Isonas PowerNet IP-Bridge-2 Installation Manual
Read Online
Read the Isonas PowerNet IP-Bridge-2 Installation Manual online using the built-in PDF viewer.
Text of the manual
IPBridge Installation Guide
Page 2
Table of Contents
1: INTRODUCTION .................................................................................................................................... 4
1.1 : BEFORE YOU BEGIN .................................................................................................................. 4
1.2 : GENERAL REQUIREMENTS: ................................................................................................... 5
1.3 : POWERNET IP-BRIDGE SPECIFICATIONS: ........................................................................ 6
1.4 : INSTALLER TOOLKIT COMPONENTS ................................................................................. 7
2: PHYSICAL INSTALLATION ................................................................................................................ 8
2.1 : MOUNTING THE IP-BRIDGE .................................................................................................... 8
2.2 : VISUAL STATUS INDICATORS ................................................................................................ 9
2.3 : IP-BRIDGE RESET BUTTON ................................................................................................... 11
3: NETWORK ............................................................................................................................................. 12
3.1 : NETWORK CONFIGURATION ............................................................................................... 12
3.2 : DAISY-CHAINING NETWORK DEVICES ............................................................................ 13
4: IP-BRIDGE POWER .............................................................................................................................. 14
4.1 : PoE POWER ................................................................................................................................. 14
4.1.1 : PoE POWER CALCULATIONS ............................................................................................. 14
4.1.2 : CONTROLLING DOWNSTREAM PoE ................................................................................ 16
4.2 : USING DC POWER .................................................................................................................... 17
4.3 : COMMON ELECTRICAL CONNECTIONS .......................................................................... 18
4.3.1 : INDEX OF TERMINAL CONNECTIONS ............................................................................ 18
4.3.2 : DC POWER FOR THE DOOR COMPONENTS .................................................................. 20
4.3.3 : SIGNAL GROUND CONNECTIONS .................................................................................... 21
5: IP-BRIDGE DOOR OUTPUTS ............................................................................................................. 21
5.1: DOOR LOCK RELAY .................................................................................................................... 22
BACK EMF PROTECTION FOR THE LOCK CIRCUIT ................................................................ 23
5.1.2: IN-RUSH CURRENT PROTECTION FOR THE LOCK CIRCUIT ...................................... 24
5.2: TTL OUTPUTS ................................................................................................................................ 25
5.2.1: TTL’S CONTROLLING A SECONDARY RELAY MODULE .............................................. 26
5.3 : READER DC POWER OUTPUT (10 VDC) ............................................................................. 27
5.4 : READER INDICATOR OUTPUTS ........................................................................................... 27
6: IP-BRIDGE DOOR INPUTS ................................................................................................................. 28
6.1 : WIEGAND DATA INPUT .......................................................................................................... 28
6.2 : WIRING THE REX INPUT ........................................................................................................ 30
6.3 : WIRING THE AUX INPUT ....................................................................................................... 31
6.4 : WIRING THE DOOR SENSOR INPUT ................................................................................... 32
7: CONFIGURATION EXAMPLES ......................................................................................................... 33
7.1 : LOCK STRIKE & WIEGAND DEVICE .................................................................................. 33
7.2 : MAGNETIC LOCK, REX, DOOR SENSOR, & WIEGAND DEVICE ................................. 34
7.3 : LOCK STRIKE & WIEGAND DEVICE WITH TAMPER .................................................... 35
7.4 : CONTROLLING THREE DOORS .......................................................................................... 36
7.5 : 1 DOOR & 1 IP CAMERA ......................................................................................................... 38
7.6 : EXTERNAL POWER W/DAISY-CHAIN ................................................................................ 39
IPBridge Installation Guide
Page 3
Document Version
Date of
Revision
Revision
Author
Description
5/20/2013
1.00
Shirl Jones
Initial Release
8/12/2013
1.01
Shirl Jones
Expanded Wiegand Device guidelines
11/13/2013
1.02
Shirl Jones
Described PoE Jumper & Reset button
location
2/25/2014
1.03
Shirl Jones
Enhanced power and grounding
instructions
5/9/2017
1.04
Melissa Stenger
Updated software information, configuration
info and Power instructions
IPBridge Installation Guide
Page 4
1: INTRODUCTION
This document is the complete guide for mounting and
wiring the ISONAS IP-Bridge product models IP-
Bridge-2 and IP-Bridge-3.
The IP-Bridge has some special capabilities that support
multiple types of input power and daisy chaining multiple
IP-Bridge’s together.
For this reason, it is essential that you read through this
entire guide before attempting an installation.
Note: Within the Pure Access Software package, these
models use the abbreviated model labels IPBR-2 & IPBR-3.
1.1 : BEFORE YOU BEGIN
The following core tasks are involved when installing an ISONAS IP-
Bridge: 1.Mount the IP-Bridge in the appropriate indoor location.
2. Supply power to the IP-Bridge unit. This may be accomplished with
power being provided on the Ethernet data cable (Power over Ethernet
[PoE]) or through an external DC power source (12VDC or 24VDC)
3. Wire the IP-Bridge to the door’s locks and other components required
for physical access control.
4. Connect the unit to the data network for communication with the host
workstation.
This guide discusses each process separately. Understanding all of these
processes makes a project much simpler and guarantees success.
IPBridge Installation Guide
Page 5
1.2 : GENERAL REQUIREMENTS:
If PoE is not being used, then use only UL-listed, access control, power-
limited power supplies with an ‘AC on’ indicator light clearly visible on the
enclosure. ISONAS recommends that Power supplies should provide at least
four hours of standby power.
Never connect power supplies to a switch-controlled receptacle.
Install the ISONAS system in accordance with the National Electrical Code
NFPA 70. (Local authority has jurisdiction.)
Use only wire or UL-listed cabling recognized as suitable for ISONAS power
supply and data communications, in accordance with the National Electrical
Code.
Where possible, separate ISONAS equipment and cabling from sources of
electromagnetic interference (EMI). Where this is not possible, take other steps
to reduce the effect of EMI on cabling or equipment.
Protect input and output terminals adequately from transient signals. Also,
connect these terminals to power-limited circuitry.
IPBridge Installation Guide
Page 6
1.3 : POWERNET IP-BRIDGE SPECIFICATIONS:
Input Voltage
PoE per IEEE 802.3at
PoE per IEEE 802.3af
12V DC to 28V DC
Current Draw
< 0.26 AMPS @ 12VDC
< 0.18 AMPS @ 24VDC
PoE: 4 Watts
Maximum Supplied Power for
External Devices
PoE-Plus power (IEEE 802.3at)
1.60 AMPS @ 12VDC
Maximum Supplied Power for
External Devices
PoE power (IEEE 802.3af)
0.60 AMPS @ 12VDC
Upstream Ethernet Interface
TCP/IP Over Ethernet
10 Mbps, auto-negotiate
Downstream Ethernet Interface
TCP/IP Over Ethernet
10 Mbps, auto-negotiate
Supports 30 downstream IP devices
Inputs/Outputs
For each supported door:
4 Inputs
Wiegand; REX; AUX; and Door Sensor
5 Outputs
2 TTL Outputs
RED LED; GREEN LED; Beeper
Wiegand Data Connection
500 ft Maximum Length
Lock Relay
2.00 amp @ 30V DC
(Resistive load)
0.03 amp @ 120V AC (Resistive load)
Standalone Memory Capacity
20000 Cards / Door
5000 Events / Door
32 Time zones / Door
Visual Indicators
6 0r 8 LEDs for Normal Operations
Operating Temperatures
-40° To 80° Celsius
Weight
Approximately 14 Ounces
Size
6.28 L x 3.55 W x 2.26 H
(inches)
IPBridge Installation Guide
Page 7
1.4 : INSTALLER TOOLKIT COMPONENTS
Before an installer goes to a customer site, they need to put together their supplies
and tool-kit. The ISONAS solution is simpler to install than other Access Control
Systems, but materials are still needed. And some of those materials may be
different than what you are use to carrying. The list below identifies some important
items that you should make sure to bring with you, to the customer’s site.
A prepared installer will have:
Installer completed the on-line reseller training program.
An installer’s Tool Kit should include the following:
1. The copy of the IP-Bridge Installation and Wiring Guide
2. A Volt-Ohm Meter
3. A PoE Injector
4. A Cross-over Cat5/Cat6 cable
5. A straight-thru Cat5/Cat6 patch cable.
6. Basic Ethernet network cable tester (Tests for: Opens, Shorts,
Split Pairs, Mis-wires & Reversals)
7. A spare IP-Bridge
8. An extra Daisy-Chain power cord
9. The ISONAS As-Built forms, which is used to record the details
of the door's installation.
The customer’s site should have Internet access. This enables the use of on-line
meeting tools, such as GoToMeeting, during any remote support sessions.
IPBridge Installation Guide
Page 8
2: PHYSICAL INSTALLATION
When selecting the location where you are going to mount the ISONAS IP-Bridge,
a few guidelines should be observed.
1) The IP-Bridge should be protected from extreme heat and sunlight. It is
rated for indoor use, between -40 to 80 degrees C.
2) The IP-Bridge is designed to be mounted on a standard 35 mm DIN Rail.
3) Mounting the IP-Bridge inside of a control cabinet or a NEMA housing
is recommended.
4) When planning a project’s DIN rail layout, determine if the door device’s
electrical return connections will be terminated by the optional modular DIN
terminal blocks. If so, adjust the IP-Bridge’s location on the DIN rail to
allow space for the modular terminal blocks.
5) The IP-Bridge should be located within a 500 foot cable length of the devices
being controlled.
2.1 : MOUNTING THE IP-BRIDGE
The major steps involved with the physical mounting of the IP-Bridge include:
1) Planning the location of the DIN rail(s)
a. Typically inside a control cabinet, or NEMA housing.
2) Attaching the DIN rails to housing’s mounting surface
3) Snapping the IP-Bridge to its DIN rail
4) Attaching the optional terminal block(s)
5) Repeat the process, for any additional IP-Bridges
IPBridge Installation Guide
Page 9
2.2 : VISUAL STATUS INDICATORS
The IP-Bridge has multiple LED status indicators to assist in monitoring and
troubleshooting the status of the unit. LED’s are labeled in Figure 01. LED’s A
and B are used to indicate the status of the IP-Bridge itself. The C & D LED
pairs indicate the status of individual doors.
Figure 01
IP-Bridge Status
LED “A”
Color
LED “B”
Color
IP-Bridge is not powered on
Off
Off
Power Turned On – Waiting in Boot Loader mode (~10 sec)
Red
Red
Performing All IP work, all mode, duration depends on
settings
Amber
Red
IP Work completed (except long DNS lookups), ports/DNS
Red
Amber
Startup Complete. No issues reported.
Green
Off
Startup Complete. Errors reported, check history
Green
Amber
Door Status (occurs once for each supported
door)
LED “C”
Color
LED “D”
Color
Waiting In (Startup) or Performing Boot Load
Amber
Amber
Waiting to be activated (if ever) or door process issue Off
Amber
Normal Operation
Red
Off
No Door (2-door Bridge)/Deactivated Door
Off
Off
Door is unlocked
Green
Green
Door is in the Lockdown condition
Red
Red
Door is unlocked, for the latch interval
Green
Off
IPBridge Installation Guide
Page 11
2.3 : IP-BRIDGE RESET BUTTON
The PowerNet IP-Bridge has a recessed reset-button located in the position shown on
Figure 02. It can be used for two different types of resets.
It is helpful to monitoring the amber LAN status LED allows you to determine the
status of the reset operation.
Reset CPU: Press, hold (approx. 2 seconds) and release the Reset button.
Once the Reset Button is released, all the door status LED’s will turn amber, and
in 15 seconds return to the normal display. If the door’s LEDs do not turn
amber, then the reset did not occur.
Reset Configuration: Press and hold the Reset button (approx. 10 seconds),
until all door status LED’s turn Amber. After the LED’s turn Amber, release the
Reset button. Selected IP-Bridge configurations are reset to factory defaults.
Setting that are changed include:
IP Address
(Default value:
192.168.1.119)
IP Port
(Default value:
10001)
Subnet Mask
(Default value:
255.255.0.0)
Gateway
(Default value:
0.0.0.0)
DHCP Setting
(Default value:
Off)
ACS Server
(Default value:
SrvrAcs)
ACS Server IP
(Default value:
0.0.0.0)
Clear AES Encryption Configuration
Reset the IP-Bridge’s Password.
Figure 02
IPBridge Installation Guide
Page 12
3: NETWORK
The IP-Bridge is connected to the customer’s network using the “Upstream”
RJ45 port.
The IP-Bridge network connection auto-detects the speed
between 10MB or 100MB, depending on the speed capabilities of the customer’s
network.
3.1 : NETWORK CONFIGURATION
The ISONAS Configuration utility tool can be used to configure the IP-Bridge’s
network settings. Here is more information on configuring IP-Bridges to Pure
Access.
Items that may be configured include:
1) Is DHCP being used?
a. Host computer’s IP Address, or network alias
2) If DHCP is not used:
a. Static IP Address.
b. Subnet Mask.
c. Gateway Address.
3) IP Port used by the IP-Bridge
4) Is “Client Mode” being used?
a. Remote Host IP Address or URL
b. Remote Host IP Port
c. DNS Server IP Address
3.2 : DAISY-CHAINING NETWORK DEVICES
The IP-Bridge supplies the functionality of a two-port network switch. It has
two physical RJ45 ports or sockets labeled “Upstream” and “Downstream” as
shown in Figure 03.
The “Upstream” RJ45 port is used to connect to the customer’s network. Some
network switches label this as the “uplink” port.
The “Downstream” RJ45 port is used to connect to other Ethernet devices; such
as additional IP-Bridges, IP based cameras, etc.
The network traffic going to/from the connected devices via the “Downstream”
Port will be directed by the IP-Bridge through the “Upstream” port.
The “Downstream” port will be provided PoE Power; as long as the IP-Bridge is
being powered by PoE and sufficient power is available. It is possible to disable
the PoE feed going out of the downstream port.
IPBridge Installation Guide
Page 13
Figure 03
4: IP-BRIDGE POWER
The IP-Bridge can be powered with PoE, PoE-Plus, or DC power in the range
of 12VDC to 28VDC.
NOTE: DO NOT power the IP-Bridge with PoE and 24VDC. If you are powering
with external power, please ensure your network cable is providing data only.
Using PoE and 24VDc will void the warranty.
4.1 : PoE POWER
PoE power can used to power the IP-Bridge itself and is commonly used
to provide power to the components at the door, such as an electric lock,
a Wiegand device, and/or a passive infrared motion detector.
The IP-Bridge can be use two types of PoE.
PoE ( IEEE 802.3af ) --- 13 watts of power can be supplied to the
IP-Bridge, via a PoE network switch that meets the 802.3af
standard. 13 watts is enough power for the IP-Bridge itself and a
single door’s typical hardware (dumb-reader and lock).
PoE-Plus ( IEEE 802.3at ) --- 25.5 watts of power can be supplied
to the IP-Bridge, via a PoE network switch that meets the 802.3at
standard.
The IP-Bridge will auto-adjust to accept the type of PoE being supplied by the
network switch.
IPBridge Installation Guide
Page 14
To meet the IP-Bridge’s variable PoE power requirements, the IP-Bridge
will classify itself with the PoE source as a “Class 0” PoE device, or “Class
4”
PoE-Plus device. The power usage of a Class 0 PoE device can range
between 0.4 to 13.0 watts at the device. The power usage of a Class 4 PoE-
Plus device can range between 12.95 to 25.5 watts at the device.
4.1.1 : PoE POWER CALCULATIONS
When the IP-Bridge is being powered by PoE-Plus, it can supply power to
external devices thru three different methods.
The 10VDC output for the Wiegand devices (via the “DC-R” terminal)
The 12VDC output for other devices.
(via the “DC” terminal)
PoE power to network devices that are daisy-chained to the IP-Bridge.
o Type “B” PoE is supplied downstream.
o Jumper Pin adjustment is required
(See next section)
IPBridge Installation Guide
Page 15
Table A is a worksheet that will help you calculate how much power is
available for the daisy chained “downstream” devices. Figure 04 graphically
displays the related power flow.
Diagram
Label
Purpose
Milliamps
Supplied (mA)
Factor
Calculated Watts
(mA) * (Factor)
“A”
“DC-R” Output
(10VDC)
0.0117
“B”
“DC” Output
(12VDC)
0.0141
IP-Bridge
Power consumed by
IP-Bridge’s
electronics
4
Total Power Used by
IP-Bridge
Sum of values
listed above
PoE Input If using PoE:
enter 12.95 watts
If using PoE Plus:
enter 25.50 watts
Answer
PoE Wattage
Available Downstream
Answer = (PoE Input) – (Total Power Used)
Table A
IPBridge Installation Guide
Page 16
Figure 04
4.1.2: CONTROLLING DOWNSTREAM PoE
The IP-Bridge is able to pass all excess PoE power out the downstream RJ45
connector. This is done with a passive type of PoE, and PoE device-detection
is not supported.
A jumper pin (JP-1) is used to enable or disable the downstream port’s PoE
power feed. JP-1 is located inside the IP-Bridge. Refer to Figure 05.
To reach the jumper, use a small screwdriver to pry the cover up at the
points indicated (Start at point #1).
To enable the provisioning of PoE power out the downstream RJ45 port, place
a jumper across pins 2 & 3 of JP-1.
Figure 05
Removing the jumper from JP-1 will disable the flow of PoE power out the
downstream RJ45 port.
IPBridge Installation Guide
Page 17
4.2 : USING DC POWER
The IP-Bridge can be powered by external DC power. The IP-Bridge will accept
DC power in the range of 12VDC to 28VDC. The DC power is fed into the IP-
Bridge via a special coaxial cable attached to connector “AA” shown Figure 06.
The
2nd end of the input power coaxial cable is attached to screw terminals on a
standard DC power supply.
Figure 06
If multiple IP-Bridges are being installed, the 2nd IP-Bridge can be powered with a
short coaxial cable such as the one Isonas sells. One end of the cable is attached
to connector “BB” on the 1st IP-Bridge, and then the cable is daisy-chained to
connector “AA” on the 2nd IP-Bridge. See Figure 07.
Figure 07
When powered with PoE, the input DC coaxial power cord is not required. If two
IP-Bridges are daisy-changed, and are using PoE, the coaxial daisy-chain power
cord is not required. Please note that the daisy-chained power connection is
rated for 4.0 A @ 12VDC (2.0 A @ 24VDC).
IPBridge Installation Guide
Page 18
4.3 : COMMON ELECTRICAL CONNECTIONS
4.3.1 : INDEX OF TERMINAL CONNECTIONS
External devices are connected to the IP-Bridge through the screw
terminals located on along the sides of the IP-Bridge.
A summary of the
purpose of each terminal connection is detailed in the table below. Refer to
the IP-Bridge’s label for the locations of each terminal connector.
Terminal
Block
Connection
Identifier
Purpose
I/O
TTL2
Logic output.
Default action is:
5 VDC is output , when in the “Off” state
0 VDC when in the “On” state.
Action can be reversed in the software configuration.
Supplies 20mA
I/O
TTL1
Logic output.
Default action is:
5 VDC is output , when in the “Off” state
0 VDC when in the “On” state.
Action can be reversed in the software configuration.
Supplies 20mA
I/O
REX
Logic Input from a Request-to-EXit device
Default Action: When connection to “Gnd” is completed,
the input goes active.
Action can be reversed in the software configuration.
I/O
DS
Logic Input from a Door Status Sensor
Default Action: When connection to “Gnd” is opened, the
input goes active.
Action can be reversed in the software configuration.
I/O
NC
Output.
“Normally Closed” connection from IP-Bridge’s
door control relay (form C)
I/O
COM
Output.
“Common” connection from IP-Bridge’s
door control relay (form C)
I/O
NO
Output.
“Normally Open” connection from IP-Bridge’s
door control relay (form C)
IPBridge Installation Guide
Page 19
Terminal
Block
Connection
Identifier
Purpose
I/O
DC
Output:
When IP-Bridge is powering from PoE, the “DC”
terminal supplies regulated 12 VDC.
When IP-Bridge is powering from 12 or 24 VDC, the
“DC” terminal supplies the voltage that is input to the
IP-Bridge.
I/O
GND
Common Ground
Connects with all ground terminals on the IP-
Bridge terminal blocks and coaxial cable
Reader
GND
Common Ground
Connects with all ground terminals on the IP-
Bridge terminal blocks and coaxial cable
Reader
DC-R
Output:
Supplies regulated 10 VDC.
Reader
N/A
Not Used
Reader
AUX
Logic Input
Default Action: When connection to “Gnd” is completed,
the input goes active.
Action can be reversed in the configuration.
Reader
BP
Output:
Allows control of the Wiegand device’s beeper.
{Future Use}
Reader
W0
Input.
Connects to Wiegand data “0” from Wiegand device
Reader
W1
Input.
Connects to Wiegand data “1” from Wiegand device
Reader
GR
Output:
Allows control of the Wiegand Green LED.
{Future Use}
Reader
RED
Output:
Allows control of the Wiegand Red LED.
{Future Use}
IPBridge Installation Guide
Page 20
4.3.2 : DC POWER FOR THE DOOR COMPONENTS
The IP-Bridge can supply DC power for external devices. This power is
made available to each door at the terminal connectors labeled “DC” and
“GND”. See Figure 08.
Figure 08
The voltage supplied by the “DC” terminal connection is determined by the
method that the IP-Bridge is being powered.
If the IP-Bridge is powered with PoE, then regulated 12VDC is available on
the “DC” terminal connection
If the IP-Bridge is powered with DC power, then the input DC voltage is
made available on the “DC” terminal connection.
For example, if the IP-Bridge is receiving 24VDC thru its
coaxial power cord, then the “DC” terminal will supply 24VDC.
The “DC” power’s return connection will be attached to the IP-Bridge’s Signal
Ground. See the next “Signal Ground Connections ” section of the manual for
more information regarding this part of the connection.
IPBridge Installation Guide
Page 21
4.3.3 : SIGNAL GROUND CONNECTIONS
In order for the electrical signals going to the door’s components to function,
they need to have a connection to the IP-Bridge’s Signal Ground. For some
doors, only one or two ground wires are needed, and these wires can easily be
directly connected to the IP-Bridge’s “Gnd” terminals.
Other installations may require multiple electrical connections, with each
requiring a connection to the Signal Ground. To support this, an optional DIN
Terminal block can be mounted next to the IP-Bridge.
The DIN Terminal Block is connected to one of the IP-Bridge’s Signal Ground
terminals. Up to 15 each, 22 gage wires can be connected to a single connection
on the DIN terminal block. See Figure 09.
Figure 09
5: IP-BRIDGE DOOR OUTPUTS
Warning: The IP–Bridge should not be powered until all connections have
been made and tested. Remove power prior to changing any connections.
The IP-Bridge can control and power multiple items at the door. Control of
standard electrical locks is supported. Supplying electrical power and additional
logic outputs are also features provided by the IP-Bridge. Controlling light and
sound status indicators on the Wiegand device are currently not supported.
IPBridge Installation Guide
Page 22
5.1: DOOR LOCK RELAY
The IP-Bridge is equipped with a lock-relay for each door lock supported.
The relay is a Form C relay that is rated for 2.0 amps at 30 VDC.
Connections to the relay’s “Normally Closed”, “Common”, and “Normally Open”
contacts are available on the terminal strip and are labeled as “NC”, “COM” and
“NO” respectively. See Figure 10.
Figure 10
A block-diagram of the lock-relay is shown in Figure 11. The relay provides a
“dry contact”. For many installations, the IP-Bridge will be supplying the DC
power for the door lock. For these installs, a wire jumper will be placed between
the “DC” and “COM” terminal connections.
Figure 11
IPBridge Installation Guide
Page 23
Protect the Digital
Output
Which type of transient
suppressor should you
install? This depends
mainly on the type of
inductive load being
switched. Some locks
have Back EMF protection
built into the lock itself.
For Back EMF in low-
voltage DC applications, a
1N4007 diode will suffice.
However, for protection
against other transient
voltages (i.e. lightening),
we recommend using a
fast-switching transient
voltage suppressor, such
as a bipolar TranZorb.
BACK EMF PROTECTION FOR THE LOCK CIRCUIT
Most door latches use a relay coil that powers up and down to open and close
the door. When power is removed from the coil, the collapse of the magnetic field
creates a problem known as Back EMF that can interfere with the IP-Bridge’s
operation, and create radio interference.
Switching off a typical 12 VDC relay coil can produce a back EMF of 300 volts or
more. If this relay is switched via an output, that voltage appears across the
terminals of the output. The problem gets worse as switching voltage/current
rises.
Figure 12 shows the recommended solution. You can virtually eliminate back
EMF by installing a transient suppression device (diode). Always check that
the diode is correctly rated for the circuit voltage. For optimum performance, the
diode should be installed at the lock or close to the lock. Standard diodes have a
stripe-band marking on one side. That side of the diode should be connected to
the “+” wire of the lock circuit.
Figure 12
IPBridge Installation Guide
Page 24
5.1.2: IN-RUSH CURRENT PROTECTION FOR THE LOCK CIRCUIT
Some Magnetic Locks with advanced quick-release circuitry will generate an
initial surge of current when the lock is turned on. This surge of current can be
20 times greater than the lock’s steady state current requirements. The lock
relay is rated for 2 amp of current. This in-rush current can greatly exceed that
rating, and shorten the useful life of the IP-Bridge.
Figure 13 shows the
solution to this. Installing
an in-rush suppressor in the
lock circuit will prevent any
detrimental effects on the
IP-Bridge.
FFFi
Figure 13
IPBridge Installation Guide
Page 25
5.2: TTL OUTPUTS
The IP-Bridge supplies two TTL outputs for each door, as shown in Figure 14.
The TTL1 and TTL2 leads are logical output leads. In their “normal” state, there
is a 5VDC potential on the leads. When the leads “activate”, this voltage
potential is removed (0 VDC).
These leads are typically used to connect to an alarm system. Certain alarm
conditions of the IP-Bridge can be configured to activate these leads. An
example would be having TTL2 activate when the door is held open too long.
Figure 14
The “TTL” signal’s return connection will be attached to the IP-Bridge’s Signal
Ground. See the previous “Signal Ground Connections” section of the manual for
more information regarding this part of the connection.
IPBridge Installation Guide
Page 26
5.2.1: TTL’S CONTROLLING A SECONDARY RELAY MODULE
The dual Secondary Relay Module (SRM) is available to enhance the IP-
Bridge’s ability to control devices located at the door.
The SRM provides a set of form-C relay contacts, which are controlled by one of
the IP-Bridge’s TTL outputs.
The SRM is commonly
used to control a
device located at the
door, in addition to
the door’s lock. A
diagram of this SRM
usage is shown below
in Figure 15.
Figure 15
SRM’s wiring color code
Color
Function
Purple
TTL input to SRM.
Connected to the IP-Bridge’s “TTL1” or “TTL2” terminal.
Black
Signal Ground from IP-Bridge.
Connects to IP-Bridge’s “GND” terminal.
White / Red
SRM Relay
Common contact
White / Violet
SRM Relay
Open contact
(when TTL is inactive)
White / Yellow
SRM Relay
Closed contact (when TTL is inactive)
IPBridge Installation Guide
Page 27
5.3 : READER DC POWER OUTPUT (10 VDC)
The IP-Bridge provides up to 500mA @ 10 VDC regulated power supply for
use when powering many Wiegand devices. This 10VDC power is provided on
the
“DC-R” terminal, and a convenient GND terminal is located adjacent to the DC-R
connection. See Figure 16.
Figure 16
5.4 : READER INDICATOR OUTPUTS
Note: These features are designated for inclusion in future releases of the IP–
Bridge. See Figure 17.
“BP” Terminal Connection:
The “BP” will be an output for controlling a beeper on the remote reader.
“GR” Terminal Connection:
The “GR” will be an output for controlling a green LED beeper on the remote
reader.
“RED” Terminal Connection:
The “RED” will be an output for controlling a red LED on the remote reader.
Figure 17
IPBridge Installation Guide
Page 28
6: IP-BRIDGE DOOR INPUTS
Warning: The IP–Bridge should not be powered until all connections have
been made and tested. Remove power prior to changing any connections.
The IP-Bridge can monitor items located at the door. It supports receiving
credential data from a Wiegand device and the control of standard electrical
locks.
6.1 : WIEGAND DATA INPUT
The IP-Bridge receives the user’s credential information from a Wiegand-
based device, such as a card reader.
Three (3) Wiegand conductors from the reader are connected to the IP-
Bridge’s “W0”, “W1”, and “GND” terminals. The Wiegand ground conductor
can be
connected to any “GND” terminal on the IP-Bridge.
The Wiegand ground connection should be dedicated to the Wiegand signal. A
separate wire conductor would be used to ground any other door components to
the IP-Bridge.
Wiegand signal should be a “driven 5 VDC signal”, provided by the Wiegand
device (may be accomplished thru a biasing resistor within the reader)
The reader’s “W0” and “W1” terminals are shown in Figure 18.
Figure 18
The Wiegand signal’s return connection will be attached to the IP-Bridge’s Signal
Ground. See the previous “Signal Ground Connections” section of the manual for
more information regarding this part of the connection.
IPBridge Installation Guide
Page 29
Wiegand Data
The Wiegand protocol has been used since 1980, so many devices exist that use this
protocol.
The ISONAS solution can interpret the incoming Wiegand data in one of 3 ways.
1) As a raw 64 bit binary number, so the card format is not a factor.
2) As a HID formatted credential number, with the ISONAS Bit masking
processing rules applied
3) As a HID formatted credential, with the ISONAS Data mangle processing
rules applied.
The recommended system integrator evaluation process is to use either an IP-Bridge
or PowerNet w/WIM and test against the existing hardware and credentials.
Validate that the reported credentials really uses the Wiegand protocol, and that the
existing card format is handled appropriately.
If you need assistance, and can supply the appropriate materials to ISONAS, we will
test your configuration at the factory
Required items include:
A reader that is known to work with the currently installed equipment.
5 working credentials, to verify credential formatting.
Installation instructions for the supplied reader, for power and operation
instructions.
IPBridge Installation Guide
Page 30
6.2 : WIRING THE REX INPUT
The REX (Request for Exit) signal expected by the ISONAS IP-Bridge is a
momentary closure. You can generate this
signal with a pushbutton, infrared motion
detector, or other simple device. Typically the
REX is placed adjacent to the door so that
people can press the button and let themselves
out the door without setting off the alarm. When
pressed, this button tells the ISONAS IP-Bridge
that someone wishes to pass through the door,
and the latch releases. In the ISONAS Crystal
software you can configure how the door
responds to the REX button.
The momentary switch is directly connected to
the ISONAS IP-Bridge. First, connect one
conductor from the switch to the IP-Bridge’s
“REX” terminal, as shown in Figure 19. Then,
connect the switch's other conductor to one of
the IP-Bridge’s “GND” terminals.
Figure 19
The “REX” input’s return connection will be attached to the IP-Bridge’s Signal
Ground. See the previous “Signal Ground Connections” section of the manual for
more information regarding this part of the connection.
About REX Input
The REX input is
connected to a “Normally
Open” contact on the
external device.
The REX event is created
with the external device
closes its contact.
IPBridge Installation Guide
Page 31
About AUX Input
The AUX input is
connected to a
“Normally Open” contact
on the external device.
The AUX event is
created with the
external device closes
its contact.
6.3 : WIRING THE AUX INPUT
In host mode, the AUX Input is another momentary contact closure which
functions exactly like the REX button. The AUX Input might be controlled by a
relay on an intercom at the door. This would allow
the receptionist to unlock the door using the
intercom system’s functionality.
In the ISONAS Crystal software you can configure
how the door responds to the AUX button.
In local mode, the door will stay unlocked for the
period that the AUX switch is closed.
The momentary switch is directly connected to the
ISONAS IP-Bridge. First, connect one conductor
from the switch to the IP-Bridge’s “REX” terminal,
as shown in Figure 20. Then, connect the
switch's other conductor to one of the IP-Bridge’s
“GND” terminals.
Figure 20
The “AUX” input’s return connection will be attached to the IP-Bridge’s Signal
Ground. See the previous “Signal Ground Connections” section of the manual for
more information regarding this part of the connection.
IPBridge Installation Guide
Page 32
6.4 : WIRING THE DOOR SENSOR INPUT
Connecting the ISONAS IP-Bridge to a door
sensor allows the Pure Access software to
determine whether that door is physically open.
Then the Pure Access software can create
alarms based on the door’s state. This
wiring task is similar to wiring the REX or
AUX buttons.
The momentary switch is directly connected to
the ISONAS IP-Bridge. First, connect one
conductor from the switch to the IP-Bridge’s
“DS” terminal, as shown in Figure 21. Then,
connect the switch's other conductor to one of
the IP-Bridge’s “GND” terminals.
Figure 21
The “DS” input’s return connection will be attached to the IP-Bridge’s Signal
Ground. See the previous “Signal Ground Connections” section of the manual for
more information regarding this part of the connection.
IMPORTANT: If There's No Door Sense Switch
If you choose NOT to install a door sense switch, then you must permanently
ground the “DS” terminal to a “GND” terminal, so the system will not see the
door as "open."
About the Door
Sense
The door sense is
connected to a
“Normally Closed”
input.
No action is taken
until the input is
opened.
IPBridge Installation Guide
Page 33
7: CONFIGURATION EXAMPLES
Several wiring examples are shown below. Please refer to previous detailed
sections for more information about each example provided.
7.1 : LOCK STRIKE & WIEGAND DEVICE
In Figure 22, a standard lock strike is being powered from the IP-Bridge.
The DC power being supplied to the lock is either:
12VDC -- if the IP-Bridge is powered by PoE or
12VDC.
Or
24VDC -- if the IP-Bridge is powered by 24VDC.
The Wiegand device is being powered with 10VDC from the IP-Bridge.
Figure 22
IPBridge Installation Guide
Page 34
7.2 : MAGNETIC LOCK, REX, DOOR SENSOR, & WIEGAND DEVICE
In Figure 23, a standard magnetic lock is being powered from the IP-Bridge.
A door sensor and REX button are also being used.
The DC power being supplied to the lock is either:
12VDC -- if the IP-Bridge is powered by PoE or
12VDC.
Or
24VDC -- if the IP-Bridge is powered by 24VDC.
The Wiegand device is being powered with 10VDC from the IP-Bridge.
Figure 23
IPBridge Installation Guide
Page 35
7.3 : LOCK STRIKE & WIEGAND DEVICE WITH TAMPER
In Figure 24, a standard lock strike is being powered from the IP-Bridge.
The DC power being supplied to the lock is either:
12VDC -- if the IP-Bridge is powered by PoE or
12VDC.
Or
24VDC -- if the IP-Bridge is powered by 24VDC.
The Wiegand device is being powered with 10 VDC from the IP-Bridge.
The Wiegand device’s Tamper switch is being monitored by the AUX input on the
IP-Bridge.
Figure 24
IPBridge Installation Guide
Page 36
7.4 : CONTROLLING THREE DOORS
In Figure 25, three doors are being controlled.
Items of note include:
PoE Plus is providing power for all doors
Standard lock strikes are being used.
o
12VDC is powering the lock strikes.
Each door has a door sensor switch installed
Wiegand devices are at each door
o
The Wiegand devices are being powered with 10 VDC
Figure 25
IPBridge Installation Guide
Page 37
The table below describes each door’s connections.
Terminal
Block
Connection
Identifier
Description
I/O
DS
Connected to the Door Sensor at the door.
I/O
COM
Connected to the “DC” terminal, which supplies 12VDC
for the locks
I/O
NO
Connected to the Door Lock
I/O
DC
Connected to the “COM” terminal to supply DC power to
the lock, thru the Lock Relay
I/O
GND
Provides return for all connections from the door.
Wiegand
Device
GND
Provides return for all connections from the door.
Wiegand
Device
DC-R
Output:
Supplies regulated 10 VDC for the Wiegand device.
Wiegand
Device
W0
Input.
Wiegand data “0” input lead, from the Wiegand device
Wiegand
Device
W1
Input.
Wiegand data “1” input lead, from the Wiegand device
IPBridge Installation Guide
Page 38
7.5 : 1 DOOR & 1 IP CAMERA
In Figure 26, access-control for a single door and an IP-camera are being
supported from a single Cat5/6 cable run. A PoE-Plus injector is providing the
power required.
Items of note include:
Connections from the door components are the same as described in
example 7.4, including:
o
PoE Plus is providing power for door access and IP camera
o
Standard lock strike is being used.
12VDC is powering the lock strike.
o
A door sensor switch is installed
o
Wiegand device is at the door
Figure 26
IPBridge Installation Guide
Page 39
7.6 : EXTERNAL POWER W/DAISY-CHAIN
In Figure 27, the daisy-chaining of two IP-Bridges is illustrated. External
Power is being used, instead of PoE. High-powered PoE could be used, as long
as the total power draw across the two IP-Bridges is under the PoE power
limitation.
The Ethernet data for both units is supplied with a single network cable
connection. The IP traffic for the 2nd unit is passed through the 1st unit.
Connections from the door components are the same as described in
example 7.4, including:
o
Standard lock strikes are being used.
12VDC is powering the lock strike.
o
A door sensor switch is installed at each door
o
Wiegand devices are at the doors
Figure 27
IPBridge Installation Guide
Page 40
For more information:
Web: www.isonas.com
E-mail: [email protected]
Tel: 800-581-0083 (toll-free) or 303-567-6516 (CO)
Fax: 303-567-6991
ISONAS Headquarters:
4720 Walnut Street, Suite 200, Boulder, Colorado 80301 USA