ACV E-Tech W 09 Installation, Operating And Servicing Instructions

Specifications

Brand: ACV
Category: Boiler
Model: E-Tech W 09 (Installation, Operating And Servicing Instructions)
File Type: PDF
File Size: —
Pages: 28

Read Online

Read the ACV E-Tech W 09 Installation, Operating And Servicing Instructions online using the built-in PDF viewer.

Text of the manual

EN • 1

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Installation, operating and servicing instructions 09 - 15 - 22 - 28 - 36 Single & Tri Phase

EN • 2

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Applicable standards 3 Importants notes 3 Manual handling instructions 3 Removing the boiler from the packaging 3 introduction 4 Description of the specifications 4 Lining 4 Heating body 4 Heating elements 4 Equipment 4 Connection 4 Dual stage thermostat 4 Certification 4 Legend 4 instructions 6 User data 6 Setting up 6 Optional internal timeclock 6 Pressure in the heating system 6 technical characteristics 7 Electrical data of model 09 Single phase 8 Electrical data of model 09 Tri phase 8 Electrical data of model 15 Single phase 8 Electrical data of model 15 Tri 8 Electrical data of model 22 Tri 9 Electrical data of model 28 Tri 9 Electrical data of model 36 Tri 9 mounting 10 Dimensions 10 Wall mounting 10 Installation room 10 installation 11 Disassembling 11 Heating connection 12 Heating connection + DWL : “Y” plan 12 Heating connection + DWL : “S” plan 12 Electric connection / Models : 09 - 15 Single phase 13 Electric connection / Models : 09 - 15 Tri phase 13 Electric connection / Model : 22 Tri phase 13 Electric connection / Model : 28 Tri phase 14 Electric connection / Model : 36 Tri phase 14 Sizing of supply wires 14 Wiring diagrams / Models : 09 - 15 Single phase 15 Wiring diagrams / Models : 09 - 15 Tri phase 16 Wiring diagrams / Model : 22 Tri phase 17 Wiring diagrams / Models : 28 - 36 Tri phase 18 Power wiring / Models : 09 - 15 Single phase 19 Power wiring / Models : 09 - 15 Tri phase 20 Power wiring / Models : 22 Tri phase 21 Power wiring / Models : 28 Tri phase 22 Power wiring / Models : 36 Tri phase 23 Honeywell sundial wiring diagrams 24 Honeywell Sundial Wiring Centre ‘S’ Plan 24 Honeywell Sundial Wiring Centre ‘Y’ Plan 25 commissioning and maintenance 26 Commissioning - Water 26 Commissioning - Electrical 26 Starting the boiler 26 Maintenance 26 Removal the heating elements 27 spare parts www.acv.com

EN • 3

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D WHO SHOULD READ THESE INSTRUCTIONS These instructions should be read by: - the specifying engineer - the installer - the user - the service engineer Symbols Warnings Essential instruction for the safety of persons and the environment. Danger of electrocution. Essential instruction for the correct operation of the installation. Recommendations • These instructions are an integral part of the equipment to which they refer and the user must be provided with a copy. • The product must be installed and serviced by qualified engineers, in compliance with current standards. • The manufacturer cannot accept liability for any damage resulting from incorrect installation or from the use of components or fittings not specified by the manufacturer. • Any failure to follow instructions relating to tests and test procedures may result in personal injury or risks of pollution. • It is important to switch the boiler off before carrying out any work. • There are no user parts inside the control panel. APPLICABLE STANDARDS The Boilers have been manufactured to comply with the following standards BS EN60335-2-35: 2002, BS EN55014-1: 2001 and BS EN55014-2:1997. The installation must be in accordance with the current standards. REMOVING THE BOILER FROM THE PACKAGING • Before lifting the boiler from the packaging, ensure that the installation area is clear and that there are no obstacles making installation difficult or unsafe. • Lay the boiler on its back (as shown on the box side), open the box and remove the cardboard packaging. • Remove the polythene cover and the polystyrene corner protection pieces. • With help from another person, lift the boiler from the packaging holding the lipped front edges of the side panels. • Do not lift or carry the boiler using the top automatic air vent and bottom pump. Importants notes These instructions are an integral part of the equipment to which they relate and must be handed to the user. The product must be installed and serviced by qualified engineers in accordance with the regulations in force. The manufacturer declines all liability for any damage caused as a result of incorrect installation or in the event of the use of appliances or accessories that are not specified by the manufacturer. The manufacturer reserves the right to change the technical characteristics and specification of its products without notice. The availability of certain versions and their accessoiries can vary following the market. Warning : Do not switch ON if there is a possibility that the water in heater is frozen. RISK OF INJURY LIFT WITH CARE GET HELP HEAVY APPLIANCE The weight of this boiler is 36Kg, which could present a risk of injury. Care should be taken when loading and unloading the boiler to and from vehicles. We recommend that the boiler be handled by two people until it is securely fixed to a wall. The safest route from the vehicle to the point of installation should be carefully assessed before unloading the boiler. Mechanical lifting aids should be utilised whenever possible. MANUAL HANDLING INSTRUCTIONS

EN • 4

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Description of the specifications: This wall hung electric boiler is available in 7 models: • The models Single phase 09 and 15 are supplied with 230 V. • The models Tri phase 09, 15 , 22, 28 and 36 are supplied with 400 V. The maximum power can be adjusted for all models by acting on the switches on the control panel. The maximum power can be adjusted for this models by acting on the terminals bridges. Models Adjustable power Min Max 09 single phase 5.6 kW 8.4 kW 15 single phase 9.6 kW 14.4 kW 22 tri phase 14.4 kW 21.6 kW 28 tri phase 14.4 kW 28.8 kW 36 tri phase 18 kW 36 kW Lining The boiler is protected by a steel lining that first of all undergoes a degreasing and phosphation process before being lacquered and burnt at 220°C. Heating body The boiler heat exchanger is constructed from mild steel with welded joints. It is hydraulic tested under a pressure of 4.5 bar (maximum working pressure = 3 bar). Heating elements Immersion heaters, constructed from stainless steel Incoloy 800 and mounted in the top of the boiler, provide the power source for the Boiler. Equipment The boiler is equipped with all the necessary components to allow direct connection to a heating system without the need for a feed and expansion cistern. These components include; primary 10 litre expansion vessel (suitable for a system water content of up to 160 litres), pressure and temperature gauge, safety valve, circulating pump, low water pressure switch, control and high limit thermostats, on/off and power level switches. CONNECTION The boiler is suitable for connection to most heating and hot water systems, with a maximum working pressure of 3 bar and a maximum temperature of 85°C. It can also be used in multiple boiler installations allowing greater outputs to be achieved. The boiler, and connection glands for both the main power supply and optional external controls are provided, suitable for single or three phase electrical supply depending upon boiler output required. An internal 3 amp MCB is provided to protect the internal control circuit, from which optional controls can be connected e.g. internal or external timeclock, room thermostat or Honeywell Sundial controls. DUAL STAGE THERMOSTAT The temperature of the boiler is controlled by a dual stage thermostat which is set by the user to give the desired boiler temperature. When the boiler has heated up to within 7°C of the set temperature, the thermostat switches off one power stage and therefore reduces the heat input. Thanks to this simple but effective form of modulation, the boiler has longer working cycles and requires less stops and starts, thus resulting in a more even temperature across the boiler. It also means less wear and tear on components and, importantly it uses less power once it has reached working temperature. certification The boilers have been manufactured to comply with the following standards BS EN60335-2-35: 1998, BS EN55014-2:1997 and BS EN50081-1-1: 1992. Legend 1. Control circuit 2. Relay 3. Timer 4. Control terminals 5. Power terminals 6. Power terminals with fusible 25A or 32A introduction 2 4 1 3 5 2 4 1 3 6

EN • 5

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D introduction Top cover Rear panel Water pressure switch Expansion vessel connection Heating return Automatic air vent Expansion vessel Valve of expansion vessel Heating flow Manual reset high limit pressure gauge Expansion vessel connection Circulating pump Heating elements Heating body Pressure safety valve Cable gland Hand side panel Control panel Brass pocket

EN • 6

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D 1 2 3 5 6 7 4 USER DATA All user controls are situated on the front panel of the boiler, there are no user controls inside the boiler casing. The following instructions assume that the boiler has been commissioned, and that the system is filled with water and has been fully vented. SETTING UP • Before switching on any electrical supplies to the boiler ensure that the combined temperature and pressure gauge reads at least 1 bar and the control thermostat is set to the desired temperature. • If an internal time clock is fitted ensure that this is switched on (see “Optional Internal Time Clock”) and if any other auxiliary controls are fitted e.g. programmer, room thermostats, cylinder thermostats etc, consult appropriate manufacturers’ instructions to switch these on. • Switch on any local means of isolation to boiler. • Switch the boiler on using the ON/OFF switch (the neon light on the switch should now glow). • Turn on both power level switches - after a short period of time the boiler temperature should start to rise, indicated by the combined temperature and pressure gauge. If the boiler fails to operate, the overheat safety thermostat should be checked. Access to the thermostat reset button is obtained by unscrewing (anti-clockwise) the domed button cover on the front panel (a screwdriver is not required).The reset button can then be seen - press the button, a click should be heard and the button is reset. If no click was heard the device is not at fault and further investigation is required by a suitably qualified engineer. • The internal clock or external programmer can now be set to allow on/off periods as desired. The ON/OFF switch and 2 power level switches should be left in the ON position during normal use. The power level switches will automatically switch on and off during normal boiler operation, depending on boiler temperature. • If the boiler is not in regular daily use during cold periods, it is recommended that it be fitted with a frost sensing thermostat to override the timeclock and prevent the system from freezing. • As with most boilers and heating appliances the casing and pipework can get hot during normal running so the boiler must not be covered and the surrounding area must be kept clear. optional internal timeclock • This operates on a 24-hour sequence. Around- the outside of the clock there are a number of white tabs - these allow 15 minute switching times.To set a boiler cycle simply push outwards the number of tabs required for your heating period. Remember : tab OUT = BOILER ON tab IN = BOILER OFF The time of day is marked by an arrow on the inner part of the clock - set the outer time to coincide with this arrow. On the centre part of the clock there is a switch. This has three positions : • Switch down - timeclock off • Switch middle - timeclock timed (normal position) • Switch up - timeclock on constant. PRESSURE IN THE HEATING SYSTEM The CH pressure must be a minimum of 1 bar and must be checked by the end user on a regular basis. If the pressure drops under 0.5 bar, the integrated water pressure switch blocks the appliance until the pressure in the system returns to a level above 0.8 bar. The installer fits the system with a separate fill valve underneath the appliance. Make sure that the appliance is powered off when filling the system. To do this, turn the on/ off switch. For more information, please ask your installer when the system is delivered. A safety valve is provided underneath the appliance. If the system pressure exceeds 3 bars, this valve opens and drains the water from the system. In this case, please contact your installer. instructions LEGEND 1. ON/OFF switch 2. Power levels switch 3. Optional internal clock or controler 4. Combined temperature and pressure gauge 5. Boiler shutdown indicator light 8. Manual reset high limit thermostat 7. Control thermostat : 1 = 40°C 2 = 50°C 3 = 60°C 4 = 70°C 5 = 80°C

EN • 7

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D technical characteristics Models 09 Single 15 Single 09 Tri 15 Tri 22 Tri 28 Tri 36 Tri Power 8.4 kW 14.4 kW 8.4 kW 14.4 kW 21.6 kW 28.8 kW 36 kW Nominal supply voltage 1 x 230 V 1 x 230 V 3 x 400 V 3 x 400 V 3 x 400 V 3 x 400 V 3 x 400 V Ohmic resitance of element 37.8 Ohm 22 Ohm 37.8 Ohm 22 Ohm 22 Ohm 22 Ohm 17.6 Ohm Heating element type 2 x 1.4 kW 2 x 2.4 kW 2 x 1.4 kW 2 x 2.4 kW 2 x 2.4 kW 2 x 2.4 kW 2 x 3.0 kW Number of elements 3 3 3 3 5 6 6 Water capacity (Litres) 13 13 13 13 13 13 13 Expansion vessel capacity (Litres) 10 10 10 10 10 10 10 Max. working pressure (bars) 3 3 3 3 3 3 3 Min. working pressure (bars) 0.8 0.8 0.8 0.8 0.8 0.8 0.8 Max. working temperature (°C) 85 85 85 85 85 85 85 Hydraulic pressure drop (mbar) 10 20 10 20 45 85 125 Heating connection 3/4” 3/4” 3/4” 3/4” 3/4” 3/4” 3/4” Height (mm) 763 763 763 763 763 763 763 Width (mm) 442 442 442 442 442 442 442 Depth (mm) 332 332 332 332 332 332 332 Weight empty (kg) 45 45 45 45 45 45 45 Electric protection IP 43 IP 43 IP 43 IP 43 IP 43 IP 43 IP 43

EN • 8

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D technical characteristics Electrical data of model 09 Single Phase Stage 1 Stage 2 TOTAL CONTROL Terminals Single phase 8.4 kW (*) 12 13 12 13 14 14 15 15 Terminal L1 (A) 24 12 36 Terminal N (A) 24 12 36 Power (kW) 5.6 2.8 8.4 Single phase 5.6 kW (**) 12 13 12 13 14 14 15 15 Terminal L1 (A) 12 12 24 Terminal N (A) 12 12 24 Power (kW) 2.8 2.8 5.6 Electrical data of model 15 Single Phase Stage 1 Stage 2 TOTAL CONTROL Terminals Single phase 14.4 kW (*) 12 13 12 13 14 14 15 15 Terminal L1 (A) 41.6 20.8 62.4 Terminal N (A) 41.6 20.8 62.4 Power (kW) 9.6 4.8 14.4 Single phase 9.6 kW (**) 12 13 12 13 14 14 15 15 Terminal L1 (A) 20.8 20.8 51.6 Terminal N (A) 20.8 20.8 51.6 Power (kW) 4.8 4.8 9.6 Electrical data of model 09 Tri Phase Stage 1 Stage 2 TOTAL Tri phase 8.4 kW Terminal L1 (A) 6 6 12 Terminal L2 (A) 6 6 12 Terminal L3 (A) 6 6 12 Power (kW) 4.2 4.2 8.4 Electrical data of model 15 Tri Phase Stage 1 Stage 2 TOTAL Tri phase 14.4 kW Terminal L1 (A) 10.4 10.4 20.8 Terminal L2 (A) 10.4 10.4 20.8 Terminal L3 (A) 10.4 10.4 20.8 Power (kW) 7.2 7.2 14.4 This values are based on standard supply voltage in Europe, that is 1 x 230V for single phase and 3 x 400 Volt for tri phase. (*) Factory configuration / (**) Remove the shunt 12 and 13 on control wiring in order to deactivate the relay. This values are based on standard supply voltage in Europe, that is 1 x 230V for single phase and 3 x 400 Volt for tri phase. (*) Factory configuration / (**) Remove the shunt 12 and 13 on control wiring in order to deactivate the relay.

EN • 9

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D technical characteristics Electrical data of model 22 Tri Phase Stage 1 Stage 2 TOTAL CONTROL Terminals Tri phase 21.6 kW (*) 12 13 12 13 14 14 15 15 Power terminal L1 (A) 20.8 10.4 31.2 Power terminal L2 (A) 20.8 10.4 31.2 Power terminal L3 (A) 20.8 10.4 31.2 Power (kW) 14.4 7.2 21.6 Tri phase 14.4 kW (**) 12 13 12 13 14 14 15 15 Power terminal L1 (A) 10.4 10.4 20.8 Power terminal L2 (A) 10.4 10.4 20.8 Power terminal L3 (A) 10.4 10.4 20.8 Power (kW) 7.2 7.2 14.4 This values are based on standard supply voltage in Europe, that is 1 x 230V for single phase and 3 x 400 Volt for tri phase. (*) Factory configuration / (**) Remove the shunt 12 and 13 on control wiring in order to deactivate the relay. Electrical data of model 28 Tri Phase Stage 1 Stage 2 TOTAL CONTROL Terminals Tri phase 28.8 kW (*) 12 13 12 13 14 14 15 15 Power terminal L1 (A) 20.8 20.8 41.6 Power terminal L2 (A) 20.8 20.8 41.6 Power terminal L3 (A) 20.8 20.8 41.6 Power (kW) 14.4 14.4 28.8 Tri phase 21.6 kW (**) 12 13 12 13 14 14 15 15 Power terminal L1 (A) 20.8 10.4 31,2 Power terminal L2 (A) 20.8 10.4 31,2 Power terminal L3 (A) 20.8 10.4 31,2 Power (kW) 14.4 7.2 21,6 This values are based on standard supply voltage in Europe, that is 1 x 230V for single phase and 3 x 400 Volt for tri phase. (*) Factory configuration / (**) Remove the shunt 14 and 15 on control wiring in order to deactivate the relay. Electrical data of model 36 Tri Phase Stage 1 Stage 2 TOTAL CONTROL Terminals Tri phase 36 kW (*) 12 13 12 13 14 14 15 15 Power terminal L1 (A) 26 26 52 Power terminal L2 (A) 26 26 52 Power terminal L3 (A) 26 26 52 Power (kW) 18 18 36 Tri phase 27 kW (**) 12 13 12 13 14 14 15 15 Power terminal L1 (A) 26 13 43 Power terminal L2 (A) 26 13 43 Power terminal L3 (A) 26 13 43 Power (kW) 18 9 27 This values are based on standard supply voltage in Europe, that is 1 x 230V for single phase and 3 x 400 Volt for tri phase. (*) Factory configuration / (**) Remove the shunt 14 and 15 on control wiring in order to deactivate the relay.

EN • 10

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D mounting Min. 25 mm Min. 400 mm Min. 200 mm 763 mm 763 mm 442 mm 332 mm 185 mm 370 mm 105 mm 101,6 mm 101,6 mm 48,4 mm 48,4 mm • The boiler must be fixed to a non flammable wall. • Observing the clearances shown below, drill 2 off 14mm x 100mm holes. • Fit the 2 bolts supplied and hang the wall bracket. • Fit washers and nuts • Hang the boiler FROST PROTECTION The boiler is NOT fitted with frost protection. If the boiler is being installed in a position where freezing could take place, then a suitable external frost thermostat should be fitted. CONNECTING TO THE SYSTEM The boiler is designed to operate on a sealed system (ie. no open vent or feed and expansion cistern) Hot water expansion within the system is taken up by the internal 10 litre expansion vessel.This is suitable for systems up to 160 litres capacity. If the system capacity is more than this then an additional expansion vessel may be required.This can be fitted external to the boiler at a convenient place on the pipework. Please note that the circulation pump is fitted to the flow connection. installation room The appliance must be positioned in such a way as to be easily accessible at all times. In addition, the following minimum distances around the appliance must be complied with. Wall mounting Dimensions

EN • 11

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D installation Panel removal and access to hydraulic connections 1. Undo screws. 2. Tilt panel towards you and lift clear remove the top cover. 3. Loosen screws of the control panel. 4. Turn up the control panel. 5. Block the control panel with the screw. disassembling A C 1 2 2 3 B 4 5

EN • 12

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D installation 39 38 37 36 35 34 33 32 31 29 28 27 26 25 24 23 22 21 19 18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 2 1 39 38 37 36 35 34 33 32 31 29 28 27 26 25 24 23 22 21 19 18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 2 1 Heating connection Limiting the maximum adjustable temperature Factory setting 30 - 85°C Floor heating 30 - 50°C 39 38 37 36 35 34 33 32 31 29 28 27 26 25 24 23 22 21 19 18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 2 1 heating connection + dHw : “Y” PLAN Limiting the maximum adjustable temperature 60 - 85°C 39 38 37 36 35 34 33 32 31 29 28 27 26 25 24 23 22 21 19 18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 2 1 heating connection + dHw : “S” PLAN 60 - 85°C Limiting the maximum adjustable temperature

EN • 13

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D installation • This appliance must be permanently connected to fixed wiring and must be earthed. • The wiring must be carried out by a competent person and in accordance with the current IEE Wiring Regulations. • Isolation device must be provided with a minimum contact clearance of 3 mm. • The MCB must be readily accessible and adjacent to the appliance. electric connection The safety contactor must be installed, outside the boiler and according to the local regulations. Power supply 3 x 400 V The safety contactor is not supplied by ACV L3 L2 N L1 L1 L1 L1 L1 L2 L2 L2 L2 L3 L3 L3 L3 1 2 3 4 E-Techw 22 Tri N L1 1 2 3 4 N L1 1 2 1 2 1 2 1 2 1 2 1 2 25A 25A 25A 25A 25A 25A The safety contactor must be installed, outside the boiler and according to the local regulations. Power supply 1 x 230 V The safety contactor is not supplied by ACV E-Techw 09 - 15 Single The safety contactor must be installed, outside the boiler and according to the local regulations. Power supply 3 x 400 V The safety contactor is not supplied by ACV L3 L2 N L1 1 2 3 4 L3 L3 L2 L2 L1 L1 E-Techw 09 - 15 Tri

EN • 14

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D The safety contactor must be installed, outside the boiler and according to the local regulations. The safety contactor must be installed, outside the boiler and according to the local regulations. installation • This appliance must be permanently connected to fixed wiring and must be earthed. • The wiring must be carried out by a competent person and in accordance with the current IEE Wiring Regulations. • Isolation device must be provided with a minimum contact clearance of 3 mm. • The MCB must be readily accessible and adjacent to the appliance. electric connection SIZING OF SUPPLY WIRES The supply wires are sized depending of the type and current of the MCB. This last firstly sized depending of the nominal current of the boiler. The admissible current of the supply xires depends of the ambient temperature, the section and length of the wires, the wires insulation, the wires canalisation, the mounting and the environment. The following values are given for information for an ambient temperature of 30°C and a maximal length of 5 meters. In all the cases, the installation must be in accordance with the current IEE Wiring Regulations. Nominal section (mm) Nominal current of the MCB (A) 1.5 16 2.5 25 4 32 6 40 10 63 16 80 E-Techw 36 Tri Power supply 3 x 400 V The safety contactor is not supplied by ACV N L1 L2 L3 1 2 3 4 L1 L2 L3 1 2 1 2 1 2 1 2 1 2 1 2 32A 32A 32A 32A 32A 32A Power supply 3 x 400 V The safety contactor is not supplied by ACV L3 L2 N L1 L1 L1 L1 L1 L2 L2 L2 L2 L3 L3 L3 L3 1 2 3 4 E-Techw 28 Tri

EN • 15

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D installation Wiring diagrams / models : 09 - 15 Single phase N L1 5 6 7 8 t P 4 3 9 10 t (78 - 53°C) (85 - 60°C) M 11 Br B Br Bk Or R R Br Or Or Y Y Or G G G Or Pk B G B B B W Pk B B 2 1 Br B R B B B B B B B t C 2 1 C 1 2 P1 1 A1 A2 P2 2 A B C D E F G J H R B K1 W R K2 12 13 W B K3 b Blue bk Black br Brown g Grey or Orange pk Pink r Red w White y Yellow A : ON/OFF switch B : Manual reset high limit thermostat C : Water pressure switch D : Alarm indicator E : Room thermostat (optional) F : Boiler thermostat G : Power level switch 1 H : Power level switch 2 J : Timer K1 : Power relay 1 - level 1 K2 : Power relay 1 - level 2 K3 : Power relay 2 - level 1 1-2 : Time clock (optional) 3-4 : Master Relay (optional) 5-6 : Stop Bridge 7-8 : Room thermostat (optional) 9-10-11 : Boiler pump 12-13 : load shedding of the relay K3

EN • 16

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Wiring diagrams / models : 09 - 15 tri phase N L1 5 6 7 8 t P 4 3 9 10 t (78 - 53°C) (85 - 60°C) M 11 Br B Br Bk Or R R Br Or Or Y Y Or G G G Or Pk R B G B B B B W Pk B B 2 1 Br B R B B B B B B B t C 2 1 C 1 2 P1 1 A1 A2 P2 2 A B C D E F G J H K1 K2 b Blue bk Black br Brown g Grey or Orange pk Pink r Red w White y Yellow A : ON/OFF switch B : Manual reset high limit thermostat C : Water pressure switch D : Alarm indicator E : Room thermostat (optional) F : Boiler thermostat G : Power level switch 1 H : Power level switch 2 J : Timer K1 : Power relay 1 - level 1 K2 : Power relay 1 - level 2 1-2 : Time clock (optional) 3-4 : Master Relay (optional) 5-6 : Stop Bridge 7-8 : Room thermostat (optional) 9-10-11 : Boiler pump installation

EN • 17

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Wiring diagrams / model : 22 tri phase N L1 5 6 7 8 t P 4 3 9 10 t (78 - 53°C) (85 - 60°C) M 11 Br B Br Bk Or R R Br Or Or Y Y Or G G G Or Pk B G B B B W Pk B B 2 1 Br B R B B B B B B B t C 2 1 C 1 2 P1 1 A1 A2 P2 2 A B C D E F G J H R B K1 W R K2 12 13 W B K3 b Blue bk Black br Brown g Grey or Orange pk Pink r Red w White y Yellow A : ON/OFF switch B : Manual reset high limit thermostat C : Water pressure switch D : Alarm indicator E : Room thermostat (optional) F : Boiler thermostat G : Power level switch 1 H : Power level switch 2 J : Timer K1 : Power relay 1 - level 1 K2 : Power relay 1 - level 2 K3 : Power relay 2 - level 1 1-2 : Time clock (optional) 3-4 : Master Relay (optional) 5-6 : Stop Bridge 7-8 : Room thermostat (optional) 9-10-11 : Boiler pump 12-13 : load shedding of the relay K3 installation

EN • 18

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Wiring diagrams / models : 28 - 36 Tri phase b Blue bk Black br Brown g Grey or Orange pk Pink r Red w White y Yellow A : ON/OFF switch B : Manual reset high limit thermostat C : Water pressure switch D : Alarm indicator E : Room thermostat (optional) F : Boiler thermostat G : Power level switch 1 H : Power level switch 2 J : Timer K1 : Power relay 1 - level 1 K2 : Power relay 1 - level 2 K3 : Power relay 2 - level 1 K4 : Power relay 2 - level 2 1-2 : Time clock (optional) 3-4 : Master Relay (optional) 5-6 : Stop Bridge 7-8 : Room thermostat (optional) 9-10-11 : Boiler pump 12-13 : load shedding of the relay K3 14-15 : load shedding of the relay K4 N L1 5 6 7 8 t P 4 3 9 10 t (78 - 53°C) (85 - 60°C) M 11 Br B Br Bk Or R R Br Or Or Y Y Or G G G Or Pk B G B B B W Pk B B 2 1 Br B R B B B B B B B t C 2 1 C 1 2 P1 1 A1 A2 P2 2 A B C D E F G J H R B K1 R Pk K2 W 12 13 W B K3 W 14 15 W B K4 installation

EN • 19

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Power wiring / models : 09 - 15 Single Phase 2 x B 2 x Bk 2 x B 2 x Or 2 x R 2 x B 2 x 2,5 mm2 230 V ~ 50 Hz POWER B Br 1 2 230 V ~ 50 Hz (3A) CONTROL 3 4 L1 N N L1 1 2 1 2 1 2 1 2 1 2 1 2 25A 25A 25A 25A 25A 25A R B B K3 Or Or B B K2 Bk Bk B B Bk B B K1 R R Or B B Bk R B B Or Type 15 14.4 kW 9.6 kW Single phase 12 13 12 13 14 14 15 15 12 13 12 13 14 14 15 15 Type 9 8.4 kW 5.6 kW Single phase 12 13 12 13 14 14 15 15 12 13 12 13 14 14 15 15 installation

EN • 20

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Power wiring / models : 09 - 15 Tri Phase Bk R Or B Br Bk R Or Bk R Or Bk R Or Bk R Or K1 K2 1 2 3 4 2 x 2,5 mm2 L3 L3 L2 L2 L1 L1 230 V ~ 50 Hz (3A) CONTROL 400 V ~ 50 Hz POWER L1 N L1 L3 L2 installation

EN • 21

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Power wiring / model : 22 Tri Phase 230 V ~ 50 Hz (3A) CONTROL 400 V ~ 50 Hz POWER L1 N L1 L2 L3 2 x Bk 2 x R 2 x Br 1 x Bk 1 x R 1 x Br B Br Bk R Br Bk R Br Bk R Br Bk R Br K1 K2 Bk R Br Bk R Br K3 1 2 3 4 4 mm2 L1 L1 L1 L1 L2 L2 L2 L2 L3 L3 L3 L3 Type 22 21.6 kW 14.4 kW TRI PHASE 12 13 12 13 14 14 15 15 12 13 12 13 14 14 15 15 installation

EN • 22

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Power wiring / model : 28 Tri Phase Type 28 28.8 kW 21.6 kW 14.4 kW TRI PHASE 12 13 12 13 14 14 15 15 12 13 12 13 14 14 15 15 12 13 12 13 14 14 15 15 Bk R Or Bk R Or Bk R Or Bk R Or K1 K2 Bk R Or Bk R Or Bk R Or Bk R Or K3 K4 2 x Bk 2 x R 2 x Or 2 x Bk 2 x R 2 x Or B Br 1 2 230 V ~ 50 Hz (3A) CONTROL 400 V ~ 50 Hz POWER 3 4 L1 N L1 L2 L3 2 x 4 mm2 L1 L1 L1 L1 L2 L2 L2 L2 L3 L3 L3 L3 installation

EN • 23

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Power wiring / model : 36 Tri Phase Type 36 36 kW 27 kW 18 kW TRI PHASE 12 13 12 13 14 14 15 15 12 13 12 13 14 14 15 15 12 13 12 13 14 14 15 15 Bk R Or Bk R Or Bk R Or Bk R Or K1 K2 Bk R Or Bk R Or Bk R Or Bk R Or K3 K4 2 x Bk 2 x R 2 x Or 2 x Bk 2 x R 2 x Or 2 x 4 mm2 400 V ~ 50 Hz POWER B Br 1 2 230 V ~ 50 Hz (3A) CONTROL 3 4 L1 N L1 L2 L3 1 2 1 2 1 2 1 2 1 2 1 2 32A 32A 32A 32A 32A 32A installation

EN • 24

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Honeywell sundial wiring diagrams Note: Illustrated model = 22 kW Tri Phase Note: All bold numbers indicate a DIN rail terminal connection CYLINDER STAT HTG HW N L 1 4 3 2 5 6 T6306B ROOM STAT 2 1 3 V4043H HTG ZONE VALVE MOTOR 7 8 9 10 V4043H DHW ZONE VALVE MOTOR Honeywell Sundial Wiring Centre `S ` Plan Note: Earth wires not shown for clarity During installation the earth wires from each component connect to terminal 3 in the wiring centre E bk- black br- brown r-red w-white y- yellow o - orange b - blue v - violet p - pink gr - grey CABLE COLOUR CODES gr gr gr gr b b b b b br br br br o o o o C

EN • 25

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D Honeywell sundial wiring diagrams CYLINDER STAT HTG HW ON N L 1 4 3 2 5 6 T6306B ROOM STAT 2 1 3 7 8 9 10 Honeywell Sundial Wiring Centre `Y ` Plan Note: Earth wires not shown for clarity During installation the earth wires from each component connect to terminal 3 in the wiring centre E bk- black br- brown r-red w-white y- yellow o - orange b - blue v - violet p - pink gr - grey CABLE COLOUR CODES gr b b b o 1 2 C HW OFF V4073A MID POSITION ZONE VALVE w w Note: Illustrated model = 22 kW Tri Phase Note: All bold numbers indicate a DIN rail terminal connection

EN • 26

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D COMMISSIONING - WATER 1. The system must be thoroughly cleansed prior to connection of the boiler. The system water should be treated to prevent general corrosion and deposition of scale or sludge in the boiler, please refer to BS7593. If installing the boiler onto an existing system, ACV recommend that an approved system cleaner is used. 2. Fill and pressurise the boiler and system to 1.5 bar, making sure to vent the boiler via the automatic air vent on top of the boiler. Note that the black dust cap on the air vent should be left loose to allow the auto vent to function. 3. Check for leaks. For specialist advice on water treatment products, contact: Fernox, Britannia Works Clavering, Essex CB11 4QZ Tel 01799 550811 COMMISSIONING - ELECTRICAL The Electrical installation supplying this boiler must conform to the current IEE Regulations. 1. Remove the front panel and check all electrical connections for tightness. 2. Ensure all internal relays, contactors etc are secure on the DIN rails. 3. Set all panel control switches to off. 4. Check the power stage delay timer settings - Adjuster (A) is factory set to the 1 to 10 minute position which is the optimum setting for the boiler and should be verified during commissioning. - Adjuster (B) is used to set the DELAY ON time of the following stage contactors, the available settings are in 1 minute increments if A is set to 1 to 10 minutes. This function is particularly useful in areas where gradual switching of electrical load is required and the resulting maximum demand kept to a minimum.The timers add to the flexibility of the installation but must be optimised by a qualified engineer.The normal setting is 1. 5. Set internal MCB to off position. 6. Set the control thermostat to desired temperature. STARTING THE BOILER 1. Switch on the internal or external timeclock (if fitted) 2. Switch on internal MCB 3. Switch on local isolator to boiler 4. Turn the boiler on using the ON/OFF switch 5. Switch on the power levels switch stage 1, the first stage contactors will energise 6. Switch on the power levels switch stage 2, after a short delay the second stage contactors will energise. Note: the power stage delay timer settings should be verified as shown in item 4 under “Commissioning - Electrical” 7. The boiler temperature will now rise as indicated by the combined temperature and pressure gauge 8. The temperature will continue to rise until the control thermostat temperature setting is reached then the boiler will switch off. Once these procedures have been followed the system can be left to operate normally by the following method. 1. Ensure that boiler thermostat is set to the desired temperature 2. Turn the boiler on using the ON/OFF switch 3. Turn on power level switch 1 4. Turn on power level switch 2 5. Set timeclock (if fitted) and/or external controls to desired boiler operating on/off times. After one week of operation all electrical connections should be re-checked for tightness and the boiler water system checked for leaks and air and rectified if necessary. MAINTENANCE For safety reasons it is recommended that the boiler is serviced annually and that servicing is carried out by a qualified service engineer. Before carrying out any work on the system ensure that the boiler is cool and all electrical supplies are isolated. 1. After removing front cover undo the four screws retaining the front control panel and gently let the panel suspend on the wiring to the rear of the panel. Undertake a visual inspection of the boiler looking out for signs of water leakage from joints, expansion vessel, and the area around the elements on top of the boiler. 2. Undertake a visual inspection of all cabling in the boiler casing checking for signs of overheating or burning. 3. Check all push-on electrical connectors for tightness and good connection to the relative components. 4. Using a correct fitting screwdriver check all electrical terminals on DIN rails and on all components for tightness. 5. Check the settings on the internal timers in accordance with the “Commissioning - Electrical” section. 6. Replace the control panel and the boiler front cover and refit screws. 7. Reinstate the electrical supply and follow the procedures set out in the commissioning section. commissioning and maintenance A B

EN • 27

ENGLISH FRANCAIS NEDERLANDS español ITALIANO deutsch 664Y4700 • D removal the heating elements 2 1 3