Firenzo Royale Installation Manual
Text of the manual
Please read this booklet and keep for future reference for the safe installation
and operation of your:
ROYALE
Freestanding Clean Air Woodburner
All installations must be in accordance with these instructions. Consult with the
building authority having jurisdiction to determine the need for a permit prior to
commencing the installation. Failure to follow t
Royale Guide Version 16/05/2013
2
INDEX
Page
3
1. Warnings
4
2. Installation Responsibilities
5
3. Installation Clearances
6
4. Assembly Instructions
7
5. Flue Installation
8
Minimum Height of Flue System Exit
9
6. Operating Instructions
11
7. Door Glass
12
8. Maintenance
13
9. Safety
13
10. Warranty
Man
Royale Guide Version 16/05/2013
3
1. WARNINGS
THIS APPLIANCE SHOULD BE MAINTAINED AND OPERATED AT ALL
TIMES IN ACCORDANCE WITH THESE INSTRUCTIONS.
The Royale is tested to Australian and N.Z. Standards AS/NZS 2918:2001.
INCORRECT INSTALLATION OF THIS APPLIANCE MAY RESULT IN
OVERHEATING OF HEAT SENSITIVE MATERIALS AND POSSIBLE FIRE.
FOR YOUR SAFETY FOLLOW TH
Royale Guide Version 16/05/2013
4
2. INSTALLATION RESPONSIBILITIES
WARNING: THE APPLIANCE AND FLUE SYSTEM SHALL BE INSTALLED
IN ACCORDANCE WITH AS/NZ 2918:2001 AND THE APPROPRIATE
REQUIREMENTS OF THE RELEVANT BUILDING CODE OR CODES.
DO NOT MODIFY THE APPLIANCE. ANY MODIFICATION OF THE
APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE
TESTING AUTHORITY
Royale Guide Version 16/05/2013
5
3. INSTALLATION CLEARANCES
Firebox Size: Height 300mm
Width 440mm
Depth 370mm
Flue Size:
150mm
Heating Area: Up to 250 sqm (for fully insulated homes)
CLEARANCES
A
B
C
D
E
F
G
H
J
K
L
M
N
O
WITH FLUE
SHIELD
100
200
300
110
50
200
520
330
810
930
1200
1030
730
500
NO FLUE SHIELD
300
200
300
110
100
400
520
400
810
1130
1