Creative Playthings PINE SKYBOX SH901-700 Assembly Manual
Text of the manual
Please read the owner’s manual before assembling your play set.
It provides additional information on the care and use of your play
set. you must carefully read the entire instruction manual before pro-
ceeding with the assembly or use of your new play set.
Creative Playthings takes great care to design its products with your
child’s safety in mind. However, only with careful supervision and
proper safety instructions, can you be assured of safe play time on
any product designed for children.
All hardware on this set is specially coated for corrosion
resistance. If non-Creative Playthings hardware is used, it
MuSt be galvanized or stainless steel.
illustration #1
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 2
PlAy Set SAfety
observing the following statements & warnings reduces the likelihood of serious or fatal injury:
• Children should use equipment only in its intended manner.
• Children should not wear loose or stringed clothing while using playground equipment.
• Children should not play on equipment in wet weather conditions due to potentially slippery surfaces.
• Children should not walk too closely in front of, behind, or between moving swings and trapezes.
• Children should not swing empty swing seats.
• Children should not jump off swings and/or trapeze while they are in motion.
• Children should not twist swing chains because this will reduce the strength of the chain and connectors.
• Children should sit in the center of the swings with their full weight on the seats.
• do not allow children under age 7 to use monkey bars unless supported by an adult.
• Children should not be on the top surface of the monkey bars or swing beam.
• on-site adult supervision is required at all times for children of all ages.
• until assembly is complete, do not let your children use the play set.
• never fasten anything not approved by Creative Playthings to your play set. Accessories or items not ap-
proved by Creative Playthings include; dog runs, clothes lines, electrical devices, or bird feeders etc.
• Suspended ropes, chains, and cables must be secured at both ends.
• Suspended ropes, chains, and cables must not be capable of looping back on themselves.
• do not allow more than 120 lbs. on Single occupancy swing accessories such as the Sling Swing and trapeze.
• do not allow more than 175 lbs. on multiple use swing accessories such as the back-to-back Plastic Horse,
and Wooden lawn Swing Glider.
• do not allow more children on the play set than can simultaneously use all the swing stations at one time.
• Children should neVeR wear bicycle helmets while playing on the play set.
Assembly Safety:
• Keep the work area clean and clear of obstructions.
• Children should stay out of the work area until the safe play area is cleared of obstacles, the play set has been
completely assembled, all hardware has been tightened and checked, and all tools have been picked up.
• Keep children off the play set until it has been completely assembled.
• Some parts of the assembly process may require help from another competent adult.
• do not stand on the platform until the play set has been completely assembled, use a step ladder if you can
not reach high enough.
• follow the manufacturers’ safety recommendations for the tools and equipment you use.
• Avoid assembling your play set in poor weather conditions.
• Wear proper clothing and safety equipment (safety glasses, boots, and gloves) while assembling your play set.
foR SAfety SAKe, PleASe tAKe tIMe to ReAd All InStRuCtIonS CoMPletely And
CAutIon youR CHIldRen APPRoPRIAtely.
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 3
SAfe PlAy AReA
SeleCtInG tHe CoRReCt loCAtIon foR youR PlAy PRoduCt IS IMPoRtAnt foR
youR CHIldRen’S SAfety And tHe PRoduCt’S lonGeVIty.
Play Set dimensions:
• the Pine Skybox play set has ground dimensions of 4'-0" x 5’-0"
• the Pine Skybox play set Accessory adds 4'-0" to the Safe Play Area at the end of your play set.
• Additional accessories may increase the size of the Safe Play Area.
• the maximum fall height for your Pine Skybox is 120" as measured from the top of the Wall Supports.
Safe Play Area:
• the Safe Play Area refers to a zone extending 6' beyond the play set on all sides, including the slide and the
space above the play set. because children may deliberately jump from a moving swing, the Safe Play Area
must be extended to 14 in front of and behind a swinging Accessory.
• the ground surface must be level. Installing your play set on sloping ground can cause it to lean or “rack". this
leaning puts additional stress on all connections and joints and in time will cause those connections to loosen
and fail.
• the Safe Play Area must be free of all structures, landscaping, trees and branches, rocks, wires, and other
obstacles to safe play. Children can be seriously injured running, or swinging into these obstacles.
• Remove all tripping hazards from the Safe Play Area. tripping hazards include; roots, stumps, rocks, landscap-
ing, sprinkler heads, railroad ties, plumbing and electrical connections.
• do not install your play set over concrete, gravel, asphalt, packed earth, or any other hard surface. the follow-
ing is a list of recommended ground covers from the Consumer Product Safety Commission.
ReCommended GRound CoveR
Suggested material
uncompressed depth
double Shredded bark mulch
9"
uniform Wood Chips
12"
Fine Gravel
12"
Fine Sand
12"
• Any edging used to contain the ground cover must be beyond the Safe Play Area. (i.e.. landscape timbers)
A fAll onto A HARd SuRfACe Could ReSult In SeRIouS
InjuRy.
6'
6'
6'
14'
14'
WHICHEVER
IS GREATER
Safe play area using
recommended ground cover.
Landscape Timbers 6' from
play structure.
illustration #2
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 4
HARdWARe bAG ContentS
ASSeMbly HARdWARe:
(dRAWinGS noT To SCALe - iLLuSTRATionS ARe RePReSenTATive oF hARdWARe)
We have packaged more hardware than is required for assembly.
50350-700
Hardware bag - Skybox 2005 - SP
52
17001-105
Weld nut - 5/16"-18
52
12017-206
Lock Washer - 5/16"
62
12002-206
Flat Washer - 5/16"
2
17003-611
hex bolt - 5/16 x 1-1/2"
4
17003-811
hex bolt - 5/16 x 2"
2
17003-1011
hex bolt - 5/16 x 2-1/2"
33
17003-1611
hex bolt - 5/16 x 4"
6
17003-2211
hex bolt - 5/16 x 5-1/2"
4
17003-2411
hex bolt - 5/16 x 6"
105
17020-106
Screw - #8 x 1-5/8"
70
17020-112
Screw - #8 x 2"
18
17020-109
Screw - #8 x 2-1/2"
4
17036-1202
Lag Screw - 5/16 x 3"
4
17036-1602
Lag Screw - 5/16 x 4"
2
17036-2002
Lag Screw - 5/16 x 5"
2
14161-400
Access Ladder bracket
5/16" Hex bolt
lag Screw
flat Head Wood Screw
5/16" flat Washer
5/16" lock Washer
5/16" Weld nut
1" Hole Cap
Access ladder
bracket
52
15081-704
hole Cap 1", brown
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 5
PRe ASSeMbly InfoRMAtIon
Lag Screw
Flat Washer
CReAtIVe PlAytHInGS PlAy SetS uSe A feW StAndARd ConneCtIonS.
beCoMInG fAMIlIAR WItH tHeSe ConneCtIonS WIll SIMPlIfy ASSeMbly And
InSuRe A SAfeR PlAy PRoduCt foR youR CHIldRen.
Hex bolt & Weld nut Assembly Procedure:
Assembly layout:
Align the holes in the parts to be fastened.
Start preliminary tightening of bolt into weld
nut by hand. Tighten each bolt with a wrench
until the lock washer is fully compressed be-
tween the head of the bolt and the flat wash-
er. See illustrations 5 and 6.
Correct Assembly:
bolt has been screwed se-
curely into weld nut and the
connection is tight. Check con-
nections periodically for tight-
ness during the life of the play
set . do not over tighten.
Incorrect Assembly:
during assembly or maintenance the
bolt protrudes 1/8" past the weld nut.
Call customer service or replace the
bolt at a local hardware store. you may
be overtightening or using the wrong
size bolt.
failure to replace this bolt with a
shorter one could result in serious
injury.
typical Installation - lag Screws:
• Tap the head of the Lag
Screw with a hammer to start
the threads into the wood and
then use a 9/16" socket to
tighten.
• do noT over tighten
typical Installation - Wood Screws:
• use an electric drill or screw gun to drive screws.
• drill 1/8" pilot holes where required.
• We recommend that you lubricate the
threads of the screws with beeswax or
soap to ease installation and minimize
breaking screws.
• It is very important to make cer-
tain that the tops of all screws are
flush with the surface of the wood
and there are no protruding sharp
edges.
1/2"
2"
Drill
Assembly Block
Push Rung Tight
Against Board
Before Drilling
Drive Screw through
hole into rung
Pilot drilling Rungs:
• All ladder rungs must be secured with
screws. To insert screws where no holes
have been pre-drilled, you must drill a 1/8"
pilot hole into the end of each rung.
• using an 1/8" high speed drill bit, drill the
hole 2" deep. The location is 1/2" in from
the inside edge of the board and on the
center line of the rungs, as shown in illus-
tration 8.
• before you drill, it is extremely important to
make sure that the shoulder of each rung is
tight against the board. use the Assembly
block to press the components together.
illustration #3
illustration #4
illustration #5
illustration #6
illustration #7
illustration #8
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 6
PlAy Set VIeW
F
H
O
Y
X
N
P
B
S
CC
V
U
J
I
C
R
A
K
D
Z
AA
BB
T
L
M
k, L, o & P are used only on a Skybox
connected to a gym with a tent roof.
illustration #9
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 7
CoMPonent PARtS
63008-221 - Skybox 2005 - SP - box 1 of 2
A 2 ea
31682-102 Angle brace - 2 x 4 x 17-1/4"
b 1 ea
31765-102 Ladder Slat - 5/4 x 5 x 19"
C 10 ea 32404-102 Wall Slat - 5/4 x 6 x 31-1/2"
d 2 ea
32433-102 Corner Post - 4 x 4 x 119"
e* 1 ea
32434-102 end Stringer - 2 x 3 x 56-1/2"
F 1 ea
32437-102 Wall Support, Left - 2 x 4 x 44-1/4"
G* 2 ea
32406-102 inside Stringer - 2 x 3 x 56-1/2"
h 1 ea
32443-102 Post extension, Left 4 x 4 x 17"
i
1 ea
32444-102 Post extension, Right 4 x 4 x 17"
J 1 ea
32445-102 Wall Support, Right - 2 x 4 x 44-1/4"
k 2 ea
32448-102 Side Tent Support 2 x 6 x 16-3/4"
L 1 ea
32449-102 Tent Post - 4 x 4 x 67-3/4"
m 4 ea
32450-102 Wall Slat, Long - 5/4 x 6 x 58-1/2"
n 2 ea
32451-102 Wall Slat, Short - 5/4 x 6 x 23-1/2"
o 1 ea
32432-102 Wall Slat, Long-narr. - 5/4 x 4 x 58-1/2"
P 1 ea
32489-102 Wall Slat, narrow - 5/4 x 4 x 23-1/2"
Q* 1 ea
50350-700 hardware bag - Skybox 2005 - SP
CC 2 ea 15132-400 Access Ladder Step
Component Part Identification:
Take inventory of all parts, making sure nothing is missing or
defective.
if you find that parts are missing or defective call the Creative
Playthings Customer Service department at 1-800-598-4997
*
not visible in illustration 9 on Page 6.
boX 1
boX 2
63008-222 - Skybox 2005 - SP - box 2 of 2
R 1 ea 32415-102 Platform end 2 x 6 x 59-1/4"
S 1 ea 32430-102 Access Ladder Rail, Left 2 x 4 x 31"
T 1 ea 32431-102 Access Ladder Rail, Right 2 x 4 x 31"
u 1 ea 32435-102 end Wall Support, Long 2 x 4 x 59-1/4"
v 1 ea 32436-102 end Wall Support, Short 2 x 4 x 50"
W 2 ea 32439-102 narrow Platform board 5/4 x 4 x 41"
x 9 ea 32440-102 Platform board 5/4 x 6 x 44-1/4"
y 2 ea 32441-102 Platform Side 2 x 6 x 47-1/2"
Z 1 ea 32442-102 Platform Support 2 x 6 x 56-1/2"
AA 2 ea 32446-102 Sandbox end 2 x 6 x 56-1/2"
bb 2 ea 32447-102 Sandbox Side 2 x 6 x 47-1/2"
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 8
MAIntenAnCe InStRuCtIonS
youR CReAtIVe PlAytHInGS PlAy Set IS StAIned At ouR fACtoRy.
StAInInG IS not needed At tHe tIMe of InItIAl ASSeMbly.
Staining Information:
• Pigmented, exterior, water repellent stains are recommended and will provide an excellent barrier against moisture
without hiding the natural wood grain or leaving a film that may later crack or peel.
• We recommend that you apply stain according to the instructions and precautions recommended by the stain manufac-
turer.
• it should take three or more quarts to cover your set.
• Contact your local dealer or call Creative Playthings for our staining products.
• All rungs are pre-finished at the factory and do not require any finishing at the time of initial assembly.
• do not paint, or varnish rungs or steps.
• Avoid using finishes that create slippery surfaces.
Maintenance:
• Wooden playground equipment will last for years with proper maintenance. maintenance of the play set finish will
vary depending on weather climate.
• As a safety precaution, check all hardware for tightness twice a month during use and at the beginning of each play
season. Tighten as required and specified in these instructions. do not over tighten.
• Check structure twice monthly during usage for any evidence of deterioration. if upon inspection, hardware has sharp
edges, rusted or structural pieces have signs of premature failure; replace them through Creative Playthings Customer
Service.
• oil all metallic moving parts monthly during the usage season.
• The swings, trapeze, tent, rope ladders, and any other removable plastic accessories should be removed and taken
indoors when outside temperatures drop below 32° F (0° C).
• Wood will expand and contract as it adjusts to temperature changes and varying moisture conditions. Checks or cracks
are a natural characteristic of all wood and will not affect the strength or durability of the wooden components.
• To maintain the finish of your set, a light sanding and an application of an exterior stain will repair scratches and pre-
vent wood from aging prematurely.
• Finishes applied to ladder rungs must not create a slippery surface. never varnish or paint! When refinishing rungs,
sand lightly and use an exterior stain or boiled linseed oil.
• The wood parts of your play set should never be disposed of by burning.
• dispose of all parts so as not to create a hazard.
tools & Materials Required for finishing & Assembly:
• Claw Type hammer
• Carpenter’s Level
• box Wrench or Sockets (1/2")
• electric drill
• 1/8" and 3/8" drill bits (high Speed)
• Screwdriver or Screw Tip for drill (medium Phillips)
• Locking Pliers
• 10 ft. Tape measure
• Framing Square
• 6 ft. Step Ladder
• beeswax or Soap (used to lubricate screw threads)
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 9
ASSeMbly InStRuCtIonS
illustration #10
illustration #11
Assembly note:
This model of the Skybox can be installed on the Williamsburg iii or the Lexington iii. This Skybox will fit on a
set with a Tent or Wood Roof. Some steps of the installation differ from the Tent set-up to the Wood Roof set-up.
These differences are indicated by caption, as shown in step one. These instructions assume that the Skybox will
be attached to the rear of the Gym. Please review all instructions before attempting assembly.
SteP 1 - Component Removal:
A number of parts on the Gym need to be removed for assembly. Some of these items will be re-installed later. All extra parts
reamaining after assembly should be saved in case of future repairs. Retain all hardware, it may be required for assembly.
tent Roof Gym
Wood Roof Gym
tent
end tent
Support
tent Pipe
Sandbox end
Sandbox Seat
tent Pipe
tent Pipe
end Wall
Support
Rear Wall
Slats
Sandbox end
Sandbox Seat
Rear Wall
Slats
tent Post
tent Roof Gym:
Loosen the end Tent Support at the rear of the Gym,
Remove the side Tent Pipes and the Tent. Remove the
screws that hold the center Tent Pipe and then remove
the center Tent Pipe. un-bolt the rear Tent Post. Remove
the six Wall Slats across the rear of the Gym and remove
the rear end Tent Support. Remove the Sandbox Seat
and Sandbox end at the rear of the Gym.
The Tent, Tent Pipes and Sandbox Seat will be re-installed.
The Wall Slats will be re-used.
Wood Roof Gym:
Remove the six Wall Slats across the rear of the Gym and
remove the rear end Wall Support. Remove the Sandbox
Seat and Sandbox end at the rear of the Gym.
The Sandbox Seat will be re-installed. The Wall Slats will
be re-used.
When mounting the Skybox to a Gym that is to have a Clubhouse or Fun deck do noT remove Sandbox end, see page 19.
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 10
ASSeMbly InStRuCtIonS
illustration #13
illustration #12
SteP 2 - Sandbox:
Fasten one Sandbox end (AA) to the inside of the rear play
set Corner Posts using four 5/16 x 4" hex bolt Assemblies*.
The counter-bored holes in the middle of the board should
be facing the gym and positioned closer to the bottom edge.
Remove the bolts that fasten the rear end of one Sandbox
Side on the Gym. Remove the Weld nuts from the Corner
Post. use two 5/16 x 5-1/2" hex bolt Assemblies to fasten
the Gym Sandbox Side and the Skybox Sandbox Side (bb)
to the Corner Post, as shown. Repeat with the other Side.
AA
bb
Sandbox
Side - Gym
* A hex bolt Assembly consists of one hex bolt, one Lock
Washer, one Flat Washer, and on Weld nut.
SteP 3 - Corner Posts and Sandbox end:
Fasten each Corner Post (d) to the outside ends of the
Sandbox Sides (bb) using two 5/16 x 4" hex bolt Assemblies,
as shown. Please note that the counter-bored holes at the
bottom of the Corner Posts should face outward so that the
head of the hex bolt rests below the surface of the Post.
Fasten the remaining Sandbox end (AA) to the Corner Posts
(d) using four 5/16 x 4" hex bolt Assemblies.
AA
bb
d
d
bb
Counter-bored
Important note: When mounting the Skybox to a Gym
that is to have a Clubhouse or Fun deck, see the special
instructions on page 19.
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 11
ASSeMbly InStRuCtIonS
The Tent Post (L) from Step 16
can be used to gauge the correct
position of the Platform Support (Z).
illustration #14
illustration #15
illustration #16
SteP 4 - Platform Sides:
drill two 3/8" diameter holes through the
center-line of each rear Corner Post on
the Gym, as shown. The upper hole
should be 88-1/8" from the bottom of the
Corner Post. The lower hole should be
84-5/8" from the bottom of the Corner
Post. These holes should be level with
the corresponding holes on the Skybox
Corner Posts.
Fasten each Platform Side (y) to the rear Gym
Corner Posts and Sandbox Corner Posts (d) using
four 5/16" x 4" hex bolt Assemblies, as shown.
d
y
y
Rear Corner
Post
to the bottom
of the Post
84-5/8"
88-1/8"
d
SteP 5 - Platform end and end Stringer:
Fasten the Platform end (R) to the Corner Posts (d) using
one 5/16 x 4" hex bolt Assembly through the Top hole (only)
on the ends of the Platform end (R).
Locate the end Stringer (e). Attach each end Stringer
(e) using two 5/16 x 5-1/2" hex bolt Assemblies as
shown. The hex bolt should start from the outside
of the Skybox. Push each bolt through the bottom
hole in the Platform end and the Corner Posts
before passing through the end Stringer. make
sure the Platform end (R) and end Stringer (e)
are aligned across their bottom edges. (The
holes in the end Stringer are offset from the
center of the board; you may have to flip the
board to achieve proper alignment.)
note: The Right Platform Side has been omitted for
clarity.
R
e
SteP 6 - Platform Support:
drill two 3/8" diameter holes through the center-line of each
rear Corner Post on the Gym, as shown. The upper hole
should be 85-1/4" from the bottom of the Corner Post. The
lower hole should be 82-1/8" from the
bottom of the Corner Post.
Fasten the Platform Support (Z)
to the rear Gym Corner Posts
using four 5/16" x 4" hex bolt
Assemblies, as shown.
When complete, the top of the
Platform Support should be level
with the top of the end Stringer
(e).
note: The Right Platform Side has
been omitted for clarity.
to the bottom
of the Post
82-1/8"
85-1/4"
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 12
ASSeMbly InStRuCtIonS
illustration #18
illustration #19
illustration #17
SteP 7 - Inside Stringers:
Locate the two inside Stringers (G). The inside Stringers (G)
are installed between the Platform Sides (W). Attach each
inside Stringer (G) using two 5/16 x 4" Lag Screws and Flat
Washers as shown. make sure the end Stringer (e), Platform
Support (Z) and inside Stringers (G) are aligned across top
edges..
G
y
e
Z
y
SteP 8 - Angle braces:
Fasten an Angle brace (A) to each end of the Platform
end (R) using two 5/16 x 2-1/2" hex bolt Assemblies. do
not tighten these bolts yet. The Angle braces (A) should be
fastened so that the angled end is flat against the nearest
Corner Post (d).
A
d
d
R
SteP 8 - Angle braces (continued):
Level the Skybox. Tighten all connections except the Angle
braces (A). do not over tighten.
Position the Angle braces (A) with the angled ends flat
against the Corner Post nearest to each. With a pencil, mark
the position where the holes in the Angle braces rest against
the Corner Posts. At each mark drill a 1/8" diameter x 2"
pilot hole in the Corner Posts. Fasten the Angle braces (A)
to the Corner Posts using one 5/16 x 3" Lag Screw and Flat
washer in each Angle brace (A).
note: The Stringers have been omitted from the illustration
for clarity.
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 13
ASSeMbly InStRuCtIonS
illustration #20
illustration #21
illustration #22
SteP 9 - narrow Platform boards:
Locate the two narrow Platform boards (W). Fasten the
narrow Platform boards (W) tightly against the Platform
Sides (W), resting on top of the Stringers (e & G) and
Platform Support (Z). Fasten the narrow Platform boards
(W) to the Stringers with six #8 x 2" Flat head Wood Screws
on each board.
SteP 10 - Platform boards:
Layout all the Platform boards (x) on the Stringers and
Platform Support. Space the Platform boards (x) evenly
between the narrow Platform boards (W). All of the Platform
boards should be placed flush to the edge of the Platform
Support. Attach each Platform board (x) using six #8 x 2"
Flat head Wood Screws.
W
y
y
x
SteP 11 - Post extensions:
Place the Right Post extension (i) against the right rear Gym
Corner Post, as shown. The top of the Right Post extension
should extend 3-1/2" beyond the top of the Gym Corner
Post. (if the Roof boards from the Gym keep the Right Post
extension from resting flat against the Gym Corner Post,
the Roof boards will need to be trimmed. Please review the
following two steps to determine the amount of trimming
needed.)
With a pencil mark the position of the Post extension holes
onto the Gym Corner Post. drill two 3/8" diameter holes
through the Gym Corner Post at the pencil marks. Fasten
the Right Post extension (i) to the Gym Corner Post using
two 6" hex bolt Assemblies.
Repeat with the Left Post externsion (h) and the left rear
gym Corner Post.
3-1/2"
i
h
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 14
ASSeMbly InStRuCtIonS
illustration #24
illustration #25
illustration #23
SteP 12 - Short end Wall Support:
Fasten the Short end Wall Support (v) between the Right
And Left Post extensions (i & h) using two 5" Lag Screws
and two Flat Washers, as shown. the Lag Screws should
go through the counter-bored holes at the top of the Post
extensions.
SteP 13 - Side Wall Supports:
Fasten the Right Side Wall Support (J) to the Right Post
extension (i) and adjacent Corner Post (d) using one
5/16 x 4" hex bolt Assembly in the lower hole at each end.
Through the upper holes, fasten the Right Side Wall Support
(J) using two #8 x 2-1/2" Wood Screws.
Repeat with the Left Side Wall Support (F) to the Left Post
extension (h) and adjacent Corner Post (d).
SteP 14 - long end Wall Support:
Fasten the Long end Wall Support (u) to the Corner Posts
using two 5/16 x 4" hex bolt Assemblies, as shown.
Right Side Wall Support (J)
Left Side Wall Support (F)
f
V
H
I
j
H
I
u
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 15
ASSeMbly InStRuCtIonS
illustration #26
illustration #27
SteP 15 - Side tent Supports:
Fasten the Side Tent Supports (k) to the rear Gym
Corner Posts using two 5/16" x hex bolt Assemblies
each. The bolts should go through the holes where
the reat end Tent Support was formerly fastened. The
Large diameter holes should face toward the Gym.
Attach an Access Ladder bracket to one of the Side
Tent Supports (k) using a 5/16 x 1-1/2" hex bolt
Assembly. Leave the connection loose. Swing the
Access Ladder bracket until one face rests against
the Side Wall Support on the Gym, as shown
in the detail illustration. make sure that
the Side Tent Support is level. mark the
center of the hole on the Side Wall
Support using a pencil. drill a 1/4" x
2-1/2" pilot hole at the pencil mark.
Fasten the Access Ladder bracket
using a 5/16 x 3" Lag Screw and Flat
Washer. Repeat with the other Side
Tent Support (k).
tent Roof Gym only
SteP 16 - tent Post:
Center the Tent Post (L) between the two rear Gym Corner
Posts. Slide the Tent Post (L) into place fitting the notches
over the Short end Wall Support (v) and the Platform
Support (Z). make sure that the Tent Post is centered and
plumb.
With a pencil, mark the position of the holes in the Tent
Post on the Short end Wall Support (v) and the Platform
Support (Z). The pencil marks should be approximately
25" apart. drill a 3/8" diameter hole through the Short end
Wall Support (v) and the Platform Support (Z) at the pencil
marks.
Fasten the Tent Post (L) to the Short end Wall Support
(v) and the Platform Support (Z) using two 2-1/2" hex
bolt Assemblies. Secure the bottom of the Tent Post (L)
using two #8 x 2-1/2" Wood Screws from below the Gym
Platform boards.
j
Gym Corner
Post
K
K
Access ladder
bracket
Many parts are omitted from this
illustration; most notably the Side
Wall Supports for the Gym
Side Wall Support
l
V
Z
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 16
ASSeMbly InStRuCtIonS
illustration #29
illustration #30
illustration #28
SteP 17 - Side Wall Slats:
Fasten five Wall Slats (C) to the left Platform Side (y) and the
Left Wall Support (e), as shown. The Wall Slat (C) closest
to the Gym should fit tightly against the Left Post extension
(h). use four #8 x 1-5/8" Flat head Wood Screws in each
Wall Slat (C). There should be approximately 2-1/4" between
each Wall Slat (C).
Repeat with the Wall Slats (C) on the right side of the
Skybox.
note: When placing Wall Slats, leave no gap larger than
3-1/2" except at entrance or exit points. The Long end Wall
Support has been omitted from the illustration for clarity.
SteP 18 - end Wall Slats:
Fasten the six Wall Slats removed in Step one (C) to the
Platform end (R) and the Long end Wall Support (u), as
shown. use four #8 x 1-5/8" Flat head Wood Screws in each
Wall Slat (u). There should be approximately 2-5/8" between
each Wall Slat (C).
note: When placing Wall Slats, leave no gap larger than
3-1/2" except at entrance or exit points.
SteP 19 - Assemble Access
ladder:
Fasten two Access Ladder Steps (CC)
to the Left Access Ladder Rail (S) using
four #8 x 2-1/2" Wood Screws, as shown.
Attach the Right Access Ladder Rail (T) to
opposite end of the Access Ladder Steps
(CC) using four #8 x 2-1/2" Wood Screws.
Fasten the Ladder Slat (b) to the back of
the Access Ladder Assembly using four #8
x 1-5/8" Screws. Leave a space of 3-1/4"
between the top of the lower step and the
bottom of the Ladder Slat.
G
C
o
C
e
W
C
u
t
b
S
CC
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 17
ASSeMbly InStRuCtIonS
illustration #31
illustration #33
illustration #32
tent Roof Gym
Wood Roof Gym
SteP 20 - long & Short Wall Slats:
Locate the Long Wall Slats (m) and Short Wall Slats (n). These slats are installed in two different ways, depending on whether
they to installed on a Gym with a Tent or Wood Roof. note: Leave no gap larger than 3-1/2" except at entrance or exit points.
tent Roof Gym:
evenly space three Long Wall Slats (m) between the Tent
Post (L) and the right rear Gym Corner Post. The spaces
will be approximately 1-7/8" . Fasten each Long Wall Slat
(m) using five #8 x 1-5/8" Wood Screws.
Place one Short Wall Slat (n) 1-1/2" from the left Gym
Corner Post and another 12-1/4" from the Gym Corner
Post. Center the narrow Wall Slat (P) between the first two.
Fasten each with four #8 x 1-5/8" Wood Screws. Fasten
the Long, narrow Wall Slat (o) 1-1/2" from the Short Wall
Slat, as shown. use five #8 x 1-5/8" Wood Screws
Wood Roof Gym:
Place one Short Wall Slat (n) 2-1/8" from the left Gym
Corner Post and another 12-7/8" from the Gym Corner
Post. Center the narrow Wall Slat (P) between the first two.
Fasten each with four #8 x 1-5/8" Wood Screws.
evenly space four Long Wall Slats (m) between the
center-most Short Wall Slat and the right rear Gym
Corner Post. The Spacing will be approximately 2-1/8".
Fasten each Long Wall Slat (m) using five #8 x 1-5/8"
Wood Screws.
l
M
M
n
1-1/2"
1-1/2"
SteP 21 - Install Access ladder:
Lean the Access Ladder Assembly against the Platform
Support (Z), as shown. Place the angled ends flat against
the Platform Support and Gym Platform boards. mark the
position of the holes in the Access Ladder Rails on the
Platform Support using a pencil.
At the pencil marks, drill 3/8" diameter holes through the
Platform Support. Fasten the Access Ladder Assembly to the
Platform Support using two 5/16 x 2" hex bolt Assemblies.
Fasten the base of the Access Ladder Assembly to the Gym
Platform boards using two #8 x 1-5/8" Wood Screws.
o
P
12-1/4"
n
P
2-1/8"
12-7/8"
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 18
ASSeMbly InStRuCtIonS
illustration #35
illustration #34
SteP 22 - top tent Pipe:
Re-fit the Center Tent Pipe, removed in step
one, into the holes at the top of the Gym Tent
Post and the Skybox Tent Post (L). hold the
Tent Pipe in place inside one of the Tent Posts.
use a 1/8" diameter high speed steel drill to
bore a pilot hole through one side of the Tent
Post and one wall of the steel Tent Pipe. Secure
the Tent Pipe to the Tent Post using one #8 x
1-5/8" Wood Screw.
make sure that the two Tent Posts are plumb
and perpendicular to the gym before securing
the other end of the Tent Pipe to the other Tent
Post with the pilot drill and a Wood Screw, as
above.
tent Roof Gym only
SteP 23 - Restore tent:
drape the Tent, removed in step 1 over the
three middle Tent Pipes with the hem facing
down. Slide one Tent Pipe through the pocket
at each end of the Tent. insert the ends of the
Tent Pipes into the holes in the end Tent Support
and Side Tent Supports (k), as shown. Loosen
the bolts securing the Side Tent Supports (k)
to fit the Tent Pipes into place. Re-tighten the
hardware when the Tent Pipes are seated.
use a 1/8" diameter high speed steel drill to
bore a pilot hole through the bottom of a Tent
Support and one wall of the steel Tent Pipe, as
shown. Secure the Tent Pipe to the Tent Support
using one #8 x 2-1/2" Wood Screw. Repeat with
the other three ends of the Tent Pipes.
Center tent
Pipe
K
Gym tent
Post
J
end tent
Support
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 19
ASSeMbly InStRuCtIonS
illustration #37
illustration #36
SteP 24 - Restore Sandbox Seat:
Re-fasten the Sandbox Seat that was removed in step one.
use the screws that originally held the Sandbox Seat.
SteP 25 - Hole Caps:
make a final check and make sure that all the bolts and
screws have been tightened.
Locate the 1" hole Caps in the hardware bag. install hole
Caps into all the counter-bored holes to cover and protect
the hardware.
Special Instructions: Mounting the Skybox to a Gym with Clubhouse or Play floor
4-5/8"
drill pilot hole
in center
Gym Sandbox
end
Skybox
Sandbox Side
Cut the Sandbox Sides
Cut 4-5/8" from the length of the Sandbox Sides (bb) of the
Skybox. drill a 3/16" diameter pilot hole 2" deep into the cen-
ter of the trimmed end of each Sandbox Side.
fasten Sandbox Sides to Gym Sandbox end
drill two 1" diameter holes 1/2" deep into the Sandbox end
of the Gym, 11/16" from the adjacent Corner Posts. in the
center of these holes, drill 5/16" diameter holes through the
Sandbox end. The counter-sink holes should be on the in-
side of the gym. it may help to mark the holes first and re-
move the Gym Sandbox end before drilling
Line up the Sandbox Sides to the holes in the Sandbox end.
Fasten using 5/16 x 3" Lag Screws and 5/16 Flat Washers.
Continue installation of both Skybox and Clubhouse (or Play
Floor) as shown in the respective manuals. if installing a
Clubhouse, see the special instructions at the bottom of the
next page.
When mounting the Skybox to a gym that will have a Clubhouse or Play Floor, the Skybox sandbox must be altered.
© Copyright 2005, Creative Playthings
Pine Skybox
19690-100 Rev J (06-16)
Page 20
ASSeMbly InStRuCtIonS
Save all instruction sheets and receipts in case it becomes necessary to con-
tact Creative Playthings for warranty service and/or part replacement. the
warranty can be found in your owner’s Manual.
Please fill out the warranty card on the back of your owners manual. your
completed warranty card will allow us to quickly process warranty claims.
thank you.
Install a Skybox Play floor to a Gym w/ Clubhouse or Play floor
42-7/8"
42-7/8"
4-3/8"
4-3/8"
drill holes
The Skybox sandbox must be installed as shown on the pre-
vious page.
fasten Cleat to Gym Sandbox end
A 1" diameter counter-bore, 1/2" deep, is required at each
hole in the cleat attached to the Gym Sandbox end for the
included 2" bolts to fit. 5/16 x 2-1/2" bolts can be used
without drilling a counter-bore. 5/16 x 2-1/2" bolts are
not included.
install remaining Cleat and Stringer as described in the Play
Floor instructions.
Cut Platform boards to Size
installing a Skybox Play Floor in this configuration requires
the Platform boards be trimmed to 42-7/8". Check for a prop-
er fit before cutting the Platform boards. drill 3/16" diameter
holes 5/8" from the cut ends.
once the boards are cut to size. Proceed as described in
Play Floor instructions.