Skywalker Flatmap 1 Installation Manual
Read Online
Read the Skywalker Flatmap 1 Installation Manual online using the built-in PDF viewer.
Text of the manual
Measure back 3mm from line drawn and add another line down.
Using a suitable cutting tool cut between the lines from inner ceiling to top of
fuselage floor. This will create a vertical slot for the bulkhead fitting. Perform
same steps on opposite side of aircraft.
Ceiling
Floor
Reattach front side foam cutout door with tape hinges.
Insert battery tray through cut out door and secure with screws to bulkhead.
Continue to trim areas marked red or as needed. Nose cover will also be
trimmed as needed.
Insert gimbal with quick release hooks into plywood bulkhead. Adjust left/right
for clearance. Cut out belly for camera lens travel as needed.