VPC G12 Operation & User’s Manual

Specifications

Brand: VPC
Category: Receiver
Model: G12
File Type: PDF
File Size: —
Pages: 20

Read Online

Read the VPC G12 Operation & User’s Manual online using the built-in PDF viewer.

Text of the manual

G12/G12x USER’S MANUAL

TABLE OF CONTENTS SECTION 1 SLIDE CONFIGURATION SECTION 2 SLIDE CONFIGURATION ACCESSORIES SECTION 3 TABLETOP CONFIGURATION SECTION 4 TABLETOP CONFIGURATION ACCESSORIES SECTION 5 RACK MOUNT CONFIGURATION SECTION 6 RACK MOUNT CONFIGURATION ACCESSORIES SECTION 7 HANDLE REMOVAL AND REPOSITIONING SECTION 8 ITA ENCLOSURES SECTION 9 ACCESSORIES SECTION 10 ITA AND RECEIVER ENGAGEMENT SECTION 11 TROUBLESHOOTING AND PRECAUTIONARY NOTES 10/17/18 Please note that any printed or downloaded User Manuals or Procedure Sheets may not reflect the most current revisions. The information contained in these materials is subject to change. For the most current information available, visit www.vpc.com.

G12/G12x USER’S MANUAL: SECTION 1

VIRGINIA PANEL CORPORATION 10/17/18 1-1 For the most current information available, visit www.vpc.com SLIDE CONFIGURATION INSTALLATION 20” SLIDE KIT (FITS 20” – 22” DEEP RACKS [508 - 558.8]) • PART # 310 113 409 24” SLIDE KIT (FITS 24” – 26” DEEP RACKS [609.6 - 660.4]) • PART # 310 113 410 28” SLIDE KIT (FITS 28” - 30” DEEP RACKS [711.2 - 762]) • PART # 310 113 451 30” SLIDE KIT (FITS 30” – 32” DEEP RACKS [762 - 812.8]) • PART # 310 113 411 36” SLIDE KIT (FITS 34” – 38” DEEP RACKS [863.6 - 965.2]) • PART # 310 113 500 Slides can be used with both the 15" and 20" G12/G12x receivers. The slide kits include a mounting bracket kit, slides and hardware. Choose your slide kit based on the distance from rail to rail and verify that the slides will not interfere with the rack enclosure. Each kit will support 180 lbs. Figure B. The platform mounting brackets are threaded so washers and nuts will not need to be locked. G12 RECEIVER SUPPORTS FOR MOUNTING PLATFORM TO SLIDES SLIDE TO BRACKET MOUNTING HARDWARE PLATFORM MOUNTING BRACKETS TOOLS REQUIRED Phillips Head Screwdriver Flat Head Screwdriver ³/32 Allen Wrench DETERMINE YOUR SLIDE KIT 1. Measure dimension A as shown in Figure A to determine the proper slide kit. NOTE: Make sure the slide length does not exceed dimensions A plus B. INSTALLATION 1. Install slides using manufacturer’s instructions. A hard copy is included with the slide kit. ( www.accuride.com/Resources/pdf/3507-r4-0309.pdf) 2. Attach platform mounting brackets to slides (Figure B). NOTE: The screws will overhang the bracket holes by 3/8". These screws will also be used to mount the keyboard tray kit, Part # 310 113 439. Continued on next page... 29.50 749.30 TOP VIEW [50.8] 2.00 DIMENSION B DIMENSION A DIMENSION C [749.3] 29.50 [31.75] 1.25 FRONT OF RACK Figure A. If dimension C exceeds 1" use the Rack Extender Kit, Part # 310 113 406 for G12 or Part # 310 113 519 for G12x. Dimensions shown: [millimeters] inches

G12/G12x USER’S MANUAL: SECTION 1

VIRGINIA PANEL CORPORATION 10/17/18 1-2 For the most current information available, visit www.vpc.com 3. Remove the rubber feet. 4. Attach the G12/G12x platform to the platform mounting brackets after removing the rubber feet (Figure C). NOTE: If you are installing a cable tray or instrument brackets, do not attach the platform until those accessories are installed. 5. Pull the receiver out as far as possible. The slides will lock in position. Push the blue tabs located on the middle section of the slides (Figure D). Apply pressure to push the receiver back in toward the rack. The smaller inner slides move into the middle section, which should not move. Push receiver until it backs into the rack. The mounting screws can now be used. ALWAYS SUPPORT THE RECEIVER AND PLATFORM WITH THE MOST ROBUST (MIDDLE) SECTION OF THE SLIDES. To ensure proper support when extending the receiver and table away from the rack, stop the receiver and platform at approximately 6” from the rack. Reach around to the rear of the receiver to the slides underneath on both sides. Manually extend the middle section of the slides forward until fully underneath the platform. The receiver and platform may then be extended while holding this middle slide in place. If completed properly, the middle section of the slides will remain underneath the platform and offer the strongest support. 6. Secure receiver to rack. Figure D. The slides will support 180 pounds. VPC recommends removing the ITA/Fixture when extending the slides for wiring access and maintenance. Figure C. Use the existing #8-32 fl at head screws, washers, and hex nuts to secure the platform to the brackets. BLUE TAB BAR NUT SLIDE CONFIGURATION INSTALLATION 20” SLIDE KIT (FITS 20” – 22” DEEP RACKS [508 - 558.8]) • PART # 310 113 409 24” SLIDE KIT (FITS 24” – 26” DEEP RACKS [609.6 - 660.4]) • PART # 310 113 410 28” SLIDE KIT (FITS 28” - 30” DEEP RACKS [711.2 - 762]) • PART # 310 113 451 30” SLIDE KIT (FITS 30” – 32” DEEP RACKS [762 - 812.8]) • PART # 310 113 411 36” SLIDE KIT (FITS 34” – 38” DEEP RACKS [863.6 - 965.2]) • PART # 310 113 500

G12/G12x USER’S MANUAL: SECTION 2

VIRGINIA PANEL CORPORATION 10/17/18 2-1 For the most current information available, visit www.vpc.com SLIDE CONFIGURATION ACCESSORIES RACK EXTENDER KIT, G12, 1.5" DEEP • PART # 310 113 406 RACK EXTENDER KIT, G12X, 1.5” DEEP • PART # 310 113 519 The G12/G12x is designed to easily fi t 19" standard racks when used in the slide confi guration. Although mounting rail dimensions are standardized, there may be variances in the rack enclosure design. VPC offers a rack extender kit for rails that are recessed more than 1". The Rack Extender Kit has a maximum depth of 2.5". TOOLS REQUIRED 5/32 Allen Wrench Phillips Head Screwdriver INSTALLATION 1. To determine if a Rack Extender Kit is needed, verify that the distance between the front of the rack enclosure and the rail is between 1" and 2.5" (Figure A). 2. Attach the mounting rack mating surface on the extender brackets to the recessed rail with the cap screws. Do not fully tighten until until the cover plate is attached. 3. Attach the cover to the brackets with the fl at head screws. 4. With the extender kit in place, secure the G12 receiver to the mating surface on the extender brackets with #10-32 cap screws. NOTE: The #10-32 cap screws are provided with the G12 receiver. [101.6] 4.00 DIMENSION C Figure A. Rack Extender Kits are used when the rails are recessed more than 1". DIMENSION C 2.5“[63.5mm]

G12/G12x USER’S MANUAL: SECTION 2

VIRGINIA PANEL CORPORATION 10/17/18 2-2 For the most current information available, visit www.vpc.com INSTRUMENT BRACKET INSTALLATION PART # 310 113 453 The instrument brackets mount to the inner slide and provide maintenance access to the chassis and the instruments. NOTE: This instrument bracket kit does not work with the 20” or 24” slide kits. TOOLS REQUIRED 5/32 Allen Wrench Phillips Head Screwdriver INSTALLATION 1. Depress the blue tab on the inner slide and remove. 2. Attach one of the brackets to the slide using three #8-32 button head screws. The left bracket assembly is shown in Figure A. 3. Attach the remaining bracket to the other inner slide. If you are also installing a cable tray, do so before reinstalling the slides and attaching the plate. See Cable Tray Installation instructions in this section. Continued on next page... Figure A. The brackets are identical parts and only the front two holes on each bracket are designed to line up with the slides. Figure B. The slots on the instrument brackets are designed to accept a strap should you want to secure your chassis.

G12/G12x USER’S MANUAL: SECTION 2

VIRGINIA PANEL CORPORATION 10/17/18 2-3 For the most current information available, visit www.vpc.com 5. Reinstall the inner slides. • Slide the left mid-section of the slide all the way out, you will feel it lock into position. • Feed the matching inner slide into position and ensure the inner section rides into place with the roller bearings seated into the groove. • Push the inner slide in about 6-8 inches and then pull out the right side. Slide the track of the mid-section over the right side of the inner slide. • Pull the slide out until the position matches the left side. • Reach to the back of the middle slides and release the spring locking mechanism (Figure C). NOTE: At this time, both sides should be partially installed when it will no longer proceed into the rack because the support tab on the instrument brackets will hit the slide mounting bracket. 6. Rotate both instrument brackets inward so the support tabs can pass the mounting brackets. Continue to push (install slides simultaneously) into position. Remember to push the blue tabs to allow the inner slide to continue to travel into the middle slide section. NOTE: The middle section will not go into the outer section until the inner section has been fully installed into the middle section. 7. Tighten the slide mounting screws. MAKE SURE ALL SCREW HEADS HAVE BEEN SECURELY TIGHTENED. ONLY USE 8-32 BUTTON HEAD SCREWS. INSTRUMENT BRACKET INSTALLATION PART # 310 113 453 Figure C. Spring-locking mechanism.

G12/G12x USER’S MANUAL: SECTION 2

VIRGINIA PANEL CORPORATION 10/17/18 2-4 For the most current information available, visit www.vpc.com SLIDE CONFIGURATION ACCESSORIES CABLE TRAY • PART # 310 113 424 The cable tray is used for strain relief and cable management. The horizontal and vertical fl anges provide tie down options that allow you to bend and route your cables as needed and also present a secure and reliable way to protect your investment. NOTE: The cable tray does not work with the 20” or 24” slide kits or the instrument bracket kit with strain relief. CABLE TRAY INSTALLATION 1. Loosen the slide mounting screws by one turn. 2. Depress the blue tab and remove the inner slides. 3. Attach the cable tray to the slides with #8-32 screws as shown in Figure A. 4. Install the inner slides and cable tray assembly into the rack. See Instrument Bracket Installation instructions in this section for more detail. 5. Tighten the slide mounting screws. Figure A. The angled side of the cable tray should face the G12/G12x receiver, and with shorter slide kits the cable tray will sit below the lip of the instrument brackets. TOOLS REQUIRED 3/32 Allen wrench

G12/G12x USER’S MANUAL: SECTION 2

VIRGINIA PANEL CORPORATION 10/17/18 2-5 For the most current information available, visit www.vpc.com Dimensions shown: [millimeters] inches Continued on next page... KEYBOARD TRAY KIT INSTALLATION PART # 310 113 439 The Keyboard Tray Kit mounts below the platform on the G12 or G12x receiver. The kit includes a keyboard with touchpad and 58" long USB connector, keyboard tray, and 12" slides. MOVEMENT 12 INCH SLIDE 1.2 [30.48] KEYBOARD WITH TOUCHPAD KEYBOARD TRAY 12 INCH SLIDES MOUNTING BRACKET, RIGHT MOUNTING BRACKET, LEFT USB KEYBOARD CONNECTOR. RUBBER GROMMET 13.0 [330.2] 13.3 [337.82] 28.4 [721.36] Figure A. Keyboard Tray Kit, Part # 310 113 439, includes components listed above and mounting hardware. TOOLS REQUIRED 3/32 Allen wrench KEYBOARD TRAY KIT INSTALLATION PART # 310 113 439

G12/G12x USER’S MANUAL: SECTION 2

VIRGINIA PANEL CORPORATION 10/17/18 2-6 For the most current information available, visit www.vpc.com PLATFORM MOUNTING BRACKET MOUNTING BRACKET, LEFT EXISTING #8-32 SCREWS Figure B. Orient the keyboard mounting brackets to align with the three screws that extend beyond the platform mounting bracket. INSTRUCTIONS 1. Attach the keyboard mounting brackets to the existing platform mounting brackets. Use the #8-32 nuts and lock washers to secure the keyboard mounting brackets to the three screws extending from the platform mounting brackets (Figure B). 2. Use the #8-32 button head screws to attach the 12" slides to the inner side of the keyboard brackets. The manufacturer stamped identification on the slides should be placed toward the rack. You need to adjust the position of the slides to access the hole locations. Hole locations are shown in Figure C. 3. Insert the keyboard into the keyboard tray. Wrap the plastic strain relief around the cable near the back of the keyboard and press into the hole provided on the keyboard tray. 4. Fully extend the 12” slides and mount the keyboard tray, (Figure D). The different hole patterns allow for variations in the overall extension of the keyboard tray. Figure D. The remaining 4 #8-32 button head screws are used to attach the keyboard tray to the slides. KEYBOARD TRAY KIT INSTALLATION PART # 310 113 439 Figure C. There are floating, self-locking fasteners in the keyboard mounting brackets which prevent the screws from backing out. You will notice the snug fit when tightening the screws.

G12/G12x USER’S MANUAL: SECTION 3

VIRGINIA PANEL CORPORATION 10/17/18 3-1 For the most current information available, visit www.vpc.com TABLETOP CONFIGURATION RECEIVER, G12, 12 MODULE • PART # 310 104 408 / 310 104 409 RECEIVER, G12X, 18 MODULE • PART # 310 104 410 / 310 104 411 / 310 104 422 G12/G12x receivers are shipped with four rubber feet for portable tabletop applications. The four feet are removable to expose ¼-20 tapped holes and allow for permanent mounting applications. PERMANENT TABLETOP MOUNTING 1. Remove rubber feet from ¼-20 tapped holes beneath the platform. 2. Prepare the mounting surface using the dimensions provided in Figure A or B, and drill 0.257" [6.53 mm] minimum thru holes. 3. Secure the receiver to the mounting surface with ¼-20 screws and washers. Figure A. Receiver with 15" Platform, Part # 310 104 408 & 310 104 410. Figure B. Receiver with 20" Platform, Part # 310 104 409 & 310 104 411. 85.60 .65 16.51 17.70 449.58 3.37 11.50 292.10 449.58 17.70 85.60 3.37 .65 16.51 449.58 17.70 85.60 16.50 419.10 3.37 .65 16.51 Dimensions shown: [millimeters] inches

G12/G12x USER’S MANUAL: SECTION 4

VIRGINIA PANEL CORPORATION 10/17/18 4-1 For the most current information available, visit www.vpc.com The rear cover is used to protect the wiring from the tabletop mounted receiver to the instruments. The rear cover includes necessary hardware to attach the G12/ G12x receiver to the tabletop. REAR COVER INSTALLATION 1. Use the ³/32 Allen wrench with the provided #8-32 screws and washers to attach the rear cover to the G12/G12x receiver. An exploded view of the assembly is provided in Figure A. TOOLS REQUIRED ³/32 Allen Wrench Figure A. Rear cover, Part # 310 113 421, is designed to attach to the G12 receiver, Part # 310 104 408/409. Part # 310 113 520 is designed to attach to the G12x receiver, Part # 310 104 410/411. OPTIONAL INSTALLATION 1. Rear covers can be permanently mounted to the tabletop using the dimensions provided in Figure B. Hardware is not included. TABLETOP CONFIGURATION ACCESSORIES REAR COVER, G12, TABLETOP CONFIGURATION • PART # 310 113 421 REAR COVER, G12X, TABLETOP CONFIGURATION • PART # 310 113 520 287.19 11.307 1.35 34.29 15.00 381 .26 TYP 6.60 Figure B. The rubber feet included with the rear cover are not necessary when permanently mounting the G12/G12x receiver. Dimensions shown: [millimeters] inches

G12/G12x USER’S MANUAL: SECTION 5

VIRGINIA PANEL CORPORATION For the most current information available, visit www.vpc.com INSTALLATION 1. Place receiver over clip/cage nuts on rack, making sure they are aligned (Figure A). 2. Tighten screws in a criss-cross pattern to ensure even torque is applied. Figure A. RACK MOUNT CONFIGURATION RECEIVER, G12, 12 MODULE • PART # 310 104 338 The 15” G12 Receiver provides a platform for use with large fi xtures. When this Receiver is fi xed mounted, it can support up to 275 lbs. TOOLS REQUIRED 5/32 Allen Wrench

G12/G12x USER’S MANUAL: SECTION 6

VIRGINIA PANEL CORPORATION 10/17/18 6-1 For the most current information available, visit www.vpc.com RACK MOUNT CONFIGURATION ACCESSORIES RACK EXTENDER KIT, G12 • PART # 310 113 413 The Rack Mount Extender Block Kit is used for mounting to racks with recessed mounting rails. It is made of aluminum with a black anodized fi nish. The Rack Extender Kit will allow for a maximum rack depth of 3.5”. TOOLS REQUIRED 5/32 Allen Wrench Phillips Head Screwdriver Flat Head Screwdriver INSTALLATION 1. Verify that the distance from the front of the rack enclosure to the rail is between 1" and 3.5" (Figure A). 2. Attach the mounting rack mating surface on the extender brackets (Figure B), to the recessed rail with the cap screws. Do not fully tighten until until the cover plate is attached. 3. Attach the cover to the brackets with the fl at head screws. 4. With the extender kit in place, secure the G12 receiver to the G12 receiver mating surface on the extender brackets with #10-32 cap screws. NOTE: The #10-32 cap screws are provided with the G12 receiver. Figure B. *For a larger and easier-to-read drawing please consult the offi cial drawing online at vpc.com. Enter part # 310113413 and select the drawing link on the right side of the Product Page. Figure B. 10-32 x .75 Button Head Socket Screws to secure rack. 4 places. M6 x 20 screws may also be used (not included). Left Extension RIght Extension 4-40 Flat Head Screws for mounting Extender Kit Top to receiver [101.6] 4.00 DIMENSION C Figure A. Rack Extender Kits are used when the rails are recessed more than 1". DIMENSION C 3.5“[88.9mm]

G12/G12x USER’S MANUAL: SECTION 7

VIRGINIA PANEL CORPORATION 10/17/18 7-1 For the most current information available, visit www.vpc.com HANDLE REMOVAL AND REPOSITIONING RECEIVER, G12 • PART # 310 104 325 / 310 104 334 / 310 104 408 / 310 104 409 RECEIVER, G12, LEFT HANDLE • PART # 310 104 356 & 310 104 359 RECEIVER, G12X • PART # 310 104 385 / 310 104 386 / 310 104 410 / 310 104 411 The G12/G12x receiver handle requires approximately 90° of counter-clockwise travel for engagement and 90° of clockwise travel for disengagement of the ITA. This handle is removable and adjustable to accommodate different mounting configuration requirements and for transport purposes. TOOLS REQUIRED 3/32 Allen Wrench REMOVAL INSTRUCTIONS 1. Remove the handle set screw with a 3/32 Allen wrench. 2. Remove the handle and reposition in 90˚ increments. 3. Replace the screw and tighten until the handle is secured tightly. 22.06 560.32 19.41 493.01 HANDLE CAN BE LOOSENED AND ROTATED IN 90 DEGREE INCREMENTS. 16.93 430.10 14.28 362.79 HANDLE CAN BE LOOSENED AND ROTATED IN 90 DEGREE INCREMENTS. 310104325, 310104286, 310104408 & 310104409, : G12/G12x receiver with a 15” platform show with handle in the standard disengaged position. 310104334, 310104385, 310104410 & 310104411, : G12/G12x receiver with a 20” platform show with handle in the standard engaged position. Dimensions shown: [millimeters] inches

G12/G12x USER’S MANUAL: SECTION 8

VIRGINIA PANEL CORPORATION 10/17/18 For more information visit vpc.com 8-1 G12 ITA ENCLOSURE ENCLOSURE, G12 , FRONT MOUNT • PART # 410 112 665 ENCLOSURE, G12, FOR DISCRETE WIRING, 4" X 18" X 12" • PART # 410 112 739 Figure A. Enclosures must be flush with the ITA bottom to ensure the proper function of the G12 system. 1.75 44.45 3.34 84.84 ENCLOSURE MUST BE FLUSH TO BOTTOM OF ITA FRAME. THE WIDTH MAY GROW TO CUSTOMERS NEEDS WITH A SIMPLE ADJUSTMENT OF THE HANDLE ON THE RECEIVER. THERE IS NO LIMIT TO THE HEIGHT OF THE ENCLOSURE. The front mounting G12 enclosure is available to meet your testing needs. Custom enclosures are also available if the standard is not applicable to your test system. TOOLS REQUIRED 3 mm Allen Wrench Phillips Head Screwdriver Dimensions shown: [millimeters] inches

G12/G12x USER’S MANUAL: SECTION 8

VIRGINIA PANEL CORPORATION 10/17/18 For more information visit vpc.com 8-2 G12X ITA ENCLOSURE ENCLOSURE, G12X , FRONT MOUNT • PART # 410 112 849 ENCLOSURE, G12X, FOR DISCRETE WIRING, 4" X 18" X 12" • PART # 410 112 856 Figure A. Enclosures must be flush with the ITA bottom to ensure the proper function of the G12x system. The front mounting G12x enclosure is available to meet your testing needs. Custom enclosures are also available if the standard is not applicable to your test system. TOOLS REQUIRED 3 mm Allen Wrench Phillips Head Screwdriver 5.37 136.40 1.25 31.75 ENCLOSURE MUST BE FLUSH TO BOTTOM OF ITA FRAME. THE WIDTH MAY GROW TO CUSTOMERS NEEDS WITH A SIMPLE ADJUSTMENT OF THE HANDLE ON THE RECEIVER. THERE IS NO LIMIT TO THE HEIGHT OF THE ENCLOSURE. Dimensions shown: [millimeters] inches

G12/G12x USER’S MANUAL: SECTION 9

VIRGINIA PANEL CORPORATION 10/17/18 9-1 For the most current information available, visit www.vpc.com INSTALLATION 1. Determine which locations in the receiver and ITA will have keying pins installed and which will be open according to Table 1. 2. Install the required keying pin combination with the 3/32 Hex Wrench (Figure A). NOTE: One keying pin kit will allow 6 variations. By using a second keying pin kit, you can have up to 36 variations. TOOLS REQUIRED ³/32 Allen Wrench Figure A. KEYING PIN KIT, RECEIVER AND ITA ASSEMBLY PART # 310 118 112 A DETAIL A SCALE 1 : 1.5 B DETAIL B SCALE 1 : 1.5 KEYING PIN LOCATIONS PATTERN 1 PATTERN 4 RECEIVER ITA RECEIVER ITA PIN A INSTALLED PIN C INSTALLED SCREW A OPEN SCREW C OPEN PIN A OPEN PIN C OPEN SCREW A INSTALLED SCREW C INSTALLED PIN B OPEN PIN D OPEN SCREW B INSTALLED SCREW D INSTALLED PIN B INSTALLED PIN D INSTALLED SCREW B OPEN SCREW D OPEN PATTERN 2 PATTERN 5 RECEIVER ITA RECEIVER ITA PIN A INSTALLED PIN C OPEN SCREW A OPEN SCREW C INSTALLED PIN A OPEN PIN C INSTALLED SCREW A INSTALLED SCREW C OPEN PIN B INSTALLED PIN D OPEN SCREW B OPEN SCREW D INSTALLED PIN B INSTALLED PIN D OPEN SCREW B OPEN SCREW D INSTALLED PATTERN 3 PATTERN 6 RECEIVER ITA RECEIVER ITA PIN A OPEN PIN C INSTALLED SCREW A INSTALLED SCREW C OPEN PIN A INSTALLED PIN C OPEN SCREW A OPEN SCREW C INSTALLED PIN B OPEN PIN D INSTALLED SCREW B INSTALLED SCREW D OPEN PIN B OPEN PIN D INSTALLED SCREW B INSTALLED SCREW D OPEN Figure B. Table 1.

G12/G12x USER’S MANUAL: SECTION 10

VIRGINIA PANEL CORPORATION 10/17/18 10-1 For the most current information available, visit www.vpc.com Prior to engaging an ITA with the receiver for the first time, ensure all modules (ITA and receiver) are properly installed. This involves inspection of modules to ensure proper mounting and to verify module positioning. Module positions are shown in Figures A and B. Modules must be installed such that Pin 1 of each respective mating receiver and ITA module pair are adjacent. VPC recommends that Pin 1 always be positioned to the left in the receiver and ITA frames. All ITA Modules must match the respective receiver Modules. It is crucial for all modules to be installed properly. G12x Only: The lower four module rows share the same description as on G12 (i.e. A1-A4). The extended tier of the G12x is considered to be rows 5 or 6. 1. The receiver should be checked for any foreign objects that may interfere with engagement. 2. After inspection, the ITA is ready for engagement with the receiver. The ITA may be placed onto the receiver platform and properly positioned relative to the receiver guide pins. Ensure that the ITA roller bearings are aligned with the receiver slide openings when the receiver handle is in the open position. 3. Carefully rotate the handle forward to actuate the receiver slide engagement mechanisms, which will draw the ITA into engagement position with the receiver. Once the handle reaches a positive stop at the end of its travel and latches into place, the modules are engaged. 4. Upon completing use of the ITA, rotate the receiver handle to the open position, remove the ITA, reinstall the receiver protective cover and rotate the handle to the closed position. 5. Always protect the contacts when the system is not in use. The receiver contacts are protected when either the ITA or receiver protective cover is engaged. VPC recommends use of both receiver and ITA protective covers to avoid potential contact damage. IMPROPER INSTALLATION WILL DAMAGE THE MODULES, AND POSSIBLY THE ITA AND/OR RECEIVER. G12 ITA & RECEIVER ENGAGEMENT IN THE EVENT OF COMPLICATIONS, A TRAINED TECHNICIAN SHOULD BE NOTIFIED IMMEDIATELY TO AVOID ANY DAMAGE TO THE SYSTEM. THIS APPLIES TO ANY DIFFICULTIES THAT MAY BE EXPERIENCED DURING ENGAGEMENT. Figure A. G12 receiver shown from the mating side, ITA shown from the wiring side. MODULE POSITION A1 MODULE POSITION A2 MODULE POSITION A3 MODULE POSITION A4 MODULE POSITION B1 MODULE POSITION B2 MODULE POSITION B3 MODULE POSITION B4 MODULE POSITION C1 MODULE POSITION C2 MODULE POSITION C3 MODULE POSITION C4 MODULE POSITION A1 MODULE POSITION A2 MODULE POSITION A3 MODULE POSITION A4 MODULE POSITION B1 MODULE POSITION B2 MODULE POSITION B3 MODULE POSITION B4 MODULE POSITION C1 MODULE POSITION C2 MODULE POSITION C3 MODULE POSITION C4 Figure B. G12x receiver shown from the mating side; G12x ITA shown from the wiring side. MODULE POSITION B4 MODULE POSITION A1 MODULE POSITION A2 MODULE POSITION A3 MODULE POSITION A4 MODULE POSITION B3 MODULE POSITION B1 MODULE POSITION B2 MODULE POSITION C6 MODULE POSITION C4 MODULE POSITION A3 MODULE POSITION A2 MODULE POSITION A1 MODULE POSITION B1 MODULE POSITION B2 MODULE POSITION B3 MODULE POSITION B4 MODULE POSITION C1 MODULE POSITION C2 MODULE POSITION C3 MODULE POSITION C4 MODULE POSITION C1 MODULE POSITION C2 MODULE POSITION C3 MODULE POSITION A5 MODULE POSITION A4 MODULE POSITION A6 MODULE POSITION A6 MODULE POSITION A5 MODULE POSITION B6 MODULE POSITION B5 MODULE POSITION B6 MODULE POSITION B5 MODULE POSITION C6 MODULE POSITION C5 MODULE POSITION C5

G12/G12x USER’S MANUAL: SECTION 11

VIRGINIA PANEL CORPORATION 10/17/18 11-1 For the most current information available, visit www.vpc.com ITA Frame is not lined up when in the process of engagement with receiver • This may indicate that the ITA is out of alignment or that a module is not mating with its intended Module. • Remove and inspect the ITA for alignment • Check for foreign objects/tools. • Inspect the matching of modules -power ITA module to mate with power receiver module, etc. Excessive force is needed to engage the Handle • With a typical contact load, approximately 35lbs force is needed to engage the handle. Consult with a VPC application engineer for detailed contact loading information. • If excessive force is required, this may indicate that the ITA is out of alignment or that a module is not mating with its intended module. • Remove and inspect the ITA for alignment. Contact Virginia Panel Corporation – unauthorized user adjustments to system will void the warranty. • Check for foreign objects/tools. • Contact damage may provide enough resistance to notice. Upon replacing a contact in the ITA, the mating contact on the receiver side should also be inspected and replaced if necessary. • Verify the orientation of the receiver and ITA modules. • Inspect the matching modules - power ITA module to mate with power receiver module, etc. ITA will not engage with the receiver after diagnosing the above problems • Contact Virginia Panel Corporation – unauthorized user adjustments to the System will void the warranty. No continuity upon engagement • When replacing an ITA contact, the mating contact on the receiver side should also be inspected and replaced if necessary. • Check wiring and replace if necessary. • Contact not secured in module. • A contact may be damaged. Visually check all contacts for damage to potentially isolate damaged pin prior to checking for continuity with a multi-meter. A “short ” in the wiring upon engagement • A damaged contact(s) may cause high resistance. Upon replacing a contact in the ITA, the mating contact on the receiver side should also be inspected and replaced if necessary. • Check wiring and replace if necessary. Receiver and ITA will not disengage • This may indicate that the engagement mechanism within the receiver is faulty -contact Virginia Panel Corporation immediately- user adjustments to system, unless authorized, will void the warranty. TROUBLESHOOTING FORCEFUL ENGAGEMENT OF THE RECEIVER AND THE ITA WILL RESULT IN SERIOUS DAMAGE TO MULTIPLE PARTS OF THE SYSTEM (MODULES, RECEIVER, ITA AND CONTACTS)!

G12/G12x USER’S MANUAL: SECTION 11

VIRGINIA PANEL CORPORATION 10/17/18 11-2 For the most current information available, visit www.vpc.com The following is a listing of precautionary notes found within this Manual and otherwise. They should be noted and followed for the equipment to operate in an optimum state. • Never probe a contact without using a mating patchcord as a test lead. • Never forcefully engage a system if there is an excessive amount of resistance on the handle. • Never allow an ITA to drop as this may cause misaligned engagement and/or irreparable damage. • Always insert and extract a contact insertion/extraction tool in line with the contact. Never apply pressure to the side as this may break either contact or tool. This also applies to forming and enlarging tools. • It is advisable that power to the interface system be disconnected prior to handling and maintenance. • Caution should always be used when engaging, making sure that all foreign objects are removed from the system. • The foremost precautionary step that needs to be taken is to protect the interface system from damage caused by people (bumping into the receiver/ITA assembly with a box, chair or electronic equipment for example). To prevent this, VPC recommends engaging either the ITA or the receiver Protective Cover to the receiver when not in use. PRECAUTIONARY NOTES