mechanical installation manual
LATEST! 2015.03.13 11H51
Centurion Systems (Pty) Ltd www.CentSys.com
all-guides
com
from 07h00 to 18h00
UTC+2
Monday to Friday
Manufacture to
international
quality standard
ISO 9001:2008
100%
testing of
products
In-house
R&D
development
team
Centurion Systems (Pty) Ltd reserves the right to make changes to the products described in this
manual without notice and without obligation to notify any persons of any such revisions or changes.
Additionally, Centurion Systems (Pty) Ltd makes no representations or warranties with respect to
this manual. No part of this document may be copied, stored in a retrieval system or transmitted in any
form or by any means electronic, mechanical, optical or photographic, without the express prior written
consent of Centurion Systems (Pty) Ltd.
1986
1990
1995
1999
Today
COMPANY PROFILE
Company Profile
Sales and technical support
to Africa, Europe, Asia,
the Americas, Australia
and the Pacific
IMPORTANT SAFETY INSTRUCTIONS
1.
1.
General Description
2.
Icons Used in this Manual
3.
Specifications
3.1. Physical Dimensions
3.2. Technical Specifications
3.3. V-Series Controller
3.4.
Lightning Protection
3.5.
Maximum Allowable Gate Mass
3.6.
Maximum Allowable Gate Coverage for different Wind Speeds
4.
Product Identification
5.
Required Tools and Equipment
6.
Preparation of Site
6.1
General Considerations for the Installation
6.2.
Determine Gate Opening Angle
6.3.
Key Terms Used in this Section
6.4.
Inward Opening Installation - 90° or Less
6.5.
Inward Opening Installation - 100°
6.6.
Hinge Depth on Gate
6.7.
Wall Bracket Mounting Methods
6.8.
Gate Bracket Mounting
7.
Cabling Requirements
8.
Critical Installation Checklist
9.
Operator Installation - Inward Opening Gates
9.1.
Key Terms Used in this Section
9.2.
Installation Tables - Inward Opening
9.3.
Physical Installation - Inward Opening
page 6
page 9
page 10
page 11
page 12
page 12
page 13
page 14
page 14
page 14
page 15
page 17
page 18
page 18
page 19
page 20
page 20
page 21
page 22
page 23
page 25
page 26
page 27
page 28
page 28
page 28
page 30
Operator Installation - Outward Opening Gates
10.1. Key Terms Used in this Section
10.2. Installation Tables - Outward Opening
10.3. Physical Installation - Outward Opening
page 40
page 40
page 40
page 42
These quick steps are for the experienced installer who needs a checklist to get a
standard installation up and running in the minimum amount of time.
Detailed installation features and functions are referred to later on in this manual.
Gather Required Tools and Equipment
STEP
2
STEP
3
Heed Necessary Site Considerations
Determine Installation Type
•
Inward Opening Installation
•
Outward Opening Installation
STEP
4
Check Cabling Requirements
STEP
6
Mount the Gate and Wall Bracket(s)
STEP
5
Determine the Gate Swing Angle
FAST TRACK Mechanical Setup
MECHANICAL SETUP
FAST TRACL
STEP
7
Install Operator
STEP
8
Mount Controller Enclosure
To ensure the safety of people and possessions, it is important that you
read all the following instructions.
Incorrect installation or incorrect use of the product could cause
serious harm to people and pets.
The installer, being either professional or DIY, is the last person
on the site who can ensure that the operator is safely installed, and that
the whole system can be operated safely.
IMPORTANT
SAFETY INSTRUCTIONS
Warnings for the Installer
CAREFULLY READ AND FOLLOW ALL INSTRUCTIONS before beginning to install
the product.
•
All installation, repair, and service work to this product must be done by a suitably
qualified person
•
Do not activate your gate opener unless you can see it and can determine that its area of
travel is clear of people, pets, or other obstructions
• NO ONE MAY CROSS THE PATH OF A MOVING GATE. Always keep people and objects
away from the gate and its area of travel
• NEVER LET CHILDREN OPERATE OR PLAY WITH THE GATE CONTROLS, and do not
allow children or pets near the gate area
•
Secure all easily-accessed gate opener controls in order to prevent unauthorised use of
the gate
•
Do not in any way modify the components of the automated system
•
Do not install the equipment in an explosive atmosphere: the presence of flammable gas
or fumes is a serious danger to safety
•
Before attempting any work on the system, switch off electrical power and disconnect the
batteries
•
The mains power supply of the automated system must be fitted with an all-pole switch
with contact opening distance of 3mm or greater. Use of a 5A hydraulic breaker with all-
pole circuit break is recommended
•
Make sure that an earth leakage circuit breaker with a threshold of 30mA is fitted
upstream of the system
•
Never short-circuit the battery and do not try to recharge the batteries with power supply
units other than that supplied with the product, or manufactured by
Centurion Systems (Pty) Ltd
•
Make sure that the earthing system is correctly constructed, and that all metal parts of
the system are suitably earthed
SAFETY FIRST
IMPORTANT SAFETY INSTRUCTIONS
all-guides
com
Safety devices must be fitted to the installation to guard against mechanical movement
risks such as crushing, dragging and shearing
•
It is recommended that at least one warning indicator light be fitted to every system
•
Always make sure that the warning signs are fitted so that they are visible from inside
and outside of the gate
•
The installer must explain and demonstrate the manual operation of the gate in the case
of an emergency, and must hand the User/Warnings guide over to the user
•
The installer must explain these safety instructions to all persons authorised to use this
gate, and be sure that they understand the hazards associated with automated gates
•
Do not leave packing materials (plastic, polystyrene, etc.) within reach of children as
such materials are potential sources of danger
•
Dispose of all waste products such as packing materials, worn-out batteries, etc,
according to local regulations
•
Always check the obstruction detection system and safety devices for correct operation
•
Neither Centurion Systems (Pty) Ltd, nor its subsidiaries, accepts any liability caused by
improper use of the product, or for use other than that for which the automated system
was intended
•
This product was designed and built strictly for the use indicated in this documentation.
Any other use, not expressly indicated here, could compromise the service life/operation
of the product and/or be a source of danger
•
Everything not expressly specified in these instructions is not permitted
SAFETY FIRST
• Never run the operator directly from the battery! Doing so will cause
damage to the operator. Only run the operator from the V-Series
Controller
• A moving gate can cause serious injury or death!
Keep clear! The gate may move at any time!
Do not allow children to play in the area of travel of the gate or
operate the gate
SAFETY FIRST
IMPORTANT SAFETY INSTRUCTIONS
The VERT-X operator has been designed to safely and cost-effectively automate a
domestic swing gate.
Combining an innovative open-nut drive system, advanced diagnostic capabilities and
functionality, rugged die-cast aluminium construction and exceptional aesthetics for
a wholly unobtrusive installation, VERT-X is positioned firmly at the apex of swing
gate automation. In addition, the engineering team behind its design has invested
considerable effort ensuring that the operator is as easy to install as it is powerful,
and as reliable as it is good-looking.
The fail-safe and fully redundant position and collision detection system has been
designed and tested to set the standard in safety of operation and to provide an
unparalleled level of reliability and durability in operation.
The gate travel limits are managed by a sealed double-redundant opto-electronic system
that has been designed not only to ensure ultra-reliable operation, but also to ensure
precise position and trajectory control. This enables very accurate and reliable collision
detection to ensure safe operation even under trying conditions.
The control card has been designed to be easy and intuitive to use with helpful
instructions on the status of the operation during and after the installation. It also has a
built-in diagnostic procedure that can verify every aspect of the control card onsite.
Some of the advanced features offered by the V-Series Controller are:
•
Fully automated single-button Limit Setup for single and double swing gates
•
Full graphics LCD display provides an intuitive user interface with built-in diagnostics to
speed up and simplify the installation process
•
Separate safety inputs for infrared beams on both the closing and opening directions of
the gate
•
Advanced closed-loop speed control to maintain safe and reliable operation of gates even
under windy conditions
•
Fully configurable gate Run Profiles
•
Selectable and adjustable Autoclose with pushbutton override
•
Pedestrian (Partial) opening with automatic closure
•
Free-exit input
•
Positive Open and Close Modes for gate locks and electric fence contacts
•
Support for Inward and Outward opening gates
•
Multiple Modes of Operation
•
Solenoid lock drive output up to 2A
•
Holiday Lockout
•
A status LED output to indicate the gate status remotely
•
Pillar Light control
•
Leaf delay is selectable for either gate leaf
•
Onboard code-hopping receiver with selective adding and deleting of remotes
SECTION 1
GENERAL DESCRIPTION
1. General Description
SECTION 1
GENERAL DESCRIPTION
2. Icons Used in this Manual
This icon indicates tips and other information that could be useful during the
installation.
This icon denotes variations and other aspects that should be considered during
installation.
This icon indicates warning, caution or attention! Please take special
note of critical aspects that MUST be adhered to in order to prevent
injury.
SECTION 2
ICONS USED IN THIS MANUAL
3.1. Physical Dimensions
3. Specifications
470mm retracted
918mm overall length
Ø133mm
320mm stroke
FIGURE 1. VERT-X OVERALL DIMENSIONS
SECTION 3
SPECIFICATIONS
all-guides
com
3.2. Technical Specifications - VERT-X Operator
Light-Industrial
Input voltage1
90V - 240V AC ± 10%, 50/60Hz
Motor voltage
12V DC
Motor power supply
Battery-driven (standard capacity - 7Ah)2
Battery charger
CP84SM - 1.8A @ 13.8V
Current consumption (Mains)
170mA
Current consumption (motor at rated load)
3A
Current consumption (motor at max load)
13A
Operator push force - maximum
220kgf
Operator stroke - maximum
320mm
Operator speed (at rated load)
28mm/sec
Typical gate opening time (90º)3
<11 sec
Manual override
Key release4
Maximum number of operations per day
250
Design life
150,000 cycles
Duty cycle (Mains present)5 6
60%
Operations in Standby over 24 hours
(with fully charged 7Ah battery)7
300
Collision sensing
Electronic
Operating temperature range
-15°C to +50ºC
Mass of operator packed (excluding battery)
Single kit8
10kg
Double kit9
18kg
TABLE 1
SECTION 3
SPECIFICATIONS
1. Can operate off a solar supply, consult your reseller for assistance
2. Can increase battery capacity for longer standby times
3. Assumes that full stroke of operator is used
4. Each operator comes with a unique set of keys
5. Based on 25°C ambient temperature and unit not in direct sunlight
6. Based on an operator push force of less than 50% of rated
7. Based on double kit excluding Infrared Safety Beams
8. Single kit contains one operator and Wall Box
9. Double kit contains two operators and one Wall Box
3.3. V-Series Controller
Maximum motor current per channel
15A (fused)
Maximum input voltage
18V DC
Standby current draw
48mA
Maximum solenoid current draw
2A DC
Maximum auxillary output current
3A (Resettable Electronic Fuse)
Collision detection
Current sense and redundant optical
Position and trajectory
Redundant optical
Temperature range
-20°C to +60°C
TABLE 2
Maximum Allowable gate Mass
Length (m)
Up to
1.5m
Up to
2m
Up to
2.5m
Up to
3m
Mass (kg)
600kg
335kg
215kg
150kg
TABLE 3
3.5. Maximum Allowable Gate Mass and coverage
An electronic lock can be fitted to improve the security of the system
3.4. Lightning Protection
The V-Series electronic controller utilises the same proven surge protection philosophy
that is used in all our products. While this does not guarantee that the unit will not
be damaged in the event of a lightning strike or power surge, it greatly reduces the
likelihood of such damage occurring. The earth return for the surge protection is provided
via the mains power supply earth. In order to ensure that the surge protection is
effective, it is essential that the unit is properly earthed.
SECTION 3
Maximum Allowable Coverage in Wind Speeds
Length (m)
Up to
1.5m
Up to
2m
Up to
2.5m
Up to
3m
Height (m)
Up to
1.8m
Up to
1.8m
Up to
1.8m
Up to
1.8m
Coverage
Maximum Wind Speeds (km/h)
25%
91
68
55
45
50%
64
48
39
32
75%
52
39
31
26
100%
45
34
27
23
TABLE 4
3.6. Maximum Allowable Coverage in Wind Speeds
SECTION 3
SPECIFICATIONS
1. Gate operator keys1
2. Wall Bracket mounting plate
3. Wall Bracket
4. VERT-X gate operator
(complete assembly)
5. Wall Bracket pin
1. Keys are specific to each operator - key number must be recorded
6. 14mm snap rings
7. Mechanical Installation Manual
8. Gate Bracket welded assembly
9. Gate Bracket pin (optional extra)
10. Gate warning decal
4. Product Identification
FIGURE 2. PRODUCT IDENTIFICATION
6
6
5
10
1
2
3
4
9
7
8
SECTION 4
PRODUCT IDENTIFICATION
FIGURE 3. V-SERIES WALL BOX INCLUDING CHARGER AND CONTROLLER
3
4
7
1
5
6
2
1. 12V 7.2Ah Battery1
2. V-Series Controller with Built-in
Receiver
3. V-Series User Guide
4. V-Series Electrical Setup
Commissioning Guide
5. CP84SM Battery Charger
6. Isolator
7. Code-hopping Remote Controls
1. Batteries can be of a larger capacity for longer power failure autonomy and are not included in the kit. Consult your
local authorised dealer for assistance
SECTION 4
PRODUCT IDENTIFICATION
all-guides
com
5. Required Tools & Equipment
Spanners
17mm/15mm
preferably socket set
Ø12mm masonry drill bit for
wall mount bracket
Ø6.5mm steel drill bit
for Gate Bracket
Connector
block
Hole saw
20mm
Angle grinder
Pin punch
6mm
Hacksaw
Spirit level
Marking
pen/chalk
Extension cord
Soldering
iron
Safety equipment
(goggles, gloves etc.)
Welding machine
(including consumables)
and safety equipment
Measuring
tape
Electric drilling
machine
Screwdrivers
3.5mm Flat
T30 torx
drive and Bit
VERT-X
ABS
Template
Hammer
Pliers
VERT-X
Mounting Template Kit
(Optional)
FIGURE 4
SECTION 5
REQUIRED TOOLS & EQUIPMENT
Crimping tool
and Pin lugs
6.1. General Considerations for the Installation:
Always recommend the fitment of additional safety equipment such as safety edges
and Safety Beams (i5 or Photon), for additional protection against entrapment or other
mechanical risks
Check that no pipes or electrical cables are in the way of the intended installation
Check that enough space is available for the gate operator with the gate in the required
open position (see Figure 6)
If the swing gate leaf is longer than 2.5 metres, ensure that an electric lock can be fitted1
For security reasons, never fit an operator on the outside of the gate, where the public
has access to it (refer to the instructions for an Outward-opening swing gate)
Never run an operator directly off the 12V battery
Install the gate operator only if:
•
It will not pose a hazard to the public
•
There is sufficient clearance to a roadway and/or public thoroughfares
•
The installation will meet all municipal and/or local authority requirements once
completed
•
The gate mass, leaf width, allowable wind loading and application is within the operator
specifications (refer to the specification tables)
•
The gate is in good working order, meaning:
•
That it swings freely;
•
Does not move on its own if left in any position;
•
Each gate leaf is strong and rigid;
•
Once installed, there is sufficient clearance between moving parts when opening and
closing to reduce the risk of personal injury and entrapment
•
Pushbuttons or Keyswitches, when required, must be positioned so that the gate is in line
of sight of the operator
1. Electric locks are recommend for most swing gate installations where greater security and/or resistance to strong winds is
required
6. Preparation of Site
SECTION 6
PREPARATION OF SITE
PREPARATION OF SITE
FIGURE 5
1 metre
1 metre
Gate in closed
position
Gate hinge
point
Gate in open position
Mark the ground
Distance Z
Mark the ground
Wall
6.2. Determine Gate Opening Angle
Use this procedure to accurately determine the gate opening angle:
6.2.1. Step 1
Close the gate and measure a
distance of one metre from the
centreline of the gate hinge.
Make a mark on the ground.
6.2.2. Step 2
Open the gate and measure a
distance of one metre along the gate
from the centreline of the gate hinge.
Make another mark on the ground.
Measure the distance on the ground
between the two marks (Z).
Using this Z-Value, determine the
gate opening angle from the table
below.
Z-Value from
To
Use gate swing angle of
1000mm
1133mm
60° - 69°
1147mm
1272mm
70° - 79°
1286mm
1402mm
80° - 89°
1414mm
1475mm
90° - 95°
1486mm
1532mm
96º - 100º
Z-Values greater than 1532mm1
TABLE 5
1. The VERT-X operator is designed for a maximum gate opening angle of 100°.
6.2.3. Step 3
Gate opening angle based on Z-Value
FIGURE 6. SIDE WALL LIMITATION FOR A 90° INWARD OPENING GATE
Wall minimum
must be greater
than 190mm
Pillar to gate hinge point
(60mm maximum)
Wall
Gate in closed position
Gate Hinge Point
Gate in open position
Gate opening 90º
or less
6.4. Inward Opening Installation - 90º or less
Figure 6 shows the minimum wall clearance and maximum pillar to gate hinge point
distance for an inward opening gate leaf opening to an angle of 90º or less.
The pillar to gate hinge point maximum ensures that the operator does not foul against
the pillar when installed. The minimum wall clearance ensures that there is enough space
to install the operator according to the installation tables.
Side wall
6.3. Key Terms Used in this Section
6.3.1. Pillar maximum
The maximum allowable distance measured from the centre of the gate hinge to the edge
of the pillar.
6.3.2. Wall minimum
This value denotes the minimum amount of space needed to install the operator and is
measured from the side wall to the gate when the gate is in the open position.
SECTION 6
PREPARATION OF SITE
PREPARATION OF SITE
6.5. Inward Opening Installation - 100º
Figure 7 shows the minimum wall clearance and maximum pillar to gate hinge point
distance for an inward opening gate leaf opening to an angle of 100°.
The pillar to gate hinge point maximum ensures that the operator does not foul against
the pillar when installed. The minimum wall clearance in the case of the 100° opening
ensures that the gate does not run into the wall.
•
For gates 1.0m to 2.0m long, the minimum wall clearance is 370mm
•
For gates 2.0m to 3.0m long, the minimum wall clearance is 540mm
FIGURE 7. SIDE WALL LIMITATION FOR A 100° INWARD OPENING GATE
Minimum wall
clearance as
indicated in
text above
Pillar to gate hinge
(60mm maximum)
Wall
Gate in closed position
Gate in open position
Gate openning 100º
Gate Hinge Point
Side wall
all-guides
com
6.6. Hinge Depth on Gate
Due to the operator body being a fixed length and the operator body extending past the
maximum travel position of the Gate Bracket pin, the operator can foul against the gate
during operation if the unit is not installed correctly. Before installing the operator, ensure
that the hinge depth in relation to the gate face is no more than 30mm.
This will ensure that the front end of the operator does not foul against the gate (see
Figure 9.)
A gate hinge depth greater than 30mm will reduce the E-value (refer to
Section 9) of the installation which, in turn, may result in the operator fouling
against the gate during operation. In the unlikely event that a hinge depth
greater than 30mm is measured (most gates will have a hinge depth of less than
30mm, with the exception of gates made from very thick material), the hinges
must be ground off and repositioned so as to ensure the hinge point is less than
30mm from the gate face.
FIGURE 8. MAXIMUM GATE HINGE DEPTH
Hinge centre
to gate face
(maximum 30mm)
Gate Hinge Point
Gate face
FIGURE 9. OPERATOR COLLIDING WITH GATE
Gate
VERT-X operator
Collision point
Hinge to gate face depth greater than 30mm
SECTION 6
PREPARATION OF SITE
PREPARATION OF SITE
6.7. Wall Bracket Mounting Methods
For reliable operation, it is important to ensure that the way the operator is secured to the
wall takes into account the strength of the pillar, the size of the gate and how frequently the
gate will be used.
6.7.1. Through-Wall
Applications:
• Pre-fabricated walling
• For heavy gates operating
frequently, use this method
FIGURE 11. CHEMICAL ANCHORS
FIGURE 12
FIGURE 10. THROUGH-WALL
Pillar
Wall Bracket
Through-wall bolt
Pillar
Wall Bracket
Chemical anchor
Steel
pillar
Wall Bracket
Welding machine
6.7.2. Chemical Anchors
Applications:
• Masonry pillars
• Frequently use
6.7.3. Welding
Application:
•
Steel pillars
6.7.4. Sleeve Anchors
Applications:
• Lighter gates
• Domestic
FIGURE 13. SLEEVE ANCHORS
FIGURE 14. RAWL BOLTS
Pillar
Pillar
Wall Bracket
Wall Bracket
Sleeve anchor
Rawl bolt
6.7.5. Rawl bolts
Applications:
•
Lighter gates
•
Domestic
SECTION 6
PREPARATION OF SITE
PREPARATION OF SITE
6.8. Gate Bracket Mounting
FIGURE 15. WELD GATE BRACKET TO GATE
Weld Gate
Bracket to gate
6.8.1. Steel Gates
The Gate Bracket is designed to
be welded onto the gate.
6.8.2. Non-Steel Gates
In the case where the gate is not manufactured from steel:
•
Use a suitable bracket made up from steel so that the Gate Bracket can be welded to it
and then fastened to the gate using an appropriate method, OR
•
Another Wall Mounting Bracket can be purchased and then the Gate Bracket can be
welded to it as shown in Figure 16.
FIGURE 16. MOUNTING THE GATE BRACKET TO A NON-STEEL GATE
Weld brackets
together
Fasten the welded Gate
Bracket to the gate
Gate
Bracket
Wall Bracket
Mounting Plate
(ordered
separately)
FIGURE 17. CABLING REQUIREMENTS
Legend
1. 90V - 240V AC mains cable via mains isolator1 switch (3 core LNE 0,5mm²)2,
or low-voltage 16V AC battery charger supply3 (2 core 1,5mm²).
2. Intercom cable (n1 + 6 core) to house.
3. Master motor (MTR M) or Slave motor (MTR S) cable.
(Minimum, 2 core 1.5mm² + 4 core 0,22mm² multi-stranded)4.
4. Optional radio receiver cable (3 core 0,5mm² multi-stranded, optional)5.
5. Optional Pedestrian Keyswitch (2 core 0,5mm² multi-stranded) or optional keypad
(3 core 0,5mm² multi-stranded).
6. Optional, but recommeded Infrared Safety Beams (3 core 0,5mm² multi-stranded
or 4 core 0.5mm² for CE compliance).
7. Optional intercom cable (n2 + 2 core 0,5mm² multi-stranded) to gate station.
8. Optional electric lock (2 core 0.5mm²).
9. Optional Pillar Light cable (3 core, size according to power regulations).
10. Optional ground loop for free-exit (1 core 0.5mm² multi-stranded - silicone-coated)6.
• All cables must be routed in conduit unless underground cable is
being used
• Mains isolator must be less than one metre from the operator
• Safety Beams are always recommended
9
5
9
6
6
10
1
2
3
8
4
7
7. Cabling Requirements
1. As per SABS/IEC 10142 Electrical Regulations the mains isolator must be fitted less than 1.5m from the controller
2. Increase cable thickness if Pillar Lights are to be installed
3. Screened cable is always recommended to provide better protection against lightning - earth one end of screening
4. Please use V-Series cabling. Order reference: CABLEVEC68 (10M maximum from Vseries controller to operator)
5. For optimum range an external receiver can be mounted on the wall
6. Consult manufacturer of loop detector for specific details
SECTION 7
CABLING REQUIREMENTS
350mm
cable loop
all-guides
com
8. Critical Installation Checklist
The following is a list of critical requirements that must be adhered to in order to ensure
reliable operation of your VERT-X operator(s):
•
Ensure that the Wall Bracket is securely anchored
•
Make sure that the operator’s maximum stroke is being utilised
•
Only use V-Series cable for the installation
•
Leave a 350mm long loop in the cable close to the operator. See Figure 17
•
Fit an electric gate lock if the gate leaf width is greater than 2.5 metres
•
Ensure that the opening and closing angles conform to the installation guidelines
•
Ensure that your gate and operator(s) are equipped to deal with Wind Loading
(refer to the Table 4 on page 14 )
SECTION 8
CRITICAL INSTALLATION CHECKLIST
Never run the operator directly from the battery! Doing so will cause
damage to the operator and invalidate the warranty. Only run the
operator from the V-Series Controller.
9. Operator Installation-Inward Opening Gate
9.2. Installation Tables - Inward Opening
SECTION 9
OPERATOR INSTALLATION - INWARD OPENING GATE
FIGURE 18. BRACKET POSITION - INWARD OPENING GATE
A
C
B
E
D
Wall
Gate Hinge Point
centre line
VERT-X
operator
Gate Hinge Point
Use the following installation tables to determine the best geometry for the installation.
VERT-X Inward Opening Geometry Tables:
90º Inward Opening Gate
E-Value
A-Value
B-Value
C-Value
D-Value
>80mm
140mm1
160mm1
638mm1
110mm1
>82.5mm
150mm
150mm
628mm
110mm
>85mm
160mm
140mm
618mm
110mm
TABLE 6
1. Optimum Installation
9.1. Key Terms Used in this Section
A-Value: The horizontal distance from the pivot point on the Wall Bracket to the gate
hinge point
B-Value: The vertical distance from the pivot point on the Wall Bracket to the gate hinge
point
C-Value: The horizontal distance from the gate hinge point to the Gate Bracket pivot
point
D-Value: The distance from the gate center line to the pivot point on Gate Bracket
welded assembly
E-Value: The distance from the face of the gate to the pivot point on the Gate Bracket
welded assembly
100º Inward Opening Gate
E-Value
A-Value
B-Value
C-Value
D-Value
>77.5mm
150mm1
140mm1
633mm1
110mm1
>82.5mm
160mm
135mm
626mm
110mm
TABLE 7
With this type of operator, it is critical to choose the correct installation
position from the installation tables to ensure that the tip of the
operator does not interfere with the gate during operation.
SECTION 9
OPERATOR INSTALLATION - INWARD OPENING GATE
1. Optimum Installation
9.3 Physical Installation - Inward Opening
9.3.1. Step 1: Determine the Gate Bracket Length (E-Value)
It is essential to first determine whether the correct Gate Bracket length (E-Value) can be
achieved according to Table 9 (Installation Table) as described below.
FIGURE 19. DETERMINE THE GATE BRACKET LENGTH
Gate
E
D
Pillar
Gate Bracket
Gate hinge
centre point
Measure hinge depth
(25mm – As Example)
Gate front face
(Where Gate Bracket
is attached to)
Example for a 90° Inward Opening Installation
Measure the hinge depth from the centre of the hinge point to the face of the gate.
If the hinge depth is greater than 30mm, then refer to Section 6.6.
For this example, a measurement of 25mm will be used.
E-Value = D-Value MINUS Hinge Depth.
Thus: E-Value = 110mm – 25mm = 85mm.
If the E-value is greater than 85mm, you may choose any installation position shown in
Table 6.
If the E-Value is less than 80mm (for 90° inward opening) or less than 77.5mm
(for 100° inward opening), the operator WILL foul against the gate during operation as
shown in Figure 9. In order to rectify this, refer to Section 6.6.
OPERATOR INSTALLATION - INWARD OPENING GATE
SECTION 9
9.3.2. Step 2: Wall Bracket Height
Determine a suitable height for the
Wall Bracket.
Be aware that the Wall Bracket is
mounted 35mm higher than the Gate
Bracket. If the gate has limited cross-
bars to which the Gate Bracket can
be attached, then this will determine
the height of the Wall Bracket.
FIGURE 20. WALL BRACKET HEIGHT
Wall Bracket
Minimum 150mm
Gate Bracket Height
35mm height
difference
between the
Gate Bracket and
the Wall Bracket
Gate
Gate
Bracket
FIGURE 21. DETERMINE WALL BRACKET
LENGTH (USING A RULER)
FIGURE 22. DETERMINE WALL BRACKET LENGTH
(USING THE ABS TEMPLATE)
Wall Bracket
length
Wall Bracket
length
B
Pillar
Gate Hinge Point
Pillar Face
Pillar Face
Pillar
9.3.3. Step 3: Mounting the Wall
Bracket
9.3.3.1. Determine the Wall
Bracket Length
From Figure 18 and Table 6 find
the corresponding B-Value for the
installation determined in
Section 9.3.1.
Using a steel ruler (tape measure) or
the VERT-X ABS template (which can
be purchased as an optional extra,
determine the Wall Bracket length.
For the steel ruler option, this is
achieved by placing the steel ruler
with the 0mm marking at the gate
hinge point and measuring out the
B-Value. The Wall bracket length
is then the difference between the
B-Value and the distance to the pillar
face. This is shown in Figure 21.
For the VERT-X ABS template
option, place the correct B-Value
measurement at the gate hinge
point. The Wall Bracket length
is determined by measuring the
distance from the horizontal line on
the template to the pillar face. This is
shown in Figure 22.
OPERATOR INSTALLATION - INWARD OPENING GATE
SECTION 9
all-guides
com
9.3.3.2. Cut and Weld the Wall
Bracket
Mark the determined length on the
Wall Bracket.
FIGURE 24. DETERMINE WALL BRACKET
POSITION (USING A RULER)
FIGURE 23. CUT AND WELD THE WALL BRACKET
FIGURE 25. DETERMINE THE WALL BRACKET
POSITION (USING THE ABS TEMPLATE)
Wall Bracket
position (Value A)
Wall Bracket
position (Value A)
Mark length
on bracket
Weld the Wall
Bracket to the
wall mounting
bracket plate
Cut off
Excess length
Wall Bracket
length
Pillar
Gate Hinge
Point
Gate Hinge
Point
Pillar
OPERATOR INSTALLATION - INWARD OPENING GATE
Measure the determined
length from the centre of
the hole.
Cut off excess length.
Insert the Wall Bracket into the
mounting plate.
Weld the brackets together.
9.3.4. Step 4: Mounting the
Wall Bracket Assembly
From Figure 18 and Table 6 find
the corresponding A-Value for the
installation determined in
Section 9.3.
Using a steel ruler (tape measure) or
the VERT-X ABS template, determine
the mounting position of the Wall
Bracket.
Ensure that the
measurement is taken to the
centre of the hole as shown
in Figures 24 and 25.
Mark the Wall Bracket in the correct
position on the wall and then mount
it using the preferred mounting
method as discussed in Section 6.5.
SECTION 9
9.3.4.1. Cutting the Gate
Bracket
Determine the E-Value for this
specific installation by following
the example in section 9.3.1 and
substituting the hinge depth of
this specific installation into the
calculation.
Cut the Gate Bracket to the E-Value
length in order to mount the bracket
to the gate and achieve the correct
D-Value.
FIGURE 26. CUT THE GATE BRACKET
Cut Gate Bracket
to length
D
E
OPERATOR INSTALLATION - INWARD OPENING GATE
The measurement is taken
from the centre of the hole
of the Gate Bracket as
indicated in Figure 26.
FIGURE 27. ATTACH THE GATE BRACKET ONTO A NON-STEEL GATE
Weld brackets
together
Fasten the welded Gate
Bracket to the gate
Gate
Bracket
Wall Bracket
Mounting Plate
(ordered
separately)
9.3.4.2. Making Up a Bracket for a Non-steel Gate
In the case where the gate is not manufactured from steel or the mounting point for the
front bracket is not on a steel section of the gate, it is necessary to make up a mounting
bracket for the Gate Bracket. This is easily achieved by purchasing a second Wall
Mounting Bracket and welding the Gate Bracket to the Wall Bracket Mounting Plate.
SECTION 9
FIGURE 29. MARK THE GATE BRACKET HEIGHT
Spirit level
With the operator levelled,
mark the Gate Bracket
height on the gate
9.3.5.1. VERT-X Metal Template
From Figure 18 and Table 6 find
the corresponding C-Value for the
installation determined in Section
9.3.1.
Close the gate leaf and mark the
C-Value distance along the gate leaf
(measured from the Gate Hinge
Point).
Refer to Figure 28 for details.
Mount the operator to the Wall Bracket and, using a spirit level, level the operator and
determine the height of the Gate Bracket. Mark the height of the Gate Bracket.
OPERATOR INSTALLATION - INWARD OPENING GATE
9.3.5. Step 5: Mounting the Gate Bracket
Although the installation is easier when using the VERT-X Metal Template (which
can be purchased as an optional extra), it is possible to install the unit without
the use of the template.
FIGURE 28. MARK THE C-VALUE
C
Gate Hinge Point
Gate Hinge
Wall
Bracket
• The operator should never be run manually directly off of a battery!
Doing so and driving the operator into an endstop will result in serious
damage being sustained by the worm drive
• Never lubricate the worm drive
SECTION 9
Remove the operator and then fix the Gate Bracket onto the gate using the preferred
mounting method
OPERATOR INSTALLATION - INWARD OPENING GATE
FIGURE 31. MOUNT THE GATE BRACKET
Spirit Level
Metal Template
Pin
Pin
Wall
Bracket
Gate
Bracket
9.3.5.2. Using the Metal Template (Optional Extra)
Using the Metal Template available and the Gate Bracket Pin:
FIGURE 30. ATTACH THE GATE BRACKET ONTO A STEEL GATE
Gate Hinge Point
C-Value
SECTION 9
Mount the template to the Wall Bracket using the bracket pin
•
Rest the spirit level on the template and level the template
•
Holding the Gate Bracket underneath the template (as shown in Figure 31), insert the pin
through the slot in the template and into the Gate Bracket
•
With the gate in the closed position, move the Gate Bracket to the end of the slot of the
metal template
•
Spot weld the Gate Bracket in place OR make the necessary markings if a Bracket has
been made up to fit a non-steel gate
•
To avoid damage, it is recommended that the Metal Template be removed before the
Gate Bracket
•
Fix the Gate Bracket onto the gate using the preferred mounting method as discussed in
Section 6.6
It is advisable to first check that the installation works before permanently fixing
the brackets in place. See section 9.7.
OPERATOR INSTALLATION - INWARD OPENING GATE
SECTION 9
all-guides
com
9.3.6. Step 6: Check the Installation if you have the Metal Template
FIGURE 32. GATE CLOSED (METAL TEMPLATE FITTED)
Metal template
Wall bracket
Gate Bracket
Gate
in closed
position
Pin
Pin
With the Metal Template mounted
to the gate as per Section 9.3.6.2.,
swing the gate leaf to the open
position. If it is possible to open the
gate to the required open position
without the template fouling against
the gate pillar or gate, and the Gate
Bracket Pin travels within the slot of
the Metal Template without fouling,
then the installation of the brackets
is deemed to be correct.
If you do not have the Metal
Template, make sure that
the spot welds are sufficient
to take a significant load
as back-driving the unit
through the gearbox in the
override condition requires a
large force when the unit is
new out of the box.
FIGURE 33. GATE OPEN
(METAL TEMPLATE FITTED)
Metal template
Wall Bracket
Gate Bracket
Pin
Pin
OPERATOR INSTALLATION - INWARD OPENING GATE
SECTION 9
9.3.7. Step 7: Mount the
Operator
With the brackets now fully fitted,
the operator can be mounted onto
the brackets.
FIGURE 34. OPERATOR MOUNTED
Operator
Gate Bracket
Wall Bracket
If the unit is mounted onto the
brackets and the gate is not in
the fully closed position, manually
override the unit and move the gate
into the closed position.
It may be necessary to adjust the
endstops to get to the fully closed
and open positions. See section 9.9
for adjusting the endstops.
To place in Manual Override:
•
Open the camlock lid to access the
override key slot;
•
Insert the key and rotate 180°;
FIGURE 35. HOW TO MANUALLY OVERRIDE THE
OPERATOR
Camlock lid
Key
OPERATOR INSTALLATION - INWARD OPENING GATE
SECTION 9
9.3.8. Step 8: Adjusting the Endstops
Ensure that the gate is in the fully closed position.
Slightly loosen the Torx screws on front endstop and adjust the endstop so that it sits up
against the pivot bracket of the operator. Tighten the Torx screws in this position.
If the gate has mechanical endstops in the closed position, there is no need to
adjust the front endstop on the operator.
FIGURE 36. ADJUST THE ENDSTOP
Loosen the Torx screws
Pivot Bracket
Move the front endstop
and tighten the Torx
screws
With the unit still in the override condition, move the gate leaf into the required open
position and adjust the rear endstop in the same way. Once the endstop has been
adjusted, close the gate leaf, re-engage the unit and remove the keys. The unit is now
ready to be connected to the controller.
• The operator should never be run manually directly off a battery!
Doing so and driving the operator into in an endstop will result in
serious damage being sustained by the worm drive
• Never lubricate the worm drive
OPERATOR INSTALLATION - INWARD OPENING GATE
SECTION 9
10. Operator Installation-Outward Opening Gate
• The installation guidelines shown below include the use of the VERT-X
ABS template and the VERT-X metal template
• The installation can still be performed without these templates by
using a tape measure and spirit level
10.2. Installation Tables - Outward Opening
FIGURE 37. OUTWARD OPENING INSTALLATION
A
C
B
E
D
Wall
VERT-X
operator
Gate in closed position
Gate Hinge Point
Gate in open position
Gate opening angle
In most cases it will be necessary to make up a suitable extension bracket on
which to mount the operator’s Wall Bracket.
10.1. Key Terms Used in this Section
A-Value: The horizontal distance from the pivot point on the Wall Bracket to the gate
hinge point
B-Value: The vertical distance from the pivot point on the Wall Bracket to the gate hinge
point
C-Value: The horizontal distance from the gate hinge point to the Gate bracket pivot
point
D-Value: The distance from the gate center line to the pivot point on Gate Bracket
welded assembly
E-Value: The distance from the face of the gate to the pivot point on the Gate Bracket
welded assembly
OPERATOR INSTALLATION-OUTWARD OPENING GATE
SECTION 10
Values- A, B, & C are measured from the gate hinge point.
Value- D is measured from the gate hinge point centre line.
Value-E is measured from the gate face to the Gate Bracket centre point.
With this type of operator, it is critical to choose the correct installation
position from the installation tables to ensure that the tip of the
operator does not interfere with the gate during operation.
Use the following installation tables to determine the best geometry for the installation.
VERT-X Outward Opening Geometry Tables:
90º Outward Opening Gate
100º Outward Opening Gate
E-Value
A-Value
B-Value
C-Value
D-Value
>85mm
155mm
140mm
633mm
110mm
>85mm
160mm1
135mm1
630mm1
110 - 115mm1
E-Value
A-Value
B-Value
C-Value
D-Value
>80mm
140mm
160mm
618mm
115mm
>82.5mm
150mm
150mm
628mm
115mm
>82.5mm
160mm1
140mm1
638mm1
115mm1
TABLE 8
TABLE 9
1. Optimum Installation
1. Optimum Installation
OPERATOR INSTALLATION-OUTWARD OPENING GATE
SECTION 10
all-guides
com
10.3. Physical installation - Outward opening
10.3.1. Step 1: Determine the Gate Bracket Length (E-Value)
It is essential to first determine whether the correct Gate Bracket length (E-Value) can be
achieved according to Table 8 and 9 (Installation Table) as described below.
FIGURE 38. DETERMINE THE GATE BRACKET LENGTH
Gate
E
D
Pillar
Gate Bracket
Gate hinge center point
Measure hinge depth
(25mm – as example)
Gate front face
(Where Gate Bracket
is attached to)
The most optimal installation position for a VERT-X 90° outward opening is:
• A = 160
• B = 140
• C = 638
• D = 115
Therefore this installation position will be described in this Manual.
(Refer to Figure 38 and Tables 8 and 9 for details).
Measure the hinge depth from the centre of the hinge point to the face of the gate.
If the hinge depth is greater than 30mm, then refer to Section 6.6.
(for this example, a measurement of 25mm will be used).
E-Value = D-Value MINUS Hinge Depth
Thus: E = 115mm – 25mm = 90mm
If the E-value is greater than 82.5mm, you may choose any installation position shown in
Table 6 (see note above for optimal installation).
If the E-Value is less than 80mm (for 90° outward opening) or less than 85mm
(for 100° outward opening), the operator WILL foul against the gate during operation.
In order to rectify this, refer to Section 6.4.
OPERATOR INSTALLATION-OUTWARD OPENING GATE
SECTION 10
10.3.2. Step 2: Wall Bracket Height
Determine a suitable height for the
Wall Bracket.
Be aware that the Wall Bracket is
mounted 35mm higher than the Gate
Bracket. If the gate has limited cross
bars to which the Gate Bracket can
be attached then this will determine
the height of the Wall Bracket.
FIGURE 39. WALL BRACKET HEIGHT
In most outward opening installations, a custom bracket will have to be made
up by the installer. The VERT-X Wall Bracket is then attached to this custom
bracket.
10.3.3. Step 3: Mounting the Wall
Bracket
10.3.3.1. Determine the Wall
Bracket Position
Find the corresponding A-Value
and B-Value for the installation
determined in Section 10.3.
Using a steel ruler (tape measure) or
the VERT-X ABS template (which can
be purchased as an optional extra),
determine the Wall Bracket length.
For the steel ruler option, this is
achieved by placing the steel ruler
with the 0mm marking at the gate
hinge point and measuring out the
B-Value. The Wall bracket length
is then the difference between the
B-Value and the distance to the pillar
face. This is shown in Figure 40.
For the VERT-X ABS template
option, place the correct B-Value
measurement at the gate hinge
point. The Wall Bracket length
is determined by measuring the
distance from the horizontal line on
the template to the pillar face. This is
shown in Figure 41
FIGURE 40. DETERMINE WALL BRACKET
LENGTH (USING A RULER)
FIGURE 41. DETERMINE WALL BRACKET LENGTH
(USING THE ABS TEMPLATE)
B-Value
B-Value
A-Value
A-Value
Wall Bracket
position
Wall Bracket
position
Gate hinge
Gate hinge
Custom Bracket
Minimum 150mm
35mm height
difference
between the Gate
Bracket and the
Wall Bracket
Wall Bracket
Gate Bracket Height
OPERATOR INSTALLATION-OUTWARD OPENING GATE
SECTION 10
10.3.3.2. Make Up and Mount the
Custom Bracket
For an outward swing installation,
the rear hinge point for the operator
needs to be on the inside of the
gate hinge. It may be necessary
to make up a custom bracket for
the installation if it is not possible
to mount the bracket to the wall
in the case where the side wall is
close enough to achieve the correct
A-Value. After determining the
correct position of the Wall Bracket in
Section 10.3.3.1., make up a custom
bracket that will securely hold the
Wall Bracket in this position as shown
in Figure 42A & 42B.
FIGURE 42A. MAKE-UP AND MOUNT CUSTOM
WALL BRACKET
FIGURE 43. CUT AND WELD THE WALL BRACKET
FIGURE 42B. MAKE-UP AND MOUNT CUSTOM
WALL BRACKET
B-Value
A-Value
Wall
Bracket
position
Gate Hinge
Centre Point
Typical Custom
Bracket
Typical Custom
Bracket
Mark length
on bracket
Weld the Wall
Bracket to the wall
mounting bracket
plate
Cut off
Excess Length
Wall Bracket
length
10.3.3.3. Cut, Weld and Mount the
Wall Bracket
Mark the determined length on the
Wall Bracket.
Measure the calculated
length from the centre of
the hole as indicated in
Figure 43.
Cut off excess length.
Insert the Wall Bracket into the
mounting plate.
Weld the brackets together.
OPERATOR INSTALLATION-OUTWARD OPENING GATE
SECTION 10
Mount the Wall Bracket in the correct
position onto the wall using the
preferred method as discussed in
Section 6.5 or mount it to the custom
bracket as shown in Figure 44.
FIGURE 44. MOUNT THE WALL BRACKET
FIGURE 45. CUT THE GATE BRACKET
Typical Custom
Bracket
Wall Bracket
Cut Gate Bracket
to length
Gate Hinge Point
D
E
10.3.4. Step 4: Cutting the Gate
Bracket
Determine the E-Value for this
specific installation by following
the example in section 10.3.1 and
substituting the hinge depth of
this specific installation into the
calculation.
Cut the Gate Bracket to the E-Value
length in order to mount the bracket
to the gate and achieve the correct
D-Value.
OPERATOR INSTALLATION-OUTWARD OPENING GATE
SECTION 10
10.3.4.1. Making Up a Bracket for a Non-steel Gate
In the case where the gate is not manufactured from steel or the mounting
point for the front bracket is not on a steel section of the gate, it is necessary
to make up a mounting bracket for the Gate Bracket. This is easily achieved by
purchasing a second Wall Mounting Bracket and welding the Gate Bracket to the
Wall Bracket Mounting Plate. See section 6.6.2
FIGURE 46. ATTACH THE GATE BRACKET ONTO A NON-STEEL GATE
Weld brackets
together
Fasten the welded Gate
Bracket to the gate
Gate
Bracket
Wall Bracket
Mounting Plate
(ordered
separately)
10.3.5. Step 5: Mounting the Gate
Bracket
FIGURE 47. MARK THE C-VALUE
Custom
Bracket
Centre of
gate hinge
C-Value
Wall Bracket
Gate Bracket
Although the installation
is easier when using the
VERT-X Metal Template
(which can be purchased
as an optional extra from
Centurion Systems), it is
possible to install the unit
without the use of the
template.
10.3.5.1. Without Template
Find the corresponding C-Value for
the installation determined in
Section 10.2.
Close the gate leaf and mark the C-Value distance along the gate leaf (measured from
the centre of the gate hinge).
Refer to Figure 47 for details.
SECTION 10
OPERATOR INSTALLATION-OUTWARD OPENING GATE
all-guides
com
FIGURE 48. MARK THE GATE BRACKET HEIGHT
Spirit level
With the operator levelled,
mark the Gate Bracket
height on the gate
Mount the operator to the Wall Bracket and, using a spirit level, determine the height of
the Gate Bracket. Mark the height of the Gate Bracket.
OPERATOR INSTALLATION - OUTWARD OPENING GATE
• The operator should never be run manually directly off a battery!
Doing so and driving the operator into in an endstop will result in
serious damage being sustained by the worm drive
• Never lubricate the worm drive
SECTION 10
Remove the operator and then fix the Gate Bracket onto the gate using the preferred
mounting method.
FIGURE 49. ATTACH THE GATE BRACKET IN PLACE
Centre of gate hinge
C-Value
SECTION 10
OPERATOR INSTALLATION - OUTWARD OPENING GATE
• The operator should never be run manually directly off a battery!
Doing so and driving the operator into in an endstop will result in
serious damage being sustained by the worm drive
• Never lubricate the worm drive
OPERATOR INSTALLATION - OUTWARD OPENING
10.3.5.2. Using the Metal Template (Optional Extra)
Using the Metal Template available and the Gate Bracket Pin:
FIGURE 50. MOUNT THE GATE BRACKET
Spirit
level
Near end of
slot
Metal template
Pin
Pin
Custom
Bracket
Wall
Bracket
Gate
Bracket
•
Mount the template to the Wall Bracket using the Bracket Pin
•
Rest the spirit level on the template and level the template
•
Holding the Gate Bracket underneath the template (as shown in Figure 50), insert the Pin
through the slot in the template and into the Gate Bracket
•
With the gate in the closed position, move the Gate Bracket to the near end of the slot
•
Spot weld the Gate Bracket in place OR make the necessary markings if a bracket has
been made up to fit a non-steel gate
•
To avoid damage it is recommended that the Metal Template be removed before the Gate
Bracket
•
Fix the Gate Bracket onto the gate using the preferred mounting method.
It is advisable to first check that the installation works before permanently fixing
the brackets in place. See Section 10.7.
SECTION 10
OPERATOR INSTALLATION - OUTWARD OPENING GATE
10.3.6. Step 6: Check the Installation if you have the Metal Template
FIGURE 51. GATE CLOSED (METAL TEMPLATE FITTED)
Metal template
Wall Bracket
Custom
Bracket
Gate Bracket
Gate in closed position
Pin
Pin
With the metal template mounted
to the gate as per Section 10.6.2.,
swing the gate leaf to the open
position. If it is possible to open the
gate to the required open position
without the template fouling against
the gate pillar or gate, and the Gate
Bracket Pin travels within the slot of
the metal template without fouling,
then the installation of the brackets
is deemed to be correct.
FIGURE 52. GATE OPEN
(METAL TEMPLATE FITTED)
Metal
template
Wall Bracket
Custom
Bracket
Gate
Pin
Pin
SECTION 10
OPERATOR INSTALLATION - OUTWARD OPENING GATE
If you do not have the Metal
Template, make sure that
the spot welds are sufficient
to take a significant load
as back-driving the unit
through the gearbox in the
override condition requires a
large force when the unit is
new out of the box.
10.3.7. Step 7: Mount the Operator
With the brackets now fully fitted, the operator can be mounted onto the brackets.
FIGURE 53. OPERATOR MOUNTED
VERT-X
operator
Gate Bracket
Wall Bracket
If the operator is mounted onto
the brackets and the gate is not in
the fully closed position, manually
override the unit and move the gate
into the closed position.
It may be necessary to adjust the
endstops to get to the fully closed
and open positions. See section 10.9
for adjusting the endstops
To place in Manual Override:
•
Open the camlock lid to access the
override key slot;
•
Insert the key and rotate 180°;
FIGURE 54. HOW TO MANUALLY OVERRIDE THE
OPERATOR
Camlock lid
Key
SECTION 10
OPERATOR INSTALLATION - OUTWARD OPENING GATE
all-guides
com
10.3.8. Step 8: Adjusting the Endstops
Ensure that the gate is in the fully closed position.
Slightly loosen the Torx screws on the back endstop and adjust the endstop so that it sits up
against the pivot bracket of the operator. Tighten the Torx screws in this position.
FIGURE 55. ADJUST ENDSTOPS
Loosen the Torx screws
Move the endstop and
tighten the Torx screws
Pivot Bracket
If the gate has mechanical endstops in the closed position there is no need to
adjust the nearest endstop on the operator.
With the unit still in the override condition, move the gate leaf into the required open
position and adjust the front endstop in the same way. Once the endstop has been adjusted,
close the gate leaf, re-engage the unit and remove the keys. The unit is now ready to be
connected to the controller.
SECTION 10
OPERATOR INSTALLATION - OUTWARD OPENING
• The operator should never be run manually directly off a battery!
Doing so and driving the operator into in an endstop will result in
serious damage being sustained by the worm drive
• Never lubricate the worm drive
Call Centurion Systems (Pty) Ltd . South Africa
Head Office: +27 11 699 2400
Call Technical Support: +27 11 699 2481
from 07h00 to 18h00 (UTC+2)
Connect with us on:
facebook.com/CenturionSystems
YouTube.com/CenturionSystems
@askCenturion
Subscribe to the newsletter: www.CentSys.com/Subscribe
www.CentSys.com
Document Number: DOC12281V100 -
13032015 - ENGLISH