IBC VFC 15-150 Manual
Read Online
Read the IBC VFC 15-150 Manual online using the built-in PDF viewer.
Text of the manual
INSTALLATION AND OPERATING INSTRUCTIONS
www.ibcboiler.com
VFC 15-150 - VFC 45-225
Modulating Gas Boilers
(Natural Gas or Propane)
WARNING: If the information in this manual is not followed exactly, a fire or
explosion may result causing property damage, personal injury, or loss of life.
Do not store or use gasoline or other flammable vapours and liquids or other
combustible materials in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
• Do not try to light any appliance.
• Do not touch any electrical switch; do not use any phone in your building.
• Immediately call your gas supplier from a nearby phone. Follow the gas
supplier’s instructions.
• If you cannot reach your gas supplier, call the fire department.
Installation and service must be performed by a qualified installer, service
agency or the gas supplier.
This Manual is also available in French - contact IBC or visit our web site www.ibcboiler.com
INSTALLATION AND OPERATION INSTRUCTIONS
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
SAFETY CONSIDERATIONS
SPECIFICATIONS
WARNING
If the information in this
manual is not followed
exactly, a fire or explosion
may result causing property
damage, personal injury, or
loss of life.
Installation, start-up and servicing of IBC boilers must be done with due
care and attention, and should only be performed by competent, qualified,
licensed and trained heating technicians.
Failure to read and comply with all instructions and applicable National and
local codes may result in hazardous conditions that could result in prop-
erty damage and injury to occupants which in extreme cases might result
in death.
HAZARDS &
PRECAUTIONS
WARNING
Points out a potentially
hazardous situation which
must be avoided to prevent
serious injury or death.
CAUTION
Points out a potentially
hazardous situation which
must be avoided to prevent
possible moderate injury and/
or property damage
NOTE
Points out installation,
maintenance and operation
details that will result in
enhanced efficiency, longevity
and proper operation of your
boiler.
DANGER
Points out an immediately
hazardous situation which
must be avoided in order
to prevent serious injury or
death.
Specification
VFC 15-150
VFC 45-225
CSA Input (Natural Gas or Propane) - MBH
CSA Input (Natural Gas or Propane) - kW
CSA Output - MBH
CSA Output - kW
15 - 150
4.4 - 44
14 - 139
4.1 - 41
45 - 225
13 - 66
41 - 206
12 - 60
A.F.U.E.
96.1%
96.1%
Minimum gas supply pressure (Natural Gas or Propane) - inch
w.c.
3
3
3
3
Maximum gas supply pressure (Natural Gas or Propane) - inch
w.c.
14
14
14
14
Power use (120Vac/60Hz) @ full fire - Watts (excluding pumps)
57
158
Weight (shipping) - lbs/Kg
165 / 75
168 / 76
Pressure vessel water content - USG/Litres
2.4 / 9
2.4 / 9
Maximum boiler flow rate - USgpm
16
25
Minimum boiler flow rate - USgpm
4
8
Maximum operating water pressure* - psig
80
80
Minimum water pressure - psig
8
8
Normal flue temperature @ 100°F boiler return water temperature
- high fire
100 to 105 °F
37.8 to 40.5°C
100 to 105 °F
37.8 to 40.5°C
Normal flue temperature @ 160°F boiler return water temperature
- high fire
160 to 165 °F
71.1 to 73.9°C
160 to 165 °F
71.1 to 73.9°C
Approved installation altitude - ASL
0 - 8,000’
0 - 8000’
Ambient temperature - Low (°F-°C)
Ambient temperature - High (°F-°C)
32°F / 0°C
122°F / 50°C
32°F / 0°C
122°F / 50°C
Max. relative humidity (non-condensing)
90%
90%
Minimum water temp.
34°F / 1.1°C
34°F / 1.1°C
Maximum water temp. (electronic hi-limit)
190°F / 87.8°C
190°F / 87.8°C
Maximum water temp. (mechanical hi-limit)
200°F / 93.3°C
200°F / 93.3°C
Max. ΔT - supply/return (electronic fence)
35°F
35°F
Maximum equivalent vent length - 2”
Each side (Vent & Air Intake)) - 2 1/2”
(Natural Gas or Propane) - 3”
Air intake options: either direct vent or indoor supply
50’
70’
120’
N/A
N/A
240’
Supplied with the boiler - The IBC boiler is shipped with an accessory parts kit
consisting of the following items:
• 1 x Vent connection kit
• 1 x Condensate trap kit
• 1 x 30 psig pressure relief valve (higher pressure 75 psig - by special order).
• 1 x Outdoor temperature sensor
* boilers are shipped with 30 psig pressure relief valve - up to 75 psig relief valve can be ordered
INSTALLATION AND OPERATION INSTRUCTIONS
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
1.0
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.1
GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.2
CODE REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.3
LOCATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.4
EXHAUST VENTING AND AIR INTAKE . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.5
CONDENSATE REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-14
1.6
WATER PIPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-19
1.7
GAS PIPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25
1.8
ELECTRICAL CONNECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-26
2.0
BOILER SYSTEMS AND OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.1
GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.2
CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.3
USER INTERFACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.4
ACCESS LEVELS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
2.5
SEQUENCE OF OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
2.6
OTHER OPERATING FEATURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2.7
SET UP & LOAD DEFINITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10
3.0
STARTUP AND COMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3.1
LIGHTING AND SHUTTING DOWN THE BOILER . . . . . . . . . . . . . . . . . . . . 3-1
3.2
PRIOR TO START-UP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2
3.3
COMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2
4.0
MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.1
BOILER MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.2
COMPONENT DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
5.0
TROUBLESHOOTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.1
PRELIMINARY CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.2
ELECTRONIC COMPONENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5.3
TROUBLESHOOTING GUIDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
6.0
DIAGRAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.1
VFC 45-225 PARTS DIAGRAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2
6.2
VFC 15-150 PARTS DIAGRAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4
6.3
ADDITIONAL PARTS DIAGRAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.4
WIRING DIAGRAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
6.5
SEQUENCE OF OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
CONTENTS
INSTALLATION AND OPERATION INSTRUCTIONS
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
The Installer must carefully read this manual to ensure that all installation
details can be adhered to. Special attention is to be paid to clearances
and access, vent travel and termination, gas supply, condensate removal
and combustion air supply.
The Installer should do a pre-installation check the to ensure that the
following precautions can be observed:
• The boiler should be installed in areas where the combustion air source is
not subject to chemical fouling or agricultural vapours. Exposure to corrosive
chemical fumes such as chlorinated and/or fluorinated hydrocarbons can
reduce the life of a boiler. Cleaners, bleaches, air fresheners, refrigerants,
aerosol propellants, dry-cleaning fluids, de-greasers and paint-removers all
contain vapours which can form corrosive acid compounds when burned in a
gas flame. Airborne chlorides such as those released with the use of laundry
detergents are also to be avoided. For this reason, the indoor air venting
option using air surrounding the boiler should not be used in a laundry room.
Similarly, ensure any direct vent air source is not adjacent to a clothes dryer
exhaust terminal. Avoid agricultural applications where the boiler and/or the
intake air source are affected by ammonia and/or dust.
• The boiler should be located where water leakage will not result in damage
to the area. If a location such as this cannot be found, a suitable drain pan
should be installed under the appliance. The boiler is not to be installed
above carpeting.
• At a new construction site, or during renovations, action must be taken
to protect the boiler from drywall dust or other construction related
contaminants; combustion air should be drawn from a CLEAN source (e.g.
outdoors) and the boiler should be isolated from interior dust sources. Do not
seal boiler case openings directly when firing - allow for air circulation and
ventilation in the immediate area.
• When the boiler is in operation, the impact of the steam plume normally
experienced at the exhaust terminal of a condensing boiler should be
assessed. Generally, intake and exhaust pipes should terminate at a rooftop
or sterile wall location. Boiler condensate is corrosive. Protective measures
must be taken to prevent corrosion damage to metal roofs or other metal
building components in contact with the condensate. Keep exhaust plumes
well away from all building air intakes including those of neighbouring
properties.
• The exhaust outlet should be placed so as to reach 24” minimum above the
down-turned intake - to avoid exhaust re-ingestion.
• For sidewall venting options: Both the inlet and exhaust terminations should
normally be located on the same plane (side) of the building. The elevation of
both pipes can be raised in “periscope style” after passing through the wall to
gain required clearance above grade and snow level.
• If the indoor combustion air option is used, ensure combustion air openings
to the boiler room remain unblocked and free of obstructions.
• Examine the condensate outlet to ensure proper disposal of condensate
will occur during operation. If condensate will be discharged into copper or
ferrous metal drains, ensure acid neutralization is employed.
• Ensure that the pressure relief valve will be installed with no valves or other
means of isolation between its inlet and the boiler. Make sure the relief valve
outlet will be piped with unobstructed piping (minimum 3/4” diameter) to a
safe discharge location.
WARNING
Do not use this boiler if any
part has been under water.
Immediately call a qualified
service technician to inspect
the boiler and to replace any
part of the control system and
any gas control that has been
under water.
DANGER
Should overheating occur
or the gas supply fails to
shut off, do not turn off or
disconnect the electrical
supply to the pump. Instead
shut off the gas supply at
a location external to the
appliance
CAUTION
Care must be taken to
properly size the boiler for
its intended use. Prolonged
full fire run time, over-
sizing or under-sizing,
and incorrect flow rates
through the boiler can lead
to increased maintenance
costs, equipment stress and
premature failure.
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
INSTALLATION
1.0
GENERAL
VFC gas-fired modulating boilers are low pressure, fully condensing units having
variable input ranges (a) 15 MBH (15,000 Btu/hr) to 150 MBH (15-150 model,
0 to 8,000’) and (b) 45 MBH to 225 MBH (45-225 model, 0 to 8,000’). The
boilers are approved as “Category IV” vented appliances using either Direct
Vent (sealed combustion) or indoor combustion air, providing a great degree of
installation flexibility.
Figure 1 shows outer case dimensions and piping and electrical holes. Use this
diagram to find a suitable location for the boiler. See also Section 1.3 Location.
DESCRIPTION
SIZE
A
Water Outlet
1-1/4" NPT-M
B
Water Inlet
1-1/4" NPT-M
C
Gas Inlet
1/2" NPT-F
D
Knock-outs (6)
1/2"
E
LCD Display
3/4"
F
Exhaust Vent
4.0" Hole
G
Combustion Air
4.0" Hole
Table 1: Connections
1.1
Figure 1a: Dimensions / Connections for VFC 15-150
Figure 1b: Dimensions / Connections for VFC 45-225
INSTALLATION AND OPERATION INSTRUCTIONS
1-2
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
CODE REQUIREMENTS
The VFC 15-150 model was tested to and certified under CSA 4.9-2000 / ANSI
Z21.13-2000. The larger VFC 45-225 unit was approved under CSA 4.9a-2005 /
ANZI Z21.13a-2005.
Installation must conform to local codes, or in the absence of these, with the
latest editions of CAN/CGA B149 and the Canadian Electrical Code Part 1 CSA
C22.2 No. 1.
In the US, installations must conform to the current National Fuel Gas Code
ANSI Z223.1 and the National Electrical Code ANSI/NFPA 70. Where required
by jurisdiction, installation must conform to the Standard for Controls and Safety
Devices for Automatically Fired Boilers, ANSI/ASME CSD-1. If there is any
conflict, then the more stringent requirement will apply.
LOCATION
VFC-series boilers are designed and approved for indoor installation (wall or rack
mounting), with significant flexibility of location provided with the available venting
options. The boiler can be placed in an alcove, basement, closet or utility room.
Surrounding ambient conditions shall be 0°C to 50°C and less than 90% relative
humidity.
Install the boiler in areas where the combustion air source is not subject to
chemical fouling or agricultural vapours. Exposure to corrosive chemical
fumes such as chlorinated and/or fluorinated hydrocarbons can reduce
the life of a boiler. Cleaners, bleaches, air fresheners, refrigerants, aerosol
propellants, dry-cleaning fluids, de-greasers and paint-removers all contain
vapours which can form corrosive acid compounds when burned in a gas flame.
Airborne chlorides such as those released with the use of laundry detergents
are also to be avoided. For this reason, the indoor air venting option using air
surrounding the boiler should not be used in a laundry room. Similarly, ensure
any direct vent air source is not adjacent to a clothes dryer exhaust terminal.
Avoid agricultural applications where the boiler and/or the intake air source
are affected by ammonia and/or dust.
Locate the boiler where water leakage will not result in damage to the area. If a
location such as this cannot be found, a suitable drain pan should be installed
under the appliance. The boiler is not to be installed above carpeting.
Boiler weight: 150 lbs / 68 kg without water. Use - as a minimum - 4 x #12 size
2" lag screws or 1/4" bolts (with metal mounting systems). Fasteners are to be
attached to solid material capable of supporting the combined weight of the boiler
and piping assembly components.
Other factors affecting potential mounting sites:
• Ensure minimum clearance requirements for combustible materials (see
Table 2) are satisfied.
• Minimum 24" clearance at the front and 10” above is recommended for
adequate servicing. Check local codes for additional access and service
clearance requirements.
• At a new construction site, or during renovations, action must be taken
to protect the boiler from drywall dust or other construction related
1.2
1.3
WARNING
Keep boiler area free
and clear of combustible
materials, gasoline, and
other flammable vapours
and liquids.
WARNING
Combustion air must not be
drawn from areas containing
corrosive air from swimming
pools or spas, including air
directly next to outdoor pools
and spas
WARNING
The boiler shall not be
exposed to water leaks from
piping or components located
overhead. This includes
condensation dropping from
un-insulated cold water lines
overhead.
1.3
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
contaminants; combustion air should be drawn from a CLEAN source
(e.g. outdoors) and the boiler should be isolated from interior dust
sources. Do not seal boiler case openings directly when firing - allow for
air circulation and ventilation in the immediate area.
Surface
Distance from
Combustible
Surfaces
Recommended
Distance for
Service
Front
2"
24"
Rear
0"
0"
Left Side
0"
8" (for vent run)
Right Side
2"
18"
Top
6"
10"
Table 2 - Clearance from boiler cabinet
Distance below the boiler of up to 15" (15-150 model) and up to 24” (45-225
model) is required to provide clearance for the inlet and exhaust venting
together with the required condensation trap. See page 1-15.
EXHAUST Venting and AIR INTAKE
It is important to carefully plan the installation to ensure the appropriate
vent materials, travel and termination decisions are incorporated. Specific
attention is warranted to manage the impact of the steam plume normally
experienced at the exhaust terminal of a condensing boiler. Generally,
intake and exhaust pipes should terminate at a rooftop or sterile wall
location, to maximize customer satisfaction. Keep exhaust plumes
well away from all building air intakes including those of neighbouring
properties.
All venting must be installed in accordance with the requirements of the
jurisdiction having authority: in Canada, Part 8, Venting Systems of the B149.1-
10 Code and any other local building codes are to be followed. In the USA
the National Fuel Gas Code, ANSI 223.1, latest edition, prevails. Where there
is a discrepancy between the installation instructions below, and the code
requirements, the more stringent shall apply.
IMPORTANT
When an existing boiler is removed from a common venting system, the common
venting system is likely to be too large for proper venting of the appliances
remaining connected to it.
When resizing any portion of the common venting system, the common venting
system should be resized to approach the minimum size as determined using the
appropriate tables in the National Fuel Gas Code, ANSI Z223.1 - latest edition. In
Canada, use the B149.1-10 Installation Code.
At the time of removal of an existing boiler the following steps shall be followed
with each appliance remaining connected to the common venting system placed
in operation, while the other appliances remaining connected to the common
venting system are not in operation.
1.4
DANGER
Do not common vent the VFC
modulating series boilers
with any other existing or new
appliance.
WARNING
Venting, condensate
drainage, and combustion
air systems for all IBC
boilers must be installed in
compliance with all applicable
codes and the instructions of
their respective Installation
Manuals.
Inspect finished vent and air
piping thoroughly to ensure
all are airtight and comply
with the instructions provided
and with all requirements of
applicable codes.
Failure to comply will result
in severe personal injury or
death.
INSTALLATION AND OPERATION INSTRUCTIONS
1-4
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
• Seal any unused opening in the common venting system.
• Visually inspect the venting system for proper size and horizontal pitch and
determine there is no blockage or restriction, leakage, corrosion and other
deficiencies which could cause an unsafe condition.
• Insofar as is practical, close all building doors and windows and all doors
between the space in which the appliances remaining connected to the
common venting system are located and other spaces of the building. Turn
on clothes dryers and any appliance not connected to the common venting
system. Turn on any exhaust fans, such as range hoods and bathroom
exhausts, so they will operate at maximum speed. Do not operate a summer
exhaust fan. Close fireplace dampers.
• Place in operation the appliance being inspected. Follow the lighting
instructions. Adjust thermostat so appliance will operate continuously.
• After it has been determined that each appliance remaining connected to the
common venting system properly vents when tested as outlined above, return
doors, windows, exhaust fans, fireplace dampers and any other gas-burning
appliance to their previous conditions of use.
• Any improper operation of the common venting system should be corrected
so the installation conforms with the National Fuel Gas Code, ANSI Z223.1 -
latest edition. In Canada, all installations must conform with the current CAN/
CGA - B149.1-10 Installation Code and/or local codes.
1.4.1 Applications
All VFC-series boilers are approved with alternative venting options: either 2-pipe
Direct Vent or single pipe /Indoor Air venting can be used offering flexibility to
meet the specific requirements of the installation. With the Direct Vent case,
combustion air is piped directly to the boiler’s air intake from outdoors (see
Section 1.4 for air intake piping requirements). Using the indoor air alternative, air
for combustion is drawn from the indoor air surrounding the boiler.
Provided the maximum overall vent length limit is not exceeded, the installer may
choose to vent the boiler through the wall, directly through the roof or upward using
an existing - but otherwise unused - chimney as a vent raceway.
1.4.2 Exhaust Vent Material
Exhaust Vent Material – CANADA
Use Polypropylene (PPs) or CPVC vent systems approved under ULC-S636
Standard for Type BH Gas Venting Systems, or stainless steel Type BH venting
systems. Permitted PPs materials comprise Single Wall Rigid pipe and fittings
and Flexible.
• ULC-S636 CPVC: 90°C (194°F)
• ULC-S636 PPs: 110°C (230°F)
In the standard configuration, VFC series boilers can supply water temperatures
up to 190°F, leaving stack temperatures above the 65°C (149°F) limit for
ULC-S636 approved PVC.
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
For long vent runs with higher initial exhaust temperature, some jurisdictions
may allow the use of mixed materials for economy: ULC-S636 approved CPVC
for the initial run followed by ULC-S636 approved PVC to the termination (It is
the responsibility of the Installer to confirm that local codes will allow this option).
Ensure appropriate transition glue is used. The installer is responsible to ensure
that sufficient temperature loss is allowed for in the CPVC section to fall below
the limit for PVC, taking into account the highest possible ambient temperature in
the area of vent travel (e.g. boiler room, attic and/or chase).
Exhaust Vent Material – USA
IBC strongly recommends only PPs or CPVC vent component systems approved
under ULC-S636 Standard for Type BH Gas Venting Systems, or stainless steel
Type BH venting systems* are to be used - BUT - many local jurisdictions in the
USA still allow the use of PVC (ULC-S636 or Sch. 40 ASTM D1785 or D2665
and fittings) or CPVC (ULC-S636 or Sch. 40/ASTM F441 with Sch. 80 fittings);
or CSA approved 3" stainless vent systems. If PVC is to be used, you shall use
a minimum of 10 lineal feet of CPVC, and then transition to PVC using approved
transition glue. The installer shall ensure that vent temperatures in the PVC
section cannot exceed 140°F.
Do not use ABS or any cellular core pipe for exhaust venting.
The boiler offers 2" venting connections. Fittings are to be used to adapt to
the appropriate diameter – see Vent Travel below. Exhaust venting is to be
connected directly to the 2" NPT male threaded stainless steel fitting on the
bottom of the pressure vessel using:
• For CPVC (and in the USA only, PVC) systems a 2" CPVC (USA: 2” PVC
allowed) threaded adaptor or 90° elbow adaptor. A condensate trap formed
using the supplied fittings shall be considered part of the exhaust and installed
near the base of the boiler (see Figure 2).
• for PPs, use IBC’s VFC PPs transition kit as appropriate for the chosen PPs
system:
Centrotherm Innoflue™
M&G Duravent PolyPro™
KIT# P-166A
KIT# P-167A
2” Stainless Coupler (190-044)
2” Stainless Coupler (190-044)
PPs Transition (180-037)
PPs Transition (180-040)
Retainer Clip (180-050)
Retainer Clip (180-051)
Combustion air piping is connected at the base of the boiler using a standard
2" PVC (ABS) coupler or elbow (see Section 1.4.7). For PPs intake piping, use
standard PPs : 2”Sch 40 adaptor parts from the respective PPs manufacturers.
Venting shall be supported in accordance with applicable code.
*Manufacturers of stainless steel Type BH venting systems must submit
their approved transition fitting to IBC for evaluation and written approval.
DANGER
Failure to install PPs adaptor
with retainer clip could cause
release of harmful exhaust
gases into the heated space,
potentially leading to injury
or death.
WARNING
Do not mix PPs venting
materials from different
Manufacturers.
These venting materials are
designed to be installed as
part of a complete system.
Failure to comply may result
in severe personal injury or
death.
Figure 1c: PP Vent Adaptor
Assembly
INSTALLATION AND OPERATION INSTRUCTIONS
1-6
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
1.4.3 Vent Travel
3" PPs (rigid single wall) or CPVC ULC-S636 approved piping is the standard
venting option; with this, the VFC 15-150 boiler can be sited up to 120 equivalent
feet from the vent termination (for the VFC 45-225, up to 240' equivalent). The
actual vent travel allowance is reduced for fittings in accordance with Table 3. –
e.g. for a VFC 15-150 using 4 x 90º CPVC elbows, the maximum lineal measure
of pipe allowed is 88 feet (120'–(4 x 8'= 32) = 88'). For the 15-150 model, vent
installations requiring only short travel can be satisfied using 2' or 2-1/2" pipe.
Flexible PPs can be used, but the allowances change as follows:
• Up to 60 lineal feet of 3” venting is allowed in nominally vertical orientation (>45°).
• Further travel is permitted using rigid single wall PPs (VFC 15-150 up to 30’
equivalent; VFC 45-225 up to 60’ equivalent).
EXHAUST Pipe Size
MaxIMUM EquivAlEnt Length
Sched.40; Rigid PPs
2" (15-150 only)
50' (each side)
2-1/2" (15-150 only)
70'
3" (15-150)
120'
3" (45-225)
240'
90° vent elbow
allow 8' equivalent
45° elbow
allow 3’ equivalent
PPs 87-90° elbow
use 8’ equivalent
Flexible PPs
2” Flexible
60’ (see Note 1)
3” Flexible
60’ (see Note 1)
Table 3: Maximum exhaust venting length
Note 1: Plus up to 30’ (15-150) or 60’ (45-225) equivalent in rigid PPs can
be used.
Note 2: Unused intake travel cannot be added to the exhaust. Unequal
intake and exhaust piping is allowed - see Section 1.4.8.
VFC 15-150: when using the 3” venting option a 3" x 2" reducer must be placed
in a vertical section of the flue gas vent (within 3' of the boiler), to avoid pooling of
condensate. Similar comments apply to the 15-150’s 2-1/2" venting option – see
below. The VFC 45-225 transitions to 3” using the 3” x 2” reducing tee supplied in
its vent kit.
Certain installations of the 15-150 model can employ the 2" vent options. This
would typically involve a 15 lineal foot run up to the ceiling joists and outside,
using perhaps 3 x 90° elbows on each of the exhaust and intake. We do not
recommend horizontal runs using 2" pipe except near the base of the boiler,
upstream of the condensate drain. See Section 1.5 Condensate Removal.
Reason: air friction from the fast moving exhaust at high-fire in a 2" pipe
overcomes gravity on 1/4" / foot vent slope – leaving a pool of condensate at the
next upturned elbow. Pooling can impair the achievement of full high-fire rating
plate performance.
Again for the 15-150 model only, there is a further 2-1/2" vent option that offers
some middle ground – it can be applied to runs of up to 70' equivalent length for
each side, without the limitation on horizontal runs as the for 2" option.
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
If the site requires a horizontal exit immediately below the boiler – bush out
to 2-1/2" or 3" pipe in the downward vertical run immediately below the 2"
threaded adaptor, and elbow to horizontal before splicing in a field sourced
2-1/2" or 3" reducing tee for mounting of the condensate trap; this will slow
the exhaust velocity sufficiently for good drainage and reduce “spitting” at the
vent termination. In this case, the 3" x 3/4" (or 2-1/2" x 3/4") reducing tee would
replace the 2" tee and 2" x 3/4" bushing supplied with the VFC 15-150 boiler.
Exhaust venting must slope down to the trap/drain with a pitch of at least 1/4" per
foot (PPs vent: follow PPs manufacturer requirements for slope) so condensate
runs towards the trap. Support should be provided for intake and vent piping,
particularly so for horizontal runs (follow local code). Insulate exhaust piping
where it passes through unheated spaces or underground, with appropriate pipe
insulation to prevent freezing of condensates.
Ensure all venting components are clean of burrs/debris prior to assembly.
Care is to be taken to avoid ingestion into the fan of PVC/ABS debris left in the
combustion air piping.
All joints must be secured. For CPVC in Canada, use ULC-S636 approved CPVC
solvent cement, in accordance with its manufacturer instructions. Follow the
cement manufacturer’s instructions closely when joining various components.For
PPs, connections shall be secured using approved retainer clips supplied by the
respective PPs manufacturer.
All vent connections must be liquid and pressure tight. Prior to firing the boiler,
and before any of the venting run is concealed by the building construction, the
installer must test the exhaust joints under fan pressure with the vent blocked,
using a soap/water solution. Installer must fill condensate trap prior to test.
Remove the fan control harness plug as illustrated in the photos, and then block
the vent outlet so that the vent run will be under maximum fan pressure. Paint all
joints with an approved leak test solution just as you would joints in a gas line,
and make sure there are no leaks. Good practice would suggest that the installer
attach a tag on the vent line near the condensate drain tee indicating the type of
test, the date and the installer’s name.
1.4.4 Venting Passage Through Ceiling and Floor
• Confirm material meets local codes including fire stopping requirements.
• Pipe clearances - no IBC requirements; follow local codes.
• All piping must be liquid and pressure tight.
Fan control harness plug
Unplugging fan control harness plug
will drive the fan into manual high
speed operation for vent leak test
WARNING
Fill trap with water before
boiler is first fired to prevent
exhaust fumes from entering
room. Never operate the
boiler unless the trap is filled
with water.
Figure 2: Basic exhaust vent assembly
INSTALLATION AND OPERATION INSTRUCTIONS
1-8
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Figure 3: Rooftop vent terminal configurations
1.4.6 Sidewall Vent Termination
Sidewall direct vent applications shall be vented as follows:
• Both the inlet and exhaust terminations should normally be located on the
same plane (side) of the building.
• The exhaust outlet is to be placed so as to reach 24" minimum above the
down-turned intake - to avoid exhaust re-ingestion.
• The elevation of both pipes can be raised in “periscope style” after passing
through the wall, then configured as in Figure 4, to gain required clearance.
1.4.5 Rooftop Vent Termination
Rooftop vents must terminate as follows:
• The exhaust pipe can terminate in an open vertical orientation without
concern about rain infiltration; this will drain away through a properly
configured condensate trap.
• If used, the intake air pipe is not typically drained, so it must be terminated with
a down-turned elbow (see Figure 3). The intake pipe does not need to penetrate
the roof at the same elevation as the exhaust (as shown); lower down roof is OK.
• To promote the projection of exhaust away from the building and from the
intake pipe, reduction of 3" pipe to 2" is permitted for a maximum lineal travel
of 3' (e.g. the final 3') including 2 x 90° elbows on each side.
• Optional bird screen may be placed in a termination fitting. Leave unglued,
and hold in place with a short nipple. This permits easy access for cleaning.
• For roof top venting of multiple boiler sets, group all intake terminals together
for a common penetration through a custom cap. Alternatively, place in the
closest proximity achievable using commonly available pipe flashing. Similarly
group the exhaust pipes and place the 2 separate groups of pipes at least 3'
apart (the closest intake and exhaust pipes shall be 36" - or more - apart).
Use the same 24" (minimum) vertical separation for all termination options.
For alternate group terminations, contact the IBC Factory for written guidance.
• DO NOT exhaust vent into a common venting system.
WARNING
Condensate can cause
corrosion of metal roofing
components and other
roofing materials. Check
with the builder or roofing
contractor to ensure that
materials will be resistant to
acidic condensate. pH levels
can be as low as 3.0
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
• Use a 45° elbow on the exhaust termination to launch the plume up and off
the sidewall, for protection of wall.
• Bird screen of 1/4" stainless steel or plastic mesh is useful to guard against
foreign objects.
To promote the projection of exhaust away from the building and from the intake
pipe, reduction of 3" pipe to 2" is permitted for a maximum lineal travel of 3' including
2 x 90° elbows on each side. This allows for smaller wall penetrations, with sufficient
travel allowance to achieve the minimum exterior configuration as shown above.
For side venting of multiple boiler sets, group all intake terminals together with
4" to 8" lateral spacing, and similarly group the exhaust pipes. Place the 2
groups on the same plane of the building (e.g. north facing wall). Place the 2
groups of pipes at least 3' apart (the closest intake and exhaust pipes shall be
36" - or more – apart. Use same 24" (minimum) vertical separation as displayed
above. Alternately, as long as the boilers are identical models - intake and
exhaust terminals can maintain a minimum of 12” of separation horizontally
from any exhaust or inlet termination of an adjacent boiler. For alternate group
terminations, contact the IBC Factory for written guidance.
Figure 4: Sidewall vent termination - piping configuration
Figure 5: Sidewall vent termination - multiple vent piping configuration
WARNING
It is extremely important to
maintain at least the minimum
separation of exhaust vent
termination from boiler
intake air as illustrated in
Figures 3, 4 and 5. Failure
to do so can result in a
dangerous situation where
exhaust gasses are re-
ingested with combustion
air. Damage to the boiler
can result from a failure to
maintain these separations.
Third party vent termination
kits and concentric wall
penetration kits that do not
maintain these minimum
separations shall NOT be
used. Improper installation
will void the warranty. Do
not use proprietary InnoFlue
or PolyPro PPs sidewall
terminals without specific
written approval from IBC.
INSTALLATION AND OPERATION INSTRUCTIONS
1-10
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Vent terminal clearance minimums are as follows:
• Clearance above grade, veranda, porch, deck or balcony – 12" (0.3m), but
check local code also (anticipated snow levels may supersede).
• Clearance to openable window or door – 36" (0.91m) (USA – 12”)
• Vertical clearance to ventilated sofit located above the terminal within a
horizontal distance of 2’ (0.61m) from the centreline of the terminal.
• Clearance to each side of centreline extended above meter/regulator
assembly: - 3' (0.91m) within a height of 15' (4.6m) above the meter/regulator.
• Clearance to service regulator vent outlet: - 3' (0.91m)
• Clearance to non-mechanical air supply inlet to building or the combustion air
intake to any other appliance: - 3' (0.91m) (USA – 12" (0.3m))
• Clearance to a mechanical air supply inlet: - 6’ (1.82m) (USA - 3’ (0.91m)
above if within 10’ (3.1m) horizontally)
• Clearance above paved sidewalk or paved driveway located on public
property: - 7' (2.2m) Note: Cannot terminate directly above a paved sidewalk
or paved driveway that is located between two single family dwellings and
serves both dwellings
• Clearance under veranda, porch, deck or balcony: - 12" (0.3m). Note:
Prohibited unless fully open on a minimum of two sides below the floor.
• Vents must be installed such that flue gas does not discharge towards
neighbor’s windows, or where personal injury or property damage can occur.
• It is important to ensure proper condensate management from vent terminations.
Condensate shall not be discharged in a manner that will cause damage to
external building finishes or components, or infiltrate the building envelope.
WARNING
In areas of high snowfall,
Users must be advised to
check side wall vent and
air intake terminations on
a regular basis to ensure
blockage does not occur.
Figure 6: Vent terminal clearances
Figure 7: Prohibited installation
Figure 9: Vent terminal clearances
Figure 8: Vent terminal clearances
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
1.4.7 “Direct Vent” Combustion Air Intake Piping
There are two basic methods of supplying combustion air to an IBC boiler.
The direct vent option uses piping from the outside to supply combustion air
directly to the boiler’s combustion air connection.
INTAKE Pipe Size
MaxIMUM EquivAlEnt Length
Sched.40; Rigid PPs
2" (15-150 only)
50' (each side)
2-1/2" (15-150 only)
70'
3" (15-150)
120'
3" (45-225)
240'
90° vent elbow
allow 8' equivalent
45° elbow
allow 3’ equivalent
PPs 87-90° elbow
use 8’ equivalent
Air Intake Filter (Part #103)
allow 8' equivalent
Flexible PPs
2” Flexible
N/A
3” Flexible
60’ maximum (see Note 1)
Table 4: Maximum intake piping length
Note 1: Further vent allowance is available for 3” Rigid Single Wall PPs as
follows: VFC 15-150: up to 30’ equivalent; VFC 45-225: up to 60’ equivalent.
For the inlet air – Schedule 40 PVC, ABS, or PPs piping of any type is permitted.
Use same diameter as Vent pipe, allowing for up to 6 ft actual run of 2” before
any required transition.
Note: It is not permitted to add to the exhaust length by transfer of unused
intake allowance.
WARNING
In addition to preventing
ingestion of chemical
contaminants, care must
be taken to ensure air
intake terminals are not
installed in locations where
contamination might occur
due to ingestion of particulate
foreign material (dust, dirt
and debris).
Figure 10: Direct vent - intake, exhaust and condensate removal system
NOTE
Care must be taken when
installing air intake piping to
ensure that a “trap” is not
formed in the piping so as to
allow a build-up of water, and
blockage of intake air.
Such blockage will result in a
boiler safety shut-down.
WARNING
Intake air openings must be
configured such that rain
or other forms of moisture
cannot enter the air intake
piping system. Otherwise
serious damage to the boiler
may result.
INSTALLATION AND OPERATION INSTRUCTIONS
1-12
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Combustion air piping is connected at the base of the boiler using a standard 2”
PVC (ABS) coupler or elbow and run horizontally or vertically to the outdoors.
Screen material can be placed at the inlet as appropriate for the environment
(e.g. insects, dust).
For 3” piping, a 3”x 2” bushing is to be used in the inlet piping within 3 feet of
the combustion air line clearance hole at the base of the boiler. Such 3’ interval
of 2” pipe can be treated as 3” pipe without reference to its smaller diameter in
calculation of the maximum allowable vent travel distance. All elbows and tees at
the base of the boiler and at the termination must be included in the calculation.
Care must be taken to ensure adequate separation is maintained between the
air intake inlet and the vent terminal. Refer to the vent terminal configuration
drawings in the Vent Termination section above.
Support should be provided for intake piping, particularly so for horizontal runs
(follow local code).
1.4.8 “Indoor Air” Combustion Air Intake Piping
An “Indoor Combustion Air installation”, as described herein, is one in which air
for combustion is taken from the ambient air around the boiler.
To support combustion, an ample air supply is required. This may require
direct openings in the boiler room to the outside. If the boiler is not in a
room adjacent to an outside wall, air may be ducted from outside wall
openings.
Provisions for combustion and ventilation air must be made as follows:
• in the USA, in accordance with the National Fuel Gas Code, ANSI Z223.1
(latest edition), or applicable provisions of the local building codes
• in Canada, in compliance with B149-10.
Figure 11: Indoor air - intake, exhaust and condensate removal system
WARNING
When using Indoor
Air options, adequate
combustion air must be
supplied to the boiler room
according to the requirements
of all applicable codes.
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Air intake filter IBC Part # 103
1.4.9 Combustion Air Filtration
If combustion air contamination from ingested particulate matter may be a
concern in any installation, an optional air intake filter may be installed. IBC
supplied air intake filters have a known pressure drop and fouling factor and
should be used as a component of the combustion air system according to the
allowable intake length in Table 4.
1.4.10 Closet Installations
For installations in a confined space (such as a closet), ventilation openings may
be needed through a door or wall to prevent excessive heat from building up
inside the space.
The boiler shall not be exposed to ambient conditions above 122°F (50°C) or
below 32°F (0°C).
NOTE
Combustion fan
blockages can occur when
environmental particulate and
foreign matter contaminants
(leaves, dust, dandelion &
cottonwood fluff, etc) are
drawn into the air intake. In
areas where this problem is
suspected to be an issue,
our optional air intake filter
should be installed.
Filters should be checked
and cleaned or replaced on
a regular schedule based on
the severity of the problem.
Figure 13: Direct vent - intake, exhaust and condensate removal system with optional air
intake filter (filtration may also be used on indoor air applications as required)
Figure 12: Optional air intake filter
IBC Part #103 - Filter element alone
is IBC Part #104
INSTALLATION AND OPERATION INSTRUCTIONS
1-14
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
CONDENSATE REMOVAL
IBC’s specified vent configuration promotes the safe drainage of moisture from the
boiler and exhaust venting without flowing liquids back through the heat exchanger
(as done by other condensing boilers). Reliable system operation requires (1)
proper design and installation of exhaust venting to allow condensate to run back
to the drain/trap; (2) proper trap depth to handle maximum potential pressure within
the vent, and (3) acid neutralization as appropriate. To achieve these:
1. Allow for a 1/4” per foot slope back to the trap connection, with appropriate
hangers to maintain that gradient; do not use 2” pipe on horizontal runs - air
friction from the fast moving exhaust at high fire in a 2” pipe can overcome
gravity even with the specified slope, leaving a pool of condensate at the
next upturned elbow; do not transition between pipe diameters on horizontal
vent runs – always place any reducing couplers in the vertical run)
2. Ensure a trap is established as described below.
3. When required, add (and maintain in good condition) a neutralization tank.
1.5.1 Condensate Trap
When installling the condensate trap, please take into account the following:
• Must be piped to within 1” of a drain or be connected to a condensate pump.
• Drainage line must slope down to the drain at a pitch of 1/4” per foot so
condensate runs towards the trap
• If necessary, the drain connection tee can be laid so the main axis is
horizontal; ensure the drain tee is as close as possible to the vent riser to
avoid water bypass and pooling.
• Most installers prefer to run the combustion air intake pipe alongside the vent,
both to the left side of the boiler to keep the area right of the unit clear for
system water piping.
• Use the supplied PVC unions for easy access for cleaning. Locate on the
vertical legs as per Figures 15 and 16. Earlier installations may have a single
union at base of the trap (as shown in Figure 14).
• Condensate traps should be checked every 2 months, and cleaned and
refilled as necessary.
WARNING
If condensates are to be
discharged into building
drain piping materials that
are subject to corrosion, a
neutralization package must
be used.
WARNING
Fill trap with water before
boiler is first fired to prevent
exhaust fumes from entering
room. Never operate the
boiler unless the trap is filled
with water.
Failure to comply will result
in severe personal injury or
death.
CAUTION
When a condensate
neutralization package
is installed, the pH of the
condensate discharge must
be measured on a regular
schedule to ensure the
neutralizing agent is active
and effective.
1.5
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
1.5.1.1 With Schedule 40 Plastic Venting Systems
(e.g. ULC-S636 CPVC)
A condensate trap must be installed near the base of the boiler as shown in Figures
14 or 15. The trap is formed using PVC pipe, elbows and threaded union fittings.
Note: for CPVC vent systems, the connecting tee and bushing should be
formed using CPVC, transitioning to PVC in the wetted section of the trap, where
non-ULC-S636 materials are allowed as this section is not in contact with flue
products. The trap must be installed as follows:
• For the 15-150 model, must be 7” min in height (see Figure 14); with the
conventional vent kit parts supplied with the boiler, approximately 15”
clearance below the boiler is required. For the 45-225 model, the trap shall
have an effective minimum depth of 16” (up to 24” below may be required;
this can be achieved using a conventional drop as shown below or a ball trap
assembly of similar properties).
• Use the supplied vent kit parts to establish the trap in the location shown
below. Do not place the drain connection tee directly at the base of the boiler.
Figure 14: Condensate trap configuration (single union option shown)
Figure 15: Condensate trap
configuration (double union option
shown)
Figure 16: Condensate trap
disassembly for cleaning
INSTALLATION AND OPERATION INSTRUCTIONS
1-16
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
1.5.1.2 With PPs Venting Systems
A condensate trap must be installed on the drain connection at the base of the
boiler as shown in Figure 17. Please follow the installation instructions below:
1. Undo Drain Spout Compression Nut (E), remove Drain Hose (G) from Trap
Drain Outlet (F). Place Vacuum breaker cap (J) over the Vacuum breaker
opening and push firmly home. Remove Upper Compression Nut and
Washer (C) and slide over Boiler Drain Outlet (A). Insert one Trap Hook barb
into the back mounting hole.
2. Fill Trap with water, and slide Trap Body (D) over Boiler Drain Outlet (A).
Swing Trap Hook (B) around the Drain Outlet (F) connection threads. Insert
remaining Trap Hook barb into the front hole. Pull the trap slightly downward
to seat it against the hook and tighten Upper Compression nut (C).
3. Attach Drain Hose (G) and tighten Drain Spout Compression Nut (E).
Figure 17: Condensate trap
installation
WARNING
The Trap Hook must be
installed as instructed and all
trap fittings must be tightened
as instructed to prevent
leakage of flue gasses.
Failure to comply may result
in severe personal injury or
death.
Condensate Trap as shipped
Condensate Trap, disassembled
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
1.5.3 Condensate Trap
Assembly - cleaning
procedure
1. Turn off the power to the boiler
and allow it to cool down.
2. Remove the trap from the boiler
(reverse the installation procedure
above).
3. Remove the Trap Cleanout
Assembly (H), from the Trap Body
and clean and flush the debris out.
4. Re-assemble trap components,
re-fill trap, and replace on boiler
as described in the installation
instructions above.
1.5.4 Further installation details
• Condensate drain must be piped to within 1” of a drain or be connected to a
condensate pump.
• Drainage line must slope down to the drain at a pitch of 1/4” per foot so
condensate runs towards the drain.
• Condensate traps should be checked every 2 months, and cleaned and
refilled as necessary.
NOTE
It is the responsibility of
the installing and/or service
Contractor to advise and
instruct the end User in how
to perform the Trap cleaning
procedure, and to advise
that the Trap be checked at
least every two months and
cleaned as required.
INSTALLATION AND OPERATION INSTRUCTIONS
1-18
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Figure 19: Condensate trap drainage
Figure 20: Condensate neutralization tank
WARNING
If condensates are to be
discharged into building
drain piping materials that
are subject to corrosion, a
neutralization package must
be used.
CAUTION
When a condensate
neutralization package
is installed, the pH of the
condensate discharge must
be measured on a regular
schedule to ensure the
neutralizing agent is active
and effective.
Figure 18: Condensate trap
disassembly for cleaning
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Water Piping
1.6.1 General Piping Issues
The VFC modulating series boilers are designed for use within a closed loop,
forced circulation, low pressure system. A 30 psi pressure relief valve (3/4" NPT)
is supplied for field installation in the flow supply line – see below. An optional 75
Psig relief valve can be used where required on closed loop systems within multi-
level buildings. Relief valve discharge piping must terminate between 6" (15cm)
and 12” (30cm) above the floor using plain un-threaded end, or per local Code.
System piping is connected to the boiler using the 1-1/4" NPT-M threaded fittings.
Unions and gate or ball valves at the boilers supply and return water connections
are recommended to simplify servicing. Un-insulated hot water pipes must be
installed with a minimum 1" clearance from combustible materials.
Fluid fill is most often accomplished by using a boiler regulator & fill valve set
at 12 psig or more, with appropriate backflow prevention device as required by
local code. This is acceptable in areas where municipal water or well water has
been treated and filtered to remove excessive minerals and sediment, and water
chemistry is known to be suitable for closed loop hydronic systems. In areas where
water quality is in question, or when chemical treatment or glycol is required, other
options should be considered. Follow applicable Codes and good piping practice.
There are a number of boiler feed and pressurization devices on the market
today that may be a better choice than a raw water fill from the mains. When
regular maintenance requires relief valve blow-off, the discharge may be directed
back into the pressurization unit for recycling of boiler fluid and chemicals
back into the system. In buildings that may be unoccupied for long periods of
time, pressurization units are useful to prevent flood damage should leakage
occur from any component in the system. An additional benefit is that backflow
prevention devices are not required when using these devices.
Figure 21: Boiler trim options
CAUTION
Installers should inquire of
local water purveyors as to
the suitability of their supply
for use in hydronic heating
systems.
If water quality is
questionable, a local water
treatment expert must
be consulted for testing,
assessment and, if required,
treatment.
Alternatively, water or
hydronic fluid of known
quality can be brought to the
site.
WARNING
During operation, the relief
valve may discharge large
amounts of steam and/or hot
water. Therefore, to reduce
the potential for bodily
injury and property damage,
a discharge line MUST be
installed that it:
1. is connected from the valve outlet
with no intervening valve and
directed downward to a safe point of
discharge.
2. allows complete drainage of both the
valve and the discharge line.
3. is independently supported and
securely anchored so as to avoid
applied stress on the valve.
4. is as short and straight as possible
5. terminates freely to atmosphere
where any discharge will be clearly
visible and is at no risk of freezing.
6. terminates with a plain end which is
not threaded.
7. is constructed of a material suitable
for exposure to temperatures of
375°F or greater.
8. is, over its entire length, of a pipe size
equal to or greater than that of the
valve outlet.
DO NOT CAP, PLUG OR OTHERWISE
OBSTRUCT THE DISCHARGE PIPE
OUTLET!
1.6
INSTALLATION AND OPERATION INSTRUCTIONS
1-20
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Do not place any water connections overhead the boiler; leaks can damage
the fan & controls. If needed, create a shield over the louvered top of the cover,
but allow clearance for airflow and service access.
For best results, use a Primary: Secondary piping system, with a pumped
boiler loop using 1-1/4" piping for the 15-150 and 1 1/2” for the 45-225. Heat
exchanger head for both models is approx. 7' at 14 gpm, and 12’ at 22 gpm
so an inexpensive fractional horsepower pump is normally adequate. Primary/
Secondary piping ensures adequate flow and de-couples Δ°T issues (boiler vs.
distribution). Aim for a 20° to 30° F Δ°T across the heat exchanger at high fire
(there is a boiler protection throttle fence limiting the Δ°T to 35°F).
WARNING
Close fill valve after any
addition of water to the
system, to reduce risk of
water escapement.
NOTE
Full sized application
drawings can be downloaded
from our web site.
www.ibcboiler.com
Table 5 - pump sizing - deleted; consult IBC Shop drawing information
Figure 22: Basic Primary/Secondary piping concept
Figure 23: Important Primary/Secondary piping details
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
The VFC modulating series boilers are designed to supply three different
heating loads with temperatures within the range 34°F to 185°F - to meet three
separately piped loads. Use closely spaced tees to connect each pumped “load”
(e.g. DHW, baseboards or radiant floor) to the primary loop, or employ the use
of a hydraulic separator to isolate the boiler loop from the system and pipe the
system from the secondary side of the separator.
A variety of application drawings showing basic design options are available from
the IBC web site at: www.ibcboiler.com
Always ensure that loads sensitive to high temperatures are protected using
means such as an aquastat (wired to the boiler’s auxiliary interlocks) or mixing
valve set for maximum limit (say 140°F) to protect radiant floors.
Figure 25: Important Primary/Secondary piping details with hydraulic separator
Figure 24: Primary/Secondary piping concept with hydraulic separator
INSTALLATION AND OPERATION INSTRUCTIONS
1-22
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
PRESSURE VESSEL HEAD
Flow rate (gpm)
4
8
12
16
20
Head @ flow (ft wc)
0.7
2.5
5.0
8.3
12.3
Table 6: Pressure Vessel Head
Ensure the pump is rated for the design circulating water temperatures; some
pumps have a minimum water temperature rating above the low temperature
potential of the boiler. Following installation, confirm actual performance by
measuring Δ°T (under high and low flow conditions) after establishing the correct
firing rate.
We require waterflow after burner shutdown to utilize legacy heat – this is
significant due to the mass of the heat exchanger (40 Kg) plus its 9L internal water
volume. Default software values will run the boiler’s primary pump for up to 5
minutes (300 seconds) after burner shutdown. Secondary pumps can be set to run
up to 5 minutes after burner shutdown (for the last calling load). As shipped, the
default software will run the Load 3 / DHW pump for 5 minutes to place the legacy
heat where it is useful – e.g. in the DHW tank. Any secondary pump can be set
to run for 0 – 300 seconds in the heat purge mode. Guard against deadheading
pumps when all zone valves are closed (see Section 2.7 Set Up & Load Definition).
The primary pump must be under the control of the boiler, to allow the boiler’s
flow proving routine to run. The boiler control looks for flow/no flow during a
pump on / off check on each start up. Ensure that temporarily wired primary or
secondary pumps (e.g. wired externally during the system fill/purge phase) are
returned to the boiler’s control terminals. A “No Water Flow” error message will
otherwise be experienced on start-up.
There are two water pressure sensors, located on the boiler’s supply and return
water piping. These act to provide both low water pressure and low water level
cut-off protection and water flow measurement. Schematics for several piping
layouts are provided, and additional drawings are available at www.ibcboiler.com.
Installers shall conform the piping design to one of the provided configurations to
simplify the control application, promote good loads-and- flows management.
The VFC modulating series boilers offer unparalleled matching of heat generation
to radiation. The low minimum firing is better suited to low thermal loads
presented in a typical multi-zoned radiation system. However, where individual
zones in a heating system have loads under 5,000 Btu/hr, the system will still
benefit through use of a buffer tank to ensure a controlled supply temperature,
and to prevent short cycling. Buffering should be added on the secondary piping
of the relevant load, to avoid bulking up the thermal mass of the primary piping
circuit (and potentially lengthen the duration of the transition from hot to cool
loads).
Propylene glycol solution is commonly used in a closed loop where freeze
protection is required. Its density is lower than that of water, resulting in
lower thermal performance at a given flow and pressure. As a rule of thumb,
a 50%:50% solution of propylene glycol and water will require an increased
system circulation rate (gpm up 10%), and system head (up 20%) to provide
performance equivalent to straight water.
VFC modulating series boilers can be connected directly to a floor of non-oxygen
barrier polybutylene material (PB tubing). For maintenance of warranty on such
systems, we require evidence of a thorough flushing of all loops, plus installation
of a dirt separator or side stream filter. A separator/filter maintenance routine
NOTE
The Primary (boiler) pump
must be under the control
of the boiler and wired to
the correct yellow and white
wires labelled “Primary” in
the wiring box.
Failure to do so will result
in a no heat condition as the
boiler will interrupt start-up
with a “No Water Flow” error.
WARNING
Do not use automotive-type
ethylene or other types of
automotive glycol antifreeze,
or undiluted antifreeze of
any kind. This may result
in severe boiler damage. It
is the responsibility of the
Installer to ensure that glycol
solutions are formulated to
inhibit corrosion in hydronic
heating systems of mixed
materials. Improper mixtures
and chemical additives may
cause damage to ferrous and
non-ferrous components as
well as non-metallic, wetted
components, normally found
in hydronic systems. Ethylene
glycol is toxic, and may be
prohibited for use by codes
applicable to your installation
location. For environmental
and toxicity reasons, IBC
recommends only using non-
toxic propylene glycol.
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
shall be carried out after the retrofit, with filter clearing after the 1st day, 1st week,
month and annually thereafter. Care is to be taken to avoid use of ferrous fittings
and pumps on PB tube systems.
1.6.2 Installation Rules
Note: The Boiler Trim element – common to each of the following systems
- includes the pressure relief, fill, expansion tank and air bleed elements. The
primary pump can be located on either the Supply or Return piping sections.
Features of the preferred Primary / Secondary piping system:
1. Good circulating water flow through the boiler irrespective of load or radiation
system head
2. Allows flexible ΔT° control in secondary loops
3. Adds to the system’s thermal buffering, to assist in handling small loads and
temperature transition.
This piping configuration requires an extra pump. The VFC modulating series
boilers’ controller hosts wiring terminals and integral relays to simplify installation
and operation of this preferred layout, offsetting such costs.
For optimal performance, place pumps on the supply side of secondary loops
to facilitate air evacuation. Use pumps with internal check valves to avoid ghost
flows and thermal siphoning.
The primary loop temperature may need to transition from a 180°F domestic water
heating load to a 100°F radiant floor requirement. The secondary pumps will swap
off/on simultaneously, provided the pre-set maximum allowable temperature of the
Figure 26: Basic Primary/Secondary, 3 load piping concept
NOTE
This piping drawings in this
manual are simple schematic
guides to a successful
installation. There are many
necessary components not
shown, and details such as
thermal traps are left out so
the drawings have greater
clarity. We require that
our boilers be installed by
licensed and experienced
trades people who are familiar
with the applicable local
and national codes. System
design is to be completed
by an experienced hydronic
designer or Engineer. It is
necessary to carefully read
and follow these installation
instructions along with the
application drawing that fits
your system.
INSTALLATION AND OPERATION INSTRUCTIONS
1-24
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
new load is not exceeded. In the case of the typical maximum limit for a radiant
floor (most would enter 140°F); the floor pump would remain off, the boiler shut
down, leaving primary circulation on until the primary loop temperature drops into
the acceptable range for the floor. Temperature sensing is done using thermistors
at the boiler supply and return – no further sensors need to be installed.
The use of the multi-temperature modulating system is optimized when the need
to shutdown the boiler is reduced or eliminated during the transitional period.
System design enhancements: (a) keep a relatively low thermal mass in the
primary loop, and (b) incorporate a 3-way mixing valve on the “cool” load piping.
If the installation involves small loads, as in typical zoned baseboard heating
applications, use of a buffer tank is recommended. To aid in temperature
transition from hot to cool loads, a 3-way mixing valve can be placed at the
entrance to the cool load (this will also provide floor protection). This will permit
immediate circulation of mixed flow into the cool loop. See separate publication
Application Notes for more detail (available at www.ibcboiler.com or from your
IBC Representative).
Always ensure that loads sensitive to high temperatures (e.g. radiant floor)
are protected using appropriate means such as a manual mixing valve, or an
aquastat (set to130°F, for example) wired to the boiler’s auxiliary interlocks.
Compared with the Primary/Secondary approach, the above design saves one
pump. Lost is the simplicity of constant head and flow at the boiler, with reduced
flexibility in the handling of large temperature differentials. Wiring: loop the yellow
& white “Primary Pump” pair up to connect to the lowest pair of contacts on
the green Pump/Valve terminal block. Then connect the two load pumps to the
chosen Load 1-2-3 contacts on the same green terminal block.
Check valves or thermal traps should be used to isolate both the supply and
return piping for each load - to avoid thermal siphoning and reverse flow.
To ensure adequate water flow through the boiler under high-head / single zone space
heating conditions, a pressure activated bypass or other means of bypass must be
used on any load where the flow rate might drop below minimum requirements (4 gpm
for the 15-150, 8 gpm for the 45-225).
Figure 27: Two pump, two load - parallel piping concept
NOTE
When using the sequential
load feature of the IBC boiler,
attention must be paid to
the operation of system
components in order to
ensure they are compatible.
Many air handlers (fan
coils) for instance have a
thermostat connection that
will energize an internal relay
to operate the air handler
circulator and its fan on
a call for heat. This may
result in operation of these
components when other
loads are running at a higher
priority, resulting in cold air
blowing, or robbing heat from
another load.
Some wiring alteration may
be required to divorce both
of these functions from
thermostat control in favour
of more effective control from
the IBC boiler.
NOTE
For information and details
regarding Multiple Boiler
application, consult our
Technical Notes - Multiple
Boiler Systems. These notes
provide necessary detail on
specific single and multiple
boiler applications “Piping”,
“Wiring” and “Settings”.
(available at www.ibcboiler.
com or from your IBC
Representative).
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
For further information and details, consult our Application Notes – which provide
detail on specific single and multiple boiler applications “Piping”, “Wiring” and
“Settings”. (available at www.ibcboiler.com or from your IBC Representative).
Gas Piping
The boiler requires an inlet gas pressure of at least 3.0" w.c. for natural gas or
propane. For either fuel, the inlet pressure shall be no greater than 14.0" w.c.
Confirm this pressure range is available with your local gas supplier.
The inlet gas connection of the boiler’s gas valve is 1/2" NPT (female).
Adequate gas supply piping shall be provided with no smaller than 1/2" Iron Pipe
Size (IPS), in accordance with the following chart:
Model
1/2" IPS
3/4" IPS
1" IPS
VFC 15-150 (Natural Gas)
10
40
130
VFC 15-150 (Propane)
50
180
620
VFC 45-225 (Natural Gas)
5
20
60
VFC 45-225 (Propane)
25
90
290
Table 7: Maximum Pipe Length (ft)
Gas piping must have a sediment trap ahead of the boiler’s gas valve (see Figure
28). A manual shutoff valve must be located outside the boiler, in accordance with
local codes/standards. All threaded joints in gas piping should be made with an
approved piping compound resistant to the action of natural gas/propane. Use
proper hangers to support gas supply piping as per applicable codes.
The boiler must be disconnected or otherwise isolated from the gas supply
during any pressure testing of the system at test pressures in excess of 1/2 psig.
Dissipate test pressure prior to reconnecting. The boiler and its gas piping shall
be leak tested before being placed into operation.
The gas valve is provided with pressure taps to measure gas pressure upstream
(supply pressure) and downstream (manifold pressure) of the gas valve (see
Figure 31). Note that manifold pressure varies slightly in accordance with firing
rates with the modulating series boilers, but will always be close to 0” w.c.
1.7
Figure 28: Typical gas piping
NOTE
Due to the precision of
modern modulating boilers
it is important to pay special
attention to gas pressure
regulation.
It is essential to check gas
supply pressure to each
boiler with a manometer or
other high-quality precision
measuring device. Pressure
should be monitored before
firing the boiler, when the
regulator is in a “lock-
up” condition and during
operation, throughout the
boiler’s full modulation range.
Pay special attention to
retrofit situations where
existing regulators may have
an over-sized orifice and/or
worn seats, causing pressure
“creep” and high lock up
pressures.
A high quality regulator will
maintain constant pressure
above the boiler’s minimum
specification at all firing
rates, and will not exceed the
boiler’s maximum pressure
rating when locked-up with no
load.
INSTALLATION AND OPERATION INSTRUCTIONS
1-26
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Removing wiring box cover
Line voltage leads for power supply,
primary pump and variable speed
output
Line voltage load pump terminal
strip
Electrical Connections
All Electrical wiring to the boiler (including grounding) must conform to local
electrical codes and/or National Electrical Code, ANS/NFPA No. 70 – latest
edition, or The Canadian Electrical Code, C22.1 - Part 1.
1.8.1 120VAC Line Voltage Hook-up
Line-voltage wiring is done within the field-wiring box. (Refer to Section 6.2.Wiring
Diagram on page 6-4). Connect the boiler to the grid power using a separate, fused
circuit and on/off switch within sight of the boiler. Use 14-gauge wire in BX cable or
conduit properly anchored to the boiler case for mains supply and pump circuits.
Connect a 120 VAC / 15 amp supply to the “AC IN” tagged leads in the wiring box.
The max. actual draw (with 4 typical residential size pumps) is less than 4 amps.
If primary / secondary piping is used, with pumps to manage multiple loads, add
a 12” pigtail to bring 120v to the bottom pair of contacts on the Pump/ Zone Valve
Terminal Block located on the upper right-hand edge of the controller. The upper
3 pairs of contacts on this green connector strip are then powered to manage up
to 3 load pumps – the top pair for Load 1, the second pair for #2 etc. Once the
controller is programmed for the respective loads, the boiler will manage all the
loads without need of further relays (OK for loads up to 1/3 HP; for more – use a
protective relay). The green Pump/Valve terminal strip is not pre-wired because
some installations will use it to manage 24 v zone valves.
The primary pump is connected to the White/Yellow pair labeled Primary Pump.
This lead is factory wired to the controller (and its 120 VAC supply) at the upper
right backside of the controller board – do not attempt to connect the primary
pump to the Pump/Zone Valve Terminal Block along the controller’s right edge
- this is for the secondary pumps and/or zone valves only. Connect the pump’s
Black wire to the Yellow of this pair (switched Hot). The White/ Yellow pair should
be individually capped if the primary pump does not obtain its power from this
pair (e.g. if a variable speed primary pump is connected to the mains power).
If a parallel pump piping configuration is used rather than primary/secondary,
loop the White/Yellow Primary Pump pair up to connect this to the lowest pair
of contacts on the green Pump/Valve terminal strip, then connect the two load
pumps in the normal way – this will bring power to the pump control block.
Pumps can be switched on/off using the keypad, so there is no need for
temporary pump wiring during system filling / air purging. If pumps are
hard-wired to the panel during the system fill/purge phase, re-wire the
boiler pump to the Primary Pump leads inside the wiring box, to enable the
water flow proving routine to run.
In a new construction application- use a construction thermostat – or jumper
with in-line on/off switch – for on/off management of the boiler. Do not
just pull power from the unit, or its moisture management routine will be
interrupted (fan turns at ultra low rpm for 90 minutes after burner shutdown).
Treat it like a computer, where you do not just pull the plug when done. If an
“Insufficient airflow / check vent” error signal shows, check for (and remove) any
water in the clear vinyl air reference tubes. This has been seen occasionally at
construction sites where the boiler has been repeatedly de-powered wet.
The combined current of all pumps connected through the on-board pump relays
should not exceed 10 amps.
1.8
CAUTION
The internal pump relays
in the IBC control have a
maximum rating of 5 Amps or
1/3 H.P. each, with a maximum
total allowable draw of 10
amps.
Isolation contactors MUST be
used if electrical loads exceed
these maximums.
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
1.8.2 Power Quality and Electrical Protection
The control board (for all models) is protected using in-line field replaceable
fuses of 5 amp (slow-blow). The control circuit board is further protected using
on-board factory repairable fusing.
The principal exposures to electrical damage:- (a) when wiring of pumps to the
boiler’s pump terminals, avoid screwdriver contact with the metal control cover;
(b) avoid water or solder spray onto fan motor circuitry.
1.8.3 Zone Valve Hook-up
If zone valves rather than pumps are used to manage multiple heating loads, then
24VAC for the zone valves should be provided to the power contacts on the Pump/
Zone Valve Terminal Block. Use a separate transformer – the 40VA unit inside the
wiring box is for internal systems only. The individual load/zone valves are then to
be wired to their associated contacts on the secondary pump/zone valve connector.
Do not confuse such “load/zone valves” with similar valves used to segregate a
single load type (e.g. those used on a zoned radiant floor) – see next section.
1.8.4 Thermostat / Sensor Wiring
Dry contacts for thermostats for each of 3 loads are provided as marked on the
lower / orange connector strip (e.g. “Therm 1”). Gang lines from a multiple-zoned
load (e.g. off the end-switches for each radiant floor zone) to present a common
thermostat signal to the controller. Ensure there are no disturbing influences
on the call-for-heat lines - e.g. no coils to switch an air handler motor. Where
these zone valves are of a non-isolated 3-wire configuration, the zone valve end
contacts must be isolated from the load’s controller thermostat terminal using an
appropriate relay. Required input for enabling the IBC boiler is a dry / mechanical
contact; ensure that triac or other parasitically-powered units are not used.
1.8.5 Other Wiring
Other optional low voltage connections to the control board include:
• Two auxiliary interlocks - for external safety devices as may be required by
some jurisdictions, such as a low water cut-off or a low gas pressure cut-out
(for off-grid propane). A floor-protecting aquastat can use one of these, to
cause a full boiler shutdown in the case of excess floor temperature.
• Contacts for indoor and outdoor temperatures sensors associated with Reset
Heating. A 10K ohm thermister for outdoor reset sensing is supplied with the
boiler, to encourage use of this temperature compensating space heating
technique for improved comfort and combustion efficiency.
• One pair for a DHW tank sensor. Connect to “DHW S” (not the respective
Therm. 1,2,3 location) and the boiler will automatically notice and go to a
smart DHW routine
• One pair of contacts for remote secondary loop temperature control.
• One pair (marked BoilerNet) for network connection – this is used for
connecting multiple VFC modulating units for autonomous staging. See
separate Technical Memo for guidance.
• A final pair of contacts, to receive a 0-10VDC (default) or 4-20 mA signal
from an external boiler controller- for direct throttle control. The boiler’s own
sensors act as high limits only. User must enter maximum and minimum boiler
supply temperatures.
Terminal Strip for:
• Thermostat/switch Inputs
• Sensor inputs
• Auxiliary Interlocks
• Network Wiring
• External Control Signal
NOTE
The IBC control only
recognizes a true dry contact
closure as a call for heat on
terminals “Therm. 1, Therm. 2
or Term. 3. Thermostats and
other devices that use a “Triac”
output cannot be used as a call
for heat without the installation
of an intervening relay with dry
contacts to connect to the IBC
terminal strip.
NOTE
The IBC boiler (like any
modern appliance that
contains electronic
equipment), must have a
“clean” power supply, and is
susceptible to power surges
and spikes, lightning strikes
and other forms of severe
electrical “noise”. Power
conditioning equipment
(surge protectors, APC or
UPS devices) may be required
in areas where power quality
is suspect.
DANGER
Do not connect thermistor
sensors to “Therm” terminals.
An overheating hazard can
result in serious personal
injury and/or property damage.
INSTALLATION AND OPERATION INSTRUCTIONS
1-28
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Note: Sensors connected to any sensor input contacts must be of NTC
Thermister - type with a resistance of 10,000 ohms at 25°C and β = 3892. We do
not recommend using 3rd party supplied sensors. Compatible water temperature
sensors and outdoor sensors can be supplied by your IBC distributor.
1.8.6 Thermostat Heat Anticipator
IBC “Therm.” contacts draw no power, so an anticipator setting for the thermostat
is not applicable with the VFC modulating series boilers. In the case of a single
temperature / heat load where zone valves are used to manage individual
thermostatically controlled zones, each room thermostat’s heat anticipator should
be adjusted to the current draw of its associated zone valve.
Figure 29: Electrical Wiring Connections (full page ladder diagram at back of this manual)
A 2.5 mm Slot screwdriver is
required for the bottom terminal
strip. Broader or narrower blades
may damage the terminal screws.
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
BOILER SYSTEMS AND OPERATION
2.0
2.1
GENERAL
VFC modulating series boilers are designed to service three separate, directly
piped heating loads using different pre-selected water temperatures and heat
regulation routines. External controls can extend applications.
The control is outfitted to provide for outdoor reset, set point regulation and DHW.
The design objective is DHW plus radiant floor and baseboard space heating,
each operable at a unique temperature.
While the three load “channels” are shipped pre-programmed with default values,
they can each be programmed with DHW, set-point control or outdoor reset
parameters (see Section 2.7 Set Up and Load Definition). The strategy is to
deliver high temperature water, as required by most indirect DHW tanks on the
market, and by finned tube baseboards, but default to the lowest possible boiler
supply temperature to maximize efficiency. The VFC modulating series boilers
can handle supply temperatures within the range 34°F to 185°F.
CONTROL
The control unit provides overall management of boiler operations, including:
1. Power-up / set-up / boiler state machine (standby / heat call management
etc).
2. Burner, pumps (primary + external) and/or zone valve management.
3. Temperature and throttle operation.
4. Maintenance of a service log with diagnostics.
5. 2 way communications.
Operating and historical data may be accessed at any time, using the Log and
Advanced Settings fields, available using the permanently lit LCD screen. See
below. Data includes the following:
• Ignition counter
• Time records, including burn time by load and the throttle duty cycle
• Error log
USER INTERFACE
2.3.1 Keypad Functions
A five button keypad is provided for intuitive navigation around the screen. The
four outer keys are used to move the cursor up or down, and side to side. The
centre button is used to make selections and confirm inputs. The left hand key
is also used to back-step to the previous screen; multiple key stokes are used to
withdraw back to the operating status screen.
2.2
WARNING
If the boiler can become
exposed to fluid temperatures
below 34°F (1°C), a method of
protection to prevent freezing
of condensate should be
employed. Contact the factory
for further information.
2.3
INSTALLATION AND OPERATION INSTRUCTIONS
2-2
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
2.3.2 LCD Display
Upon power-up, the LCD screen initially flashes a software release number
then switches to a Standby- display mode, showing real time data plus key
temperature target settings.
When there is a call for heat from any load, that load is identified at the Status
line (e.g. Heating – RFL (for radiant floor) in place of Standby). The Target
temperature for the relevant load is conspicuously displayed while that load is
being handled.
Note: The Status line displays those loads that are heating or calling for
heat. In this instance (“Heating 3DHW”), Load 3 has been set up as DHW and
is actively heating, with no other loads calling for heat. If you saw (“Heating
3DHW C:1RFL”), it would indicate Load 3 DHW is actively heating, while Load
1 (Radiant Floor heating with Reset) is shown as requiring heat but awaiting its
turn. If a third load has been implemented and is also calling, the Status line
display would expand to show the relevant details.
Legend:
• RFl: Radiant Floor with Reset
• CIR: Cast Iron Radiators w/ Reset
• BBd: Baseboards w/ Reset
• AIR: Air Handler w/ Reset
• StP: Set Point
• DHW: Domestic Hot Water
Other information is accessible using a menu based system – described in the
following sections.
ACCESS LEVELS
The controller provides for the display of further information (via the Load
Status Screen) plus three levels of access for the adjustment of control settings.
This is done to simplify the control interface for the user while retaining field
access to the full functionality of the system for the appropriately trained
heating professional. The split access feature offers a layer of security against
adventurous “finger trouble”, including accidental adjustment to settings that could
lead to inefficient operation (e.g. excessive cycling) or dangerous conditions.
To access the Main Menu, touch any key. Move the cursor up or down using the
top and bottom keys.
The Load Status Screen offers a comprehensive summary of all settings and
actual readings for each heating load, eliminating a need to jump between
screens while doing an extended watch of boiler operation.
Note: where the word “more” is displayed at the bottom or top of a screen, it is
possible to see more lines by moving the cursor in that direction.
2.4
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
2.4.1 User setup
The occupant has access to a number of practical settings. The most meaningful
include adjustment of the indoor temperature target plus the temperature setback
and occupied / unoccupied modes. The User Menu also provides access to the
time & date fields, provides the means to toggle between C° / F° plus allows
adjustment of the screen image itself (“Contrast Adjustment”).
2.4.2 Installer Setup
The installer has access to all “User” adjustable fields plus a much wider
selection of inputs. Loads can be declared and configured, with temperature
settings appropriate to the characteristics of the heating system.
Key issues here are selection of appropriate boiler supply temperature criteria for
the type of emitter, and the establishment of practical temperature differentials
(e.g. DHW tank target vs. boiler supply). A record of the service history is also
available for onscreen access.
2.4.3 Advanced Diagnostics
Not an access level, this field allows a view into detailed sensor readings and
operating parameters such as fan rpm. This screen is useful for advanced
troubleshooting of pressure sensors, etc.
2.4.4 Advanced Setup
This access level is set for the sole use of factory representatives and is
permanently password protected.
2.4.5 Passwords
A Password access feature is loaded on the controller, for use in situations where
there is exposure to unauthorized and / or uneducated adjustment. The installer
is encouraged to consult with the user to determine the need for ongoing access
to settings. In risk situations, the password feature can be invoked by selecting
“Password On/Off” and toggling to “On” in either or both of the User and Installer
menus.
Pre-set passwords are used:
• For the User the code is “11111” followed by “enter”
• A common “installer” code is also used, to ensure continuing access even with
a change in service personnel. Contact IBC for access to this password.
INSTALLATION AND OPERATION INSTRUCTIONS
2-4
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
SEQUENCE OF OPERATION
The control module has 5 cycles during normal operation, as well as an error
mode for problem detection:
1. Standby cycle
2. Purging
3. Ignition cycle
4. Heating cycle
5. Circulating cycle
6. Error mode
Each state is explained below. A flow chart for the sequence of operation can be
found in the back of the manual.
GLOSSARY OF TERMS
This glossary briefly defines some terms used in the Sequence discussion.
• Call for Heat: The thermostat indicates that room temperature is below the
thermostat setting.
• Heat Required: Temperature sensors on the boiler indicate that water
temperature is below the water temperature target or setpoint.
• Heating Enabled: The boiler is powered and there is a Call for Heat, Heat is
Required. The boiler will start and enter the Heating Cycle unless it is in an
error mode.
2.5.1 Standby
Waiting for a Heating Enabled signal. The burner and boiler pump are off during
this time.
2.5.2 Purging
Prepurge
On a Heating Enabled signal, the boiler automatically enters a prepurge cycle.
The fan starts and automatically adjusts to a level suitable for ignition. Ten seconds
later, the pump starts. After a total of 15 seconds, the ignition cycle begins.
Interpurge
The boiler enters an interpurge cycle if ignition is unsuccessful. The fan and
pump continue to run, and ignition is delayed by an additional 15 seconds.
Postpurge
The fan remains on for 20 seconds and then reduces airflow to an ultra low flow
mode for 90 minutes unless preempted.
2.5
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
The pump remains on for 5 minutes (adjustable) after the heating cycle ends.
If the heating cycle ends as a result of water temperature exceeding the load
specific band limit, the postpurge will continue as normal, but the boiler will enter
the circulating mode.
The cut off temperature levels are specific for each load; they are determined
using the preset target plus ½ of the supply differential entered. Default values
for such differentials are 22°F (+/- 11°F) for space heating with outdoor reset and
40°F ( +/- 20°F) for DHW and other set point loads,
If there is a Heating Enabled signal any time during this cycle, the postpurge
ends, and a prepurge begins, otherwise the boiler will enter Standby mode.
2.5.3 Ignition
After the prepurge, the gas valve opens for 4.0 seconds.
If no flame is detected at the end of the trial, the interpurge cycle is entered. If
ignition fails 3 times successively, the boiler locks out for a 1 hour long interval,
after which the ignition cycle is refreshed (e.g. for 3 further attempts). Alternately,
the boiler can be powered down and restarted to accelerate the re-try sequence.
The homeowner should follow up persistent recurrence of the 1 hour reset
routine by contacting a qualified service technician, to evaluate the cause of such
ignition irregularity.
With a successful ignition, the output of the boiler decreases immediately to a low
level, and the heating cycle begins.
2.5.4 Heating
The heating cycle lasts until the Heating Enabled state ends (for all loads),
or until water temperature exceeds the target temperature by ½ of the supply
differential for the last served load and the throttle has fallen to the minimum
output. At the end of the heating cycle, the boiler enters a postpurge.
During the heating cycle, the boiler addresses the multiple defined loads
in accordance with its Prioritization algorithm. See Section 2.6.1. Boiler
output changes to meet heating demands as indicated by the temperature
characteristics of the boiler supply and return water. Boiler supply water
temperature targets vary according to the set up parameters entered, and are
subject to further variation for loads where Outdoor Reset has been selected.
Where thermal loads are within the boiler’s 15 to 150 MBH throttle range, the
control algorithm seeks to regulate the boiler supply temperature within ±3°F
of the target temperature. On/Off differentials apply to loads below the 15 MBH
minimum input rating. The following default differentials are automatically applied
upon initial load characterization: DHW and other SetPoint loads (±20°F); space
heating with Outdoor Reset invoked (±11°F). These default differentials can be
adjusted in the password protected Installer access area.
2.5.5 Circulating
This cycle operates when water temperature exceeds target by 1/2 of the supply
differential for that load at minimum output, and call for heat is still present. After
entering a postpurge, the system pump remains on until water temperature is
1/2 of the supply differential below setpoint temperature.
The boiler can also enter the Circulating mode during transition from a high
INSTALLATION AND OPERATION INSTRUCTIONS
2-6
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
temperature load (e.g. DHW at 180°F) to a cool target (e.g. radiant floor on
Outdoor Reset, at perhaps 90°F). In the case in which the temperature is outside
the applicable differentials, the burner will shut off while the pump remains
on until water temperature is 11°F below the new load (radiant floor) target
temperature. Thermal shock avoidance routine is employed to avoid undesirable
effects of large temperature swings: the hot load pump remains on until the
boiler’s return water sensor detects temperature stability - to sink excess heat.
For example, upon satisfaction of a DHW call the DHW zone pump will remain
running until the boiler return water temperature falls to the DHW tank target
temperature. This deposits legacy heat from the primary loop into the water tank
before activation of a radiant floor load pump.
Always ensure that loads sensitive to high temperatures are protected using
appropriate means - e.g. a three way mixing valve set to restrict entering water
temperature to 130°F, or at minimum, an aquastat (set to130°F, for example) to
be wired to the boiler’s auxiliary interlocks to protect a radiant floor.
2.5.6 - Error Mode
The controller continually checks sensors to see that they are operating within
normal parameters. If sensors indicate the boiler is operating outside it limits, it
will declare an error condition.
Two types of error conditions can occur:
• Soft Errors: result when an abnormal condition exists which does not present
an immediate safety hazard. The boiler enters an extended purge, followed
by the error cycle of 5 minutes for all conditions other than Maximum Ignition
Trials (a modified Hard Error which locks out for 1 hour after 3 unsuccessful
ignition attempts). Following the purge, the fan and pump are stopped until
the end of the error cycle. Normal operation then resumes.
• Hard Errors: result when a condition exists that may be a safety hazard.
The boiler enters an extended purge then the fan and pump are stopped.
The boiler is in a lockout, and must be checked and restarted by a service
technician.
With software versions 3.10.0 and higher, the boiler offers an error status signal
feature. Please see IBC Technical Note: Boiler Status – Analog Output.
See Section 5.3.1 Control Panel for a list of hard and soft errors and their
likely causes. Note that other problems such as disconnected wires or defective
sensors may be the cause of the error. Always check connections and wiring first.
OTHER OPERATING FEATURES
2.6.1 Prioritization
The control module hosts a scheduling routine to manage the boiler’s operation
when more than one load has been defined. Typically, loads declared as DHW
receive significant - but not absolute - priority. A time vs. differential system will
allocate heat amongst each of up to 3 loads over time.
Multiple heating loads - with varying temperature targets - are run sequentially
as opposed to simultaneously (with a mixing valve). The objective is to serve
each load at the minimum possible temperature, as opposed to running hot
then mixing down – with hardware, saving the related hardware and fuel cost.
2.6
WARNING
This boiler is equipped with
an automatic blocked vent
shutoff system. In the case
of an “Insufficient Airflow
Error” event, a licensed and
qualified service technician
shall follow the steps set out
at Section 5.3.1 Airflow.
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
The approach optimizes the low temperature combustion benefits of direct cool
running of a radiant floor. The large throttle turndown range coupled with outdoor
reset means that several loads can receive heat in-turn, with less on/off duty
cycling than would occur with other heat sources.
The boiler is shipped with default values for each type of declarable load (e.g.
DHW, radiant floor). The preset variables for DHW (a value of 80 on a 20-90
scale) give it substantial priority, which declines over time if another load is
calling. Spacing heating loads (with Outdoor Reset) are given a default value of
35, while other SetPoint loads start with 50 points. Over time, such points are
transferred between the loads in accordance with the system rules. The boiler
will automatically shift between loads once the points totals reach an upset value.
Upon a load transfer, the burner will modulate down to its base level and will
then throttle up as required for the new load. If competing loads have not been
satisfied at the load switch stage, the control will register the firing rate and will
return rapidly to such rate on the next rotation.
Heat-apportioning can be altered using the keypad in the password protected
Installer input section. For instance if Baseboards (set up with Outdoor Reset as
Load 3) are not providing the desired heat, the on-time of the baseboards can
be increased by increasing the Prioritization value relative to the other declared
channels (e.g. moving the Load 3 preset value from 50 to 60 or reducing another
load’s value). Temperature targets for the underserved load could also be raised
in this example. For absolute priority, move the Load setting above 90. This
will eliminate Load switching. Do not set each load to the top value, and it is
generally better to avoid equal ratings. Note: the priority scale values do not need
to add up to 100 – they are relative only to each other.
2.6.2 Load Pairing
With software versions 3.10.0 and higher, the controller allows two loads of
compatible temperature settings to be run together. See IBC Technical Note:
Load Pairing for further details.
2.6.3 Reset Heating
The boiler offers Outdoor Reset control as standard equipment; this coordinates
the control of boiler supply water temperature for space heating with the outdoor
temperature. Outdoor Reset offers enhanced home comfort and efficiency by
using variable water temperatures to compensate for the differing rates of heat
loss that a building faces as outdoor temperature changes. At any outdoor
temperature above the coldest day expected, it automatically uses lower
heating temperatures than would otherwise be used. This saves energy without
sacrificing comfort.
When applied within a condensing boiler, outdoor reset offers direct and
significant combustion efficiency benefits by allowing generally lower circulating
water temperature. This provides cooler return water to the boiler, promoting
more condensation (= energy capture).
Contacts are provided for connection of an outdoor sensor (a tekmar 070 or
similar sensor is shipped with each boiler) to be placed in an appropriate outdoor
position. The temperature management algorithm flexes the boiler supply
temperature according to characterized heating curves that are automatically
called up through the load declaration process. Curves are provided for each
of the radiation terminal types offered - e.g. high or low mass radiant floor, air
handler, finned tube baseboards etc.
NOTE
US law effective Sept 2012
requires residential heating
boilers under 300,000 btu/
hr to be equipped with
Automatic Means of boiler
water temperature adjustment
in relation to heat demand.
This boiler offers such control
but also a means to override
it. See the inside back cover
of this Manual for a message
in respect of the use of such
override.
INSTALLATION AND OPERATION INSTRUCTIONS
2-8
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
In an “open loop” reset system, a room or zone thermostat is used to send a call
for heat over a 24VAC lead; this opens the respective zone valve, and signals the
boiler to fire using onward leads to the boiler’s dry contacts (use one of the pairs
marked “Therm 1, 2 or 3” on the orange connector terminal located on the right
edge of the controller). Gang such leads in parallel from multiple zone valves for
single connection to the boiler. Note that typical room thermostats simply provide
a call for heat, they do not control the circulating water temperature from the
boiler in an open loop reset system. Adjustment of a room thermostat from 23°C
to 30°C will make no further difference to the delivered temperature if the floor
slab has stabilized at the boiler temperature served up by the reset curve.
Where Outdoor Reset is applied without the indoor sensor feedback option, some
manual adjustment may be required to achieve the desired comfort level. Fine
adjustment can be made at the keypad using the Indoor Setpoint Temperature
variable, located as Line 1 in the User screen. To increase heat (e.g. from 72°F to
73°) - move the Indoor value upward (warmer) from the level otherwise chosen.
This shifts the position of the reset curve, will amend the boiler water temperature
by a similar amount. Do not adjust the Design Indoor Temp. value - a movement
upward in concert with Line 1 adjustment will have the effect of neutralizing the
intended effect.
An optional indoor temperature feedback routine can be activated (with field
installation of an indoor sensor, connected to the contacts located on the
controller) to automate adjustment of the Outdoor Reset routine.
The key inputs on initial set up are (1) Design Outdoor Temperature – the coldest
expected weather typically experienced at the installation site; (2) the Design
Supply Temperature – the desired boiler operating level to occur at that coldest
day; and (3) the Design Indoor Temp. - this is the value that anchors the reset
curve. The Indoor Set Point Temp. variable is the primary means for the user to
“bias” the outdoor reset routine to add or reduce heat.
If outdoor reset is selected and there is no signal received from the sensor,
the controller assigns a provisional 0°C value and will adopt the appropriate
temperature target from the relevant reset curve.
See Section 2.7 Set Up & Load Definition for activation procedure.
Figure 30: Outdoor reset curves
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
2.6.4 Variable Speed Pumping
This section reserved.
2.6.5 Temperature Setback
For heating loads declared as Space Heating (e.g. with Outdoor Reset) and/
or DHW (where a thermistor probe is used), there are provisions for entering
temperature setback intervals. During the setback period, the boiler supply
water temperature target is adjusted from the pre-set fixed or floating (with
Outdoor Reset) levels. There is a simultaneous movement in the Indoor Setpoint
Temperature or DHW Tank Setpoint, to yield a consistent spread and avoid
undesirable cycling. Normally users would apply this feature to achieve fuel
savings during night-or-away hours. It is also possible to use the feature to
set forward (up) the temperature; this may be of use for certain commercial
applications where short-term high temperature DHW service is desired.
Up to 56 events / week can be programmed for each eligible load – for example,
DHW can be set back twice and returned (twice) each day. The routine can be
applied by specific day (Mon-Sun).
The automated setback feature cannot be applied to setpoint loads, including
DHW with simple aquastat control. This is due to the lack of linkage with the
thermostat; setback without linkage could lead to unacceptable cycling.
Access is via the User Setup screen.
2.6.6 Unoccupied Mode
Users can further reduce energy consumption by switching the boiler to the
unoccupied mode during holidays or other away periods.
While in the Unoccupied mode, the DHW load is turned off, while Space Heating
loads for which Outdoor Reset is activated will drop both the circulating water and
the indoor setpoint temperature parameters to 50°F. Set Point controlled loads
are not adjusted through this process, to avoid the potential for boiler cycling as
there is no linkage with the relevant thermostat.
On the main User Setup Menu, select “Occupancy Status”, then toggle between
Occupied (top button) and Unoccupied (lower button) as desired.
2.6.7 Summer Shutdown
During the Installer set up process, a cut-off level for outdoor temperature can be
selected - to curtail any further space heating. This is typically used to turn off an
INSTALLATION AND OPERATION INSTRUCTIONS
2-10
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Outdoor Reset enabled load once the outdoor temperature reaches a threshold
level e.g. 60°F. The load will be automatically reactivated once the weather
returns to levels below the selected threshold. Use of this feature with a value 5°
- 10°F below the Indoor Setpoint Temperature is strongly recommended to avoid
short cycling of the boiler during very marginal heating conditions.
From the main Installer Setup Menu, select “Heat Load Configuration”, then
“Configure Load (use the load number tagged as Space Heating)”, and drop
down to “Summer Shutdown”. Press Enter to select, then use the keys to move
the threshold temperature to the desired level, and press the centre key again to
record. The controller must receive a valid signal from the tekmar 070 outdoor
sensor, supplied with the boiler, to operate.
2.6.8 Remote / Slave Mode
Installers have the option of placing the control of the boiler under an external
electronic controller (such as a tekmar 265). Connections are provided to
receive a 0-10vDC or 4-20 mA signal for throttle management. The default
configuration is 0-10V; to switch over to 4-20mA, remove the electrical box
corner cover to provide access to the slotted clearance hole on the lower right
corner of the control module; use needle-nose pliers to move the plastic jumper
tab from the right two terminals to the left two terminals accessible through
the slotted clearance hole. Where the IBC controller senses a signal on the
remote connections, it automatically subordinates its internal throttle logic, and
adopts the external signal. In such slave mode, temperature management is
also surrendered to the external controller’s sensors. The installer only enters
Maximum Boiler Supply and On/Off Differential temperatures; the boiler will
respond to these as high limit switches.
From the main Installer Setup Menu, select “Define Load (with desired #)”, then
locate and enter “External Control”. Next, configure the load with the Maximum
and Differential temperature values.
SET UP & LOAD DEFINITION
After the boiler is powered up, the installer can use the keypad and display to
characterize the application, as follows:
1. In the Standby mode, start by pressing any key to call up the Main Menu.
2. Using the directional keys, move the cursor to Installer Setup, then depress
the centre (Enter) key. See Section 2.4.5. Passwords if these are in use or
desired.
3. Select Date & Time (and Enter), then move the cursor about to adjust time
(on a 24:00 hour basis), date and invoke Daylight Savings if appropriate. Use
the upper key to increase a value (e.g. date, time, temperature), the bottom
key to reduce. Note that it is often possible to move in steps of 10 or 100 by
moving the cursor right or left once a field has been selected for adjustment.
Hit the Enter key to record the desired / amended information after each
value has been selected.
4. Use the left-most key to step back to the Installer Setup screen, and select
Heat Load Configuration for input of the load characteristics.
2.7
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
5. Each of the boiler’s 3 Load positions can be configured for any type of
heating. VFC boilers are factory shipped with default settings as follows:
Load 1 set as Space Heating or Reset Heating, with High Mass Radiant
Floor set as the terminal type; Load 2 as Set Point; and Load 3 as DHW. The
factory defaults can be changed using the Define Load 1-2-3 lines to reverse
the order, turn off a Load or do whatever the installer desires.
6. Once the appropriate Loads are set, use the left-hand key to move back to the
Setup Heating Loads screen, then move down to Configure Load 1 (and hit enter).
7. The screen will display the input fields appropriate to the nature of the load
selected, e.g. Design Outdoor Temp. for a Space Heating (or Reset Heating)
load. Note: these fields are pre-loaded with default values that are to be
altered to reflect the desired parameters.
8. For reset loads, the initial selection to be made addresses the “emitter” type
– choices include H(high) Mass Radiant, L(ow) Mass Radiant, Baseboard, Air
Handler etc. An appropriate reset curve is called up through this procedure.
Reset loads carry a default value for Design Outdoor Temp. of -10°F (-23°C).
Raise or lower this as appropriate – e.g. for Vancouver, use 19° to 25°F,
while for Edmonton -35°F would be appropriate. Note: - for some users, this
adjustment may seem counter-intuitive. Moving the setting toward a colder
design value will have the effect of reducing the boiler’s target temperature
for any given weather, because a given current condition is relatively warmer
than the designated “coldest” day.
Moving down the screen, set the Design Supply Temperature – the targeted
temp. for circulating water on the coldest day. For an in-slab radiant floor
this would typically be 125°F (50°C). For finned tube baseboards typically
driven at 180°F, try 160°F max. instead, to promote combustion efficiency.
For air handlers, try running 20°F lower than typically used. Of course, the
appropriate setting will depend on the characteristics of the emitter and the
building but in general the VFC modulating boiler’s large throttle turndown
will allow better average temp. control, permitting lower maximums.
9. For Reset Loads, move down the screen again to display more lines;
Use the Summer Shutdown field to enter a threshold temperature for the
avoidance of heating during warmer times. This is typically set at 60° to 65°F
so as to eliminate excessive boiler cycling in marginal heating conditions.
Use the Minimum Temp. field to optimize boiler run times on low mass loads.
Finned tube baseboards sink very little heat when operated below 100°F;
application of a “full reset curve” (e.g. 160°F right down to a 70°F room
target) would cause boiler cycling in light-to-moderate heating conditions.
Set baseboard minimums at 100-120°F and aim for 4 or less cycles/hr. A
minimum setting can also be used to enhance home comfort with single or
excessive speed air handlers to avoid the cool blast effect. Set the lowest
possible level for combustion efficiency. IBC’s high efficiency fully modulating
air handlers (AH60 or CAF60) can use a minimum as low as 100°F to
achieve up to 95% efficiency when combined with the VFC modulating
boiler’s wide throttle turndown.
INSTALLATION AND OPERATION INSTRUCTIONS
2-12
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
10. For all loads, select and enter a Maximum allowable temperature and on/
off Supply Differential Temp. Note these values must be input; they are not
automatically assigned as done within some boiler controls. Ensure the
Maximum takes account of the construction and safety requirements of each
application – e.g., 140°F max. for typical in-slab radiant floor, for avoidance of
thermal stress. The Differential shall be set to offer a reasonable temperature
control range (suggested values: 22°F for high mass radiant // 40°F for low
mass baseboards // 30°F for DHW). Ensure that the spread between the
Target and Maximum temps is greater than one half of the Differential (e.g.
for a radiant floor Design Supply Temperature of 125°F and a Maximum of
140°F, a differential of 22°F (half of which is 11°F) fits nicely.
11. Avoid situations where the Maximum is close or below the potential Target, or
the boiler will cycle off its (software) water high limit.
12. Priority:- where more than one load is present, it is critical that a value be
entered to allow reasonable load scheduling (see Section 2.6.1).
13. At the lower end of the Load 1-2-3 setup screen, there are 4 lines available
for “mapping” of sensor inputs.. For example, “Indoor Temp. from …..Indoor”
indicates that the boiler will look for a signal from an indoor sensor on the
Indoor Sensor wiring contacts. Failing a valid signal, the screen will display
“Indoor Temp. …..Open”, and there will be no effective indoor trim of the
reset curve. These lines do not require amendment at most installation sites.
The mapping feature allows reassignment of the sensor contacts to support
non-standard functions. For example, re-allocation of the Water Temp. signal
from “(boiler) Outlet” to “Secondary Loop” will allow the throttle management
routine to manage a secondary loop temperature rather than the boiler’s own
direct supply temperature. Use this when injecting into a commercial heating:
cooling loop. Another possibility: two separate reset channels – each with its
own indoor trim. Sensor ports open for such re-assignment are DHW, Indoor,
Outdoor and Secondary Loop.
14. The final 3 lines are for the motorized mixing valve option. See separate
documentation for this.
15. To compensate for altitude at the installation site, use the Altitude adjustment
feature, found in the front Installer Setup menu (several lines below “Heat
Load Configuration”. Key in the altitude – in hundreds of feet above sea
level. For example, an installation at 2,860 feet should be entered as “29” (as
rounded to the nearest hundred).
16. Two lines below Altitude adjustment is the field for amendment of the primary
pump heat purge time. To shorten the 5 minute post-firing period, reduce the
300 second interval to as low as 60 sec. Similar adjustment of secondary
pump run time can be made in the Heat Load Configuration / Configure Load
1,2,3 fields (down to zero sec.= off).
17. With software versions 3.10.0 and higher, the controller allows two loads of
compatible temperature settings to be run together. See IBC Technical Note:
Load Pairing for further details.
BOILER SYSTEMS AND OPERATION
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
18. Upon completion of the input of load parameters, use the left button to step
back through the menu system to return to the Operating Status screen.
19. To enact the control arrangements as input, it is necessary that the piping
structure and system wiring are configured appropriately (refer to Section
1.6.2 Installation Rules, page 1-20 for piping layouts and the Wiring
Schematics on pages 6-7 and 6-8). Ensure that DHW aquastat or thermistor
probe leads, thermostat and pump (or zone valve) leads are connected at
their respective contact points on the terminal block.
20. Forced shutdown: – use the Heat Load Configuration screen to switch off
load(s) to remove a call for heat, if no other means are readily available.
Simple removal of power to boiler is to be avoided – this interrupts
the moisture management routine. Treat the unit as you would treat a
computer, allowing an orderly shutdown.
INSTALLATION AND OPERATION INSTRUCTIONS
2-14
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
THIS PAGE INTENTIONALLY LEFT BLANK
STARTUP AND COMMISSIONING
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
STARTUP AND COMMISSIONING
3.0
3.1
LIGHTING AND SHUTTING DOWN
THE BOILER
INSTALLATION AND OPERATION INSTRUCTIONS
3-2
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
3.2
PRIOR TO START-UP
3.2.1 Pre-Ignition Checks
1. Ensure venting system is complete and seal tested. Confirm any common
venting system at the installation site is isolated and independent of the VFC
boiler, that any holes left from removal of a previous boiler have been sealed,
and that any resizing of the old flue has been done. Fill condensation trap to
full neck height.
2. Check water piping system is fully flushed and charged, and that all air has
been discharged through loosened bleed caps. Note it is possible to switch
all pumps on/off from the keypad – without a call for heat. This greatly
simplifies system filling and air bleeding (go to Installer Setup, drop down
to Pump Purge and toggle to On. When complete, return to Off, or this will
automatically occur with a call for heat). Use a minimum water pressure of 12
psig. And confirm pressure relief valve is installed and safely drained.
3. Perform a final check of electrical wiring.
4. Using a manometer, check to see that adequate gas pressure is present
at the inlet gas supply test port. Requirements are minimum 3” w.c and
maximum 14” w.c.
3.2.2 Test Ignition Safety Shutoff
With the boiler in operation, test the ignition system safety shutoff device by
shutting the manual gas valve immediately outside the boiler case. Ensure
boiler has shut off and the appropriate Error information is displayed on the LCD
screen. To restart boiler, reset power.
commissioning
The VFC modulating boilers are factory calibrated to operate with natural gas (or
propane if so ordered) at sea level. The relevant valve adjustment screws have
been factory sealed using Loctite thread-lock compound, which can be broken
where required. However, no mixture adjustment shall be performed unless
done by a qualified technician using properly functioning combustion
analyzing equipment.
Upon initial set up, the installer can enter the site elevation to compensate
for altitude. Without such intervention, the gas valve will automatically de-rate
the maximum input in accordance with the density altitude, at approximately 2%
per 1,000’ above sea level. The gas valve’s zero governor will ensure that the
gas:air mixture is not affected at altitude.
To verify the proper operation of the gas valve in the field, the following procedure
can be carried out by a qualified technician (see Figure 31).
1. with a small (1/8" or 3 mm) flat screwdriver, open the manifold pressure
test port by turning its centre- screw 1 full turn counterclockwise. Attach a
manometer between the manifold pressure test port and the reference line.
2. Allow the boiler to ignite / run against a large load, to maintain high fire
3. With the boiler at maximum output, use a 2 mm hex key to adjust the zero-
offset (see Figure 31, “A”) as required to achieve 0” wc. This adjustment is
only necessary if this screw has been tampered with.
3.3
Inlet gas supply pressure test port
Manifold pressure test port
DANGER
Making adjustments to
the IBC gas valve without
a properly calibrated gas
combustion analyzer and by
persons who are not trained
and experienced in its use
is forbidden. Failure to use
an analyzer can result in an
immediate hazard.
WARNING
Fill trap with water before boiler
is first fired to prevent exhaust
fumes from entering room.
Never operate the boiler unless
the trap is filled with water.
Failure to comply will result in
severe personal injury or death.
STARTUP AND COMMISSIONING
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
4. With a combustion analyzer probe in the flue gas test port, turn the Gas:Air
Ratio Adjustment screw (see Figure 31, “B”) to achieve 28% excess air
(corresponding CO2 values are 9.2% for natural gas and 10.4% for propane).
This screw offers very fine adjustment, and may require several turns.
Note: This screw has significant backlash. When changing direction of turn,
it may take up to a full turn before any change is indicated on the analyzer
reading. Clock the gas meter to confirm full maximum rating plate input.
5. To confirm or adjust the minimum fire level settings, Re-define the load as
“Manual Control”. Use Heat Output in “Configure Load x” to control the output
as needed.
6. At the minimum firing rate, adjust the zero-offset screw (see Figure 31, “A”)
to obtain 28% excess air. It may be necessary to reduce the output in stages
if this adjustment has been tampered with.
7. Turn boiler off by removing the call for heat (use the Heat Load Configuration
screen to turn load to off if no other ready means available), then remove the
manometer connections, and turn the centre-screw in the manifold pressure
test port 1 full turn clockwise. Ensure fully closed, but not over-tightened.
Figure 31: Gas Valve and Pressure Reference System
Zero-offset adjustment screw
Gas:Air ratio adjustment screw
Insertion of flue gas analyzer probe
Removal of flue gas test port plug
NOTE
Upon installation of this
boiler, you must use an
indelible marker on the rating
plate to mark an X in the box
associated with the fuel used.
INSTALLATION AND OPERATION INSTRUCTIONS
3-4
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
THIS PAGE INTENTIONALLY LEFT BLANK
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
MAINTENANCE
4.0
BOILER MAINTENANCE
4.1.1 General Care
• Keep combustible materials and flammable liquids and vapours away from the
boiler.
• Keep vent terminals clear of obstructions (snow, dirt, etc.).
4.1.2 Inspection
Inspection of the boiler is to be performed annually by a qualified service
technician.
4.1.3 Venting
• Check vent terminals for and remove any obstructions (e.g. leaves, dust,
other debris).
• Check, and clean or replace intake air filters or screens as required.
• Check for holes or leaks in venting. Replace venting as needed.
• Examine for any signs of moisture caused by sweating intake air pipes;
insulate as required.
• Ensure proper resealing or reinstallation of venting on each servicing.
4.1.4 Condensate Traps
• Open PVC union to drain, watching for mud / debris. Flush and refill.
• If condensate neutralization is used, check pH level of condensate discharge.
4.1.5 Burner
• Remove burner to inspect for extent of fouling. Blow clear using compressed
air. Evaluate the magnitude of clearing required, and establish a reasonable
burner inspection schedule. Some boiler / locations may call for annual
service, others showing clean burners will only need attention every 2 – 5
years. Consider adding air filtration if burner requires cleaning every year.
In alternate years, visually inspect burner through sight glass. Ensure flame
is stable and without excessive fluttering. Normal flame pattern is evenly
distributed over the burner surface.
• If burner is operating improperly, remove and clean or replace. Use a CO2
analyzer to determine proper combustion. CO2 level should be 9.0% (for
natural gas) or 10.2% (propane).
• When re-installing burner, ensure it is inserted so that the seam (that runs
along the length of the metal-fibre surface) is placed as far away from the
ignitor as possible (180° rotation arc away). Also confirm spark gap is 1/8".
Confirm visually by removing viewport, turning gas supply OFF, and allowing
the boiler to run through an ignition cycle. Compare the spark length with the
spark rod diameter, which is the same 1/8" (e.g. use the rod as a reference).
4.1
CAUTION
Label all wires prior to
disconnection when servicing
controls. Wiring errors
can cause improper and
dangerous operation.
CAUTION
The owner is responsible for
general care of the boiler.
Improper maintenance of
the boiler may result in a
hazardous condition.
WARNING
Whenever the burner is
removed for inspection or
boiler servicing, the sealing
gaskets must be examined
and replaced if damaged.
Upon re-assembly, an
approved leak test solution
must be applied around the
burner flange sealing area to
ensure there is no leakage of
combustible gas/air premix.
WARNING
Fill trap with water before
boiler is first fired to prevent
exhaust fumes from entering
room. Never operate the
boiler unless the trap is filled
with water.
Failure to comply will result
in severe personal injury or
death.
INSTALLATION AND OPERATION INSTRUCTIONS
4-2
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
4.1.6 Heat Exchanger
During burner inspection (with the burner removed), examine the heat exchanger
tubes adjacent to the burner’s normal position. In areas of poor gas quality, there
may be a buildup of black plaque (typically sulfur). Other fouling agents: airborne
dust, debris and volatiles.
The VFC heat exchanger has a larger surface area and significantly larger
flue-paths than other condensing boilers; consequently it has more resilience to
fouling. Clean when the gaps between the tubes become blocked with plaque,
in accordance with Technical Notes “HEAT EXCHANGER CLEANING Version
1.2”. Anticipate action every 2 – 5 years for typical residential use, or annually for
boilers in commercial applications. Hard working boilers may need more frequent
inspection and cleaning. Newer models are equipped with an internal “hours of
use” timer, which will alert users when cleaning is required.
4.1.7 Pump
Check that the pump is on in normal operation and that the water Δ°T is
reasonable for a given firing rate (e.g. 10°F between supply and return when
firing at 75,000 Btu/hr. for a VFC 15-150 unit).
4.1.8 Gas Piping
Check for damage or leaks and repair as needed.
4.1.9 Control Module
• Check that boiler operation is consistent with the steps in Section 2.5
Sequence of Operation.
• Check that water temperature targets and setpoint is satisfactory and have
not been adversely amended.
• Check the operating history using the screen: - use Installer Setup // Logs, to
scan for hours of service, cycles per hour, and any logged errors. One method
is to use the graphical presentation of the duty cycle by load – go to Logs,
move the cursor to a load and push “Enter” to access. This gives a profile of
the boiler’s duty cycle by throttle level – see below.
• The first screen (below) shows that this boiler (a 15-150) has operated for
54% of total Load 1 on-time at the bottom 10% of the throttle range (e.g.
between 15,000 to 27,500 Btu/hr.).
• Where a load is heavily weighted to the lowest firing rate and the cycles/
day count is in excess of 96/day, there may be insufficient loading of the
boiler. Consider increasing the temperature target for such load and/or the
respective Minimum Temperature setting.
• If a problem exists with the control, consult troubleshooting guide.
CAUTION
The IBC heat exchanger has a
small amount of combustion
chamber insulation (refractory),
which contains ceramic fibers.
When exposed to extremely high
temperatures, the ceramic fibers,
which contain crystalline silica,
can be converted into cristo-
balite - which is classified as a
possible human carcinogen.
Care should be taken to avoid
disturbing or damaging the re-
fractory. If damage occurs, con-
tact the factory for directions.
Avoid breathing and contact with
skin and eyes and follow these
precautions:
1. For conditions of frequent
use or heavy exposure, respira-
tor protection is required. Refer
to the “NIOSH Guide to the
Selection and Use of Particulate
Respirators Certified under 42
CFR 84” for selection and use of
respirators certified by NIOSH.
For the most current informa-
tion, NIOSH can be contacted at
1-800-356-4676 or on the web at
www.cdc.gov/niosh.
2. Wear long sleeved, loose fit-
ting clothing, gloves and eyes
protection.
3. Assure adequate ventilation.
4. Wash with soap and water
after contact.
5. Wash potentially contami-
nated clothes separately from
other laundry and rinse washing
machine thoroughly.
6. Discard used insulation in an
air tight plastic bag.
NIOSH stated first aid:
Eye contact - Irrigate and wash
immediately.
Breathing - Provide fresh air.
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
• The second screen (below) shows another boiler (a 45-225) has operated for
26% of the total Load 2 on-time at the bottom 30% of the throttle range and
virtually no time below that.
Interpretation of this type of operation must be done carefully, by observing
the system as it runs. This could either be a classic case of over-sizing to a
load that cannot sink heat fast enough, resulting in short cycling - OR - it may
be normal and healthy operation for some loads, such as air handlers or heat
exchangers that can always sink heat above the lower firing rates.
4.1.10 Water
• Check water pressure and temperature. There should be no noticeable
change if boiler is functioning normally. Check for any noise in the system.
• Check water piping for damage or leaks and repair as needed.
4.1.11 Freeze Protection
Check freeze protection. Use only antifreeze made specifically for hydronic
systems. Inhibited propylene glycol is recommended. Antifreeze volume must not
exceed 50% of the total volume of water in the system.
4.1.12 Boiler Treatment
• Check consistency of any boiler treatment used (e.g. Furnox™), for
appropriate mixture. Chemical inhibitors are consumed over time, lowering
their density.
• Verify proper operation after servicing.
4.1.13 Relief Valve - Maintenance and Testing
The relief valve manufacturer requires that under normal operating conditions
a “try lever test” must be performed every two months. Under severe service
conditions, or if corrosion and/or deposits are noticed within the valve body,
testing must be performed more often. A “try lever test” must also be performed
at the end of any non-service period.
Test at or near maximum operating pressure by holding the test lever fully open
for at least 5 seconds to flush the valve seat free of sediment and debris. Then
release the lever and permit the valve to snap shut.
CAUTION
Installers should inquire of
local water purveyors as to
the suitability of their supply
for use in hydronic heating
systems. If water quality is
questionable, a local water
treatment expert must
be consulted for testing,
assessment and, if required,
treatment. Alternatively, water
or hydronic fluid of known
quality can be brought to the
site.
CAUTION
Before testing the relief valve,
make certain the discharge
pipe is properly connected to
the valve outlet and arranged to
contain and safely dispose of
equipment discharge.
WARNING
For service replacement of the
fan on the VFC 45-225 boiler,
use the NRG-137; DO NOT
ATTEMPT TO PLACE A RG-
148 FAN (as used on previous
versions of the VFC 45-225
boiler) ON A BOILER HAVING
A CONDENSATE TRAP DEPTH
OF LESS THAN 28” – an RG
148 fan can blow a clear a
shorter trap, allowing noxious
fumes to enter living space.
WARNING
Do not use automotive-type
ethylene or other types of
automotive glycol antifreeze,
or undiluted antifreeze of
any kind. This may result in
severe boiler damage. It is the
responsibility of the Installer to
ensure that glycol solutions are
formulated to inhibit corrosion
in hydronic heating systems
of mixed materials. Improper
mixtures and chemical
additives may cause damage
to ferrous and non-ferrous
components as well as non-
metallic, wetted components,
normally found in hydronic
systems. Ethylene glycol is
toxic, and may be prohibited
for use by codes applicable
to your installation location.
For environmental and toxicity
reasons, IBC recommends
only using non-toxic propylene
glycol.
INSTALLATION AND OPERATION INSTRUCTIONS
4-4
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
COMPONENT DESCRIPTION
A diagram of components and their placement can be found at the end of
this manual. To obtain service parts, contact your installer, telephone IBC
Technologies or visit our website at www.ibcboiler.com. The following list provides
a summary description of major components:
4.2.1 Fan/Blower
Part#/Type: RG130 – IBC # 240-040 (VFC 15-150)
RG137 – IBC # 240-048 (VFC 45-225)
Function: Moves combustion air and flue gas products through the boiler
and venting.
Installation: Fan removal is done at the flange (4 x #10-32 x 7/8” hex head)
and the gas valve (3 x M4 x 30mm Phillips head self tapping screws accessible
for the underside of the gas valve; for improved access – remove vinyl air
reference tubes and black air pressure sensor.
4.2.2 Gas Valve
Type: IBC # 180-022
Function: zero governor gas valve provides strict gas/air mixture control over
the range — 15 - 150 MBH for VFC 15-150 or 45 – 225 MBH for VFC 45-225.
Installation: see Section 3.3 - Commissioning, for gas valve adjustments
4.2.3 Direct Spark Ignition Module
Type: Fenwal 240-004B (alternate Capable Controls 240-049)
Function: microprocessor based spark generator and flame proving control
with 15 sec. pre-purge; 3 try before an auto re-setting 1 hour lockout.
Installation: (see Diagram 6.1-1 for correct position). Use IBC # 180-011
suppression cable as the ignition lead.
4.2.4 Differential Pressure Sensor
Type: Air Prove Switch (IBC # 240-003)
Function: precise measurement of combustion airflow for operating control.
Installation: (see Figure 31 for correct connection of air reference lines).
4.2
Fan/Blowers: 15-150(L), 45-225(R)
Air pressure sensor removal
showing reference line connections
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
4.2.5 Water Pressure Sensor
Type: Water Pressure (IBC # 240-006)
Function: water pressure and flow sensing.
Installation: (see Diagram 6.1-1, and Diagram 6.1-2, 31 for correct position).
4.2.6 High Limit
Part#/Type: IBC # 240-032 High Limit calibrated for 200°F, 15°F differential.
Function: Shuts boiler off when water temperature exceeds safety limit.
Installation: (see Diagram 6.1-1 for correct position). Mount with Honeywell
Tradeline #107408 Heat Conductive Compound between the base of the hi-limit
switch and the mounting surface.
4.2.7 Transformer
Part#/Type: IBC # 240-008 Primary- 120 VAC; Sec.- 24 V AC; 40VA control
transformer.
Function: Provides 24 VAC for the control board, for (1) the control / safety
circuit, (2) relays for pump and zone valve control, plus (3) input to DC power
converters for 5 V and 12 V circuits (NB not for use to power external zone
valves).
Installation: (see Diagram 6.1-1 for correct position).
4.2.8 Temperature Sensors
Part#/Type: IBC # 240-006 Thermistor; 10,000Ω with Beta = 3892
Function: Senses water temperature. Signals controller to adjust output
according to water temperature.
Installation: (see Diagram 6.1-1 for correct position). Use 1/4" nutdriver to
loosen ring clamp. Install with back curve toward pipe using Honeywell Tradeline
#107408 Heat Conductive Compound and re-tighten ring clamp. Warning! - Do not
over-tighten clamp as this will damage sensor.
4.2.9 Control Module
Part#/Type: IBC # 500-001 Universal Control Board
Function: (see Section 2.0 Boiler Systems And Operation for an explanation of
controller function).
Installation: (see Diagram 6.1-1 for correct position). The 4 screws on
the front panel corners secure the cover. To remove the unit from the mounting
brackets, ensure all wires are removed from the connectors on the edge and back
of the control module. Place fingers on the board edge only when handling.
There is a 3V lithium battery (IBC # 240-024) for powering the permanent memory
if AC power is not connected.
On-board field replaceable fuses (IBC # 240-023) are 5A, slow blow, 5mm x
20mm, and must be replaced using these same specs.
Main combustion components
(clockwise from left) Burner, with
ignitor and V clamp - Fan coupler
- Fan/Blower - Mixing plates &
housing - Gas valve
Combustion group assembly
Control Module removal
Disconnecting Control Module plugs
INSTALLATION AND OPERATION INSTRUCTIONS
4-6
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
THIS PAGE INTENTIONALLY LEFT BLANK
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
5.0
TROUBLESHOOTING
The troubleshooting section is divided into 3 sections:
5.1 Preliminary Checks
5.2 Electronic Components
5.3 Troubleshooting Guide
Often, a problem can be identified and solved through simple checks of the
basics: confirming the electrical power supply, gas flow and resetting the
thermostat control. To extend the cover of such preliminary checks, the boiler’s
control module offers a clear visual display of the status of the various control
circuit components.
Should a problem remain unsolved after applying the preliminary checks,
proceed to the detailed system review, using the Troubleshooting Guide. The
Guide covers potential error conditions as grouped into the following categories:
5.3.1 Using Control Module Errors Displayed
5.3.2 Ignition Problems
5.3.3 Cycling Problems
5.3.4 Temperature Problems
5.3.5 Miscellaneous
Below each section is a list of Symptoms, Diagnoses, and Remedies.
Also provided with this manual are a number of diagrams (see Section 6.0) for
use with troubleshooting including:
• Electrical Wiring Diagrams
• Sequence of Operations Flowchart
• Boiler Component Layout Diagrams
Preliminary Checks
The first step in troubleshooting this system should be a review of the Controller’s
LCD screen. There are a number of diagnostic features incorporated in the
software that evaluate system integrity, display error conditions and provide initial
suggested remedial actions (see Section 2.5.6 Error Mode.)
In addition to checking the display, the following list is a guideline for
troubleshooting:
1. Confirm power to the boiler: check that control module display is on (e.g.
display is lit).
2. Check that boiler is not in a safety lockout.
3. Ensure wiring is clean and secure.
4. Check that gas is reaching the unit.
5. Confirm water system is properly charged to 12 psig and pump is
serviceable.
5.1
INSTALLATION AND OPERATION INSTRUCTIONS
5-2
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Electronic Components
This section details the method for troubleshooting the non-standard electronic
components on the boiler including the electronic differential air pressure sensor
and the temperature sensors.
5.2.1 Temperature Sensors
The resistance of the temperature sensors varies inversely with temperature. To
test, measure the temperature of the sensed environment and compare with the
value derived from the measurement of the resistance (obtained by connecting a
good quality test meter capable of measuring up to 5,000 kΩ (5,000,000Ω) at the
controller end of the sensor lead).
To obtain a resistance reading, remove power to the boiler. Locate the blue
2-wire leads coming from the thermistors, which are affixed to the boiler supply
and return piping to the right of the heat exchanger. Disconnect the Molex
connectors located approx. 6" from the sensors. Place multi-meter probes into
Molex socket. Do not apply voltage to the sensor as damage may result.
Sensors are sensitive to excess binding force, which can distort the internal
dielectric isolation. Use modest tension only when affixing sensor to pipe.
TEMPERATURE
RESISTANCE
TEMPERATURE
RESISTANCE
°F
°C
Ω
°F
°C
Ω
0
-18
85,362
100
38
5,828
5
-15
72,918
105
41
5,210
10
-12
62,465
110
43
4,665
15
-9
53,658
115
46
4,184
20
-7
42,218
120
49
3,760
25
-4
39,913
125
52
3,383
30
-1
34,558
130
54
3,050
35
2
29,996
135
57
2,754
40
4
26,099
140
60
2,490
45
7
22,763
145
63
2,255
50
10
19,900
150
66
2,045
55
13
17,436
155
68
1,857
60
16
15,311
160
71
1,689
65
18
13,474
165
74
1,538
70
21
11,883
170
77
1,403
75
24
10,501
175
79
1,281
80
27
9,299
180
82
1,172
85
29
8,250
185
85
1,073
90
32
7,334
190
88
983
95
35
6,532
195
91
903
Table 8: Temperature Sensor resistance values
5.2
Return water temperature sensor
10KΩ sensors supplied with boiler
2 x Water temperature sensors - (L)
1 x Outdoor sensor - (R)
See table #8 for resistance values
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
5.2.2 Fan/Blower
Operating power is provided by means of a separate 120 VAC connector at
the back of the fan (white/black/green). Control of the fan is provided via a four
lead connector at the front of the fan. This connector feeds a PWM control
signal (black wire) from the controller and provides a tachometer signal (white
wire) back from the fan. Unplugging the connector will cause the fan to go to
high speed and trigger a “Blocked Vent Error” within 6 seconds if the boiler is
operating.
Lead Color
Function
Troubleshooting
Red
35 VDC Positive power
terminal
Fan will only operate at max.
speed if disconnected.
Blue
35 VDC Negative power
terminal
Fan will only operate at max.
speed if disconnected.
Black
Signal from controller
Fan will only operate at max.
speed if disconnected.
White
Fan tach.
2 pulses/rev (freq x 30=rpm)
Table 9: Fan Operation
5.2.3 Differential Air Pressure Sensor
Go to the Advanced Diagnostics screen, and with the fan off (“Fan Duty Cycle =
0) look for a Fan Pressure reading of 102 +/-5. Next check with fan in operation,
and look for an increased Fan Pressure value. In normal operation, the Fan
Pressure reading should move toward the Required Pressure value. A backward
movement in Fan Pressure indicates the clear vinyl reference lines have been
reversed.
Control wire plug
Unplug to run fan full speed
Circuit board revealed
Removing circuit board cover
Figure 32 (right): Test
points on circuit board
for air pressure sensor
voltage readings
INSTALLATION AND OPERATION INSTRUCTIONS
5-4
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Next, confirm that the circuit is properly powered. The supply voltage to the
sensor should be 13.8 VDC; to check, the simplest technique is to measure the
circuit on the face of the controller circuit board (vs. an attempt to splice into the
harness / connectors). See above for a presentation of the measurement points.
Finally, to measure the sensor output, connect a DC volt meter between points
“J501-33” (located on the footprint of the 34 pin connector – immediately below
the right leg of the LCD display - second pin from bottom right) and GND (see
above). With the fan off, the measure should read 0.5VDC. With a Fan Pressure
of approx. 300, the meter will read 1.5v (approx.). Note:- this component is a
sensor, not a switch; do not over-pressurize by blowing into the air reference
lines. Maximum pressure capacity is 40” w.c. @ 20 C but only 10” w.c. @ 5C.
5.2.4 Water Pressure Sensors
Go to the Advanced Diagnostics screen, and check the top 2 display lines —
Inlet Pressure and Outlet Pressure. With the pumps at rest and system pressure
of 12.5 psi, the Inlet Pressure and Outlet Pressure sensor values should read
235 +/- 5. Of the two, while at rest, the Inlet normally reads 1 – 2 points higher,
reflecting the extra 2' of water column. The third displayed line Delta Pressure will
normally indicate a value of approx. 20 with pump in operation. The location of
the boiler pump will determine the movement of valid sensor values; in general,
inlet pressure will increase while the outlet will decrease when the pump starts.
Check operation of both sensors by isolating the boiler from its system piping,
closing the system fill valve then cracking the pressure relief valve; both signals
should reflect declining pressure. If one or both remain “fixed”, drain boiler and
replace sensor(s), or dislodge any blocking debris from sensor inlet channel
and reinsert. To remove a red-coloured “502” sensor, it is necessary to release
a stainless steel retaining clip at the base of the unit (see Section 6.1 Parts
Diagrams, part #65). Before refilling system, ensure the 502 sensor retainer clips
are properly re-installed. The black “505” sensors are threaded and do not use
the retainer clip system.
5.2.5 Hi-Limit Switch (water and vent)
Check resistance between leads. If resistance is very low, temperature should
be acceptable. If resistance is very high, temperature should be out of bounds.
A simple means of checking whether a high limit switch is open is by measuring
the AC voltage across the device. If the reading is 24 VAC the switch is open. If a
0VAC reading is shown, it is closed. NEVER connect an ohm-meter or continuity
checker across a live circuit.
5.2.6 Ignition Module
There are two approved ignition modules - Fenwal (grey) and Capable Controls
(white). Each have a red LED lamp providing the following signals: Fenwal – 1
rapid flash on 1st entering Pre-purge, 3 rapid flashes upon Failure to Ignite After 3
Attempts; the Capable Controls module provides a single flash at the start of each
Purge and Interpurge cycle, continuous rapid flashes during the 4 second spark
interval, solid illumination following successful ignition until burner shutdown, and
a slow on/off cycle with a 3-try failure.
Flame current can be monitored on the Fenwal. Connect an electrical test
meter - set to read Microamps (symbol μA) to the two test pins at the top right of
the ignition module. Recycle the boiler so it enters another trial for ignition and
monitor the flame current reading. When the burner ignites, a steady reading of
Do not blow into sensor ports
Air pressure sensor mounting
Return water pressure sensor
Fenwal ignition module - Microamp
(μA) test points are shown at top
right corner of module (above red
L.E.D.)
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
2-7 Microamps should be measured by your meter. The control will lock out if
the reading drops below 0.7 Microamps. (see Section 5.3.1 - “Control Module
- Maximum ignition trials error”, and Section 5.3.2 - “Ignition problems”). For
conversion from Fenwal to the Capable Control, specify IBC part# 240-049 – that
provides the module plus added wire lead and instructions.
INSTALLATION AND OPERATION INSTRUCTIONS
5-6
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
5.3
troubleshooting GUIDE
SYMPTOM
DIAGNOSIS
REMEDY
Airflow Error
LCD Screen Message:
Error – Insufficient Air Flow -
Check Venting
Insufficient combustion airflow;
soft error; will retry in 5 minutes
Check fan operation
•
Check lead is attached at fan.
•
Cycle power off/on; listen for fan initialization.
If no action, focus your attention on the fan
itself.
Check for fouled
reference lines and air
sensor
•
Check clear vinyl air reference lines below
gas valve for any sign of water. After
disconnecting from black sensor, blow clear.
Check for exhaust re-ingestion, or repeated
power interruptions .
•
Ensure condensate trap is not blocked.
•
Go to Advanced Diagnostics and check
differential air pressure sensor (at rest and
with fan on). See Section 5.2.3.
Check achieved fan
power
In Advanced Diagnostics, during Pre-purge, Fan
Pressure (FP) should move close to Required
Pressure (RP); if FP only 120-150 vs. RP of
250 or 300, then check for actual vent system
blockage: (a) disconnect intake within boiler
case; (b) open burner then fan/gas valve looking
for debris.
Water noise in vent.
Excess condensate in
venting.
•
Check condensate trap for obstructions.
Remove obstructions and refill condensate
trap with water.
•
Check vent length, size and configuration,
particularly re: horizontal 2" piping.
Waterflow Error
LCD Screen Message:
Error - No Water Flow
Low water flow – soft error; will
retry in 5 minutes
Check pressure
sensors
•
Check wiring: water pressure sensors to
controller.
•
Check pressure sensors. See Section 5.2.4
– 2nd paragraph.
Check for proper
piping
Refer to Section 1.6 Water Piping for
recommended piping installation.
Check primary pump
If there is a valve on the primary loop, close it
and listen for cavitation (evidence flow). If not,
go to Installer Setup; select pump purge “on” to
run pumps without a heat call - check for heat
buildup at pump body (indicates no flow).
Check for restriction
in water pipe
Check temperature differential across heat
exchanger at low –medium firing rate if possible.
Examine air strainer components for scale.
WARNING
Never attempt to repair
the control module (circuit
board). If the control module
is defective, replace it
immediately.
5.3.1 Using Control Module Errors Displayed
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
SYMPTOM
DIAGNOSIS
REMEDY
Maximum Ignition Trials
Error
LCD Screen Message:
Error – Ignition Failure after 3
tries
Boiler has failed to ignite on 3
successive attempts. Boiler in
lockout for 1 hour, then repeats
3-try seq. Consult service
technician if error recurs.
No spark when
igniting. Igniter
probe/flame sensor
disconnected.
Check that igniter lead is secure at the control
module and at the probe.
Manual gas shutoff is
closed or gas line not
fully purged.
Check for gas flow. Open manual gas shutoff
and reset boiler.
Gap between igniter
probe and burner is
too large or too small.
Adjust gap between igniter probe/flame sensor
and burner to a distance of 3/16" (turn off gas
supply and remove viewport for best visibility;
use profile of 1/8" diameter ignitor rod to gauge
distance)
Spark, but no ignition.
Check spark module is sending power to gas
valve – close gas supply, then disconnect
(black) electric housing from face of gas valve,
gently spread plastic tabs to open, and look for
24vac voltage between blue and brown wires
during an ignition cycle. Replace module if no
current detected
Boiler ignites, but
shuts off at the
end of the ignition
trial. Improperly
grounded pressure
vessel/burner or
unserviceable ignition
lead or spark module.
•
Ensure pressure vessel is grounded.
•
Check the igniter probe/flame sensor is
electrically isolated from the vessel, and its
ceramic insulator is intact.
•
Replace ignition lead
•
Replace spark module
Hi Limit Error
LCD Screen Message:
Error – Water High-Limit
Exceeded
Water temperature exceeds hi-
limit. Boiler in hard lockout. Will
reset in 1 hour. Consult service
technician.
Defective or
disconnected hi-limit
switch.
•
Check wiring to hi-limit switch and control
module.
•
Check hi-limit switch. See Section 5.2.5.
Vent Hi-Limit Error
LCD Screen Message:
Error - Vent High-Limit
Exceeded *** Call for service!
Vent temperature has exceeded
the vent limit switch. Boiler
in lockout. Consult service
technician.
•
Check wiring to ensure sensor is properly
connected to control module.
•
Check for evidence of any damage to vent
system.
•
Push manual reset button, maintain constant
watch during boiler operation to evaluate
vent temperature at maximum operating
settings to ensure no unsafe condition exists,
e.g. max flue temp. within allowable limits for
exhaust pipe material used.
INSTALLATION AND OPERATION INSTRUCTIONS
5-8
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
5.3.2 Ignition Problems
SYMPTOM
DIAGNOSIS
REMEDY
Noisy spark when
igniting
Ignition lead is not
firmly connected.
Reconnect ignition lead.
Contaminants/
moisture on igniter
probe/flame sensor.
Ensure probe is dry by re-running post-purge;
otherwise, clean or replace igniter probe.
Boiler rumbles when
igniting.
Fluctuating gas
pressure/ gas
pressure too high/too
low.
Check CO2 level via analyzer.
Check for proper
piping.
Check pressure with manometer during ignition.
Boiler will not attempt
to ignite. Fan and pump
are operating normally.
No power to ignition
control module.
• Check system wiring.
• Check air reference tubing.
Igniter probe/flame
sensor disconnected.
Reconnect probe.
Blown fuse in ignition
module.
Check fuse. If blown, replace.
Defective Control
Module.
Check ignition output from control module.
Boiler will not attempt
to ignite. Fan and / or
pump are off Display
not illuminated
No power to boiler.
Check line voltage .
Defective transformer.
Check transformer. Reconnect or replace as
needed.
SYMPTOM
DIAGNOSIS
REMEDY
Temperature Sensor
Error
LCD Screen Message:
Error - Max. In-Out Temp.
Exceed. -> Check water flow
Water temperature signal
not within acceptable range.
Potential flow or sensor failure.
Consult service technician.
Current outlet
temperature exceeds
operating limit.
• Check water flow.
Defective or
disconnected
temperature sensor.
• Check wiring to temperature sensor and
control module.
• Check temperature sensor. See Section
5.2.1.
Miscellaneous
LCD Screen Message :
Blank – screen dark, but fan
running Indicative of power-
surge damage to appliance
• Check transformer; replace if damaged.
• Check circuit board for visible damage.
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
5.3.3 Cycling Problems
SYMPTOM
DIAGNOSIS
REMEDY
Rapid Cycling
Improper values
entered via keypad.
Check load maximum temps are above target
temps, by 1/2 of the selected boiler differential.
Ensure boiler differential is OK (16-30°F is
generally adequate)
Excess Condensate in
venting.
Check venting slopes on horizontal runs. Look
for sags.
Obstruction in
condensate trap.
Inspect and clean condensate trap.
Improper vent length
or improper slope to
vent.
Check venting. Compare vent length and
diameter to Table 3: Maximum Venting.
Incorrect settings or
defective thermostat.
Check operation. Refer to manufacturer’s
instructions. Check setting with ammeter.
Air in system or
marginal water flow.
Bleed/purge system as required. Confirm
adequate pump size and temp rise in HX
Slow combustion air
blower.
Check that CO2 level is OK 9.0% nat. gas
(10.2% for propane).
Dirty burner/heat
exchanger.
Check pressure drop.
Insufficient water
flow due to improper
piping.
Refer to recommended piping in Section 1.6
Insufficient water flow
due to undersized
pump.
Check manufacturer’s rating charts/check
temperature differential across heat exchanger.
Insufficient water flow
due to restrictions in
water pipe.
Check temperature differential across zone/heat
exchanger.
Insufficient radiation.
Check actual amount of radiation per zone and
refer to manufacturer’s rating tables.
Unit over-fired.
Clock gas meter/check gas pressure with
manometer/ check CO2 level.
Unit Oversized.
Check load calculation vs. min. boiler output.
Improperly set or
defective operating/
safety controls.
Check operation with ohmmeter/voltmeter.
INSTALLATION AND OPERATION INSTRUCTIONS
5-10
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
5.3.4 Temperature Problems
Symptom
Diagnosis
Remedy
Insufficient heat
Operating
temperature too low.
increase temperature target. See Section 2.7
Priority parameters
or load configuration
improperly set up.
Review load configuration parameters. See
Section 2.7
Unit undersized.
Refer to Load Calculation vs. Boiler Output.
Air trapped within
system.
Bleed system as required.
Improper system
piping.
Refer to recommended piping in Section 1.6
System pump
undersized.
Check pump manufacturer’s data/check temp
differential across heat exchanger.
Poor gas/air mixing.
Check CO2 level.
Defective thermostat.
Refer to manufacturer’s instructions.
Obstruction in
condensate drain.
Inspect and clean condensate drain.
Unit cycling on
operating/ safety
controls.
Check operation with Ohmmeter/Voltmeter.
System radiation
undersized.
Check manufacturer’s rating tables for capacity
per foot.
Temperature exceeds
thermostat setting
Incorrect anticipator
setting.
Check with Ammeter.
Thermostat not level.
Check level.
One or more zones do
not heat properly
Air trapped within
zone(s) piping
Vent system/zone as required.
Insufficient radiation/
excessive heat loss.
Check actual length of pipe using radiation / heat
loss calculation.
Insufficient flow rate
to zone(s).
Check temperature drop across zone.
Defective zone valve/
zone circulator.
Check operation per manufacturer’s instructions.
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
5.3.5 Miscellaneous
SYMPTOM
DIAGNOSIS
REMEDY
Fumes and High Humidity
Improperly installed
condensate trap
Refer to installation/operation instructions
Leak in vent piping
Inspect using soap solution
Flue gas leak within
boiler
Visually inspect all mechanical connections
INSTALLATION AND OPERATION INSTRUCTIONS
5-12
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
THIS PAGE INTENTIONALLY LEFT BLANK
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
6.0
DIAGRAMS
6.1 - VFC 45-225 PARTS DIAGRAMS
6.2 - VFC 15-150 PARTS DIAGRAMS
6.3 - additional parts DIAGRAMS
6.4 - WIRING DIAGRAMS
6.5 - SEQUENCE OF OPERATION
INSTALLATION AND OPERATION INSTRUCTIONS
6-2
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
6.1
VFC 45-225 PARTS DIAGRAM
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Item #
Description
Part #
Qty
5
Fan NRG 137
240-048
1
10
O-Ring
150-073
1
15
Fan Adapter Plate
180-023
1
20
Screw, M4x10 Tapping, Flat
Head, Equipped w/Fan
3
25
Air Intake Base
180-017
1
30
Swirl Plate
180-020
1
35
Air Intake Cover
180-018
1
40
Gas Valve
180-022
1
45
Spacer, #8, 1/8” Thick, 1/4” OD
150-092
3
50
Screw, M4 x 30, Tapping,
Equipped w/Gas Valve
3
55
Screw #10-32 x 7/8” Hex Head
150-110
4
60
Gasket, Fan - Fan Coupler
250-381
2
65
Fan Coupler Spacer
250-370
1
70
Nut, #10-32, With External Tooth
Washer
150-111
4
75
Switch, Snap Disk, Manual Reset,
230F
240-030
1
80
Switch, Snap Disk, Auto-reset,
203F
240-032
1
85
Mounting Plate, Snap Disk
250-333
1
90
Ignition Module (alternate
Capable Controls 240-049)
240-004B
1
95
Screw, Sheet Metal, #8 x 3/4”
150-102
2
100
Sensor, Water Pressure
240-006
2
105
Enclosure
250-312
1
110
Mounting Bracket, Gas Valve
250-316
1
115
Sensor, Air Pressure
240-003
1
120
Transformer
240-008
1
125
Side Cover, Controller
250-327
1
130
Screw, #6-32 x 3/8”
150-014
6
135
Chassis, Controller
250-107
1
140
PCB, Controller
230-001
1
145
Spacer, Male-Female, #6-32 x
3/4”
150-096
4
150
Front Cover, Controller
250-108
1
155
Pipe Clamp
150-039
3
160
2” ABS Intake Assembly
1
165
Clip Nut, M10, 19mm Center
150-105
4
170
Heat Exchanger
170-009
1
175
Refractory, Outer
250-287
1
180
Refractory, Inner
250-306
1
185
Gasket, Heat Exchanger Lid
250-328
1
190
Lid, Heat Exchanger
250-284
1
195
Screw, M10 x 55, Hex Head
150-106
4
200
Washer, Fender, M10
150-104
4
205
Ignitor
240-002
1
210
Gasket, Ignitor
250-050
1
Item #
Description
Part #
Qty
215
Screw, M4 x 8
150-091
4
220
Sight Glass Holder
250-309
1
225
Gasket, Sight Glass
250-060
2
230
Sight Glass
250-059
1
235
Gasket, Burner
250-308
2
240
Burner
180-021
1
245
V-Clamp
150-071
1
250
Fan Coupler
250-280
1
280
Front Cover, VFC 225
250-315
1
INSTALLATION AND OPERATION INSTRUCTIONS
6-4
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
6.2
VFC 15-150 PARTS DIAGRAM
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Item #
Description
Part #
Qty
6
Fan RG 130
240-040
1
11
Gasket Fan-Fan Adapter
250-310
1
15
Fan Adapter Plate
180-023
1
20
Screw, M4 x 10, Flat Head
Equipped w/240-040
4
25
Air Intake, Base
180-017
1
30
Swirl Plate
180-020
1
35
Air Intake, Cover
180-018
1
40
Gas Valve
180-022
1
45
Spacer, #8, 1/8" Thick, 1/4" OD
150-092
3
50
Screw, M4 x 30, Tapping,
Equipped w/180-022
3
55
Screw, #10-32 x 7/8", Hex Head
150-110
4
61
Gasket, Fan-Fan Coupler
250-311
1
70
Nut, 10-32, with External Tooth
Washer
150-111
4
75
Switch, Snap Disk, Manual Reset,
230F
240-030
1
80
Switch, Snap Disk, Auto-reset,
203F
240-032
1
85
Mounting Plate, Snap Disk
250-333
1
90
Ignition Module (alternate
Capable Controls 240-049)
240-004B
1
95
Screw, Sheet Metal, #8 x 3/4"
150-102
2
100
Sensor, Water Pressure
240-006
2
105
Enclosure
250-312
1
111
Gas Valve Mounting Bracket
250-314
1
115
Sensor, Air Pressure
240-003
1
120
Transformer
240-008
1
125
Side Cover, Controller
250-327
1
130
Screw, #6-32 x 3/8", Pan Head
150-014
6
135
Chassis, Controller
250-107
1
140
PCB, Controller
230-001
1
145
Spacer, Male-Female, #6-32 x
3/4"
150-096
4
150
Front Cover, Controller
250-108
1
155
Pipe Clamp
150-039
3
160
2" ABS Intake Assembly
1
165
Clip Nut, M10, 19mm Center
150-105
4
170
Heat Exchanger
170-009
1
175
Refractory, Outer
250-287
1
180
Refractory, Inner
250-306
1
185
Gasket, Heat Exchanger Lid
250-328
1
190
Lid, Heat Exchanger
250-284
1
195
Screw, M10 x 55, Hex Head
150-106
4
200
Washer, Fender, M10
150-104
4
205
Ignitor
240-002
1
210
Gasket, Ignitor
250-050
1
215
Screw, M4 x 8, Pan Head
150-091
1
Item #
Description
Part #
Qty
220
Sight Glass Holder
250-309
1
225
Gasket, Sight Glass
250-060
2
230
Sight Glass
250-059
1
235
Gasket, Burner
250-308
2
240
Burner
180-021
1
245
V-Clamp
150-071
1
250
Fan Coupler
250-280
1
270
Front Cover, VFC 150
250-313
1
INSTALLATION AND OPERATION INSTRUCTIONS
6-6
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Diagram 6.1-2: Water pressure sensor group
Diagram 6.1-3: Vent high limit
Diagram 6.1-4: Accessory parts kit (shipped with boiler)
51 TRAP/EXHAUST KIT
Diagram 6.1-5: Intake Air Filter (order separately)
Item #
Description
Part #
47
Pressure Relief Valve
180-005
49
Outdoor Temperature Sensor
240-025
51(a)
Trap/Exhaust Kit VFC15-150
P-150
51(b)
Trap/Exhaust Kit VFC45-225
P-151
66
Washer, #10, External Tooth
150-085
67
Screw, #10-32 x 1/2"
150-084
75
Switch, Snap disk, Manual Reset, 230F
240-030
100
Sensor, Water Pressure
240-006
101
Pressure Sensor Bushing
250-023
103
Intake Air Filter Element
180-103
104
Intake Air Filter Housing
180-104
Parts Below - Not Shown
68
Ignition Cable
210-001
69
Fuse Kit (10 pack)
P-114
71
8 Position Terminal Block - Green
240-019
72
22 Position Terminal Block - Orange
240-020
73
DC to AC Fan Harness Conversion Kit
71-ACDC
74
Acid Neutralization Tank
180-029
102
Ignitor Kit w/Gasket
P-142
6.3
additional parts DIAGRAMS
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
6.4
WIRING DIAGRAMS
Diagram 6.2-1: Pictorial wiring diagram
ELECTRICAL NOTES AND SPECIFICATIONS
INSTALLATION AND OPERATION INSTRUCTIONS
6-8
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Diagram 6.2-2: Ladder wiring diagram
INSTALLATION AND OPERATION INSTRUCTIONS
6-10
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
6.5
SEQUENCE OF OPERATION
Diagram 6.3: Sequence of operation diagram
INSTALLATION & COMMISSIONING REPORT
Boiler Details:
Model Number _____________________ Serial Number ______________________________________________
Date of Installation ______________ Address of installation __________________________________________
_____________________________________________________________________________________________
User contact information _______________________________________________________________________
Installer Information Company ___________________________________________________________________
Address ______________________________________________________________________________________
Phone/Fax/E mail ______________________________________________________________________________
Fuel
Natural Gas
Propane
Gas Supply Pressure (high fire) _______ Inches w.c. Measured Rate of Input (high fire) ____________ Btu/hr
Installation instructions have been followed and completed (Section 1 of Installation and Operating Instructions).
Check-out procedures have been followed and completed (Section 3 of Installation and Operating Instructions).
Leak testing completed
gas piping
venting system
Fan and combustion components
System Cleaned and Flushed (type of cleaner used) ________________________________________________
System Filled (type/concentration of any glycol/chemicals used) _______________________________________
Air purge completed (go to Installer Setup - - Pump Purge - - On, and operate pumps until air has been ejected)
Relief Valve correctly installed and piped
Relief valve “try lever” test performed
Condensate trap filled
Condensate drain clear and free flowing
Condensate Neutralization? Yes/No
Ignition Safety Shutoff test completed. Flame current reading - High fire _______ µA - Low fire _______ µA
Standby readings from IBC display screen - (remove all heat calls) - Outdoor Temperature ________ Tank
Temperature _______ Outlet Temperature _________ Outlet Pressure __________ Heat Output ___________
Load Status Screen readings - Load 1 _______________ Load 2 _______________ Load 3 _______________
From Installer Setup Menu (scroll down) - Altitude ______________ Prim. Pump Purge Time _______________
Multiboiler Config. ______ (go to Installer Setup - - enter - this setting should be “Off” except for Master Boiler)
Advanced Diagnostic Menu readings - boiler in Standby - (remove all heat calls)
Outdoor Temperature _______ Inlet Pressure _______ Outlet Pressure _________ Delta Pressure __________
Flow Rate __________ Fan Speed __________ Required Pressure ___________ Fan Pressure ____________
Owner advised and instructed in the safe operation and maintenance of the boiler and system.
Information regarding the unit and installation received and left with owner
Combustion Readings - recommended, but optional (required for fuel conversion):
CO2 _____________ % O2 ______________ % CO ____________ ppm
Flue temperature _________ Return water temperature (measure simultaneously with flue temp.) _______________
Installers: send this completed sheet - Fax to 604 877 0295 - or - scan and Email to [email protected], and earn
an extra year’s Parts Warranty coverage (User to submit corresponding Installation Record from User Guide).
Commissioning has been completed as listed on this report - Installer Signature _____________________________
DESCRIPTION OF WORK DONE
Installer set-up
Load Definition - Load #1 _______________________________________________________________________
Load Configuration - Load #1
_____________________________________________________________________________________________
Load Definition - Load #2 _______________________________________________________________________
Load Configuration - Load #2
_____________________________________________________________________________________________
Load Definition - Load #3 _______________________________________________________________________
Load Configuration - Load #3
_____________________________________________________________________________________________
R1 (Sept 2005)
Initial release
R2 (July 2007)
Venting requirements (Canada) to ULC-S636; internal wiring diagram and warranty details added
R3 (Mar 2010)
VFC 45-225-SL variant added (with new NRG-137 fan); warranty removed to separate document
R4 (SEPT 2012)
Polypropylene venting, detachable lid heat exchanger and US Energy Act disclosures added;
VFC 45-225-SL designation merged within base VFC 45-225 model
IMPORTANT
This Boiler is equipped with a feature that saves energy by reducing the boiler water
temperature as the heating load decreases. This feature is equipped with an override
which is provided primarily to permit the use of an external energy management system
that serves the same function. THIS OVERRIDE MUST NOT BE USED UNLESS AT
LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE:
• An external energy management system is installed that reduces the boiler
water temperature as the heating load decreases.
• This boiler is not used for any space heating.
• This boiler is part of a modular or multiple boiler system having a total input
of 300,000 BTU/hr or greater.
• This boiler is equipped with a tankless coil (not applicable to IBC’s VFC boilers).
US installers should contact IBC for any further information required.
As referenced on page 2-7 of this manual, the following message is relevant to users in the USA:
IBC Technologies Inc.
1445 Charles Street,
Vancouver, BC
Canada V5L 2S7
Tel: 604.877.0277
Fax: 604.877.0295
www.ibcboiler.com
120-100E-A-R4
September 2012