Graco 312864B Instruction Manual

Text of the manual

Instructions - Parts

Communications Gateway Module For use with Graco Control Architecture based systems to provide fieldbus communications capabilities. Important Safety Instructions Read all warnings and instructions in the system operation manual. Save these instructions. TI11985A 4003764 Conforms to UL Std. 508 Certified to CAN/CSA Std. C22.2 No. 14

Models . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Component Identification . . . . . . . . . . . . . . . . . . . . 3 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Graco Standard Warranty . . . . . . . . . . . . . . . . . . . 12 Graco Information . . . . . . . . . . . . . . . . . . . . . . . . 12 Models To order replacement parts, see Parts on page 11. To order installation kits for a Graco Control Architecture based system, see the system operation manual. Communications Gateway Module Part No. Fieldbus CGMDN0 DeviceNet CGMEP0 EtherNet/IP CGMPB0 PROFIBUS CGMPN0 PROFINET

Communications Gateway Module

B Base C Fieldbus Connector D Module Connection Screws E Access Cover F Module Status LEDs G Fieldbus Status LEDs (see descriptions on page 6) H CAN Connectors FIG. 1: TI11985A TI11814A TI11815A TI11816A A D C (see Fieldbus Connector Table) Fieldbus Connectors Table (C) B PROFINET EtherNet/IP DeviceNet PROFIBUS or G G G E TI11972A F H Front Back

The Communications Gateway Module (CGM) provides

a control link between Graco Control Architecture based systems and a selected fieldbus. This provides the means for remote monitoring and control by external automation systems. Data provided by the CGM to the fieldbus depends on which Graco Control Architecture based system and fieldbus are connected. A data map supplied on a map token is defined for this pairing. Once the data map has been loaded into the CGM, it is stored internally, and the map token is no longer required for operation. Data Exchange Data is available by block transfer, cyclic transfer, change of state triggered, and explicit access to individ- ual attributes as defined by the fieldbus specification. NOTE: The following system network configuration files are available at www.graco.com • EDS file: DeviceNet or Ethernet/IP fieldbus net- works • GSD file: PROFIBUS fieldbus networks • SDML: PROFINET fieldbus networks Module Status LED Signals *The red LED (F) will flash a code, pause, then repeat. See Diagnostic Information on page 10. NOTE: Verify that you are using the correct token for your sys- tem and reinstall token. If fails, order new token. Module Requirements Power Supply The CGM requires a 12-30 VDC @ 0.2 A power supply. Refer to the system manual for system level power sup- ply guidelines. Environment Conditions Refer to the system manual for guidelines regarding environment conditions for the CGM. Installation The CGM is available for use with all Graco Control Architecture based systems that have compatible design. Each CGM requires the following to operate in a system: • Mounting hardware • Map token • Fieldbus files If your system is compatible for use with a CGM, install the supplied CGM as explained in the system operation manual or installation kit manual. If the CGM is offered only as an accessory for your sys- tem, see Accessories in the system operation manual for available CGM kits. Connect Cables If your system is supplied with the CGM and required components, connect cables as explained in the system operation manual. If the CGM is offered as an accessory for your system, connect cables as explained in the CGM mounting kit manual. Signal Description Green on System is powered up Yellow Internal communication in progress Red Solid CGM hardware failure *Red (7 flashes) Data map load failure Incorrect data map for fieldbus type No data map loaded NOTICE Route cables to avoid interference with moving parts.

Install or Update Data Map

NOTE: The fieldbus connection is temporarily disabled during the installation or update of a map token. 1. Ensure system is inactive. 2. Remove access cover (E). 3. Insert and press map token (T) firmly into slot. 4. Press and hold the map upload push button (M) for three seconds. The red LED (L) will flash twice, pause, and repeat once after the data map is suc- cessfully uploaded. This may take up to 10 seconds. NOTE: The rotary switch (S) has no function for the CGM. 5. Remove token (T). Store in a safe place. 6. Replace access cover (E). FIG. 2 TI12319A E FIG. 3 L M S T TI12320A

Other Gateway Manuals