Veeder-Root TLS-450 Manual
Read Online
Read the Veeder-Root TLS-450 Manual online using the built-in PDF viewer.
Text of the manual
Veeder-Root makes no warranty of any kind with regard to this publication, including, but not limited to, the implied warranties of
merchantability and fitness for a particular purpose.
Veeder-Root shall not be liable for errors contained herein or for incidental or consequential damages in connection with the
furnishing, performance, or use of this publication.
Veeder-Root reserves the right to change system options or features, or the information contained in this publication.
This publication contains proprietary information which is protected by copyright. All rights reserved. No part of this publication
may be photocopied, reproduced, or translated to another language without the prior written consent of Veeder-Root.
Contact TLS Systems Technical Support for additional troubleshooting information at 800-323-1799.
DAMAGE CLAIMS / LOST EQUIPMENT
Thoroughly examine all components and units as soon as they are received. If any cartons are damaged or missing, write a
complete and detailed description of the damage or shortage on the face of the freight bill. The carrier's agent must verify the
inspection and sign the description. Refuse only the damaged product, not the entire shipment.
Veeder-Root must be notified of any damages and/or shortages within 30 days of receipt of the shipment, as stated in our Terms
and Conditions.
VEEDER-ROOT’S PREFERRED CARRIER
1.
Contact Veeder-Root Customer Service at 800-873-3313 with the specific part numbers and quantities that were missing
or received damaged.
2.
Fax signed Bill of Lading (BOL) to Veeder-Root Customer Service at 800-234-5350.
3.
Veeder-Root will file the claim with the carrier and replace the damaged/missing product at no charge to the customer.
Customer Service will work with production facility to have the replacement product shipped as soon as possible.
CUSTOMER’S PREFERRED CARRIER
1.
It is the customer’s responsibility to file a claim with their carrier.
2.
Customer may submit a replacement purchase order. Customer is responsible for all charges and freight associated with
replacement order. Customer Service will work with production facility to have the replacement product shipped as soon as
possible.
3.
If “lost” equipment is delivered at a later date and is not needed, Veeder-Root will allow a Return to Stock without a restocking
fee.
4.
Veeder-Root will NOT be responsible for any compensation when a customer chooses their own carrier.
RETURN SHIPPING
For the parts return procedure, please follow the appropriate instructions in the "General Returned Goods Policy” pages in the
"Policies and Literature" section of the Veeder-Root North American Environmental Products price list. Veeder-Root will not
accept any return product without a Return Goods Authorization (RGA) number clearly printed on the outside of the package.
©Veeder-Root 2013. All rights reserved.
Table of Contents
iii
Introduction
Contractor Certification Requirements ..............................................................................1
Related Manuals ...............................................................................................................1
Before You Begin ..............................................................................................................2
Safety Precautions ............................................................................................................2
Precautions Against Static Electricity ................................................................................3
System Backup .................................................................................................................3
Replacing the CPU Board
Removing the CPU Board ................................................................................................8
Replacing Software CF Card
Replacing CF Card from Version 3.X or Earlier to Latest Version ..................................14
Replacing the iButton ................................................................................................15
Installing Software Features
Software Features Installation Procedure .......................................................................16
Feature Upgrade Procedure ...........................................................................................17
Verify Features Installed .................................................................................................19
Software Maintenance
Software Thumb Drive Connection .................................................................................21
Software Download Procedure .......................................................................................22
Software Install Procedure ..............................................................................................23
Figures
Figure 1.
Locating Printer’s USB connector ..............................................................4
Figure 2.
USB/Ethernet board - V-R thumb drive ports.............................................5
Figure 3.
Accessing Diagnostic Main Screen from the Home Screen.......................6
Figure 4.
Software Maintenance button.....................................................................6
Figure 5.
Initiating a System Backup.........................................................................7
Figure 6.
Front doors.................................................................................................8
Figure 7.
Locating CPU board hold-down pins..........................................................9
Figure 8.
Cable connections to CPU board.............................................................10
Figure 9.
Locating CPU board components ............................................................11
Figure 10.
Installing iButton flanged end up ..............................................................12
Figure 11.
Orient CF card side grooves to the CF card connector guides ................12
Figure 12.
Removing/replacing RAM board ..............................................................13
Figure 13.
Inserting i-Button into USB Adapter .........................................................16
Figure 14.
Locating Printer’s USB connector ............................................................17
Figure 15.
Downloading Software Features from the USB Adapter..........................18
Figure 16.
Installing Software Features.....................................................................19
Figure 17.
About button.............................................................................................19
Figure 18.
Verifying Installed Software Features.......................................................20
Figure 19.
Locating Printer’s USB connector ............................................................22
This manual contains instructions for replacing the following TLS-450 console components:
• CPU board
• RAM board
• Replacing Software/CF card
• Replacing iButton
• Installing software features
• Replacing CF card
• Replacing CF card version 3.X or earlier to latest version
This manual does not provide troubleshooting information.
Contractor Certification Requirements
Veeder-Root requires the following minimum training certifications for contractors who will install and setup the
equipment discussed in this manual:
Installer (Level 1) Certification: Contractors holding valid Installer Certification are approved to perform wiring
and conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wireless
equipment installation; tank and line preparation; and line leak detector installation.
ATG Technician (Level 2/3 or 4) Certification: Contractors holding valid ATG Technician Certifications are
approved to perform installation checkout, startup, programming and operations training, system tests,
troubleshooting and servicing for all Veeder-Root Series Tank Monitoring Systems, including Line Leak Detection.
In addition, Contractors with the following sub-certification designations are approved to perform installation
checkout, startup, programming, system tests, troubleshooting, service techniques and operations training on the
designated system.
• Wireless 2
• Tall Tank
VR Vapor Products Certification: Contractors holding a certification with the following designations are
approved to perform installation checkout, startup, programming, system tests, troubleshooting, service techniques
and operations training on the designated system.
• ISD – In Station Diagnostics
• PMC – Pressure Management Control
• CCVP - Veeder-Root Vapor Polisher
• Wireless – ISD/PMC Wireless
• A current Veeder-Root Technician Certification is a prerequisite for the VR Vapor Products course.
Warranty Registrations may only be submitted by selected Distributors.
Related Manuals
577013-879
TLS-450 Site Prep Manual
577013-918
TLS-450 Troubleshooting Guide
Before You Begin
2
Before You Begin
Before you begin component replacement, read the following guidelines:
• To avoid electrical shock, be sure AC power to the console is Off when performing the procedures in this
manual.
• FAILURE TO COMPLY WITH THE FOLLOWING WARNINGS AND SAFETY PRECAUTIONS COULD
CAUSE DAMAGE TO PROPERTY, ENVIRONMENT, RESULTING IN SERIOUS INJURY OR DEATH.
Safety Precautions
The following safety symbols may be used throughout this manual to alert you to important safety hazards and
precautions.
ELECTRICITY
High voltage exists in, and is supplied
to, the device. A potential shock hazard
exists.
TURN POWER OFF
Live power to a device creates a potential
shock hazard. Turn Off power to the device
and associated accessories when servicing
the unit.
INJURY
Careless or improper handling of tools
can cause bodily injury.
STATIC SENSITIVE COMPONENTS
Wear grounded anti-static wrist strap before
handling printed circuit boards.
READ ALL RELATED MANUALS
Knowledge of all related procedures
before you begin work is important.
Read and understand all manuals thor-
oughly. If you do not understand a pro-
cedure, ask someone who does.
WARNING
Heed the adjacent instructions to avoid
damage to equipment, property, environment
or personal injury.
WARNING
This system operates on 120/240 Vac power. Serious injury or death from
electrical shock could occur if the power ON/OFF warnings in this manual are
not heeded.
1. Read and follow all instructions in this manual, including all
safety warnings.
2. Remove rings from hands, metal watch bands and bracelets, and
loose hanging neck jewelry before performing these procedures.
3. Do not modify or use service parts other than those provided by
Veeder-Root.
OFF
OFF
Precautions Against Static Electricity
3
Precautions Against Static Electricity
Before removing electronic components from their antistatic bags read the following static electricity precautions.
1.
Before handling any components, discharge your body's static electric charge by touching a grounded
surface.
2.
Do not remove parts from their antistatic bags until you are ready to install them.
3.
Do not lay parts on the antistatic bags! Only the insides are antistatic.
4.
When handling parts, hold them by their edges and their metal mounting brackets.
5.
Avoid touching components or edge connectors that plug into slots and wear the antistatic wrist strap (Part
No. 576010-908) included in your component replacement kit.
6.
Never slide parts over any surface.
7.
Avoid plastic, vinyl, and styrofoam in your work area.
System Backup
Before powering off the console perform a system backup:
WARNING! For all software maintenance functions in consoles you must use the CPU USB printer
port.
PERFORM THE FOLLOWING STEPS.
1.
Turn off power to the console.
2.
Using a T-15 Torx driver, remove the two screws in the left door of the console (ref. item 2 in Figure 6).
3.
Disconnect the Printer's USB cable from its connector on the CPU board and insert your V-R Backup thumb
drive (P/N 330020-607) into the CPU USB connector as shown in Figure 1 below.
4.
Close the door. Turn on power to the console.
OFF
Figure 1. Locating Printer’s USB connector
LEGEND FOR NUMBERED BOXES IN Figure 14
1.
Comm module
2.
Top of CPU board
3.
Printer USB connector
sw feat act2.eps
1
2
3
Figure 2. USB/Ethernet board - V-R thumb drive ports
5.
Touch the Diagnostics button on the Home Screen (see item 2 in Figure 3).
LEGEND FOR NUMBERED BOXES IN Figure 2
1.
USB/Ethernet board bracket
2.
V-R thumb drive plugged into USB port
954-10.eps
1
2
Figure 3. Accessing Diagnostic Main Screen from the Home Screen
6.
Touch the Software Maintenance button on the Diagnostic Maintenance screen (see Figure 4) to open the
Software Maintenance - Backup Restore tab screen (see Figure 5).
Figure 4. Software Maintenance button
LEGEND FOR NUMBERED BOX IN Figure 3
1.
Home Screen access button
2.
Diagnostic Main Screen access button
09-21-2007
11-31-30
SYSTEM STATUS
Environment
BIR
ALL TANKS
Delivery
Inventory
USER DEFINED 3
ALL TANKS
ALL SENSORS
USER DEFINED 1
USER DEFINED 2
2
954-14.eps
1
Touch the Backup button (item 1 in Figure 5) to begin the system backup process.
Figure 5. Initiating a System Backup
8.
After the ‘Backup Completed Successfully’ message displays power off the console, open the left door and
remove the thumb drive from the CPU printer USB port, replace the printer cable USB connector in the port,
close the door and replace the two screws.
LEGEND FOR NUMBERED BOX IN Figure 5
1.
Backup button
09-21-2007
11-31-30
Software Maintenance - Backup Restore
Backup
Restore
Download
Install
1
Backup
Restore
Revert to Previous
Software Versions
Prepare USB
Recovery
Drive
IDLE
954-18.eps
Replacing the CPU Board
Removing the CPU Board
1.
Switch Off power to the console.
2.
Open both front doors of the console (see Figure 6).
Figure 6. Front doors
LEGEND FOR NUMBERED BOXES IN Figure 6
1.
Left (Printer) door
2.
Top and bottom #8 taptite screws securing left door
3.
Right (Display) door.
4.
Top and bottom #8 taptite screws securing right door
1
2
4
2
4
954-1.eps
3
Replacing the CPU Board
Removing the CPU Board
9
3.
Locate the three retention snap pins along the front of the CPU board (see Figure 7).
Figure 7. Locating CPU board hold-down pins
4.
Remove the grounding wrist strap (Part No. 576010-908) from its package and wrap one end around your
wrist. Adhere the other end to the metal plate on the inside of the Printer door.
5.
Disconnect the four cables from the Display door along the front edge of the CPU board (sse Figure 8).
6.
Position your forefinger beneath one of the pins and press up releasing the CPU board (see item 3 in
Figure 7). Repeat at each of the remaining two retention pins.
LEGEND FOR NUMBERED BOXES IN Figure 7
1.
Board retention snap pins
2.
Compartment bulkhead.
3.
At each retention pin, slide forefinger in between board and
bulkhead and pry board away from bulkhead to release pin.
RELAY RATINGS
RELAY RATINGS
240 VAC, 2 A MAX
240 VAC, 2 A MAX
24 VDC, 2 A MAX
24 VDC, 2 A MAX
WARNING: TO MAINTAIN
INTRINSIC SAFETY, ALL
COVERS MUST BE IN
PLACE.
WARNING: TO MAINTAIN
INTRINSIC SAFETY, ALL
COVERS MUST BE IN
PLACE.
WARNING: TO MAINTAIN
INTRINSIC SAFETY, ALL
COVERS MUST BE IN
PLACE.
WARNING: TO MAI
INTRINSIC SAFETY
COVERS MUST BE
PLACE.
1
1
1
954-8.eps
2
3
1
Replacing the CPU Board
Removing the CPU Board
10
Figure 8. Cable connections to CPU board
7.
Tilt the board a little away from the bulkhead (item 2 in Figure 7) and grasping the edge of the board pull out
firmly to remove the board from its backplane board connector. Once the CPU board is free from the
connector, slowly remove the board from the console being careful not to hit the CF card against the door.
8.
Place the old and new CPU boards side by side on a clean work surface.
9.
Remove the iButton from the old CPU board and install it in the same socket on the new CPU board (see
Figure 9). Make sure the flanged side of the iButton is up in its socket (see Figure 10).
10. Remove the CF card from the old board and install it in the same connector on the new CPU board. Orient
the CF card so the large/small grooves in the side of the CF card align with large/small guides on the sides of
the connector (see Figure 11).
11. Remove the RAM board by pushing the retaining clips away from the notches in the side of the RAM board
allowing it to spring up about 30 degrees from the CPU board (see Figure 12). When board springs up it
may be removed (handle the RAM board by its edges). Place the RAM board in the same (top) connector on
the new CPU board, aligning the notch in the board’s connector edge over the rib in the CPU RAM board
connector. Push the RAM board in at a slight angle to seat the connector, then gently push down on the RAM
board until the retention clips snap into the notches in both edges of the RAM board (see Figure 12).
12. Once the iButton, CF card and RAM board are installed in the new CPU board, lift the CPU board by its
outer corners and slide the board into the console until the CPU board connector is entering the backplane
board’s connector, then push firmly down to seat the CPU board in the connector.
13. Make sure the holes in the CPU board for the three retention pins are aligned over the three pins. With your
thumb, push against the CPU board at each retention pin until they are all snapped into place.
LEGEND FOR NUMBERED BOXES IN Figure 8
1.
USB printer cable
2.
Touch screen control cable
3.
Display data cable
4.
LED/display cable
954-9.eps
4
3
2
1
Replacing the CPU Board
Removing the CPU Board
11
14. Connect each of the four cables in their respective CPU board connectors (see Figure 8).
15. Close the right door and replace the two #8 taptite screws.
16. Close the left door and replace the two #8 taptite screws.
17.
Turn on the power to the console.
Figure 9. Locating CPU board components
LEGEND FOR NUMBERED BOXES IN Figure 9
1.
Compact Flash (CF) card
2.
RAM board
3.
iButton
U4
U4
C245
C245
U12
U12
Color LCD Interface
Color LCD Interface
Grayscale LCD Interface
Grayscale LCD Interface
38
38
37
37
14
14
VR Bus Termination
VR Bus Termination
8
C36
C36
D13
D13
FB4
FB4
U25
U25
9
8
35
35
10
10
35
35
R81
R81
C388
C388
A
1
U26
U26
7
C252
C252
D18
D18
K
C273
C273
C274
C274
C112
C112
1
U11
U11
U28
U28
D2
A D2
K
7
1
D20
D20
C109
C109
C285
C285
C110
C110
C111
C111
1
1
C113
C113
7
U15
U15
D17
D17
C116
C116
A
C115
C115
TP6
TP6
K
C114
C114
D4
D4
A
C129
C129
L3
L3
K
R28
R28
C254
C254
R124
R124
D8
D8
K
1
D7
D7
A
R107
R107
1
14
14
TP16
TP16
J4
J4
1
37
37
C387
C387
J26
J26
C281
C281
C284
C284
C283
C283
TP3
TP3
C280
C280
L2
L2
C282
C282
J11
J11
1
R37
R37
R34
R34
EDGE CONNECTOR
EDGE CONNECTOR
+
C293
C293
R155
R155
27
27
D1
D1
28
28
A11
A11
A1
A1
38
38
B1
B1
2
B11
B11
C95
C95
C38
C38
R95
R95
C256
C256
C258
C258
L1
L1
TP1
TP1
C277
C277
C276
C276
C257
C257
C271
C271
U53
U53
C270
C270
C269
C269
1
8
2
7
38
38
R36
R36
1
37
37
TP9
TP9
4
1
5
J5
J5
J9
J9
C75
C75
C71
C71
C87
C87
C259
C259
10
10
14
14
26
26
8
TP4
TP4
C272
C272
8
5
U52
U52
FPGA JTAG
FPGA JTAG
9
J14
J14
1
4
1
2
R106
R106
8
C302
C302
14
14
7
U23
U23
K
A
U21
U21
1
1
5
1
Y5
Y5
1
U10
U10
7
C299
C299
C78
C78
1
30
30
5
26
26
1
U8
U8
R248
30 R248
30
48
48
F
R27
R27
C73
C73
RN4
RN4
U17
U17
5
1
RN5
RN5
RN1
RN1
RN3
RN3
54
54
RN2
RN2
R
1
1
2
4
6
L
N
G
J
1
10
10
8
12
12
1
16
16
14
14
T
M
P
H
K
29
29
R184
R184
R185
R185
1
4
R243
R243
19
19
28
C86 28
C86
1
R169
R169
R122
R122
R15
R15
C66
C66
C61
C61
1
14
14
U18
U18
C68
C68
C60
C60
R123
R123
C
E
A
1
3
5
7
R141
R141
R149
R149
13
13
9
11
11
B
D
R205
R205
15
15
R219
R219
R79
R79
R41
R41
25
25
24
24
1
48
48
15
15
C50
C50
C94
C94
C83
C83
U13
U13
J1
J1
1
U7
U7
24
24
J28
J28
25
25
1
2
C117
C117
4
U29
U29
9
C118
C118
18
18
R83
R83
U20
U20
10
10
TH1
TH1
R86
R86
16
16
R98
R98
1
8
1
R100
R100
Q7
Q7
R99
R99
9
C31
C31
R108
R108
U27
U27
R137
R137
R9
R9
R146
R146
R136
R136
C39
C39
R18
R18
R8
R8
1
Printer
Printer
5
4
C307
C307
FUD3
FUD3
P1
P1
U22
U22
C262
C262
D21
D21 K
J7
J7
50
50
40
40
TP77
TP77
C42
C42
5
U3
U3
8
10
10
15
15
20
20
C34
C34
J_USB1
J_USB1
R16
R16 R17
R17
1
L5
L5
A
25
25
Slave
Slave
C308
C308
15
15
20
20
45
45
40
40
45
45
J6
J6
25
25
Master
Master
Q2
Q2
50
50
C103
C103
C249
C249
U24
U24
Console Port
Console Port
C57
C57
C53
C53
8
1
5
C301
C301
9
16
16
J32
J32
3
C275
C275
1
R229
R229
2
C98
C98
R119
R119
16
16
9
2
J18
J18
4
U30
U30
1
66Mhz
66Mhz
16
16
R222
R222
FB28
FB28
R221
R221
C88
C88
R132
R132
8
Y1
Y1
C128
C128
1
Z6
Z6
1
2
38
38
2
C130
C130
PORESET
PORESET
R29
R29
R190
R190
R235
R235
J2
J2
37
37
R192
R192
R188
R188
1
1
S4
S4
1
Touch Screen Header
Touch Screen Header
1
5
J10
J10
8
U32
U32
4
Z3
Z3
Z5
Z5
Z4
Z4
J20
J20
1 1
7
PQ2 JTAG
PQ2 JTAG
BD Group - CPU board - TLS-450 console
BD Group - CPU board - TLS-450 console
23
23
24
24
RN16
RN16
R20
R20
C24
C24
C177
C177
R350
R350
A14
A14
Z2
Z2
B14
B14
1
1
Z1
Z1
4
5
C2
C2
J12
J12
8 U19
U19
R126
R126
C25
C26C25
C26
5
C1
C1
C4
C4
R3
R3
J29
J29
C221
C221
R44
R44
1
R118
R118
4
C137
C137
R61
R61
C341
C341
C305
C305
R348
R348
C381
C381
1
R59
R59
TP32
TP32
C176
C176
26
26
A62
A62
R117
R117
R114
R114
R115
R115
R104
R104
R238
R238
AB
AB
AD
AD
AF
AF
C204
C204
C203
C203
V
Y
T
B62
B62
R236
R236
R241
R241
R191
R191
M
P
K
F
H
D
C239
C239
332878-001 Rev A
332878-001 Rev A
R233
R233
R129
R129
C294
C294
C386
C386
R153
R153
R145
R145
R116
R116
R232
R232
C246
C246
B
25
25
R163
R163
C241
C241
2
TP5
TP5
59
59
25
25
U2
U2
C27
C27
C20
C20 C28
C28
100
100
1
R6
R6
9
76
76
FB3
FB3
C15
C15
75
75
1
U5
U5
5
8
51
51
Y2
Y2
C9
C94
1
6
26
26
50
50
RN15
RN15
1
1
RN17
RN17
20
22 20
22
16
16
18
18
1
12
12
14
14
RN14
RN14
8
10
10
C7
C7 24
24
A
U6
U6
R76
R76
R152
R152
R217
R217
R212
R212
2
4
C238
C238
25
25
C183
C183
U14
U14
1
37
37
20
20
FB27
FB27
10
10
11
11
38
38
1
1
C240
C240
48
48
TP34
TP34
C304
C304
C237
C237
C207
C207
C
R
AC
AC
AE
AE
AA
AA
W
U
1
1
RN25
RN25
1
J
N
L
G
E
1
1
RN23
RN23
RN19
RN19
R69
R69
19
19
21
21
15
17 15
17
U1
U1
11
11
13
13
7
9
RN24
RN24
1
1
TP26
TP26
16
16
C225
C225
C215
C215
3
5
A
1
1
RN22
RN22
1
TP25
TP25
RN12
RN12
J48
J48
61
61
RN7
RN7
RN10
RN10
RN8
RN8
C243
C243
143
143
C362
C362
S2
S2
1
TH3
TH3
TOP/L1
TOP/L1
R144
R144
4
5
FUD1
FUD1
U31
U31
TP2
TP2
8
1
C296
C296
U51
U51
1
J3
J3
Y4
Y4
1
1
4
U33
U33
C383
C383
R210
R210
S1
S1
15
15
SRESET
SRESET
1
4
C384
C384
R48
R48
9
C55
C55
16
16
HRESET
HRESET
1
R250
R250
R211
R211
12
12
R154
R154
R181
R181
R162
R162
R161
R161
R159
R159
R203
R203
R209
R209
R202
R202
R201
R201
R47
R47
8
R46
R46
1
1
8
J23
J23
5
C92
C92
R128
R128
16
16
U16
U16
9
R127
R127
1
Unused Memctrl
Unused Memctrl
10
10
59
59
30
30
R174
R174
A
R62
R62
R56
R56
R55
R55
R54
R54
R347
R347
R176
R176
R7
R7
C51
C51
R207
R207
R21
R21
R77
R77
R173
R173
R171
R171
31
31
R244
R244
Expansion Memory
Expansion Memory
1
15
15
Main Memory
Main Memory
J42
J42
61
61
143
143
Backlight Connector
Backlight Connector
J27
J27
C380
C380
J25
J25
J24
J24
1
K
D3
D3
A
1
TH2
TH2
FUD2
FUD2
J8
J8
1
2
954-3.eps
3
1
Replacing the CPU Board
Removing the CPU Board
12
Figure 10. Installing iButton flanged end up
Figure 11. Orient CF card side grooves to the CF card connector guides
LEGEND FOR NUMBERED BOXES IN Figure 11
1.
CF card connector (female)
2.
Large groove
3.
Small groove
4.
CPU board’s CF card connector (male)
5.
Large guide
6.
Small guide
954-4.eps
954-5.eps
1
2
5
6
3
4
Replacing the CPU Board
Removing the CPU Board
13
Figure 12. Removing/replacing RAM board
LEGEND FOR NUMBERED BOXES IN Figure 12
1.
Removing RAM board
2.
Retaining clip
3.
RAM board will spring up as you push retaining
clips away notches in sides of board
4.
Replacing RAM board
5.
Position notch in bottom of board over rib in
connector
6.
Rotate RAM board down until the retaining clips
snap into place
59
59
30
30
R174
R174
A
R62
R62
R56
R56
R55
R55
R54
R54
R347
R347
R176
R176
R7
R7
C51
C51
R207
R207
R21
R21
R77
R77
R173
R173
R171
R171
31
31
Expansion Memory
Expansion Memory
1
Main Memory
Main Memory
J42
J42
61
61
143
143
Backlight Connector
Backlight Connector
J27
J27
C380
C380
J25
J25
J24
J24
1
K
D3
D3
A
1
TH2
TH2
FUD2
FUD2
J8
J8
1
59
59
30
30
R174
R174
A
R62
R62
R56
R56
R55
R55
R54
R54
R347
R347
R176
R176
R7
R7
C51
C51
R207
R207
R21
R21
R77
R77
R173
R173
R171
R171
31
31
Expansion Memory
Expansion Memory
1
Main Memory
Main Memory
J42
J42
61
61
143
143
Backlight Connector
Backlight Connector
J27
J27
C380
C380
J25
J25
1
K
D3
D3
A
1
TH2
TH2
FUD2
FUD2
J8
J8
1
59
59
30
30
R174
R174
A
R62
R62
R56
R56
R55
R55
R54
R54
R347
R347
R176
R176
R7
R7
C51
C51
R207
R207
R21
R21
R77
R77
R173
R173
R171
R171
31
31
Expansion Memory
Expansion Memory
1
Main Memory
Main Memory
J42
J42
61
61
143
143
Backlight Connector
Backlight Connector
J27
J27
C380
C380
J25
J25
J24
J24
1
K
D3
D3
A
1
TH2
TH2
FUD2
FUD2
J8
J8
1
954-6.eps
2
2
5
6
2
2
3
1
4
Replacing Software CF Card
1.
Switch Off power to the console.
2.
Open the left (Printer) door of the console (see Figure 6).
3.
Remove the grounding wrist strap (Part No. 576010-908) from its package and wrap one end around your
wrist. Adhere the other end to the metal plate on the inside of the Printer door.
4.
Remove the CF card from the CPU board (see item 1 in Figure 9 for location) and install the new CF card.
Orient the card so the large/small grooves in the side of the card align with large/small guides on the side of
the socket base (see Figure 11).
5.
Close the left door of the console, reversing the procedures followed in Step 1.
6.
Reapply power to the console. The software upgrade is complete.
Replacing CF Card from Version 3.X or Earlier to Latest Version
When replacing a software CF card with Version 4.a or later, refer to the section System Backup
before replacing CF card. The backup thumb drive is used to save data from the installed CF card and
then will be used to restore existing setup and historic data to the new CF card.
If the label on the RAM board indicates it has 128 MB memory, it must be replaced with the 256 MB
RAM board from the CF Card Upgrade kit. To replace the RAM board, follow the instructions for
Removing/Replacing RAM board in Figure 12.
1.
Switch Off power to the console.
2.
Open the left (Printer) door of the console (see Figure 6).
3.
Remove the grounding wrist strap (Part No. 576010-908) from its package and wrap one end around your
wrist. Adhere the other end to the metal plate on the inside of the Printer door.
4.
Remove the CF card from the CPU board (see item 1 in Figure 9 for location) and install the new CF card.
Orient the card so the large/small grooves in the side of the card align with large/small guides on the side of
the socket base (see Figure 11).
5.
Disconnect the printer’s USB cable from its connector on the CPU board and insert the V-R backup thumb
drive into the CPU USB connector.
6.
Close the left door of the console, reversing the procedures followed in Step 1.
7.
Touch the Software Maintenance button on the Diagnostic maintenance screen (Figure 4) to open the
Software Maintenance Backup Restore tab screen (Figure 5).
8.
Touch the Restore button to begin restore. The message ‘operation requires an interruption in service’
appears. Select okay (
) to restore data.
9.
When you have finished, complete steps 1 and 2, then remove the thumb drive and reattach the printer cable
to its CPU board USB connector.
Replacing the iButton
1.
Switch Off power to the console.
2.
Open both front doors of the console (see Figure 6).
3.
Locate the three retention snap pins along the front of the CPU board (see Figure 7).
4.
Remove the grounding wrist strap (Part No. 576010-908) from its package and wrap one end around your
wrist. Adhere the other end to the metal plate on the inside of the Printer door.
5.
Disconnect the four cables from the Display door along the front edge of the CPU board (sse Figure 8).
6.
Position your forefinger beneath one of the pins and press up releasing the CPU board (see item 3 in
Figure 7). Repeat at each of the remaining two retention pins.
7.
Tilt the board a little away from the bulkhead (item 2 in Figure 7) and grasping the edge of the board pull out
firmly to remove the board from its backplane board connector. Once the CPU board is free from the
connector, slowly remove the board from the console being careful not to hit the CF card against the door.
8.
Place the old and new CPU boards side by side on a clean work surface.
9.
Remove the iButton from the old CPU board and install it in the same socket on the new CPU board (see
Figure 9). Make sure the flanged side of the iButton is up in its socket (see Figure 10).
10. Once the iButton is installed in the new CPU board, lift the CPU board by its outer corners and slide the
board into the console until the CPU board connector is entering the backplane board’s connector, then push
firmly down to seat the CPU board in the connector.
11. Make sure the holes in the CPU board for the three retention pins are aligned over the three pins. With your
thumb, push against the CPU board at each retention pin until they are all snapped into place.
12. Connect each of the four cables in their respective CPU board connectors (see Figure 8).
13. Close the right door and replace the two #8 taptite screws.
14. Close the left door and replace the two #8 taptite screws.
15. Turn on the power to the console.
Installing Software Features
Before installing a software feature upgrade, perform a system backup using a V-R Backup thumb drive (P/N
330020-607) following the procedure described in “System Backup” on page 3.
The V-R Backup thumb drive is different from a V-R Software Upgrade thumb drive - the two are not
interchangeable.
Software Features Installation Procedure
1.
Get the USB Adapter and upgrade i-button from the upgrade kit. Remove the plastic end cap from the USB
Adapter and Insert the i-button in the adapter as shown in Figure 13 below.
Figure 13. Inserting i-Button into USB Adapter
2.
Replace the plastic retaining cap on the adapter after inserting the i-Button.
3.
Turn off power to the console.
4.
Using a T-15 Torx driver, remove the two #8 taptite screws the left door of the console (ref. item 2 in
Figure 6).
5.
Disconnect the Printer's USB cable from its connector on the CPU board and insert the USB Adapter into
the CPU USB connector as shown in Figure 14 below.
6.
Close the door.
LEGEND FOR NUMBERED BOXES IN Figure 13
1.
USB adapter
2.
i-Button
3.
Insert i-Button, large end up
1
2
3
954-11.eps
OFF
Installing Software Features
Feature Upgrade Procedure
17
7.
Turn on power to the console and follow the required Feature Upgrade procedure. When you have completed
the Feature Upgrade procedure reverse the steps 3 through 6 above to remove the thumb drive and reattach
the printer cable to its CPU board USB connector.
8.
Close the door and replace the two #8 taptite screws.
Figure 14. Locating Printer’s USB connector
Feature Upgrade Procedure
1.
On the console’s Home Screen, touch the Diagnostics button to display the Diagnostics Main Screen (see
Figure 3).
2.
Touch the Software Maintenance button on the Diagnostic Maintenance screen (see Figure 4).
LEGEND FOR NUMBERED BOXES IN Figure 14
1.
Comm module
2.
Top of CPU board
3.
Printer USB connector
sw feat act2.eps
1
2
3
Installing Software Features
Feature Upgrade Procedure
18
3.
When the Software Maintenance - Backup Restore screen displays touch the Download tab. Touch the check
boxes beside the feature(s) you wish to download to the console from the i-button (item 1 in Figure 15).
4.
Once you have selected the desired features to download, touch the Download button to begin the download
process (item 2 in Figure 15).
Figure 15. Downloading Software Features from the USB Adapter
5.
Once the download process completes, touch the Install tab. Touch the check boxes beside the feature(s)
you wish to install (item 1s in Figure 16). Once you have selected the desired features to install, touch the
Install button (item 2 in Figure 16).
LEGEND FOR NUMBERED BOXES IN Figure 15
1.
Select Feature(s) to download
2.
Download button
09-21-2007
11-31-30
Software Maintenance - Download
Backup
Restore
Download
Install
1
2
Feature
Status
List
Updates
Download
954-15.eps
Business Inventory Reconciliation
Ready to download
AccuChart II
Ready to download
Installing Software Features
Verify Features Installed
19
Figure 16. Installing Software Features
6.
After the selected features are installed the console will need to restart. Allow the console to restart.
Verify Features Installed
1.
Touch the Home screen button. Touch the Diagnostic Main Screen Access button on the Home Screen (see
Figure 3).
2.
Touch the About button on the Diagnostic Main Screen (see Figure 17).
Figure 17. About button
LEGEND FOR NUMBERED BOXES IN Figure 16
1.
Select Feature(s) to install
2.
Install button
09-21-2007
11-31-30
Software Maintenance - Install
Backup
Restore
Download
Install
2
Feature
Status
Install
954-16.eps
Waiting Selection
Ready to install
Ready to install
1
Business Inventory Reconciliation
AccuChart II
Installing Software Features
Verify Features Installed
20
3.
Verify that the features you installed are listed in the About screen’s feature list (see example in Figure 18).
Figure 18. Verifying Installed Software Features
4.
After completing a software feature upgrade, perform a system backup using the V-R Backup thumb drive (P/
N 330020-607).
The V-R Backup thumb drive is different from a V-R Software Upgrade thumb drive - the two are not
interchangeable.
LEGEND FOR NUMBERED BOXES IN Figure 18
1.
Check to see that installed features are
visible in the System installed Features
list.
09-21-2007
11-31-30
About - System
System
1
Software: Part #
Created
Hardware Description
CPU
iButton
INPUT/OUTPUT MODULE (B1.S1)
UNIVERSAL SENS MODULE (B1.S2)
INPUT/OUTPUT MODULE (B8.S5)
YYWWXXXX
000000f3c9500b
123
8220001
4278190081
Serial #
342002.A.121.3
Feb 21 2010 15:58:17
954-18.eps
Installed Features
Total Control
* Email Notification
* Custom On-Board Help
* Custom Alarms
* Custom Dashboard
TLS-450 Direct Access TM Software/Web Browser
Business Inventory Reconciliation
AccuChart II
Before installing a software upgrade, perform a system backup using a V-R software thumb drive P/N 330020-
604 following the procedure described under System Backup in “Before You Begin” on page 2.
The V-R Backup thumb drive is different from a V-R Software Upgrade thumb drive - the two are not
interchangeable.
When installing a CF card upgrade, follow the instructions in the ‘Replacing Software CF Card’ section of this
manual.
Software Thumb Drive Connection
A 2 GB CF card must be installed in the console before using a thumb drive to upgrade to V4.b or
later software.
1.
Get the software update thumb drive from the upgrade kit.
2.
Turn off power to the console.
3.
Using a T-15 Torx driver, remove the two screws the left door of the console (ref. item 2 in Figure 6).
4.
Disconnect the Printer's USB cable from its connector on the CPU board and insert the software thumb drive
into the CPU USB connector as shown in Figure 14 below.
5.
Close the door.
6.
Turn on power to the console and follow the required Download and Install procedures. When you have
finished, reverse steps 2 through 5 above to remove the thumb drive and reattach the printer cable to its CPU
board USB connector.
7.
Close the door and replace the two screws.
OFF
Software Download Procedure
22
Figure 19. Locating Printer’s USB connector
Software Download Procedure
The Download tab screen is used to control USB downloads from either a valid V-R Code/Features USB thumb
drive or a V-R Recovery USB thumb drive that is plugged into a USB port in the console.
When the Download tab is selected, the software thumb drive will automatically be queried for updates that are
available. 'Reading Update List' is displayed in the status bar while the list is being acquired.
When the list is acquired, the status bar will display 'Waiting selection'. Updates and statuses will be displayed in
the Feature/Status columns. A check will be made to see which updates have already been installed. A check will
be made to see if a compatibility problem exists for any update. If a version compatibility problem exists, a dialog
box will be displayed instructing you to contact customer service to obtain the proper version.
LEGEND FOR NUMBERED BOXES IN Figure 14
1.
Comm module
2.
Top of CPU board
3.
Printer USB connector
sw feat act2.eps
1
2
3
Software Install Procedure
23
Touch the box beside one or more of the desired selection(s) in the Feature column that you want to download.
Touch the Download button and the screen's status bar will read 'Downloading'. If pending updates are already on
the CF card and were never activated, you will be asked if you want to delete the pending updates, or to abort the
operation. When the download is complete, the screen will display a dialog box notifying you of the results of the
download and the status bar will return to 'Waiting Selection'.
Software Install Procedure
The Install tab screen is use to control the installation of downloaded software. During the installation process,
several dialog boxes will be displayed to inform you of key events.
During Installation there must be no dispensing. However, the installation process only takes a few minutes.
Following installation, the console converts the setup databases. If new features are installed and activated,
setup(s) relevant to the new feature(s) will be required.
1.
Touch the feature on the list you want to install and then touch the Install button on the right side of the
screen.
2.
Touch the OK button on the System Restart dialog box, or touch Cancel to abort the installation or to reselect
the feature(s) you want to install. The console will restart with the newly installed features.
3.
If you used the USB port of the Ethernet/USB module to install the new features, remove the software thumb
drive and put it in a safe place. Perform setup for the newly installed features.\
4.
If you used the CPU board printer's USB port to install the new features, turn off power to the console. Open
the left door of the console and remove the software thumb drive from the printer port and reconnect the
Printer cable. Close the left door and replace the two screws. Turn on power to the console and perform
setup for the newly installed features.
Keep V-R Code/Feature and Recovery USB thumb drives in a secure location.