front vertical rails of the rack and indicate the positions of the cage nuts. 2. Install four cage nuts on the inside of the rail (see section 7.1) and then align the blanking panel to the cage nuts. Secure the blanking panel with four M5 washer-face screws. Figure 58 Attaching Blanking Panels

Completing the Rack Component

Installation After you have installed all the necessary components into the rack and arranged the cabling, you need to replace the side panels, the rear door, and the front door to complete the installation. For instructions on how to replace side panels, refer to section 6 - Removing and Replacing the Side Panels. For instructions on how to replace the rear and front doors, refer to section 5 - Removing and Replacing the Door.