Apeks 2000PSI THE DUPLEX Installation Manual
Read Online
Read the Apeks 2000PSI THE DUPLEX Installation Manual online using the built-in PDF viewer.
Text of the manual
Revision Date: 04/11/2019
©Apeks, LLC 2019
THE DUPLEX TM 2000PSI
BOTANICAL OIL EXTRACTION SYSTEM
INSTALLATION MANUAL
WARNING
FAILURE TO FOLLOW THE SET UP AND OPERATION PROCEDURE
PROVIDED IN WITHIN THIS MANUAL MAY VOID THE EXTRACTION
SYSTEM’S WARRANTY
Apeks Supercritical
150 Commerce Blvd.
Johnstown OH 43031
740-809-1160
[email protected]
www.apekssupercritical.com
Scan this QR code to get
the most recent version of
the installation instructions.
Apeks Supercritical: The Duplex™ Installation Manual
2
Revision Date 04/11/2019
Table of Contents
Section
Page #
1. Critical Safety Overview ............................................................................................................................... 3
2. Before the System Arrives ........................................................................................................................... 4
2.1. System Overview .................................................................................................................................. 4
2.1.1. Diaphragm Compressor ............................................................................................................. 5
2.1.2. Extractor Vessel Stand ............................................................................................................... 6
2.1.3. Separator Vessel/Control Stand ................................................................................................. 7
2.2. General System Specifications ............................................................................................................. 8
2.3. Electrical Requirements ....................................................................................................................... 8
2.4. Facility Requirements ......................................................................................................................... 10
3. When the System Arrives .......................................................................................................................... 10
3.1. Receiving the Crates .......................................................................................................................... 10
3.2. Unpacking Instructions ........................................................................................................................ 11
3.3. Set Up and Assembly ......................................................................................................................... 15
3.3.1. Layout/Footprint ...................................................................................................................... 15
3.3.2. Coolant Line and Chiller Setup ................................................................................................. 15
3.3.3. CO2 Connections ...................................................................................................................... 16
3.3.4. CO2 Vent Connections .............................................................................................................. 18
3.3.5. Air Connection ......................................................................................................................... 18
3.3.6. Electrical Connections .............................................................................................................. 20
3.3.7. Chillers ..................................................................................................................................... 21
3.3.8. Email Alerts and Software Updates .......................................................................................... 22
4. Pre-Training Checklist................................................................................................................................ 23
5. References ............................................................................................................................................... 24
6. Appendices ................................................................................................................................................ 25
6.1. System Layouts .................................................................................................................................. 25
6.2. Torque Requirements ......................................................................................................................... 29
Apeks Supercritical: The Duplex™ Installation Manual
3
Revision Date 04/11/2019
1. Critical Safety Overview
Throughout these instructions, this symbol is used to indicate that the instructions are
critically important to your safety and the safety of your system. Failure to follow the
instructions as written can result in a rapid release of high pressure CO2, potentially causing
equipment damage or harm to workers.
WARNING
Subcritical and Supercritical CO2 systems operate under high pressure. Operators must be fully trained and
familiar with the systems. Failure to operate the systems correctly can result in equipment damage and/or bodily
injury.
WARNING
Subcritical and Supercritical CO2 systems use large amounts of CO2 during operation. Ensure that the system
is installed in a well-ventilated area to prevent buildup of CO2, which can cause asphyxiation. Always use a CO2
monitor to ensure safe operations.
WARNING
Opening a vessel under pressure can result in a rapid release of pressure and ejection of material from inside
the vessel. DO NOT ATTEMPT TO OPEN A VESSEL UNDER PRESSURE! Always make sure a vent path for
the vessel is opened and the corresponding pressure gauge reads zero prior to loosening the vessel closure.
WARNING
Subcritical and Supercritical CO2 systems are designed to operate indoors, in a temperature-controlled
environment. Extreme temperatures (below 60°F and above 80°F) will negatively impact the functionality of the
system. The environmental temperature range applies to the system, chiller, pump and CO2 bottles.
WARNING
Only use Propylene Glycol and distilled water in the chiller and cooling system. Never use Deionized Water in
the chiller or cooling system.
WARNING
Extraction system components can weigh in excess of 2000lbs and need to be moved carefully. Never attempt
to move system pieces without the proper equipment, failure to do so could result in serious injury or death.
WARNING
Always wear safety glasses when operating and servicing the system.
Apeks Supercritical: The Duplex™ Installation Manual
4
Revision Date 04/11/2019
2. Before the System Arrives
2.1. System Overview
Duplex Diaphragm Compressor
Separator Chiller
Extractor Chiller
Extractor Vessel Stand
Separator Vessel Stand
Figure 1: Overhead view of standard layout (Duplex 2000-20Lx20LDU)
Apeks Supercritical: The Duplex™ Installation Manual
5
Revision Date 04/11/2019
2.1.1. Diaphragm Compressor
Main Control
Enclosure
HMI
CO2 Outlet
CO2 Inlet
Junction Box
Regenerative
Heat
Exchangers
Fork Pockets
Figure 2: Front view of standard layout (Duplex 2000-20Lx20LDU)
Figure 3: Diaphragm Compressor
Apeks Supercritical: The Duplex™ Installation Manual
6
Revision Date 04/11/2019
2.1.2. Extractor Vessel Stand
Extractor
B
Extractor
A
Temperature
Control Heat
Exchanger
Flow Switch
Figure 4: Extraction Vessels on Extraction Stand
Apeks Supercritical: The Duplex™ Installation Manual
7
Revision Date 04/11/2019
2.1.3. Separator Vessel/Control Stand
Bank 1
Bank 2
E-Stop
Evacuation Valve
Vent Valve
Flow Switch
Collection Cup
Water Valves
Cup Lift
Control Panel Mount
Figure 5: Extraction Vessels and Control Panel
Apeks Supercritical: The Duplex™ Installation Manual
8
Revision Date 04/11/2019
2.2. General System Specifications
Extraction
Stand
Separation/
Control
Stand
Diaphragm
Compressor
Extractor
Chiller
Separator
Chiller
Air
Compressor
Max
Pressure
(psi)
2000psi
2000psi
2000psi
100psi
100psi
125psi
Operating
Temperature
(°F)
40°F - 160°F 40°F - 160°F 75°F - 250°F 20°F - 150°F
20°F - 150°F
60°F - 80°F
Dimensions
(in)
WxDxH
58x42x77
53x36x84
74x37x68
25x34x53
19x30x39
14x24x18
Weight (lbs)
1000 lbs
750 lbs
4500 lbs
500 lbs
450 lbs
80 lbs
2.3. Electrical Requirements
Figure 6: Electrical Requirements for Duplex with two Indoor Chillers
Apeks Supercritical: The Duplex™ Installation Manual
9
Revision Date 04/11/2019
WARNING
Do not Modify Power Connections
Figure 7: Electrical Requirements for Duplex with one Outdoor Chillers
Apeks Supercritical: The Duplex™ Installation Manual
10
Revision Date 04/11/2019
2.4. Facility Requirements
2.4.1. Temperature – The system is designed to run in a climate-controlled facility, where the
temperature is maintained between 60°F and 80°F.
2.4.2. Ventilation and Dust Control – The system should be placed in a well-ventilated environment
that is free from excess dust from other manufacturing operations.
2.4.3. Foundation – Apeks systems are designed to be installed on a concrete (or similarly stable) flat
floor.
2.4.4. Modulation – Apeks Duplex systems are designed to be able to be located in different rooms or
area to isolate different portion of the process. This modulation should be stated during the
purchase process or additional costs and delays may occur.
2.4.5. CO2 Vent – Customer is responsible for running rigid tubing from system outlet to a safe vent
location. (NOTE: Vent lines should be rated to the pressure of the system. ⅜" x.035 or
½" x.049 stainless steel tubing recommended. Contact Apeks for part recommendation if
necessary.)
3. When the System Arrives
3.1. Receiving the Crates
3.1.1. Apeks Labeling – Look for an Apeks sticker on the outside of each crate to verify it came
directly from Apeks without tampering. See Figure 1. Note: If no sticker is found, open crate to
verify no damage has occurred during shipping.
Figure 1: Shipping Label
Apeks Supercritical: The Duplex™ Installation Manual
11
Revision Date 04/11/2019
3.1.2. TiltWatch – Locate the TiltWatch Plus sensors on the outside of the crate, as shown in Figure
2. Ensure that the crate has not exceeded 30° in any direction. If the crate has exceeded 30°,
do not accept the delivery from the shipping company until contacting Apeks at (740) 809-1160.
3.1.3. Inspecting Crates for Damage – Prior to opening the crate(s), verify that there is no external
damage. If damage is found, do not accept delivery from the shipping company without noting
any damage on Proof of Delivery. In addition, call Apeks at (740) 809-1160 to report damage
and start the reporting process with the shipping company.
3.2. Unpacking Instructions
WARNING
Heavy Components. Do not attempt to lift without the proper equipment.
3.2.1. Uncrating the Extractor Stand and Separator/Control Stand
3.2.1.1. Tools Needed: Drill with Philips head bit, pry bar and hammer.
3.2.1.2. Remove the sides and top of the shipping crate.
3.2.1.3. Remove the wooden tie downs that keep the system attached to the skid. See Figure 3.
Figure 2: TiltWatch Label
Apeks Supercritical: The Duplex™ Installation Manual
12
Revision Date 04/11/2019
3.2.1.4. Carefully use a forklift to remove the stand from the skid and attach the four leveling feet to
each stand. See Figure 4.
3.2.1.5. Once the system is on the ground use these feet to get the system level and then snug the
jam nut against the stand to secure the feet.
Wood Tie-Downs
Jam Nut
Figure 3: Wood Tie-Downs
Figure 4: Leveling Feet
Apeks Supercritical: The Duplex™ Installation Manual
13
Revision Date 04/11/2019
3.2.2. Uncrating the Diaphragm Compressor
3.2.2.1. Remove the sides and top of the shipping crate. See Figure 5.
3.2.2.2. Remove lag screw/bolts that keep the pump attached to the skid.
3.2.2.3. Carefully use a forklift to remove the pump from the skid and attach the four rubber
vibration dampening feet to the four corners of the pump. See Figure 6.
Figure 5: Diaphragm pump on skid
Figure 6: Vibration Dampening Feet
Apeks Supercritical: The Duplex™ Installation Manual
14
Revision Date 04/11/2019
3.2.3. Uncrating the Chillers
3.2.3.1. Remove the sides and top of the shipping crate.
3.2.3.2. Remove the wooden blocks holding the chiller to the base.
3.2.3.3. Use a forklift or the provided ramp to remove the chiller from the base.
3.2.3.4. When chiller is in final location, lock the wheels.
3.2.4. Verifying Apeks Shipper – Every Apeks machine is sent with a shipper that will contain quality
control checklist and a packing slip. Verify that all items on the packing slip (example below)
have been received. Contact Apeks if there are items missing.
Apeks Supercritical: The Duplex™ Installation Manual
15
Revision Date 04/11/2019
3.3. Set Up and Assembly
3.3.1. Standard Layout/Footprint with Indoor Chiller
3.3.2. Coolant Line and Chiller Set Up
3.3.2.1. Separator Coolant Loop – The separator coolant loop will incorporate the Separator
Chiller, the diaphragm compressor and the Separator Vessel/Control Stand.
3.3.2.1.1. Chiller Outlet to Diaphragm Compressor – The hose on the chiller outlet will
connect to the oil heat exchanger on the diaphragm pump.
3.3.2.1.2. Diaphragm Compressor to Separator Stand – The hose coming from the brass
tee on the diaphragm compressor will connect to the water valve with the flow switch
on the separator stand.
3.3.2.1.3. Separator Stand to Chiller Inlet – The hose on the chiller outlet will connect to the
water valve without the flow switch on the separator stand.
3.3.2.2. Extractor Coolant Loop – The extractor coolant loop will incorporate the Extractor Chiller
and the Extractor Vessel Stand.
3.3.2.2.1. Chiller Outlet to Extractor Stand – The hose on the chiller outlet will connect to the
temperature control heat exchanger on the extractor stand.
3.3.2.2.2. Extractor Stand to Chiller Inlet – The hose on the chiller inlet will connect to the
flow switch on the extractor stand.
3.3.2.3. Initial Fill – This step will need to be performed after the chillers electrical connection has
been made and the chiller is connected to the main control enclosure. (See Electrical
Requirements section, page 21.)
Figure 7: Standard Layout/Footprint with Indoor Chiller
Apeks Supercritical: The Duplex™ Installation Manual
16
Revision Date 04/11/2019
3.3.2.3.1. Once the water line connections and electrical connections have been made, fill the
chiller reservoir with 95/5 mix of water/propylene glycol.
3.3.2.3.2. From the manual screen, start the desired chiller.
3.3.2.3.3. Continue to fill the chiller reservoir with the same fluid mix as the chiller pump fills the
system with fluid.
3.3.2.3.4. Once the reservoir has stopped receding, top off reservoir and allow the chiller to
continue to run as the chiller pump primes.
3.3.2.3.5. This priming should continue until the pressure in the chiller reaches operational
level: 45psi for the extractor chiller, 78psi for the separator chiller. Note: if chiller over
pressurizes, partially close the ball valve on the back of the chiller to reduce pressure
to the operating pressure.
3.3.2.3.6. As the pressure increases the reservoir level may decrease so top off as necessary.
3.3.2.3.7. Once the chillers are up to pressure, the extractor chiller is ready to run and can be
turned off.
3.3.2.3.8. The separator chiller loop will need separator bank 2 filled with fluid
3.3.2.3.8.1. Go to the manual screen and click the “Fill Separator Bank 2 WATER” button.
Note: If this button does not appear on the screen click on the “Manual Mode”
button.
3.3.2.3.8.2. As the pump fills the second separator bank the reservoir will need to be filled
again and the pump may need to re-primed if the pressure drops.
3.3.3. CO2 Connections – There are four CO2 lines to be connected on the Duplex system, two
between the Extractor and Separator Stands and one each between those stands and the
Diaphragm Compressor.
3.3.3.1. Separator Vessel Stand to Diaphragm Compressor – This connection is a 36" long
stainless steel braided flexible line with ¾" compression fittings.
Figure 8: Separator Stand to Compressor
Apeks Supercritical: The Duplex™ Installation Manual
17
Revision Date 04/11/2019
3.3.3.2. Diaphragm Compressor to Extractor Vessel Stand – This connection is a 36" long
black nylon flexible line with ½" compression fittings.
3.3.3.3. Extractor Vessel Stand to Separator Vessel Stand – These connections are 18" long
stainless steel braided flexible lines with 3/8" compression fittings. Connect 1 and 2 on the
extractor stand to 1 and 2 on the separator stand respectively.
1
2
Figure 9: Diaphragm Compressor to Extraction Vessel
Figure 10: Extraction Vessel Stand to Separator Vessel
Apeks Supercritical: The Duplex™ Installation Manual
18
Revision Date 04/11/2019
3.3.4. CO2 Vent Connection – Apeks extraction systems come with rigid vent tubing all connected to
one outlet located near Valve 0 underneath the Motor Starter Enclosure. The customer is
responsible for running this vent line to desire location in build and should use material rated to
the pressure of the system (3/8" x.035 or ½ " x.049 stainless steel tubing recommended).
Connection is a 3/8" Swagelok compression fitting.
3.3.5. Air Connections – There are over twenty-five air operated ball valves that are used to control
the CO2 flow path throughout the system. These valves are controlled by an air manifold on the
back of the control panel mount.
3.3.5.1. Air Manifold – The air manifold receives electrical signals from the controller and uses
compressed air to open valves. See Figure 12.
1
2
Figure 11: Vent Connection
Figure 12: Manifold Air ouputs
Apeks Supercritical: The Duplex™ Installation Manual
19
Revision Date 04/11/2019
3.3.5.2. Separator Vessel Stand to Extractor Vessel Stand – There are thirteen ¼" red airlines
that run between the separator and extractor stand. These lines are connected with a
push-to-connect coupling and labeled on both sides. Fully insert the tubing into the
coupling to connect. See Figure 13.
3.3.5.3. Separator Vessel Stand to Diaphragm Compressor – There is one ¼" red airline that
runs between the separator stand and the diaphragm compressor. This line is connected
with a push-to-connect coupling and labeled on both sides. Fully insert the tubing into the
coupling to connect. See Figure 14.
Figure 13: Airline connections
Figure 14: Airline connection to Compressor
Apeks Supercritical: The Duplex™ Installation Manual
20
Revision Date 04/11/2019
3.3.6. Electrical Connections
3.3.6.1. Harting Connector – This connector carries all the signals from the pressure transducers,
flow switches, etc. back the main control enclosure (excluding the thermocouples). These
are quick connecting electrical connections that plug in and are secured with snaps on
each side as seen in Figure 15.
3.3.6.2. Thermocouple Connector – This connector carries the signal from the thermocouples
back the main control enclosure. This connector is a plug style connection as seen in
Figure 16.
3.3.6.3. Separator Vessel Stand to Extractor Vessel Stand
3.3.6.3.1. Junction Box 3 (Extractor B Side)
3.3.6.3.1.1. Harting Connector #1214CBL1.
3.3.6.3.1.2. Thermocouple Connector #1709CBL1.
3.3.6.3.1.3. Thermocouple Connector #1809CBL1.
3.3.6.3.2. Junction Box 2 (Extractor A Side)
3.3.6.3.2.1. Harting Connector #1511CBL2.
3.3.6.3.2.2. Thermocouple Connector #1805CBL1.
3.3.6.4. Separator Vessel Stand to Diaphragm Compressor (Junction Box 1)
3.3.6.4.1. Harting Connector #1209CBL1.
3.3.6.4.2. Thermocouple Connector #1705CBL1.
Figure 15: Harting Connector
Figure 16: Thermocouple Connector
Apeks Supercritical: The Duplex™ Installation Manual
21
Revision Date 04/11/2019
3.3.6.5. Diaphragm Compressor Motor Wiring – The wiring for the motor on the diaphragm
compressor terminates in the bottom of the motor starter shown in Figure 17. These three
wires should be labeled T1, T2 and T3 and should be terminated in the respective
locations. The wiring coming from the top of the motor starter will be terminated to the
facility power.
3.3.7. Chillers
3.3.7.1. Communication Cable – Each chiller is connected to the main control enclosure by a 15-
pin connector shown in Figure 18. The cable will be labeled EXT Chiller or SEP Chiller.
3.3.7.2. Power – The chiller is terminated to the facility power by customer supplied wiring,
terminated to the chiller power box on the back-left hand side of the chiller. See Figure 19.
Figure 17: Motor Starter on Control Panel
Figure 18: Communication Cable
Apeks Supercritical: The Duplex™ Installation Manual
22
Revision Date 04/11/2019
3.3.8. Email Alerts and Software Updates
3.3.8.1. The Apeks systems should be connected to the internet via an Ethernet cable. Connecting
the Apeks system to the internet allows for software updates, and email alerts.
3.3.8.2. Attach an Ethernet cable to the Ethernet connection located on the side of the electrical
control box.
3.3.8.3. For email alerts, setup a designated email to be used only for the Apeks system. The
Apeks system will then send messages to a designated email, and then this email will send
messages to any person’s phone numbers you decide to forward messages to.
3.3.8.4. After connecting the system to the internet via an Ethernet cable, and after the designated
email for the system has been set up, please go to
http://www.apekssupercritical.com/customer-support/service-request/
and submit a ticket with the systems information and an Apeks representative will be in
touch.
3.3.8.5. After setting up the system for email alerts, the operator can then decide what notifications
to receive.
3.3.8.5.1. Click on the “Message Screen.” See Figure 20.
3.3.8.5.2. From this screen choose the messages to receive.
Power Box
Figure 19: Chiller
Figure 20: Message Selection Screen
Apeks Supercritical: The Duplex™ Installation Manual
23
Revision Date 04/11/2019
4. Pre-Training Checklist
In preparation for training, please refer to the installation manual for unpacking and set up instructions. Below
is a checklist of what needs to be purchased or completed BEFORE scheduling your onsite training. Onsite
training is a four hour block of instruction that is NOT designed to include unpacking and set up. Incomplete
items at the time of onsite training will result in incomplete training or additional charges for rescheduling.
Our training process is as follows:
1.
Customers to reference the installation manual for instructions on un-crating and system set up.
2.
Customer to complete entire Pre-Training Checklist.
3.
A FaceTime or Skype session is required (when available) to ensure checklist is complete, set up is
correct and to cover basic operation and cleaning of the system.
4.
After 1 through 3 are complete, onsite training can be scheduled. There will be a 2-3 week lead time.
Pre-Training Checklist:
Below is a checklist of what needs to be purchased or completed BEFORE scheduling your onsite training.
o Must be complete before scheduling training: Print complete operational manual and have on site the
day of training, along with the chiller manual.
o Must be complete before scheduling training: Apeks system and diaphragm compressor are unpacked
and set up in its location of operation. Refer to unpacking instructions in the installation manual.
o Must be complete before scheduling training: See installation manual for electrical requirements of your
system. All electrical connections are to be completed before onsite training is scheduled.
o Must be complete before scheduling training: Purchase and have on site for training:
o Bottles of CO2, gas feed, check valve free, food grade or better. Minimum requirements are:
o (4) 75 lb. bottles for 20Lx20LD
o 4x20LD – to be determined
o Distilled water and Propylene glycol 95/5 mix; Propylene Glycol - 1 Gallon
o Total Gallons of mixture needed for system:
o 9 gal for indoor chiller
o Minimum of 55 gallon barrel for outdoor chiller – check with the service department:
(740) 809-1160 option 2
o 190 or higher proof ethanol
o Future maintenance will require:
o Shop vacuum with a long, slim nozzle for removing material from extractor.
o Pencil Type Belt Tension Tester; http://apeksonlinestore.com/product/tension-tester/
o CO2 Monitor; Amprobe CO2 100
Apeks Supercritical: The Duplex™ Installation Manual
24
Revision Date 04/11/2019
o Material to be extracted must be very dry and ground to the consistence of coffee grounds. Have ready the
day of training.
o After completing the pre-training checklist, request scheduling of onsite training via our website:
http://www.apekssupercritical.com/training/
o Onsite training is generally a four hour block of instruction that will go into detail the fundamentals of
operation and maintenance of each component of the system.
5. References
YouTube Instructional Videos
https://www.youtube.com/user/ApeksSupercritical
Apeks online store (740)-809-1160 option 2
http://apeksonlinestore.com/
Software Updates and E-mail Alerts (740) 809-1160 option 2
http://www.apekssupercritical.com/service/
Apeks Supercritical: The Duplex™ Installation Manual
25
Revision Date 04/11/2019
6. Appendices
6.1. Appendix A – System Layouts
The Duplex™ – 2000-20Lx20LDU: Standard Layout
Apeks Supercritical: The Duplex™ Installation Manual
26
Revision Date 04/11/2019
The Duplex™ – 2000-20Lx20LDU: CGMP Layout
Apeks Supercritical: The Duplex™ Installation Manual
27
Revision Date 04/11/2019
The Duplex™ – 2000-4x20LDU: Standard Layout
Apeks Supercritical: The Duplex™ Installation Manual
28
Revision Date 04/11/2019
The Duplex™ – 2000-4x20LDU: with External Chiller Layout
Apeks Supercritical: The Duplex™ Installation Manual
29
Revision Date 04/11/2019
6.2. Appendix B – Torque Requirements
1.
Fuse Holders (1492-H6) = 7.1 lb-in
2.
Power Supply (1606-XLE120E) – 7 lb-in
3.
Terminal Blocks (1492-J4) = 9 lb-in
4.
Ground Blocks (1492-JG4) = 9 lb-in
5.
Ground Block Middle Screw (1492-JG4) = 7.1 lb-in
6.
JG10 Large Ground Blocks (1492-JG10) = 20.4 lb-in
7.
JG10 Large Ground Block Middle Screw (1492-JG10) = 8.9 lb-in
8.
Small Motor Contactor Phillip Screws (100-C55D10) = 31 lb-in
9.
Small Motor Contactor (43-44) Phillip Screws = 13 lb-in
10.
Overload Relay (T1/T2/T3) Phillip Screws = 22 lb-in
11.
Overload Relay (95-98) Phillip Screws = 5 lb-in
12.
Large Motor Contactor Allen Screws (100-C72D10) = 53 lb-in
13.
Large Motor Contactor Phillips Screws (100-C72D10) = 13 lb-in
14.
Overload Relay Allen Screws (193-EEGE) = 40 lb-in
15.
Overload Relay Phillips Screws (192-EEGE) = 5 lb-in
16.
Micro 850 Power Supply = 4.4 lb-in
17.
Micro 850 Terminal Strip = 4.4 lb-in
18.
2080 TC2 = 2.21 lb-in
19.
2080 IF4 = 2.21 lb-in
20.
2080 IF2 = 2.21 lb-in
21.
HMI = 5 lb-in
22.
Yellow Terminal Jumpers = 7.1 lb-in
23.
Estop Contact (800F-X01) = 8 lb-in
24.
Relay Base Screws (700-HN153) = 7 lb-in
25.
IF8 = 5.3 lb-in
26.
Relay Output Module = 5.3 lb-in
27.
10A Circuit Breaker (18 AWG) = 13.3 lb-in
28.
10A Circuit Breaker (14 AWG) = 17.7 lb-in
29.
10A Circuit Breaker (8 AWG) = 39.9 lb-in
30.
Ewon Flexy Power Connector = 7 lb-in
31.
Ewon Cosy Power Connector = 7 lb-in
32.
125V Plug = 12 lb-in