AFL OptiNID Duo Quickstart Installation Instructions

Text of the manual

OptiNID® Duo Quick Start Installation Instructions

Mounting locations Screw and Strap ©2019, AFL, all rights reserved. INS-01007, Revision A, 8.22.19 Specifications are subject to change without notice. Screw here Strap Screw here Strap Two types of grommets Circular and U grommets Drop Cable Preparation with half-piece of foam tape. See Scales below. Secure drop cable with compression connector Secure drop cable with clip and grommet Proper placement of drop buffer tube Slide removable splice chip to disengage or engage into base Populated splice chip single, mass or splitter Field-installable connector installed on drop cable 25 inches Splice 11 inches (min.) Drop Cable Buffer Tube 250/900 μm 1 www.AFLglobal.com

Route spliced 900 µm pigtail.

Clean and install connector. Additional devices may be installed splitters or filters. Optional demarcation cover and optional security screw. Insert additional SC or LC Adapters. Install with metal clips in demarcation chamber. Clean and install premise drop connector Attach foam and tiewrap to secure premise drops. Close and Secure NID Optional screw QR code for additional information Slide Ground into place to engage into base OptiNID® Duo Quick Start Installation Instructions ches Splice 11 inches (min.) 22 inches (max.) Drop Cable Buffer Tube 2 www.AFLglobal.com ©2019, AFL, all rights reserved. INS-01007, Revision A, 8.22.19 Specifications are subject to change without notice.

Other Enclosure Manuals