AFL OptiNID Duo Quickstart Installation Instructions
Text of the manual
OptiNID® Duo Quick Start Installation Instructions
Mounting locations
Screw and Strap
©2019, AFL, all rights reserved. INS-01007, Revision A, 8.22.19
Specifications are subject to change without notice.
Screw here
Strap
Screw here
Strap
Two types of grommets
Circular and U grommets
Drop Cable Preparation with half-piece
of foam tape. See Scales below.
Secure drop cable with
compression connector
Secure drop cable with clip
and grommet
Proper placement of drop
buffer tube
Slide removable splice chip to
disengage or engage into base
Populated splice chip
single, mass or splitter
Field-installable connector
installed on drop cable
25 inches
Splice
11 inches
(min.)
Drop Cable
Buffer Tube
250/900 μm
1
www.AFLglobal.com
Route spliced 900 µm pigtail.
Clean and install connector.
Additional devices may be installed
splitters or filters.
Optional demarcation cover and
optional security screw.
Insert additional SC or LC Adapters.
Install with metal clips in
demarcation chamber.
Clean and install premise drop
connector
Attach foam and tiewrap to secure
premise drops.
Close and Secure NID Optional screw
QR code for additional information
Slide Ground into place to engage
into base
OptiNID® Duo Quick Start Installation Instructions
ches
Splice
11 inches
(min.)
22 inches
(max.)
Drop Cable
Buffer Tube
2
www.AFLglobal.com
©2019, AFL, all rights reserved. INS-01007, Revision A, 8.22.19
Specifications are subject to change without notice.