Load-bearing tower Staxo 100
with brief design as per Eurocode
User Information
Instructions for assembly and use (Method statement)
© by Doka GmbH, A-3300 Amstetten
98003-287-01
User Information Load-bearing tower Staxo 100
3
999804302 - 02/2018
Contents
4
Introduction
4
Elementary safety warnings
7
Eurocodes at Doka
8
Doka services
10
System description
12
System overview
14
The Staxo 100 frame in detail
17
Practical examples
19
Adapts to different ground plans, heights,
floor shapes and loads
25
Linking towers / placing scaffold planking
between towers
27
Forming downstand beams
29
Assembly (overview)
31
Horizontal assembly
35
Assembling towers in the upright
35
Assembling towers in the upright with
'mounted-ahead' railings
42
Assembling towers in the upright with
'mounted-ahead' 1.20m frames
47
Assembling towers in the upright by forklift
truck
49
Practical examples
50
Repositioning
51
Repositioning using traveller units
53
Lifting by crane
55
Lifting by forklift truck
56
General remarks
56
Anchoring on the structure
58
Back-stays/shoring supports for the load-
bearing towers
63
Inclination adjustment
67
Adaptation to building layout
72
Secondary-beam stabilisers
73
Combining Staxo 100 with Staxo
74
Combining with Dokamatic tables
76
Steel primary beams
77
Intermediate level made up with multi-
purpose walings
78
Transporting, stacking and storing
84
Removing and refitting the connection sleeve
85
Structural design
88
Component overview
999804302 - 02/2018
Introduction
User Information Load-bearing tower Staxo 100
Introduction
Elementary safety warnings
User target groups
▪ This booklet is aimed at all persons who will be work-
ing with the Doka product or system that it describes.
It contains information on the standard design for
setting up this system, and on correct, compliant uti-
lisation of the system.
▪ All persons working with the product described
herein must be familiar with the contents of this
booklet and with all the safety instructions it contains.
▪ Persons who are incapable of reading and under-
standing this booklet, or who can do so only with dif-
ficulty, must be instructed and trained by the cus-
tomer.
▪ The customer is to ensure that the information mate-
rials provided by Doka (e.g. User Information book-
lets, Instructions for Assembly and Use, Operating
Instruction manuals, plans etc.) are up to date and
available to all users, and that they have been made
aware of them and have easy access to them at the
usage location.
▪ In the relevant technical documentation and form-
work utilisation plans, Doka shows the workplace
safety precautions that are necessary in order to use
the Doka products safely in the usage situations
shown.
In all cases, users are obliged to ensure compliance
with national laws, standards and regulations
throughout the entire project and to take appropriate
additional or alternative workplace safety precau-
tions where necessary.
Hazard assessment
▪ The customer is responsible for drawing up, docu-
menting, implementing and continually updating a
hazard assessment at every job-site.
This booklet serves as the basis for the site-specific
hazard assessment, and for the instructions given to
users on how to prepare and utilise the system. It
does not substitute for these, however.
Remarks on this booklet
▪ This booklet can also be used as a generic method
statement or incorporated with a site-specific
method statement.
▪ Many of the illustrations in this booklet show the
situation during formwork assembly and are
therefore not always complete from the safety
point of view.
Any safety accessories not shown in these illustra-
tions must still be used by the customer, in accord-
ance with the applicable rules and regulations.
▪ Further safety instructions, especially warnings,
will be found in the individual sections of this
booklet!
Planning
▪ Provide safe workplaces for those using the form-
work (e.g. for when it is being erected/dismantled,
modified or repositioned etc). It must be possible to
get to and from these workplaces via safe access
routes!
▪ If you are considering any deviation from the
details and instructions given in this booklet, or
any application which goes beyond those
described in the booklet, then revised static cal-
culations must be produced for checking, as well
as supplementary assembly instructions.
Regulations; industrial safety
▪ All laws, Standards, industrial safety regulations and
other safety rules applying to the utilisation of our
products in the country and/or region in which you
are operating must be observed at all times.
▪ If a person or object falls against, or into, the side-
guard component and/or any of its accessories, the
component affected may only continue in use after it
has been inspected and passed by an expert.
User Information Load-bearing tower Staxo 100
Introduction
5
999804302 - 02/2018
Rules applying during all phases of
the assignment
▪ The customer must ensure that this product is
erected and dismantled, reset and generally used for
its intended purpose in accordance with the applica-
ble laws, standards and rules, under the direction
and supervision of suitably skilled persons.
These persons' mental and physical capacity must
not in any way be impaired by alcohol, medicines or
drugs.
▪ Doka products are technical working appliances
which are intended for industrial
/ commercial use
only, always in accordance with the respective Doka
User Information booklets or other technical docu-
mentation authored by Doka.
▪ The stability and load-bearing capacity of all compo-
nents and units must be ensured during all phases of
the construction work!
▪ Do not step on or apply strain to cantilevers, clo-
sures, etc. until suitable measures to ensure their
stability have been correctly implemented (e.g. by
tie-backs).
▪ Strict attention to and compliance with the functional
instructions, safety instructions and load specifica-
tions are required. Non-compliance can cause acci-
dents and severe injury (risk of fatality) and consid-
erable damage to property.
▪ Sources of fire in the vicinity of the formwork are pro-
hibited. Heating appliances are only allowed if prop-
erly and expertly used, and set up a safe distance
away from the formwork.
▪ The customer must consider all types of weather
conditions on equipment and in connection with the
use or storage of the equipment (e.g. slippery sur-
faces, risk of slippage, effects of wind, etc.) and must
take steps in good time to safeguard the equipment
and the surrounding areas and to protect the work-
ers.
▪ All connections must be checked at regular intervals
to ensure that they are secure and in full working
order.
In particular threaded connections and wedged con-
nections have to be checked and retightened as nec-
essary in accordance with activity on the jobsite and
especially after out-of-the-ordinary occurrences (e.g.
after a storm).
▪ It is strictly forbidden to weld Doka products – in par-
ticular anchoring/tying components, suspension
components, connector components and castings
etc. – or otherwise subject them to heating.
Welding causes serious change in the microstruc-
ture of the materials from which these components
are made. This leads to a dramatic drop in the failure
load, representing a very great risk to safety.
It is permissible to cut tie rods to length with metal
cutting discs (introduction of heat at the end of the
rod only), but it is important to ensure that flying
sparks do not heat and thus damage other tie rods.
The only articles which are allowed to be welded are
those for which the Doka literature expressly points
out that welding is permitted.
Assembly
▪ The equipment/system must be inspected by the
customer before use, to ensure that it is in suitable
condition. Steps must be taken to rule out the use of
any components that are damaged, deformed, or
weakened due to wear, corrosion or rot.
▪ Combining our formwork systems with those of other
manufacturers could be dangerous, risking damage
to both health and property. If you intend to combine
different systems, please contact Doka for advice
first.
▪ The equipment/system must be assembled and
erected in accordance with the applicable laws,
Standards and rules by suitably skilled personnel of
the customer's, having regard to any and all required
safety inspections.
▪ It is not permitted to modify Doka products; any such
modifications constitute a safety risk.
Closing the formwork
▪ Doka products and systems must be set up so that
all loads acting upon them are safely transferred!
Pouring
▪ Do not exceed the permitted fresh-concrete pres-
sures. Over-high pouring rates overload the form-
work, cause greater deflection and risk breakage.
Stripping out the formwork
▪ Do not strip out the formwork until the concrete has
reached sufficient strength and the person in charge
has given the order for the formwork to be stripped
out!
▪ When stripping out the formwork, never use the
crane to break concrete cohesion. Use suitable tools
such as timber wedges, special pry-bars or system
features such as Framax stripping corners.
▪ When stripping out the formwork, do not endanger
the stability of any part of the structure, or of any
scaffolding, platforms or formwork that is still in
place!
999804302 - 02/2018
Introduction
User Information Load-bearing tower Staxo 100
Transporting, stacking and storing
▪ Observe all country-specific regulations applying to
the handling of formwork and scaffolding. For system
formwork the Doka slinging means stated in this
booklet must be used - this is a mandatory require-
ment.
If the type of sling is not specified in this booklet, the
customer must use slinging means that are suitable
for the application envisaged and that comply with
the regulations.
▪ Remove any loose parts or fix them in place so that
they cannot be dislodged or fall free!
▪ All components must be stored safely, following all
the special Doka instructions given in the relevant
sections of this booklet!
Maintenance
▪ Only original Doka components may be used as
spare parts. Repairs may only be carried out by the
manufacturer or authorised facilities.
Miscellaneous
The weights as stated are averages for new material;
actual weights can differ, depending on material toler-
ances. Dirt accretions, moisture saturation, etc. can
also affect weight.
We reserve the right to make alterations in the interests
of technical progress.
Symbols used
The following symbols are used in this document:
DANGER
This is a notifier drawing attention to an
extremely dangerous situation in which non-
compliance with this notifier will lead to death
or severe, irreversible injury.
WARNING
This is a notifier drawing attention to a dan-
gerous situation in which non-compliance
with this notifier can lead to death or severe,
irreversible injury.
CAUTION
This is a notifier drawing attention to a dan-
gerous situation in which non-compliance
with this notifier can lead to slight, reversible
injury.
NOTE
This is a notifier drawing attention to a situa-
tion in which non-compliance with this noti-
fier can lead to malfunctions or damage to
property.
Instruction
Indicates that actions have to be performed
by the user.
Sight-check
Indicates that you need to do a sight-check
to make sure that necessary actions have
been carried out.
Tip
Points out useful practical tips.
Reference
Cross-references other documents.
User Information Load-bearing tower Staxo 100
Introduction
7
999804302 - 02/2018
Eurocodes at Doka
In Europe, a uniform series of Standards known as
Eurocodes (EC) was developed for the construction
field by the end of 2007. These are intended to provide
a uniform basis, valid throughout Europe, for product
specifications, tenders and mathematical verification.
The EC are the world's most highly developed Stand-
ards in the construction field.
In the Doka Group, the EC are to be used as standard
from the end of 2008. They will thus supersede the DIN
norms as the "Doka standard" for product design.
The widely used "Permissible stress design" (compar-
ing the actual stresses with the permissible stresses)
has been superseded by a new safety concept in the
EC.
The EC contrast the actions (loads) with the resistance
(capacity). The previous safety factor in the permissible
stresses is now divided into several partial factors. The
safety level remains the same!
Comparison of the safety concepts (example)
Ed
Design value of effect of actions
(E ... effect; d ... design)
Internal forces from action Fd
(VEd, NEd, MEd)
Rd
Design value of the resistance
(R ... resistance; d ... design)
Design capacity of cross-section
(VRd, NRd, MRd)
Fd
Design value of an action
Steel:
Rd = Rk
Timber: Rd = kmod · Rk
Fd = γF · Fk
γM
γM
(F ... force)
Fk
Characteristic value of an action
"actual load", service load
(k ... characteristic)
e.g. dead weight, live load, concrete pressure,
wind
Rk
Characteristic value of the resistance
e.g. moment resistance to yield stress
γF
Partial factor for actions
(in terms of load; F ... force)
e.g. for dead weight, live load, concrete pres-
sure, wind
Values from EN
12812
γM
Partial factor for a material property
(in terms of material; M...material)
e.g. for steel or timber
Values from EN
12812
kmod
Modification factor (only for timber – to take
account of the moisture and the duration of load
action)
e.g. for Doka beam H20
Values as given in EN 1995-1-1 and EN
13377
Ed
Rd
Permissible stress design
EC/DIN concept
Factual≤ Fpermissible
Ed≤ Rd
A Utilisation factor
60 [kN]
60<70 [kN]
115.5 [kN]
� ~ 1.65
Fyield
Fpermissible
Factual
98013-100
A
90 [kN]
115.5 [kN]
90<105 [kN]
Rk
Rd
Ed
�M = 1.1
�F = 1.5
98013-102
A
The "permissible values" communicated in
Doka documents (e.g.: Qpermissible = 70
kN)
do not correspond to the design values
(e.g.: VRd = 105
kN)!
➤Avoid any confusion between the two!
➤Our documents will continue to state the per-
missible values.
Allowance has been made for the following par-
tial factors:
γF = 1.5
γM, timber = 1.3
γM, steel = 1.1
kmod = 0.9
In this way, all the design values needed in an
EC design calculation can be ascertained from
the permissible values.
999804302 - 02/2018
Introduction
User Information Load-bearing tower Staxo 100
Doka services
Support in every stage of the project
Doka offers a broad spectrum of services, all with a sin-
gle aim: to help you succeed on the site.
Every project is unique. Nevertheless, there is one
thing that all construction projects have in common –
and that is a basic structure with five stages. We at
Doka know our clients' varying requirements. With our
consulting, planning and other services, we help you
achieve effective implementation of your formwork
assignment using our formwork products – in every one
of these stages.
Project Development Stage
Bidding Stage
Operations Scheduling Stage
Taking well-founded decisions
thanks to professional advice and
consulting
Optimising the preliminary work
with Doka as an experienced part-
ner
Controlled, regular forming oper-
ations, for greater efficiency
resulting from realistically calculated
formwork concepts
Find precisely the right formwork
solutions, with the aid of
▪ help with the bid invitation
▪ in-depth analysis of the initial sit-
uation
▪ objective evaluation of the plan-
ning, execution, and time-risks
Draw up potentially winning bids, by
▪ basing them on realistically calcu-
lated guideline prices
▪ making the right formwork
choices
▪ having an optimum time-calcula-
tion basis
Plan cost-effectively right from the
outset, thanks to
▪ detailed offers
▪ determination of the commission-
ing quantities
▪ co-ordination of lead-times and
handover deadlines
1
2
3
User Information Load-bearing tower Staxo 100
Introduction
9
999804302 - 02/2018
The advantages for you
thanks to professional advice and
consulting
▪ Cost savings and time gains
When we advise and support you
right from the word 'go', we can
make sure that the right formwork
systems are chosen and then
used as planned. This lets you
achieve optimum utilisation of the
formwork equipment, and effec-
tive forming operations because
your workflows will be correct.
▪ Maximised workplace safety
The advice and support we can
give you in how to use the equip-
ment correctly, and as planned,
leads to greater safety on the job.
▪ Transparency
Because our services and costs
are completely transparent, there
is no need for improvisation dur-
ing the project – and no unpleas-
ant surprises at the end of it.
▪ Reduced close-out costs
Our professional advice on the
selection, quality and correct use
of the equipment helps you avoid
damage, and minimise wear-and-
tear.
Concrete Construction Stage
Project Close-out Stage
Optimum resource utilisation
with assistance from the Doka
Formwork Experts
Seeing things through to a posi-
tive conclusion
with professional support
Workflow optimisation, thanks to
▪ thorough utilisation planning
▪ internationally experienced pro-
ject technicians
▪ appropriate transport logistics
▪ on-site support
Doka Services are a byword for
transparency and efficiency here,
offering
▪ jointly handled return of rented
formwork
▪ professional dismantling
▪ efficient cleaning and recondition-
ing using special equipment
4
5
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
System description
Load-bearing tower Staxo
100 – the
extra-high-capacity, fast load-bearing
tower made of steel, with integral
safety features
Staxo 100 comes with all the field-proven advantages
of Staxo – meaning that it is robust, fast and versatile.
On top of all this, Staxo 100 has been given an exten-
sive package of built-in safety features, and its load
capacity greatly increased.
Sturdy galvanised steel frames, in three different
heights, are the basis of this high-speed, high-perfor-
mance load-bearing tower system.
High load-bearing capacity, quick and easy assembly
using integrated connectors, and great versatility -
these are the outstanding characteristics of Staxo.
Wherever high loads occur, in either the building-con-
struction or civil-engineering fields, this load-bearing
tower is the ideal solution.
The high-performance load-bearing tower
▪ high capacity of up to 100
kN per leg
▪ with lightweight components (frames up to h=1.20
m
can be manhandled)
▪ ergonomical: easy-to-handle parts
... speeds up work
▪ the small number of system components makes for
easier handling and means that no time is wasted
searching for parts
▪ the connector components are captively integrated
into the frames and so cannot be lost
▪ no tools are needed for assembling the towers
... provides optimum safety
▪ high stability, due to its 1.52 m wide frames
▪ slip-proof ladders integrated in the frames
▪ suspension points for chest harness
... is flexible
▪ the inter-frame spacing can be varied (from 0.60
m
to 3.00
m), for optimum utilisation of the frames'
load-bearing capacity. (From 1.00m, in 50
cm incre-
ments).
▪ different frame heights - 0.90 m, 1.20 m and 1.80
m
- for rough height adjustment in 30 cm increments:
0.90, 1.20 and 1.80 m
▪ fine adjustment by means of screw-jack U-heads
and feet
▪ can be used in conjunction with floor props and
Dokaflex
... is economical
▪ The tower units are quick and easy to assemble:
- either on their sides or in the upright
- for tall towers, tower units can be pre-assembled
on their sides, and then simply stacked by crane
- scaffold planking units make it easy to erect and
dismantle the tower and superstructure
▪ with special wheel units, complete tableforms can
quickly be wheeled to their next location
▪ the Forklift shifting device TG makes the job of erect-
ing, dismantling and transporting Doka load-bearing
towers very much easier.
User Information Load-bearing tower Staxo 100
System description
11
999804302 - 02/2018
Areas of use
The Load-bearing tower Staxo is ideal:
▪ as falsework for use in bridge-building, where high
loads occur and where great stability is called for in
that horizontal forces such as wind loads have to be
safely transferred
▪ in the building construction field, e.g. for administra-
tion buildings and multistorey car-park decks, where
large-area tableform units reduce forming times
▪ in the industrial and power-station construction field,
as a load-bearing tower for all manner of applications
Doka stair tower 250
The Doka stair tower 250 consists of 1.20 m frames and
a small number of light-weight aluminium stairway ele-
ments.
Quick to erect, the stair tower provides 'high-level'
safety and lets the site crew get quickly to their work-
places.
Follow the directions in the 'Doka stair tower
250' User Information!
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
System overview
Basic design concept
a ... inter-frame spacing = 60* / 100 / 150 / 175 / 200 / 250 / 300
cm
b ... frame width = 152
cm
* only for 1.20 and 0.90m frames
The Staxo
100 system components
Head units (A)
Staxo
100 frame (B)
Diagonal crosses (C)
A Head unit
B Staxo
100 frame
C Diagonal cross
D Base unit
E Scaffold planking
a
b
98003-228-01
B
A
C
E
D
C
4-way screw-
jack head
Screw jack U-
head
Heavy-duty
screw jack 70
top + Split nut B
U-head D
Top height-adjustment spindle for load-bearing
towers. For holding the superstructure and adjust-
ing its height.
Rotatable, but
with no height
adjustment.
May be used
with either one
or two Doka
H20 beams.
For holding the primary beams
(e.g. multi-purpose walings, steel
girders).
For holding the
primary beams
(e.g. WS10
multi-purpose
walings or dou-
ble H20
beams).
The primary
beams are fixed
so that they
cannot tip over.
Staxo
100 frame
1.80m
Staxo
100 frame
1.20m
Staxo
100 frame
0.90m
Hot-dip galvanised steel frames. Connectors for upward stacking of
the frames are captively integrated into each frame.
Drop-in steel-tube bracing crosses
between the frames.
Identified by:
▪ Embossed marking (G) e.g.
18.250
- 18 = frame height 1.80
m
- 250 = inter-frame spacing
250
cm
▪ Notched, colour-coded clips (H)
(see table)
G
H
User Information Load-bearing tower Staxo 100
System description
13
999804302 - 02/2018
Note:
For horizontal bracing of the frames, always use Diag-
onal crosses 9.xxx.
In levels in which scaffold planking units are mounted,
horizontal bracing with diagonal crosses is no longer
needed. This only applies, of course, if the scaffold
planking units are left in place in this ‘storey’ until the
very end of the assignment (assembly, pouring etc.)
Base units (D)
Scaffold planking units (E)
Designation
Colour-coded
clip
Notches
Diagonal cross 9.060
Black
—
Diagonal cross 9.100
Green
—
Diagonal cross 9.150
Red
—
Diagonal cross 9.175
Light green
—
Diagonal cross 9.200
Blue
—
Diagonal cross 9.250
Yellow
—
Diagonal cross 9.300
Orange
—
Diagonal cross 12.060
Black
1
Diagonal cross 12.100
Green
1
Diagonal cross 12.150
Red
1
Diagonal cross 12.175
Light green
1
Diagonal cross 12.200
Blue
1
Diagonal cross 12.250
Yellow
1
Diagonal cross 12.300
Orange
1
Diagonal cross 18.100
Green
3
Diagonal cross 18.150
Red
3
Diagonal cross 18.175
Light green
3
Diagonal cross 18.200
Blue
3
Diagonal cross 18.250
Yellow
3
Diagonal cross 18.300
Orange
3
These function in the same way as
standard diagonal crosses, but also
have a permanently mounted
waist-level guardrail strut (F) . This
strut can also be retro-fitted to
standard diagonal crosses.
Designation
Colour-coded
clip
Notches
Diagonal cross H 9.100
Green
—
Diagonal cross H 9.150
Red
—
Diagonal cross H 9.200
Blue
—
Diagonal cross H 9.250
Yellow
—
Diagonal cross H 12.100
Green
1
Diagonal cross H 12.150
Red
1
Diagonal cross H 12.200
Blue
1
Diagonal cross H 12.250
Yellow
1
F
Screw-jack feet
Heavy-duty screw
jack 70
+ Split nut B
Heavy-duty screw
jack 130 + Split nut B
Bottom levelling spindle for load-bearing towers.
The split nut B can be swung apart, meaning
that it does not need to be turned through the
full length of the threaded spindle.
Specially for height
mis-matches such as
on steps. Otherwise
identical to Heavy-
duty screw jack 70.
See the section
headed 'Structural
design' for dimen-
sioning details.
Scaffold planking 30/...cm
Scaffold planking 60/...cm with
manhole
Steel scaffold planking units for
making safe assembly decks.
Aluminium/timber scaffold plank-
ing units with self-closing cover,
for making safe assembly decks.
Integral anti-liftout guard
Width: 30
cm
Width: 60
cm
Lengths: 100 / 150 / 175 / 200 / 250 / 300
cm
Permitted service load: 1.5
kN/m2 (150 kg/m2)
Load Class 2 to EN 12811-1:2003
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
The Staxo 100 frame in detail
Features of the Staxo 100 frames
The following features characterise the Staxo 100
frame and distinguish it from the former Staxo frame.
Anchorage points for personal fall
arrest systems (PFAS)
NOTICE
Only Staxo
100 frames fulfil the capacity rat-
ings stated in this document!
A ‘Staxo 100’ sticker
B Stamped-in type designation: 18, 12 or 9
C Arrow to make clear where 'top and bottom' are
(arrow pointing up = frame is in correct position)
D Attachment point for personal fall-arrest set
D
C
B
A
98003-206-01
WARNING
➤Make sure that the anchorage point is at or
above the required minimum height, as oth-
erwise there will not be sufficient room to
arrest a fall.
Attachment point allowed for personal fall-arrest set only.
Attachment of the crane suspension tackle for lifting is prohibited.
To horizontal tube: allowed.
To ladder rungs: prohibited.
To diagonal tube: prohibited.
98003- -0
334 2
98003- -01
334
98003- -0
334 3
98003- -0
334 4
User Information Load-bearing tower Staxo 100
System description
15
999804302 - 02/2018
Integral interconnection system
▪ The crane-handling-safe link between the frames
uses a captive locking spring plus built-in safety
bolt. It can be locked or released in an instant - with
no need for any tools.
Mode of functioning for upward stacking
Mode of functioning for fitting the base units
Yellow locking spring pushed toward the inside = con-
nection sleeve unfixed.
Mode of functioning for fitting the head units
Blue locking spring is pushed toward the inside.
Safety catch
▪ tried-and-tested interconnection system (captive)
▪ secures the diagonal crosses
▪ two defined positions (closed – open)
Connecting the couplers
a ... max. 16 cm (exception: where tubes are being connected for
constructional design purposes)
b ... Diameter 48
mm
c ... Diameter 75
mm
Profile form
▪ low weight, yet high load-bearing capacity
▪ sturdy
Yellow locking spring pushed
toward the outside
= connection sleeve fixed
Blue locking spring pushed
toward the outside
= frames linked in
crane-handling-safe manner
E Connection sleeve
F
Yellow locking spring
G Blue locking spring
E Connection sleeve
F
Yellow locking spring
98003-229-01
E
F
98003-229-04
G
98003-229-02
F
E
G Blue locking spring
Closed
Open
A Transition swivel coupler 48/76mm.
This type of link is not in conformity with DIN
4421 (DIN
EN
74).
No loads may be introduced parallel to the Staxo tubes.
B Swivel coupler 48mm or Normal coupler 48mm
98003-229-03
G
9703-243-01
98003-222-01
c
a
a
b
B
A
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
Profile seal
▪ prevents connection sleeve falling out
▪ protects against damage
▪ sliding contact surface for nuts
Vertical access system
▪ integral ladder
▪ extra 'handles' to pick the frame up by
WARNING
Never climb up or down the outside of the
tower! You risk falling and/or causing the tower
to tip over!
➤Only ever climb up the inside of the tower.
When doing this, make sure that the scaffold
planking units are in the correct positions (as
intermediate landings)!
98003-255-01
98003-257-01
98003-257-01
User Information Load-bearing tower Staxo 100
System description
17
999804302 - 02/2018
Practical examples
Tableforms and tower frames are both assembled from
the same system components.
Tableform units
▪ For repetitive use, the load-bearing tower can be
assembled into complete table-forms.
Combined with Dokaflex
For downstand beams, the load-bearing towers and
beam-forming supports can be combined very effec-
tively with Dokaflex.
Edge floor-beam
Tower frames
With a load-bearing capacity of up to 97
kN per leg,
Staxo
100 is an extremely strong load-bearing tower
system.
It safely withstands horizontal forces such as wind
loads.
The wide frames make for high stability right from the
word 'go'.
Close inter-frame spacing is possible, for transferring
high loads.
A Load-bearing tower
B Dokaflex
C Beam forming support 20
D Handrail post T 1.80m (optionally with Toeboard holder T
1.80m), Edge protection system
XP, Handrail clamp S or Hand-
rail post 1.50m
E Lashing strap 5.00m
F
Doka express anchor 16x125mm and Doka coil 16mm
A
B
D
E
C
F
98003-230-01
The Universal dismantling tool makes it easier
to turn the Split nut B - even when it is under
higher loads.
98003-231-01
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
Shoring load-bearing structures
On bridges, culverts and industrial structures, the load-
bearing tower and Doka large-area formwork Top 50
together make an ideal combination.
In this way, even complex structures can be formed
using mostly standard parts - at lower cost.
Falsework beneath arched bridge
Typical cross-section - Falsework beneath super-
structure formwork
9716-222-01
98003-232-01
User Information Load-bearing tower Staxo 100
System description
19
999804302 - 02/2018
Adapts to different ground plans, heights, floor shapes and loads
The different sizes of diagonal brace for each height of
frame enable the frames to be spaced close together or
further apart, depending on the load.
In this way, only as much material is used as is really
needed.
e.g. light loads – frames spaced further apart
e.g. heavy loads – frames spaced close together
Plan view
Plan view
e.g. adapting to irregular shaped layouts
by using single legs
98003-311-01
98003-309-01
9716-263-01
98003-310-01
98003-268-01
98003-269-01
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
Height ranges and materials schedule
Frame-sizes up to 1.80
m
1.80m, 1.20m and 0.90m frames are possible here.
Table A
Choose the right diagonal crosses for the distance between the frames.
The schedule of materials does not include scaffold planking units.
The scaffold planking units have to be planned separately for each set-up configuration. Provided they are located in the same level, they replace
the Diagonal crosses 9.xxx needed for horizontal bracing. This reduction in the number of diagonal crosses needed must be allowed for in the
schedule of materials.
NOTICE
▪ The minimum values hmin. given in Table A
are only applicable if the biggest possible
frame is always used in the base section.
▪ The lowering distance of 6
cm is already
allowed for in Table A!
▪ LK and LF are in accordance with the struc-
tural design. In some cases, the structural
design will permit greater extension lengths
- see Tables B and C in the section headed
'Height adjustment'.
98003-219-01
h
h
Fh
LK
LF
LF
Fixed height of frame Fh [m]
Variant 1
LK = max. 30
cm
LF = max. 30
cm
Variant 2
LK = max. 45
cm
LF = max. 70
cm
Variant 3
LK = max. 45
cm
LF = max. 130
cm
Basic items
4-way screw-jack head,
Screw jack U-head
or Heavy-duty screw jack 70 top
Screw-jack foot
4-way screw-jack head,
Screw jack U-head
or Heavy-duty screw jack 70 top
Screw-jack foot or
Heavy-duty screw jack 70
+ Split nut B
4-way screw-jack head,
Screw jack U-head
or Heavy-duty screw jack 70 top
Heavy-duty screw jack 130 + Split nut B
Staxo
100 frame 0.90m
Staxo
100 frame 1.20m
Staxo
100 frame 1.80m
Diagonal cross 9.xxx
Diagonal cross 12.xxx
Diagonal cross 18.xxx
h [m]
min. - max.
h [m]
min. - max.
h [m]
min. - max.
1.20
1.75 - 1.80
4
4
2.06 - 2.35
4
4
2.78 - 2.95
4
4
-
2
-
1
2
-
1.80
2.02 - 2.40
4
4
2.06 - 2.95
4
4
2.78 - 3.55
4
4
-
-
2
1
-
2
1.80
2.20 - 2.40
4
4
2.52 - 2.95
4
4
---
4
4
4
-
-
5
-
-
2.10
2.32 - 2.70
4
4
2.52 - 3.25
4
4
3.24 - 3.85
4
4
2
2
-
3
2
-
2.40
2.62 - 3.00
4
4
2.82 - 3.55
4
4
3.54 - 4.15
4
4
-
4
-
1
4
-
2.70
2.92 - 3.30
4
4
2.92 - 3.85
4
4
3.24 - 4.45
4
4
2
-
2
3
-
2
3.00
3.22 - 3.60
4
4
3.22 - 4.15
4
4
3.54 - 4.75
4
4
-
2
2
1
2
2
3.30
3.52 - 3.90
4
4
3.52 - 4.45
4
4
4.44 - 5.05
4
4
2
4
-
4
4
-
3.60
3.82 - 4.20
4
4
3.82 - 4.75
4
4
4.14 - 5.35
4
4
-
-
4
1
-
4
3.90
4.12 - 4.50
4
4
4.12 - 5.05
4
4
4.44 - 5.65
4
4
2
2
2
4
2
2
4.20
4.42 - 4.80
4
4
4.42 - 5.35
4
4
4.74 - 5.95
4
4
-
4
2
2
4
2
4.50
4.72 - 5.10
4
4
4.72 - 5.65
4
4
5.04 - 6.25
4
4
2
-
4
4
-
4
4.80
5.02 - 5.40
4
4
5.02 - 5.95
4
4
5.34 - 6.55
4
4
-
2
4
2
2
4
5.10
5.32 - 5.70
4
4
5.32 -6.25
4
4
5.64 - 6.85
4
4
2
4
2
4
4
2
5.40
5.62 - 6.00
4
4
5.62 - 6.55
4
4
5.94 - 7.15
4
4
-
-
6
2
-
6
5.70
5.92 - 6.30
4
4
5.92 - 6.85
4
4
6.24 - 7.45
4
4
2
2
4
4
2
4
6.00
6.22 - 6.60
4
4
6.22 - 7.15
4
4
6.54 - 7.75
4
4
-
4
4
2
4
4
6.30
6.52 - 6.90
4
4
6.52 - 7.45
4
4
6.84 - 8.05
4
4
2
-
6
4
-
6
6.60
6.82 - 7.20
4
4
6.82 - 7.75
4
4
7.14 - 8.35
4
4
-
2
6
2
2
6
6.90
7.12 - 7.50
4
4
7.12 - 8.05
4
4
7.44 - 8.65
4
4
2
4
4
4
4
4
7.20
7.42 - 7.80
4
4
7.42 - 8.35
4
4
7.74 - 8.95
4
4
-
-
8
2
-
8
7.50
7.72 - 8.10
4
4
7.72 - 8.65
4
4
8.04 - 9.25
4
4
2
2
6
4
2
6
7.80
8.02 - 8.40
4
4
8.02 - 8.95
4
4
8.34 - 9.55
4
4
-
4
6
2
4
6
8.10
8.32 - 8.70
4
4
8.32 - 9.12
4
4
8.64 - 9.85
4
4
2
-
8
4
-
8
8.40
8.62 - 9.00
4
4
8.62 - 9.55
4
4
8.94 - 10.15
4
4
-
2
8
2
2
8
8.70
8.92 - 9.30
4
4
8.92 - 9.85
4
4
9.24 - 10.45
4
4
2
4
6
4
4
6
9.00
9.22 - 9.60
4
4
9.22 - 10.15
4
4
9.54 - 10.75
4
4
-
-
10
2
-
10
9.30
9.52 - 9.90
4
4
9.52 - 10.45
4
4
9.84 - 11.05
4
4
2
2
8
4
2
8
98003-113
98003-113
98003-113
User Information Load-bearing tower Staxo 100
System description
21
999804302 - 02/2018
Frame-sizes up to 1.20
m
1.20m and 0.90m frames are possible here.
Table A
Choose the right diagonal crosses for the distance between the
frames.
The schedule of materials does not include scaffold planking units.
The scaffold planking units have to be planned separately for each
set-up configuration. Provided they are located in the same level,
they replace the Diagonal crosses 9.xxx needed for horizontal brac-
ing. This reduction in the number of diagonal crosses needed must
be allowed for in the schedule of materials.
NOTICE
▪ The minimum values hmin. given in Table A
are only applicable if the biggest possible
frame is always used in the base section.
▪ The lowering distance of 6
cm is already
allowed for in Table A!
▪ LK and LF are in accordance with the struc-
tural design. In some cases, the structural
design will permit greater extension lengths
- see Tables B and C in the section headed
'Height adjustment'.
▪ Greater extension lengths are possible (up
to max. 45
cm) if the head units and/or base
units are given suitable scaffold-tube brac-
ing.
▪ In principle, it is possible to use Heavy-duty
screw jacks 70 and Heavy-duty screw jacks
70 top. However, when these are combined
with the small frames, you must observe the
limitations given in Tables B and C of the
section headed 'Height adjustment'.
Fixed height of frame Fh [m]
LK = max. 30
cm
LF = max. 30
cm
Basic items
4-way screw-jack head or Screw jack U-head
Screw-jack foot
Staxo
100 frame 0.90m
Staxo
100 frame 1.20m
Diagonal cross 9.xxx
Diagonal cross 12.xxx
h [m]
min. - max.
1.20
1.75 - 1.80
4
4
-
2
1
2
1.80
2.18 - 2.40
4
4
4
-
5
-
2.10
2.32 - 2.70
4
4
2
2
3
2
2.40
2.62 - 3.00
4
4
-
4
1
4
2.70
3.10 - 3.30
4
4
6
-
8
-
3.00
3.22 - 3.60
4
4
4
2
6
2
3.30
3.52 - 3.90
4
4
2
4
4
4
3.60
3.82 - 4.20
4
4
-
6
2
6
3.90
4.12 - 4.50
4
4
6
2
8
2
4.20
4.42 - 4.80
4
4
4
4
6
4
4.50
4.72 - 5.10
4
4
2
6
4
6
98003-220-01
h
h
Fh
LK
LF
LF
98003-113
4.80
5.02 - 5.40
4
4
-
8
2
8
5.10
5.32 - 5.70
4
4
6
4
8
4
5.40
5.62 - 6.00
4
4
4
6
6
6
5.70
5.92 - 6.30
4
4
2
8
4
8
6.00
6.22 - 6.60
4
4
-
10
2
10
6.30
6.52 - 6.90
4
4
6
6
8
6
6.60
6.82 - 7.20
4
4
4
8
6
8
6.90
7.12 - 7.50
4
4
2
10
4
10
7.20
7.42 - 7.80
4
4
-
12
2
12
7.50
7.72 - 8.10
4
4
6
8
8
8
7.80
8.02 - 8.40
4
4
4
10
6
10
8.10
8.32 - 8.70
4
4
2
12
4
12
8.40
8.62 - 9.00
4
4
-
14
2
14
8.70
8.92 - 9.30
4
4
6
10
8
10
9.00
9.22 - 9.60
4
4
4
12
6
12
9.30
9.52 - 9.90
4
4
2
14
4
14
Fixed height of frame Fh [m]
LK = max. 30
cm
LF = max. 30
cm
Basic items
4-way screw-jack head or Screw jack U-head
Screw-jack foot
Staxo
100 frame 0.90m
Staxo
100 frame 1.20m
Diagonal cross 9.xxx
Diagonal cross 12.xxx
h [m]
min. - max.
98003-113
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
Frame-sizes up to 1.20
m (with 0.90
m frames
in the top and bottom 'storeys')
1.20m and 0.90m frames are possible here.
Table A
Choose the right diagonal crosses for the distance between the
frames.
The schedule of materials does not include scaffold planking units.
The scaffold planking units have to be planned separately for each
set-up configuration. Provided they are located in the same level,
they replace the Diagonal crosses 9.xxx needed for horizontal brac-
ing. This reduction in the number of diagonal crosses needed must
be allowed for in the schedule of materials.
NOTICE
▪ The minimum values given in the table can
only be obtained if the integrated connec-
tion sleeve is removed from the frame.
▪ The lowering distance of 6
cm is already
allowed for in Table A!
▪ LK and LF are in accordance with the struc-
tural design. In some cases, the structural
design will permit greater extension lengths
- see Tables B and C in the section headed
'Height adjustment'.
▪ In the top and bottom ‘storeys’, 0.90m
frames MUST be used.
▪ Greater extension lengths are possible (up
to max. 40
cm) if the head units and/or base
units are given suitable scaffold-tube brac-
ing.
▪ In principle, it is possible to use Heavy-duty
screw jacks 70 and Heavy-duty screw jacks
70 top. However, when these are combined
with the small frames, you must observe the
limitations given in Tables B and C of the
section headed 'Height adjustment'.
98003-221-01
h
h
Fh
LK
LF
LF
98003-302-01
Fixed height of frame Fh [m]
LK = max. 25
cm
LF = max. 25
cm
Basic items
4-way screw-jack head or Screw jack U-head
Screw-jack foot
Staxo
100 frame 0.90m
Staxo
100 frame 1.20m
Diagonal cross 9.xxx
Diagonal cross 12.xxx
h [m]
min. - max.
1.80
2.18 - 2.30
4
4
4
-
5
-
2.70
3.08 - 3.20
4
4
6
-
8
-
3.00
3.38 - 3.50
4
4
4
2
6
2
3.60
3.98 - 4.10
4
4
8
-
10
-
3.90
4.28 - 4.40
4
4
6
2
8
2
4.20
4.58 - 4.70
4
4
4
4
6
4
4.50
4.88 - 5.00
4
4
10
-
15
0
4.80
5.18 - 5.30
4
4
8
2
13
2
5.10
5.48 - 5.60
4
4
6
4
11
4
5.40
5.78 - 5.90
4
4
4
6
9
6
5.70
6.08 - 6.20
4
4
10
2
15
2
6.00
6.38 - 6.50
4
4
8
4
13
4
6.30
6.52 - 6.80
4
4
6
6
11
6
6.60
6.82 - 7.10
4
4
4
8
9
8
6.90
7.12 - 7.40
4
4
10
4
16
4
7.20
7.42 - 7.70
4
4
8
6
14
6
7.50
7.72 - 8.00
4
4
6
8
12
8
7.80
8.02 - 8.30
4
4
4
10
10
10
8.10
8.32 - 8.60
4
4
10
6
16
6
8.40
8.62 - 8.90
4
4
8
8
14
8
8.70
8.92 - 9.20
4
4
6
10
12
10
9.00
9.22 - 9.50
4
4
4
12
10
12
9.30
9.52 - 9.80
4
4
10
8
17
8
98003-113
User Information Load-bearing tower Staxo 100
System description
23
999804302 - 02/2018
Height adjustment
▪ The 3 different heights of frame 0.90
m, 1.20
m and
1.80
m enable coarse adjustment to within 30
cm.
▪ Fine adjustment, down to the last millimetre, is done
using the various head and base units.
System dimensions
on multi-storey towers
Regarding Table A ‘Height ranges and materials
schedule’, use the version of this table given in the
chapter for the usage situation concerned.
Table B: Head zone
Values in cm
Min. values with no formwork-striking play
Table C: Base zone
Values in cm
Min. values with no formwork-striking play
NOTICE
The structural design of the load-bearing tower
may make it necessary to plan for shorter
extension lengths. See the section headed
'Structural design' for dimensioning details.
Screw jack U-head and
4-way screw-jack head
Heavy-duty screw jack 70 top
U-head D
Frames in the top 'storey'
1.80 / 1.20 / 0.90m
1.80m
1.20m
0.90m
1.80 / 1.20 / 0.90m
LK max.
45.8
71.2
71.2
71.2
1.6
LK min.
7.8
8.4
8.4
24.9
1.6
Screw-jack foot
Heavy-duty screw jack 70
+ Split nut B
Heavy-duty screw jack 130
+ Split nut B
Frames in the base 'storey'
1.80m
1.20m
0.90m
1.80m
1.20m
0.90m
1.80m
1.20m
0.90m
LF max.
46.2
46.2
46.2
71.2
71.2
71.2
131.2
131.2
--
LF min.
8.2
8.2
26.3
8.8
28.2
58.1
40.0
100.0
--
98003-219-04
LK
98003-237-01
LK
98003-236-01
LK
98003-219-03
LF
98003-236-02
LF
98003-236-03
LF
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
on single-storey towers
Note:
For towers consisting of one 'storey' only, the min. val-
ues LK and LF given in Tables B and C for the screwjack
head and base units respectively will often not be
reached.
Reason: The lengths of the screwjack head and base
units and the integrated connector in the frame add up
to a larger dimension than the height of the frame.
These constraint points have already been allowed for
in the operational height data given in Table A.
Close-up: Cut-away view of frame tube
a
b
c
Connector
30.5
--
--
Screw jack foot
--
69.2
--
Heavy duty screw jack 70
--
101.2
--
Heavy duty screw jack 130
--
173.0
--
Screw jack U-head
--
--
68.8
4-way screw-jack head
--
--
68.8
Heavy duty screw jack 70 top
--
--
100.9
U-head D
--
--
10.0
V Connector
98003-238-01
a
c
b
V
User Information Load-bearing tower Staxo 100
System description
25
999804302 - 02/2018
Linking towers / placing scaffold planking between towers
Staxo
100 planking struts 1.00m and 1.50m can be
used – together with scaffold planking units – to create
workspaces, access routes or stiffening reinforcements
between Staxo
100 towers.
▪ No need to use scaffold tubes and loose couplers to
make links in the frame plane
▪ Can be used as guard rails in the frame plane
▪ Can be used as links and, if statically necessary, as
bracing between the towers
▪ Towers are always kept the same distance apart
Close-up showing how the Staxo
100 planking strut
is fixed to the Staxo
100 frame-joint to make a deck-
ing level
Width-across 22
mm
Note:
There is a height mismatch between the scaffold plank-
ing units placed on Staxo
100 planking struts and those
placed on the Staxo
100 frames.
a ... 16
cm
b ... 152.4
cm
c1 ... 97.6
cm with Staxo
100 planking strut 1.00m
c2 ... 147.6
cm with Staxo
100 planking strut 1.50m
d1 ... 250.0
cm with Staxo
100 planking strut 1.00m
d2 ... 300.0
cm with Staxo
100 planking strut 1.50m
e ... permitted influence (see Table)
Permitted influence width 'e' [cm]
Tr827-202-03
Tr827-206-01
Service load
1.5
kN/m2
0.75
kN/m2
Staxo
100 planking strut 1.00m
300
—
Staxo
100 planking strut 1.50m
225
300
Tr827-200-01
a
Tr827-201-01
b
c
d
b
e
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
Practical examples
Linking towers
Placing scaffold planking between towers
Erecting guard rails in frame plane
Note:
In the bracing-strut plane, guard rails may be erected
using scaffold tubes 48.3mm and Transition swivel cou-
plers 48/76mm.
Tr827-202-04
B
D
Tr827-204-02
A
C
Tr827-205-02
C
B
Tr827-203-02
C
D
B
A Staxo
100 planking strut 1.00m
B Staxo
100 planking strut 1.50m
C Scaffold planking
D Diagonal cross (where statically required)
E Scaffold tube 48.3mm
F
Transition swivel coupler 48/76mm
Tr827-206-02
B
Tr827-206-03
E
F
User Information Load-bearing tower Staxo 100
System description
27
999804302 - 02/2018
Forming downstand beams
The Staxo
100 spindle adapter has been specially
designed for use in forming downstand beams.
▪ Can be mounted onto both types of Multi-purpose
waling: WS10 and WU12.
▪ Because they are fixed onto multi-purpose walings
(whose length can be selected), a variable adjusting
range is possible.
▪ Allows exact lining-and-levelling.
▪ No doubling-up required.
Practical example
Mounting the Staxo 100 spindle
adapter
Example on Multi-purpose waling WU12 Top50
➤Insert the Staxo 100 spindle adapter into the waling-
gap of the Multi-purpose waling WU12.
➤Move it to the desired position and fix it on firmly with
the wedge.
A Staxo 100 spindle adapter
B Screw jack U-head
C Staxo
100 frame
D Multi-purpose waling WU12 Top50
E 4-way screw-jack head
F
Bracing
98003-332-02
A
A
A
A
98003-332-01
A
D
C
E
B
F
NOTICE
▪ It must be ensured – in every single case –
that the screwjack U-heads are restrained in
both directions.
This may be achieved by way of:
- contact to the structure
- nailed-down floor-slab formwork
- bracing
▪ Non-restrained screw-jack heads are not
permitted.
▪ In the transverse direction of the multi-pur-
pose waling (torsion of waling), bracing is
absolutely essential!
▪ The multi-purpose waling, the screw-jack
and the load-bearing tower must be stati-
cally dimensioned as stipulated in this User
Information booklet.
NOTICE
➤Do not oil or grease wedged connections.
A Staxo 100 spindle adapter
B Screw jack U-head
C Staxo
100 frame
D Multi-purpose waling WU12 Top50
G Anti-twist lock (prevents the Staxo 100 spindle adapter from
being turned out of position)
TR1009-203-01
A
G
A
D
C
B
G
999804302 - 02/2018
System description
User Information Load-bearing tower Staxo 100
➤Next, fit on a 4-way screw-jack head.
A Staxo 100 spindle adapter
E 4-way screw-jack head
TR1009-203-02
A
E
User Information Load-bearing tower Staxo 100
Assembly (overview)
29
999804302 - 02/2018
Assembly (overview)
Set-up configurations
Load-bearing tower Staxo 100
Horizontal assembly
Standard set-up
Assembling in the upright
with Fork lift shifting device TG
by hand
'Mounted-ahead' railings
'Mounted-ahead' 1.20m frames
and diagonals
98003-213-01
98003-211-01
98003-101
98003-293-01
98003-294-01
999804302 - 02/2018
Assembly (overview)
User Information Load-bearing tower Staxo 100
Fall protection when erecting,
modifying or dismantling the load-
bearing tower
If required by local regulations or as the result of a haz-
ard assessment performed by the scaffold erector,
when erecting, modifying or dismantling the load-bear-
ing tower it may be necessary to use a personal fall-
arrest system, 'mounted-ahead' frames and/or railings,
or a combination of both.
NOTICE
Use only the anchorage points as shown in the
section headed 'The Staxo
100 frame in
detail'!
WARNING
➤Make sure that the anchorage point is at or
above the required minimum height, as oth-
erwise there will not be sufficient room to
arrest a fall.
User Information Load-bearing tower Staxo 100
Horizontal assembly
31
999804302 - 02/2018
Horizontal assembly
Preliminary remark:
▪ The terms 'vertical' and 'horizontal' (e.g. referring to
the diagonal crosses) are always used here with ref-
erence to their installation situation in the finished,
upright tower.
▪ The job of erecting the load-bearing tower begins
with the bottom (i.e. first) 'storey'.
▪ Arrow on frame must be pointing upwards.
(= yellow locking spring at bottom)
Erecting the first storey
➤Having regard to the instructions given above, place
the tower frames on their sides on timber supports
(min. 4cm high).
Bracing the frames in the vertical
➤Link the frames with diagonal crosses.
NOTICE
General remarks:
▪ Slide the diagonal cross onto the safety-
catch bolt and immediately secure it with the
safety catch.
98003-206-01
98003-216-02
NOTICE
When erecting the tower, make sure that the
climbing rungs are in the correct position rela-
tive to the tower.
Seen from outside, the ladder must always be
on the left-hand side.
This makes it possible to use scaffold planking
units where needed (see 'Assembling towers
in the upright with 'mounted-ahead' railings').
F
Diagonal cross
98003-286-01
98003-216-01
F
F
999804302 - 02/2018
Horizontal assembly
User Information Load-bearing tower Staxo 100
Plan-bracing the frames (in the horizontal)
➤Slot diagonal crosses onto the safety-catch bolts of
the horizontal frame tubes, and fix them in place.
➤Press the yellow locking springs on the frame
inwards (to open) – the connection sleeves can now
be moved freely.
➤Push in and secure the base units. See the section
headed 'Lifting by crane'.
Erecting further storeys
Note:
Do not pre-assemble units any higher than 10
m.
➤Lock the connection sleeves on the frames that you
are about to add, by pressing the yellow locking
springs towards the outside.
➤Place this frame onto the finished section and push
the blue locking spring of the bottom frame outward
(to join the frames).
➤Fit and secure diagonal crosses in the same way as
in the first 'storey'.
h ... max. 10
m
➤Install scaffold planking units where needed.
Basic rule:
▪ Maintaining correct geometry by fixing a horizontal
diagonal cross in the 1st and last-but-one or last
'storey', and every 10
m.
Additionally as required e.g.
- if there is a horizontal restraint for the tower
(even a temporary one)
- if local loads need to be transferred (e.g. from
attaching the tower to the crane after it has
been ground-assembled in the horizontal)
For detailed design-load information, see the type
test.
D Frame
E Yellow locking spring
K Diagonal cross
98003-215-01
K
E
D
E Yellow locking spring
H Connection sleeve
F
Diagonal cross
98003-303-01
E
H
F
F
F
h
98003-213-01
User Information Load-bearing tower Staxo 100
Horizontal assembly
33
999804302 - 02/2018
➤Close the anti-liftout guard.
Mount the toeboard
To create a safe workplace, toeboards must be
mounted:
➤Hook the Staxo
100 toeboards onto the safety-catch
bolts.
➤Fit the site-provided planks.
➤Fix the planks with nails.
Optionally: Railings on the top 'storey'
To meet very stringent safety requirements, 'mounted-
ahead' railings can be fitted in the top section.
This is done in line with the instructions given in
'Assembling towers in the upright with 'mounted-ahead'
railings'.
➤Mount the Staxo side railings and secure them with
a Spring locked connecting pin 16mm to prevent
accidental lift-out.
Close-up 1
➤Mount Staxo front railings and secure them with a
Spring cotter
5mm to prevent accidental lift-out.
Close-ups 2 and 3
Having scaffold planking units in the top ‘sto-
rey’ makes it easier to carry out assembly work
on the towerframe superstructure.
Determining the right plank-length: Centre-to-
centre distance between the frames, minus
10
cm
A Staxo 100 toeboard
B Safety-catch bolt
C Plank
Tr842-200-03
Tr772-203-01
C
A
B
B
L
Staxo side railing
M Staxo front railing
N Spring locked connecting pin 16mm
O Spring cotter 5mm
2
3
L
M
L
M
1
98003-312-01
N
98003-312-02
98003-312-03
98003-312-04
O
999804302 - 02/2018
Horizontal assembly
User Information Load-bearing tower Staxo 100
Lifting into the upright by crane
➤Check before attaching the lifting chain:
Lifting into the upright
➤Attach the crane suspension tackle to the frames of
the top section and lift the entire tower into the
upright.
Dismantling
After the tower has been placed back on its side, it can
be dismantled in reverse order.
▪ All the locking springs must be closed =
pushed outwards (to link the frames).
▪ All safety catches must be closed.
▪ All base units must be secured.
NOTICE
Max. extension length of the base units when
the tower is being lifted into the upright: 35
cm!
NOTICE
▪ Erect the load-bearing tower in the vertical
on ground that is statically capable of sup-
porting the load.
▪ If the load-bearing tower is over 6
m high,
back-stay it or combine it with other towers.
When the tower is standing in the upright,
check once again to make sure that all the
safety catches are closed.
98003-214-01
Detaching the crane suspension tackle
near ground level:
This method must not be used for placing the
tower back on its side!
Items needed:
▪ 3 x Scaffolding tube 48.3mm (G)
- Minimum length:
Inter-frame space + 1.00
m
▪ 6 x normal or swivel couplers, 48mm (H)
➤Attach scaffold tubes:
- one between the bottom frames
- two between the top frames
➤Attach two cables, chains or lifting straps to
the bottom scaffold tube.
➤Lead the cables, chains or lifting straps
along the outside of the tower and between
the top scaffold tubes.
a ... min. 0.5
m
b ... max. 0.2
m
After the tower has been lifted into the upright,
the cables, chains or lifting straps are
detached by a crewman working from ground
level.
NOTICE
As early as in the planning phase, considera-
tion should also be given to the dismantling
operations (e.g. travelling/towing the load-
bearing tower/unit into the reach of the crane
for safe repositioning or for horizontal on-
ground dismantling)!
98003-218-01
G
H
a
b
User Information Load-bearing tower Staxo 100
Assembling towers in the upright
35
999804302 - 02/2018
Assembling towers in the upright
Assembling towers in the upright with 'mounted-ahead' railings
As a rule:
▪ Arrow on the frame must point up.
(= yellow locking spring down)
▪ Slide the diagonal cross onto the safety-catch bolt
and immediately secure it with the safety catch.
Example with Heavy-duty screw jack 70 and 4-way
screw-jack head.
NOTICE
▪ Erect the load-bearing tower in the vertical
on ground that is statically capable of sup-
porting the load.
▪ If the load-bearing tower is over 6
m high,
back-stay it or combine it with other towers.
98003-206-01
98003-233-01
NOTICE
When erecting the tower, make sure that the
climbing rungs are in the correct position rela-
tive to the scaffold planking units.
98003-256-01
999804302 - 02/2018
Assembling towers in the upright
User Information Load-bearing tower Staxo 100
Erecting the first storey
➤Place a Split nut B on the Heavy-duty screw jack 70,
push the two halves together and secure it with the
spring locking pin.
➤Press the yellow locking springs on the frame
inwards (to open) – the connection sleeves can now
be moved freely.
➤Insert the Heavy duty screw jacks 70 into the frames.
➤Link the frames with diagonal crosses.
Erecting the second storey
Fitting the 'mounted-ahead' railings
➤Mount Staxo side railings above the diagonal
crosses.
Close-up of how to hang into place
➤Mount Staxo front railings above the Staxo 100
frames.
Close-up of how to hang into place
Make sure that the spring locking pin points
downwards when it is secured.
A Split nut B
B Heavy duty screw jack 70
C Spring locking pin
D Frame
E Yellow locking spring
F
Diagonal cross
98003-234-01
A
B
C
B
D
E
E
98003-210-01
F
L
Staxo side railing
M Staxo front railing
98003-251-01
L
L
98003-251-02
M
M
98003-250-01
98003-250-03
98003-250-02
User Information Load-bearing tower Staxo 100
Assembling towers in the upright
37
999804302 - 02/2018
Mounting the scaffold planking units
➤Place scaffold planking on the finished 'storey'.
➤Close the anti-liftout guard.
Staxo 100 mounting gallows 40kg
The Staxo 100 mounting gallows 40kg makes it easier
to put up and take down Doka load-bearing towers
Staxo
100 when these are erected and dismantled in
the upright.
Practical example
G Scaffold planking
G
98003-209-01
Tr842-200-01
Follow the directions in the ‘Staxo 100 mount-
ing gallows 40kg’ Operating Instructions!
Permitted load-bearing capacity:
40
kg / Staxo 100 mounting gallows 40kg,
Staxo 100 attaching cable 40cm and
Staxo 100 hoisting cable 40kg 30m
92833-20 -01
2
999804302 - 02/2018
Assembling towers in the upright
User Information Load-bearing tower Staxo 100
Stacking the frames
➤Climb up onto the scaffold planking.
➤Lock the connection sleeves on the frames that you
are about to add, by pressing the yellow locking
springs towards the outside.
➤Place this frame onto the finished section and push
the blue locking spring of the bottom frame outward
(to join the frames).
Bracing the frames in the vertical
➤Fit and secure diagonal crosses in the same way as
in the first 'storey'.
Erecting the third 'storey'
Raising the 'mounted-ahead' railings
1) Push the Staxo front railings down into the stand-by
position.
2) Move the Staxo side railings up one section ('sto-
rey').
3) Move the Staxo front railings up again.
➤Mount the assembly planking.
➤Climb up onto the scaffold planking.
➤Fix on the frames in the same way as on the 2nd sec-
tion.
Yellow locking spring pushed
toward the outside
= connection sleeve fixed
Blue locking spring pushed
toward the outside
= frames linked in a tight, drop-
out-proof connection
E Connection sleeve
F
Yellow locking spring
G Blue locking spring
98003-272-01
98003-229-01
E
F
98003-229-04
G
F
Diagonal cross
98003-207-01
1
3
2
2
98003-208-01
User Information Load-bearing tower Staxo 100
Assembling towers in the upright
39
999804302 - 02/2018
➤Fit and secure diagonal crosses in the same way as
in the second 'storey'.
Horizontal bracing
➤Slot diagonal crosses onto the safety-catch bolts of
the horizontal frame tubes, and fix them in place.
Erecting further storeys
➤Add further frames in the same way as for the 3rd
storey, and brace them in the vertical with diagonal
crosses.
Mount the toeboard
To create a safe workplace, toeboards must be
mounted:
➤Hook the Staxo
100 toeboards onto the safety-catch
bolts.
➤Fit the site-provided planks.
➤Fix the planks with nails.
F
Diagonal cross
To meet particularly stringent safety require-
ments, the ‘mounted-ahead’ railings can be
left in place on all levels (‘storeys’) with scaf-
fold planking units.
NOTICE
If no scaffold planking units are used, or if
these are removed before the tower is finally
put into use, the following rule applies:
Basic rule:
▪ Maintaining correct geometry by fixing a horizontal
diagonal cross in the 1st and last-but-one or last
'storey', and every 10
m.
Additionally as required e.g.
- if there is a horizontal restraint for the tower
(even a temporary one)
- if local loads need to be transferred (e.g. from
attaching the tower to the crane after it has
been ground-assembled in the horizontal)
For detailed design-load information, see the type
test.
F
98003-211-01
K Diagonal cross
NOTICE
▪ If the load-bearing tower is over 6
m high,
back-stay it or combine it with other towers.
Determining the right plank-length: Centre-to-
centre distance between the frames, minus
10
cm
A Staxo 100 toeboard
B Safety-catch bolt
C Plank
98003-285-01
K
Tr772-203-01
C
A
B
B
999804302 - 02/2018
Assembling towers in the upright
User Information Load-bearing tower Staxo 100
Head zone
Fitting the head unit
➤Press the blue locking springs of the top frames
towards the inside (to open them).
➤Insert the head unit.
Always place the primary beams (single or double
formwork beams) centrally.
The screw jack U-heads can also be turned to an angle
to keep single formwork beams centred.
Dismantling
After the tower has been placed back on its side, it can
be dismantled in reverse order.
I
Blue locking spring
J
Head unit
98003-212-02
I
J
9716-215-01
WARNING
➤Where formwork beams cantilever out a long
way, secure them against accidental lift-out.
WARNING
Loads that are applied non-centrally can cause
overloading of the system.
➤Ensure that all loads are applied centrally!
NOTICE
➤When lifting and repositioning the entire
tower unit (or pre-assembled sub-units) by
crane: Follow the instructions in the section
headed 'Lifting by crane'!
NOTICE
As early as in the planning phase, considera-
tion should also be given to the dismantling
operations (e.g. travelling/towing the load-
bearing tower/unit into the reach of the crane
for safe repositioning or for horizontal on-
ground dismantling)!
9776-102-01
User Information Load-bearing tower Staxo 100
Assembling towers in the upright
41
999804302 - 02/2018
999804302 - 02/2018
Assembling towers in the upright
User Information Load-bearing tower Staxo 100
Assembling towers in the upright with 'mounted-ahead' 1.20m frames
General remarks:
▪ Arrow on frame must be pointing upwards.
(= yellow locking spring at bottom)
▪ Slide the diagonal cross onto the safety-catch bolt
and immediately secure it with the safety catch.
e.g. with Heavy duty screw jack 70 and 4-way screw-
jack head.
Erecting the first storey
➤Place a Split nut B on the Heavy-duty screw jack 70,
push the two halves together and secure it with the
spring locking pin.
➤Press the yellow locking springs on the frame
inwards (to open) – the connection sleeves can now
be moved freely.
➤Insert the Heavy duty screw jacks 70 into the frames.
➤Link the frames with diagonal crosses.
NOTICE
▪ Erect the load-bearing tower in the vertical
on ground that is statically capable of sup-
porting the load.
▪ If the load-bearing tower is over 6
m high,
back-stay it or combine it with other towers.
98003-205-01
98003-233-01
Make sure that the spring locking pin points
downwards when it is secured.
A Split nut B
B Heavy duty screw jack 70
C Spring locking pin
D Frame
E Yellow locking spring
F
Diagonal cross
98003-265-01
A
B
C
B
D
E
E
98003-263-01
F
User Information Load-bearing tower Staxo 100
Assembling towers in the upright
43
999804302 - 02/2018
Mounting the scaffold planking units
➤Place scaffold planking onto the bottom level.
➤Close the anti-liftout guard.
Erecting the second storey
Stacking the frames
➤Lock the connection sleeves on the frames that you
are about to add, by pressing the yellow locking
springs towards the outside.
➤Place this frame onto the finished section and push
the blue locking spring of the bottom frame outward
(to join the frames).
➤Push diagonal crosses onto the bottom safety-catch
bolts and secure them with the safety catches.
Bracing the frames in the vertical
➤Raise the scaffold planking units to the next level.
➤Push diagonal crosses onto the top safety-catch
bolts and secure them with the safety catches.
G Scaffold planking
G
98003-273-01
Tr842-200-01
98003-262-01
Yellow locking spring pushed
toward the outside
= connection sleeve fixed
Blue locking spring pushed
toward the outside
= frames linked in a tight, drop-
out-proof connection
E Connection sleeve
F
Yellow locking spring
G Blue locking spring
G Scaffold planking
F
Diagonal cross
98003-229-01
E
F
98003-229-04
G
98003-274-01
F
G
999804302 - 02/2018
Assembling towers in the upright
User Information Load-bearing tower Staxo 100
Erecting the third 'storey'
Stacking the frames
➤Add 1.20
m frames in the same way as for the 2nd
section.
➤Push diagonal crosses onto the bottom safety-catch
bolts and secure them with the safety catches.
Mounting scaffold planking units and bracing
the frames in the vertical
➤Place scaffold planking on the finished 'storey'.
➤Push diagonal crosses onto the top safety-catch
bolts and secure them with the safety catches.
Horizontal bracing
➤Slot diagonal crosses onto the safety-catch bolts of
the horizontal frame tubes, and fix them in place.
G Scaffold planking
F
Diagonal cross
98003-264-01
F
G
98003-261-01
NOTICE
If no scaffold planking units are used, or if
these are removed before the tower is finally
put into use, the following rule applies:
Basic rule:
▪ Maintaining correct geometry by fixing a horizontal
diagonal cross in the 1st and last-but-one or last
'storey', and every 10
m.
Additionally as required e.g.
- if there is a horizontal restraint for the tower
(even a temporary one)
- if local loads need to be transferred (e.g. from
attaching the tower to the crane after it has
been ground-assembled in the horizontal)
For detailed design-load information, see the type
test.
K Diagonal cross
98003-285-01
K
User Information Load-bearing tower Staxo 100
Assembling towers in the upright
45
999804302 - 02/2018
Erecting further storeys
➤Add further frames in the same way as for the 3rd
'storey', and brace them in the vertical with diagonal
crosses.
Mount the toeboard
To create a safe workplace, toeboards must be
mounted:
➤Hook the Staxo
100 toeboards onto the safety-catch
bolts.
➤Fit the site-provided planks.
➤Fix the planks with nails.
NOTICE
▪ Arrange the scaffold planking units either on
alternate sides from one 'storey' to the next,
or across the entire area.
▪ When the scaffold planking units are
located on alternate sides, 3 scaffold plank-
ing units must be used on the final (i.e. top)
‘storey’, one of them with a manhole. Make
sure that the manhole is in the correct posi-
tion here.
▪ If the load-bearing tower is over 6
m high,
back-stay it or combine it with other towers.
G Scaffold planking
G
G
98003-259-01
Determining the right plank-length: Centre-to-
centre distance between the frames, minus
10
cm
A Staxo 100 toeboard
B Safety-catch bolt
C Plank
Tr772-203-01
C
A
B
B
999804302 - 02/2018
Assembling towers in the upright
User Information Load-bearing tower Staxo 100
Head zone
Fitting the head unit
➤Press the blue locking springs of the top frames
towards the inside (to open them).
➤Insert the head unit.
Always place the primary beams (single or double
formwork beams) centrally.
The screw jack U-heads can also be turned to an angle
to keep single formwork beams centred.
Dismantling
After the tower has been placed back on its side, it can
be dismantled in reverse order.
I
Blue locking spring
J
Head unit
98003-212-02
I
J
9716-215-01
WARNING
➤Where formwork beams cantilever out a long
way, secure them against accidental lift-out.
WARNING
Loads that are applied non-centrally can cause
overloading of the system.
➤Ensure that all loads are applied centrally!
NOTICE
➤When lifting and repositioning the entire
tower unit (or pre-assembled sub-units) by
crane: Follow the instructions in the section
headed 'Lifting by crane'!
NOTICE
As early as in the planning phase, considera-
tion should also be given to the dismantling
operations (e.g. travelling/towing the load-
bearing tower/unit into the reach of the crane
for safe repositioning or for horizontal on-
ground dismantling)!
9776-102-01
User Information Load-bearing tower Staxo 100
Assembling towers in the upright
47
999804302 - 02/2018
Assembling towers in the upright by forklift truck
Fork lift shifting device TG
The Fork lift shifting device
TG may only be used for
erecting, dismantling and transporting Doka load-bear-
ing towers Staxo, Staxo
40, Staxo
100, Staxo
100
eco,
d2 and d3.
Items needed:
Max. load
Max. heights of load-bearing towers
Requirements for fork-lift trucks or telescoping
stacker trucks
▪ Driver protection roof
▪ Centre-to-centre distance of the fork prongs:
850
mm
▪ Permitted types of fork extension:
- box-style fork extensions 1)
- telescopic fork prongs
▪ Min. fork length:
Distance between the frames of the load-bearing
tower + 400
mm
▪ Max. fork width: 195
mm
▪ Max. fork height: 71
mm
Follow the directions in the Operating Instruc-
tions!
Item
Designation
Q'ty
(A)
Fork lift shifting device TG
1
(B)
Multi-purpose waling WS10 Top50 2.00m
2
(C)
Connecting pin 10cm
4
(D)
Spring cotter 5mm
4
(E)
Scaffold tube 48.3mm 1.00m
2
(F)
Screw-on coupler 48mm 50
4
(G)
Scaffold tube 48.3mm 2.00m
1
(H)
Swivel coupler 48mm
2
Operating cord, site-provided (optional)
1
WARNING
➤While load-bearing towers are being erected
or dismantled, lifted or lowered: It is forbid-
den to walk or stand beneath suspended
loads.
Max. load
on forklift
Max. load on Fork lift shifting device
with box-style fork
extensions
with telescopic forks
4000 kg
1000 kg
600 kg
2000 kg
600 kg
600 kg
92807-201-01
F
A
B
G
C
D
E
H
with superstructure
without superstructure
Max. load on forklift
4000 kg
Max. load on forklift
2000 kg
when
travelling
when lifting
when
travelling
when lifting
a
7.20
m
9.00
m
5.00
m
7.00
m
b
9.00
m
12.60
m
7.00
m
10.00
m
c
5.40
m
9.00
m
4.00
m
7.00
m
d
3.60
m
3.60
m
3.00
m
3.00
m
WARNING
➤It is forbidden to use forklift or telescoping
stacker trucks to erect/dismantle or transport
load-bearing towers without a Forklift shift-
ing device TG.
➤It is not permitted to use non-enclosed
(open) fork extensions.
A Box-style fork extension
B Open fork extension
1) observe the following manufacturer data:
▪ load carrying capacity of the fork extension
▪ required length of the fork prongs
Tr745-200-05
a
c
c
b
d
d
92807-207-01
A
92807-208-01
B
999804302 - 02/2018
Assembling towers in the upright
User Information Load-bearing tower Staxo 100
Travelling the towerframe units
Assembling the towerframe units
➤Build each storey at ground level.
➤Use a forklift truck to stack the towerframe storeys
into a single towerframe unit.
Dismantling
To dismantle, perform the above steps in reverse order.
NOTICE
Very important points for the moving pro-
cedure:
▪ As well as the fork-lift driver, a specially
trained watchman must also be on hand
during all lifting, assembly and travelling
operations.
▪ max. inclination of trackway: 2%.
▪ There must be a flat, firm (e.g. concrete)
base that is capable of supporting the load.
NOTICE
➤For details of how to assemble and join
together the individual 'towerframe storeys',
see 'Assembling towers in the upright'!
NOTICE
Always only dismantle the bottom 'storey' of
the towerframe unit.
Tr745-200-05
User Information Load-bearing tower Staxo 100
Assembling towers in the upright
49
999804302 - 02/2018
Practical examples
999804302 - 02/2018
Repositioning
User Information Load-bearing tower Staxo 100
Repositioning
Different ways of repositioning
Using traveller units
By crane
By forklift truck or
telescoping stacker truck
With transport winches
With Shifting carriage TG
98003-299-01
98003-300-01
98003-298-01
98003-296-01
NOTICE
▪ The most suitable approach to repositioning
and dismantling should already be dis-
cussed and agreed with the site in the pro-
ject phase, especially for very tall towers.
▪ There are also other ways of repositioning
the towers that are not shown in this User
Information booklet. The customer (contrac-
tor) bears sole responsibility for use of all
such methods and must prepare a separate
risk assessment for any such intended
method.
User Information Load-bearing tower Staxo 100
Repositioning
51
999804302 - 02/2018
Repositioning using traveller units
Completely assembled tableforms can be wheeled to
their next location, quickly and easily, using traveller
units.
The following different types of wheel unit are available
for this. The crane is only needed when the tower has
to be lifted up to the next storey.
All types of wheel unit can perform the following func-
tions:
▪ Lifting
▪ Wheeling
▪ Lining-and-levelling
▪ Lowering
Example with Winch 70:
Traveller unit variants:
▪ Shifting carriage TG
▪ Modular system (with winches)
Modular system (with winches)
Optimum adaptability to on-site requirements.
There is a choice of 2 types of winch and 2 types of
wheel.
➤Clamp the winch to the frame of the load-bearing
tower, using the Staxo/d2 adapter frame.
➤Secure the foot-pieces to prevent them dropping out.
See the section headed 'Lifting by crane'.
Equipment needed for one shifting unit
NOTICE
When repositioning load-bearing towers that
include standard superstructures, remember:
Ratio b:h = max. 1:3, with 'b' being the narrow-
est side.
Custom constructions must be statically veri-
fied!
98003-327-01
b
b
h
Max. load:
1000
kg per Winch 70
(lifting height 70 cm) with solid-tyre wheel
1500
kg per Winch 125
(lifting height 125
cm) with Heavy-duty wheel 15
kN
NOTICE
▪ The floor must be stable, firm and suffi-
ciently smooth (e.g. concrete).
Follow the directions in the 'Staxo/d2 winch'
Operating Instructions!
Item Designation
N° of items
A
Winch 70 or 125
4
B
Staxo/d2 adapter frame
4
C
Solid-tyre wheel or Heavy-duty wheel 15kN
4
D
Double wheeled transporter
4
98003-226-01
A
C
D
B
999804302 - 02/2018
Repositioning
User Information Load-bearing tower Staxo 100
Accessory for transporting the winches when
empty:
The Double wheeled transporter is bolted into the
connecting sockets on the wheel flange and makes it
easier to wheel the (empty) wheel-units.
Shifting carriage TG
This is an easy-to-operate, manual hydraulic lifting car-
riage for shifting light to medium-weight tableform units.
As well as making the tableforms easier to move
around, it also makes it easier to erect and strike the
formwork.
▪ Hydraulic, for near-effortless lifting.
▪ Tables can be 'inched' down slowly with handle-con-
trol.
▪ 3 guide-rolls, for maximum manoeuvrability.
▪ With an overall width of only 82 cm, the carriage can
pass easily through any doorway when empty.
➤Push the Shifting carriage TG up against the nar-
rowsides of the tableform – the slot-in lifting profile
reaches under the bottom cross-tube of the frame.
➤Secure the foot-pieces to prevent them dropping out.
See the section headed 'Lifting by crane'.
Equipment needed for one shifting unit
A Double wheeled transporter
9716-220-01
A
Max. load per Shifting carriage TG 1000
kg
NOTICE
▪ The floor must be stable, firm and suffi-
ciently smooth (e.g. concrete).
▪ Max. gradient of floor: 5 %.
▪ Max. configuration that can be transported
using 2 Shifting carriages TG: Tables with 3
cross-frames per storey and a max. height
of 5.0
m.
Follow the directions in the 'Shifting carriage
TG' Operating Instructions!
Item
Designation
N° of items
A
Shifting carriage TG
2
A Shifting carriage TG
B Slot-in lifting profile
98003-225-01
A
B
User Information Load-bearing tower Staxo 100
Repositioning
53
999804302 - 02/2018
Lifting by crane
Where the tableforms are to be repositioned in the ver-
tical, i.e. crane-lifted, they must be fitted with a Lifting
rod 15.0 and Retaining plate 15.0 , which make it easy
to attach the transfer cables.
Assembly
➤Mount the Lifting rod 15.0 and Retaining plate 15.0.
Preparation
Connect superstructure components together
➤e.g. connect the primary and secondary beams to
rafter plates, and nail on the form-ply.
Connect the superstructure to the head units
➤e.g. with Locking rod 15.0, Clamping plate and Wing
nut 15.0.
Secure the head units so that they cannot be
lifted out
➤Slot the fixing handle into the cross-tube of the
frame.
Secure the base units to prevent them
dropping out
➤Slot the fixing handle into the cross-tube of the
frame.
NOTICE
The max. height of towerframe unit that can be
lifted in one piece is 20
m!
Max. load:
1000
kg per Lifting rod 15.0 - where the load is applied
centrally
A Lifting rod 15.0
B Retaining plate 15.0
Use a 20
mm diam. bit to drill the hole through
the form-ply. It can later be filled with a Univer-
sal plug R20/25.
Follow the directions in the Operating Instruc-
tions!
WARNING
Danger from loose and unsecured parts.
➤Observe the following points before lifting!
9720-276-01
5.1
5.1
A
B
On Screw jack U-head
On 4-way screw-jack head
Only possible with Clamping
plate a = 28
cm (2002 models
onward)
D Locking rod 15.0
E Clamping plate
F
Wing nut 15.0
G Fixing handle
I
Fixing handle
9734-236-02
D
E
F
9734-277-01
D
E
F
a
9716-285-01
G
9716-239-01
I
999804302 - 02/2018
Repositioning
User Information Load-bearing tower Staxo 100
Link the frames in a crane-handling-safe
manner
➤Close the yellow and blue locking springs, by press-
ing them towards the outside.
Repositioning operation
➤Attach the crane sling to the Lifting rods 15.0 and lift
the tableform to its next location. Spread-angle β
max. 30°.
Shifting the table in skeleton construction
➤Take the load off the table by turning the threaded
spindles.
➤Clamp on the wheel-units.
➤Push in and secure the base units.
➤Using the wheel-units, lower the table, and wheel it
out as far as the stop.
➤Remove the front wheel-units.
➤Screw the Lifting rod 15.0 into the previously
mounted Retaining plate 15.0.
➤Attach the crane sling to the Lifting rod 15.0, then
raise the crane until the front legs are just off the
floor.
➤Push the table outwards until only the innermost legs
are still over the floor.
➤Mount more lifting rods and attach crane slings.
➤Use a chain hoist to shorten the rear cables until the
table is suspended in the horizontal.
➤Manoeuvre the table all the way out with the crane,
then lift it to the next storey.
K Yellow locking spring
L
Blue locking spring
While the tableform is being lifted, there must
NOT be any loose parts, tools or
other items on the tableform!
98003-229-04
L
K
9716-229-01
9716-230-01
M Wheel-out stop
N Chain hoist
9716-231-01
M
9716-232-01
N
User Information Load-bearing tower Staxo 100
Repositioning
55
999804302 - 02/2018
Lifting by forklift truck
Fork lift shifting device TG
For product information on the Fork lift shifting device
TG and the requirements in respect of the forklift truck,
see the section entitled 'Assembling towers in the
upright by forklift truck'.
Max. heights of load-bearing towers
Travelling the towerframe units
Follow the directions in the Operating Instruc-
tions!
with superstructure
without superstructure
Max. load on forklift
4000 kg
Max. load on forklift
2000 kg
when
travelling
when lifting
when
travelling
when lifting
a
7.20
m
9.00
m
5.00
m
7.00
m
b
9.00
m
12.60
m
7.00
m
10.00
m
c
5.40
m
9.00
m
4.00
m
7.00
m
d
3.60
m
3.60
m
3.00
m
3.00
m
NOTICE
Very important points for the moving pro-
cedure:
▪ As well as the fork-lift driver, a specially
trained watchman must also be on hand
during all lifting, assembly and travelling
operations.
▪ max. inclination of trackway: 2%.
▪ There must be a flat, firm (e.g. concrete)
base that is capable of supporting the load.
Tr745-200-05
a
c
c
b
d
d
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
General remarks
Anchoring on the structure
With Anchoring shoe for stair tower
Q ... shear force
Z ... tensile force
Methods for fixing in concrete:
▪ By using a Cone screw B 7cm to fix the anchoring
shoe to an existing suspension point prepared with
Universal climbing cones 15.0 (diameter of hole in
anchoring shoe = 32
mm). Hardwood shim (essen-
tial for ensuring a firm fit) prevents damage to the
concrete (scratch marks).
This fixing method is only possible with anchoring
shoes manufactured from 05/2009 onwards.
▪ With one or two dowels (diameter of hole in anchor-
ing shoe = 18
mm).
Design of the anchoring planes
The load-bearing tower is connected to the Anchoring
shoe for stair tower by scaffold tubes and couplers.
Q
Z
Permitted loads [kN]
Anchorage method
Max. anchoring loads [kN] per
anchor
Concrete strength at the time of
loading
Tensile
force Z
Shear force Q
Tensile force Z
Shear force Q
6.0
6.0
1 dowel in the centre hole
14.0
6.0
fck,cube,current = 20 N/mm2
12.0
6.0
2 dowels, one in each of the outer holes,
e.g. Doka express anchor 16x125mm
13.3
3.0
fck,cube,current = 15 N/mm2
1 Cone screw B 7cm
in the centre hole
44.0
6.0
fck,cube,current = 10 N/mm2
NOTICE
When designing units assembled from tubes
and couplers, all applicable standards and
regulations must be observed, in particular
EN
12812 'Falsework', EN 39 'Loose steel
tubes for tube and coupler scaffolds' and EN
74 'Couplers, spigot pins and baseplates for
use in falsework and scaffolds'.
A Scaffolding tube 48.3mm (L min = distance from structure)
B Scaffolding tube 48.3mm (L = variable)
C Scaffolding tube 48.3mm (L = variable)
D Anchoring shoe for stair tower
E Swivel coupler 48mm
F
Normal coupler 48mm
G Transition swivel coupler 48/76mm
H Horizontal diagonal brace
98003-282-01
A
B
C
D
E
H
F
G
User Information Load-bearing tower Staxo 100
General remarks
57
999804302 - 02/2018
Vertical distance between the anchoring
levels
▪ Will depend on the assembly method, the wind loads
and the design assumptions
▪ Near junctions (frame-joins)
Practical example
NOTICE
The load-bearing tower must be stiffened with
a diagonal cross in the anchoring plane.
H Diagonal cross
NOTICE
▪ The actual design of the anchoring planes,
and the maximum permitted distances from
the structure, must be reviewed separately
for each project.
▪ Adjacent load-bearing towers must be
braced to one another as statically required,
in a similar way to when towers are
anchored to the structure.
98003-247-01
H
H
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Back-stays/shoring supports for the load-bearing towers
Back-stay on the superstructure
Back-stay for load-bearing towers
For transferring planned horizontal loads e.g. wind
loads, concrete loads or in custom applications (e.g. on
inclined load-bearing towers or for high load-bearing
capacities).
Bores in spindle unit and shoe (complete)
a ... dia. 21
mm
b ... dia. 27
mm
c ... Dia. 35
mm
H ... Horizontal force
V ... Resulting vertical force from H
A ... Back-stay/shoring force
A ... Back-stay force
Q ... Shear force (corresponds to horizontal force H)
R ... Resulting anchor force
Z ... Anchor tensile force
NOTICE
Lashing straps are not suitable for transferring
planned horizontal loads.
A Screw-jack unit
B Shoe complete
78.0
a
41.0
X
C
C
Tr845-203-02
a
b
b
b
c
a
A
B
B Load-bearing tower
C Bracing for load-bearing towers
D Multi-purpose waling
E Connecting pin 10cm
F
Spring cotter 5mm
X Tie rod 15.0 (not included in scope of supply)
Length = a minus 119
cm
This leaves a 17
cm adjustment range available
NOTICE
▪ Screw the tie rods all the way in to the rod
connectors of the back-stay (i.e. until they
are fully engaged)!
▪ When calculating the leg loads, allow for the
additional forces imposed by the back-stay!
▪ With high loads and long back-stays, watch
out for any elongation of the back-stay!
H
A
V
98003-249-01
B
C
C
D
E
F
A
R
Z
Q
9734-287-02
User Information Load-bearing tower Staxo 100
General remarks
59
999804302 - 02/2018
Back-stay force Ak = 30 kN (Ad = 45
kN)
Back-stay force Ak = 40
kN (Ad = 60
kN)
Back-stay force Ak = 50
kN (Ad = 75
kN)
Examples of anchor points in uncracked C 25/30 concrete:
a) HILTI heavy-duty anchor HSL-3 M20
b) HILTI heavy-duty anchor HSL-3 M24
c) HILTI HIT HY200A+HIT-V(5.8) M30
or equivalent products from other manufacturers.
Follow the manufacturers' applicable fitting instructions.
Anchored with Doka Express anchor 16x125mm
Note:
The 'Shoe (complete)' must be turned by 180° in the
horizontal.
Permissible back-stay force [kN]
Anchor force [kN]
Zk
Qk = Hk
Rk
Zd
Qd = Hd
Rd
α = 30° a)
18.2
26.0
31.7 27.3
39.0
47.6
α = 45° a)
27.6
21.2
34.8 41.4
31.8
52.2
α = 60° b)
44.8
15.0
47.2 67.2
22.5
70.8
Anchor force [kN]
Zk
Qk = Hk
Rk
Zd
Qd = Hd
Rd
α = 30° a)
24.3
34.6
42.3 36.5
51.9
63.5
α = 45° b)
36.8
28.3
46.4 55.2
42.5
69.6
α = 60° c)
59.7
20.0
62.9 89.6
30.0
94.4
Anchor force [kN]
Zk
Qk = Hk
Rk
Zd
Qd = Hd
Rd
α = 30° b)
30.4
43.3
52.9
45.6
65.0
79.4
α = 45° c)
46.0
35.4
58.0
69.0
53.1
87.0
α = 60° c)
74.6
25.0
78.7 111.9
37.5
118.1
CAUTION
➤Do not remove the Bracing for load-bearing
towers before adequate stability for the load-
bearing tower is ensured.
A Shoe complete
fck,cube,current > 15 N/mm2
fck,cube,current > 25
N/mm2
Ak
Ad
Ak
Ad
α = 30°
16.9
25.4
21.9
32.9
α = 45°
10.2
15.2
13.2
19.7
α = 60°
7.1
10.6
9.1
13.7
Follow the directions in the 'Doka express
anchor 16x125mm' Fitting Instructions!
R
Z
Q
9734-287-01
A
A
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Bracing waling connector WS10
The Bracing waling connector WS10 is used for bracing
load-bearing towers erected on ground which has suffi-
cient load-bearing capacity but in which it is not possi-
ble to fix tension anchoring.
It is also possible to brace several load-bearing towers
to one another to transfer the horizontal loads jointly.
Bracing individual towers in the bracing-strut and
frame planes
Note:
Separate towers may also be braced in the frame plane
or bracing-strut plane only.
Close-up
Note:
The Bracing for load-bearing towers is attached to the
multi-purpose waling directly by means of a spindle
unit, without a ‘Shoe (complete)’.
Permissible back-stay force [kN]
Bracing waling connector WS10
A Bracing waling connector WS10
B Multi-purpose waling WS10 Top50 2.25m
C Tie rod 15.0mm galvanised ...m
D Super plate 15.0
E Bracing for load-bearing towers – without ‘Shoe (complete)’
Tr845 200
- -01
Tr845-200-03
A
B
B
C
D
E
C
C
G
G
H
H
F
G
F
Eye-lug anchor 15.0 without tie rod
G Connecting pin 10cm and Spring cotter 5mm
H Extra safeguard against slippage (end-stop) with Connecting pin
10cm and Spring cotter 5mm
Bolted on through the upper bore
(Ø
21
mm) of the screw-jack unit
Bolted on through the lower bore
(Ø
27
mm) of the screw-jack unit
50.0
40.0
A Screw-jack unit
Permitted tensile force: 50
kN
➤When calculating the leg loads on the Load-
bearing tower, allow for the additional forces
from the bracing!
Tr845-204-02
A
Tr845-204-01
A
User Information Load-bearing tower Staxo 100
General remarks
61
999804302 - 02/2018
Shoring to the superstructure
For transferring planned horizontal loads e.g. wind
loads, concrete loads or in custom applications (e.g. on
inclined load-bearing towers or for high load-bearing
capacities).
H ... Horizontal force
V ... Resulting vertical force from H
A ... Back-stay/shoring force
Permitted load-bearing capacity of Eurex 60
550 (compressive force)*
Used as a plumbing accessory
* 15
kN tensile force at any extension length
30
kN tensile force at any extension length and when anchored with
2 dowels
Fixing to the ground
➤Anchor the plumbing accessories in such a way as to
resist tensile and compressive forces!
Holes in plumbing strut shoe Eurex 60:
a ... diam. 28
mm
b ... diam. 18
mm (suitable for Doka express anchors)
Anchoring the footplate
The Doka express anchor can be re-used many times
over.
Anchored with one dowel (up to 15 kN tensile
force)
CAUTION
➤Do not remove the compression bracing
before adequate stability for the load-bear-
ing tower is ensured.
A Load-bearing tower
B Plumbing strut Eurex 60 550
C Plumbing strut shoe Eurex 60 EB
D Prop head Eurex 60 Top50
Permitted load-bearing
capacity [kN]
Extension length [m]
A
B
C
D
A
V
98003-307-01
H
3
4
5
6
7
8
9
10
13
14
35
30
25
20
15
10
5
0
11
12
9745-101
A Doka express anchor 16x125mm
B Doka coil 16mm
Follow the Fitting Instructions!
Characteristic cube compressive strength of the con-
crete (fck,cube,current):
min. 25
N/mm2 (C20/25 concrete)
Required safe working load of alternative anchors
for footplates:
▪ Rd ≥ 30.0 kN (Fpermissible ≥ 20.0 kN)
in the diam. 18 mm hole
▪ Rd ≥ 43.5 kN (Fpermissible ≥ 29.0 kN)
in the diam. 28 mm hole
Follow the manufacturers' applicable fitting instruc-
tions.
Tr717-200-02
a b
b
9745-222-01
A
B
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Anchored with two dowels (up to 30 kN tensile
force)
Temporary back-stays directly on the
load-bearing tower, for site-erection
NOTICE
▪ One dowel must be positioned between the
lugs of the footplate.
▪ Remove the footplate from the plumbing
strut for this step.
▪ After anchoring the footplate, reinstall the
Plumbing strut Eurex 60 550 at the position
shown.
Characteristic cube compressive strength of the con-
crete (fck,cube,current):
min. 30
N/mm2 (C25/30 concrete)
Required safe working load of alternative anchors
for footplates:
Rd ≥ 30.0 kN (Fpermissible ≥ 20.0 kN)
Follow the manufacturers' applicable fitting instruc-
tions.
9745-222-03
NOTICE
Only suitable for use during erection of the
load-bearing tower, but not for transferring
planned horizontal loads.
A Scaffolding tube 48.3mm (with drilled hole ⌀17mm)
B Normal coupler 48mm
C Spindle connecting plate T
D Back-stay for load-bearing towers
E Tie-rod 15.0mm
98003-308-01
A
C
B
E
D
User Information Load-bearing tower Staxo 100
General remarks
63
999804302 - 02/2018
Inclination adjustment
If the superstructure or the ground are inclined at an
angle of 1% or more, slope compensation must be
provided.
using Wedges for screw-jack
.....
%
These prefabricated birch plywood wedges make it
possible to stand load-bearing towers in the perpendic-
ular on surfaces with various inclinations, even when
utilising the full leg load.
Inclined superstructures
Securing the superstructure at angles of over 12%:
➤Connect the head-plate to the longitudinal beam
(e.g. with Locking rod 15.0/33cm and Super-plate
15.0 or Angle anchor plate 12/18)
Inclined ground surface
using Staxo wedge support WS10
Used with timber wedges, this component provides
angle adjustment to floor-slab constructions with a
max. inclination of 45°.
Bolted into the multipurpose waling, this wedge support
prevents the timber wedges slipping and ensures that
the loads are safely transferred.
Note:
If the legs of the load-bearing tower have to be located
outside the pattern of drilled holes in the multi-purpose
waling, then a suitable 20
mm diam. hole must be
drilled in the web of the waling.
using Staxo wedge support WU12/14
Same function as Staxo wedge support WS10, except
that it is suitable for being pinned to a 12
cm or 14
cm
high waling.
The wedge support is labelled '12' and '14' on the
respective sides, to ensure that it is always correctly
positioned.
CAUTION
Excessively steep wedges may slip away!
➤Maximum inclination: 20%!
For this reason, wedges must NOT be placed
on top of one another in an attempt to compen-
sate for inclinations that are greater than 20%.
A Wedge for screw-jack
.....
%
B Locking rod 15.0/33cm
C Super-plate 15.0
D Wedge for screw-jack
.....
%
9703-255-01
A
B
C
D
9703-254-01
NOTICE
This type of connection is no substitute for
extra structural design measures such as
back-stays.
View without superstructure
a ... min. 15
cm
A Staxo wedge support WS10
B Timber wedge, project-specific
C Multi-purpose waling WS10 Top50
D Nailed connection
NOTICE
The grain of the timber wedges must always
be in the vertical!
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
using an M20 hexagonal bolt
In this case, the superstructure rests on e.g. an
M20x240 hexagonal bolt (A) . This bolt is inserted
through the recessed opening in the Screw jack U-head
and is secured with a self-locking M20 hexagon nut.
with Swivel bearing plates for Screw
jack U-head
Rotatable in all directions, the Swivel bearing plate for
Screw jack U-head has been designed for use with slab
supports where the superstructure slopes on both
sides.
On projects where the superstructure slopes on one
side only, the solutions shown above are preferable.
The Swivel bearing plate for Screw jack U-head is only
allowed to be used in conjunction with the Screw jack
U-head or Heavy duty screw jack 70 top.
Note:
When assessing the oblique bending, always consult
the Statical Calculation Dept.!
CAUTION
➤Maximum inclination: 8%!
9716-292-01
A
NOTICE
The following structural-design limitations
must be taken into account:
▪ Swivel bearing plate for Screw jack U-head'
on head unit only:
- Use only the permitted leg loads for
'Head units not restrained' for construct-
ing the superstructure, but do not
exceed 65
kN.
▪ Swivel bearing plate for Screw jack U-head
on both head and base unit:
- Use only the permitted leg loads for
'Head units not restrained' for construct-
ing the superstructure, but with an addi-
tional load reduction of 25%.
▪ Maximum inclination of superstructure: 18%
▪ Permitted overall inclination (in both the lon-
gitudinal and transverse directions): 18%
▪ From an overall inclination of 12%: Super-
structure must be secured!
▪ Allow for the oblique bending on the primary
beam!
▪ When calculating the extension lengths of
the head and base units, always allow for
the extra height of the Swivel bearing plate
for Screw jack U-head (92
mm).
NOTICE
The following geometrical limitations must
be taken into account:
▪ Maximum widths of walings / beams (see
the section headed 'Steel primary beams').
▪ Additional height of the Swivel bearing plate
for Screw jack U-head (92
mm).
▪ Different foot/U-head extension lengths
caused by inclined superstructures.
User Information Load-bearing tower Staxo 100
General remarks
65
999804302 - 02/2018
Assembly
Multi-purpose waling centrally clamped on the
Swivel bearing plate for Screw jack U-head:
➤Insert a Locking rod 15.0 330mm through one of the
side holes (diam.
18
mm) on the Swivel bearing
plate for Screw jack U-head.
➤Using the nuts & bolts etc. supplied with the product,
fix the Swivel bearing plate for Screw jack U-head to
the Screw jack U-head or Heavy duty screw jack 70
top (spanner size 17
mm).
➤Place the multi-purpose waling on the Swivel bearing
plate for Screw jack U-head.
➤Screw a Super-plate 15.0 onto the Locking rod 15.0
and tighten it.
IPB structural steel section clamped on its side on
the Swivel bearing plate for Screw jack U-head:
➤Using the nuts & bolts etc. supplied with the product,
fix the Swivel bearing plate for Screw jack U-head to
the Screw jack U-head or Heavy duty screw jack 70
top (spanner size 17
mm).
➤Place the IPB structural steel section on the Swivel
bearing plate for Screw jack U-head.
➤From below, insert Locking rods 15.0 330mm
through the punched-out holes on the bent edge of
the Swivel bearing plate for Screw jack U-head.
➤Place a Clamping plate for U-head over the Locking
rods 15.0 and screw it down tightly with hexagon
nuts 15.0.
A Swivel bearing plate for Screw jack U-head
B Screw jack U-head or Heavy duty screw jack 70 top
C Staxo 100 frame
D Multi-purpose waling
E Super-plate 15.0
F
Locking rod 15.0 330mm
G Nuts, bolts etc.
Tr770-200-01
C
D
B
E
F
A
G
A Swivel bearing plate for Screw jack U-head
B Screw jack U-head or Heavy duty screw jack 70 top
C Staxo 100 frame
F
Locking rod 15.0 330mm
G Nuts, bolts etc.
H IPB structural steel section
I
Clamping plate for U-head
J
Hexagon nut 15.0
To prevent the Multi-purpose walings tipping
over while an unattached superstructure is
being mounted, it is advisable – even where
the overall inclination is less than 12
% (in both
the longitudinal and transverse directions) – to
attach 2 Doka H20 beams (K) to each Multi-
purpose waling using Flange-clamps H20 (L) .
Tr770-202-01
C
H
B
F
I
J
A
G
K
L
Tr770-204-01
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
with Compensating plate
The 'Compensating plate' is made of tough plastic and
is used to compensate for sloping support surfaces
beneath load-bearing towers, without limiting their load-
bearing capacity.
▪ Angle adjustment from 0 - 16
% in all directions.
▪ The baseplate is always supported across its entire
area.
▪ The punch-marked number scale is a practical aid
for setting and checking the required angle.
▪ No timber wedges or other chocks are needed.
▪ Max. size of baseplate: 15 x 15
cm
(meaning that Eurex 60
550 cannot be stood on it)
α ... max. angle 16
%
hs ... screw-jack extension length (determines design-load of load-
bearing tower)
Set-up instructions:
➤Place the 'Compensating plates' on concrete.
➤Set the required angle with the black rotary plate.
The numbers must correspond – see close-up.
➤Position the Doka load-bearing tower.
➤Make sure that the 'Compensating plate' is sitting
firmly, and check that the leg is in the vertical.
NOTICE
▪ The 'Compensating plate' must be placed
on concrete only.
▪ For the proof against slippage between the
Compensating plate and the concrete, a
friction coefficient of 0.33 must be assumed.
A
Tr946-200-01
hs
A Compensating plate
B Screw-jack foot
C Spirit level
B
Tr946-200-02
C
A
16%
16%
User Information Load-bearing tower Staxo 100
General remarks
67
999804302 - 02/2018
Adaptation to building layout
with Staxo 100 single legs
Standard design
a ... Inter-frame spacing = 100/150/175/200/250/300
cm
b ... Frame width = 152
cm
c ... Distance of add-on single-leg plane from main tower
= 25 - 150
cm
We recommend using the "Modul" scaffolding
or a commercially available movable scaffold
to facilitate assembly.
98003-319-03
A Staxo 100 single leg 1.80, 1.20 or 0.90
m
E Diagonal cross
(the type will depend on the size of frame and the inter-frame
space)
F
Diagonal cross 9.xxx (where distance 'c' is between 120
cm and
150
cm – otherwise use a scaffolding tube as bracing)
WARNING
Allow for the reduced loading capacities!
➤Can only be used on top-held load-bearing
towers.
➤Allow for higher assumed wind loads!
NOTICE
▪ Horizontal diagonal crosses 9.xxx are
needed at intervals of every two 'storeys' -
beginning with the first storey.
▪ It is not possible to use Diagonal crosses
9.060 and 12.060 in single-leg configura-
tions.
▪ On load-bearing towers higher than
13.20
m, extra bracing – with scaffolding
tubes 48.3mm and Normal couplers 48mm
– must be mounted in the bottom storey.
F
E
A
c
98003-267-01
b
a
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Practical examples
▪ Reducing the number of legs (instead of 2 tower
units, an extra leg-plane is added to one side of the
tower).
▪ Adapting to angled or curved layouts.
Triangle-type solution
c ... 25 - 150
cm
Practical examples
▪ Adapting to angled or curved layouts.
Wheeling
H Scaffold tube 48.3mm
I
Swivel coupler 48mm
98003-319-02
H
I
98003-271-01
98003-268-01
98003-269-01
A Staxo 100 single leg 1.80, 1.20 or 0.90
m
B Scaffolding tube 48.3mm
C Swivel coupler 48mm
NOTICE
Before a Staxo tower with extra legs can be
wheeled, vertical bracing must be added in the
bottom 'storey' between these single legs and
the Staxo 100 tower!
C Swivel coupler 48mm
G Scaffolding tube 48.3mm
B
C
C
A
B
c
98003-275-01
98003-270-01
98003-284-01
C
G
User Information Load-bearing tower Staxo 100
General remarks
69
999804302 - 02/2018
with Eurex 60 550 floor props
Product description
▪ The perfect complement to all Doka load-bearing
towers.
▪ Transfers loads economically, also in confined
spaces.
▪ Extension length: 3.50
to 5.50
m
▪ For even greater heights, the prop can be length-
ened to 7.50
m or 11.0
m. In this case, allow for the
reduction in capacity as shown in the diagram!
▪ Meets DIBT - German Institute for Construction
Engineering - approvals criteria.
▪ Special aluminium profile tubes give the prop its low
weight of only 47.0
kg.
▪ Can be telescoped in 10
cm increments, with contin-
uous fine adjustment.
▪ All parts are captively integrated - telescopic tube
has anti-dropout safeguard.
Follow the directions in the 'Eurex 60 550' User
Information!
98003-314-01
9745-211-01
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Permitted load-bearing capacity of Eurex 60
550
Permitted capacities [kN] as a function of the exten-
sion length and the position of the outer tube
(prop category T55 to EN 16031)
*) Position of outer tube
Holding primary beams
Assembly
➤Place the U-head or four-way head on the prop and
fix with spring-steel stirrup.
Bracing
Swivel couplers Eurex 60 can be fixed at any height on
the outer tube. This means that bracing tubes can be
attached wherever needed.
Examples:
▪ between prop and load-bearing tower frame
▪ between two or more props
▪ to facilitate erection of the prop (as a 'handle' for
workers to hold onto)
Position of
outer tube*)
Prop length [m]
at bottom
at top
5.5
61.8
67.0
5.4
65.0
70.9
5.3
68.5
74.9
5.2
72.1
78.6
5.1
76.0
83.5
5.0
80.3
88.6
4.9
84.0
88.9
4.8
88.9
4.7
4.6
4.5
4.4
4.3
4.2
4.1
4.0
3.9
3.8
3.7
3.6
3.5
at bottom
at top
9745-2 -01
21
9745-2 -01
21
U-head Eurex 60 for steel girders
(e.g. WS10), squared timbers or
formwork beams H20
Four-way head Eurex 60 for sin-
gle or double formwork beams H
20
A Floor prop Eurex 60 550
B Swivel coupler Eurex 60
C Scaffolding tube 48.3mm
9745-201-01
9745-201-01
9745-212-01
9745-203-01
C
B
A
User Information Load-bearing tower Staxo 100
General remarks
71
999804302 - 02/2018
Holding Eurex 60 550 floor props upright
during erection
Removable folding tripod 1.20m
Plumbing struts
A Floor prop Eurex 60 550
B Removable folding tripod 1.20m
A Deckenstütze Eurex 60 550
B Plumbing strut 340 or 540 IB with Strut shoe EB
98003-315-01
A
B
9703-256-01
A
B
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Secondary-beam stabilisers
Secondary-beam stabilisers are used to prevent form-
work beams tipping over while panels are being laid on
them.
Advantages:
▪ Special claws to prevent slippage on the beam-
flange
▪ Needs only small commissioning quantities, as the
Secondary-beam stabilisers can be re-set in tandem
with the formwork erection cycle:
- approx. 20 Secondary-beam stabilisers 1
- approx. 10 Secondary-beam stabilisers 2
Note:
In certain special situations, (e.g. when forming inclined
floor-slabs), Secondary-beam stabilisers can also be
used for transferring horizontal loads.
For more information, please contact your Doka techni-
cian.
Assembly:
➤Hang the Secondary-beam stabilisers into place with
an Alu beam fork H20.
The secondary beam is now held in place.
➤Lay the formwork sheets.
➤After the formwork sheets have been laid, unhook
and remove the Secondary-beam stabilisers with an
Alu beam fork
H20.
Secondary-beam stabiliser 1
Secondary-beam stabiliser 2
98039-217-01
98039-217-02
98024-329-01
User Information Load-bearing tower Staxo 100
General remarks
73
999804302 - 02/2018
Combining Staxo 100 with Staxo
NOTICE
In principle, the system frames of the Load-
bearing towers Staxo and Staxo 100 are com-
patible with one another. Ideally, however,
tower frames should each be assembled from
components of the same system (i.e. 'mono-
system'). The diagrams in the User Informa-
tion booklet and type-test only apply to mono-
system tower frames.
If this is not possible, then the following points
must be remembered:
▪ The lower leg loads permitted for the Staxo
system must be assumed.
- Custom applications with permitted
capacities of 85 or 97
kN per leg are not
possible
- No type-test
▪ At the very least, each 'storey' must be
assembled from components of the same
system (because the two systems use dif-
ferent horizontal diagonal braces).
For details regarding structural design, set-up
and use, see the User Information booklet
'Doka load-bearing tower Staxo' !
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Combining with Dokamatic tables
Superstructure attached by
Dokamatic table Staxo spindle
connectors
▪ Ready-assembled Dokamatic tables can be
mounted directly onto Staxo 100
▪ Height adjustment is possible in both the head and
base zone of the load-bearing tower
▪ Superstructure can be inclined by up to 12% (in both
the longitudinal and transverse directions)
Assembly
➤Mount a Screw-jack foot on the top frame.
➤Bolt the 'Dokamatic table Staxo spindle connector'
onto the Screw-jack foot.
Spanner size (width-across): 24
mm
Attaching the Dokamatic table:
➤Place the Dokamatic table onto the Staxo unit with
the aid of two Dokamatic lifting straps 13.00m and
the crane.
➤Fit Connecting pins 10cm to connect the table, and
secure these with spring cotters. The second con-
necting pin on each longitudinal connection prevents
any displacement of the table superstructure.
NOTICE
This configuration requires screwjack feet at
the top of the tower instead of the usual screw-
jack head units!
9
-01
8026-216
B Dokamatic table Staxo spindle connector
C Screw-jack foot
B Dokamatic table Staxo spindle connector
E Connecting pin 10cm
F
Spring cotter 5mm
G Dokamatic table
98026-213-01
C
B
98026-212-01
B
B
E
E
F
F
G
G
G
User Information Load-bearing tower Staxo 100
General remarks
75
999804302 - 02/2018
Inclinations
using Wedges for screw-jack
.....
% (hardwood
wedge)
➤Bolt the 'Wedge for screw-jack
.....
%' onto the
Screw-jack foot. If any more holes are needed in the
'Wedge for screw-jack', these can be drilled on-site.
Details of extra holes in the Wedge for screw-
jack
.....%
a ... 55
mm
H Wedge for screw-jack ..... %
J
Holes to be drilled (diam. 20 mm)
K Ready-drilled hole (diam. 20 mm)
NOTICE
Max. table inclination 12% (in both the longitu-
dinal and transverse directions).
98026-214-01
H
H
98026-215-01
a
a
J
J
K
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Steel primary beams
The following tables will be helpful to you when you are
planning load-bearing tower superstructures consisting
of steel primary beams and Screw jack U-heads, Heavy
duty screw jacks 70 top or Swivel bearing plates for
Screw jack U-head.
Usage conditions for Doka series walings
1) Hardwood support (A) needed.
The bevelled edges prevent it resting in the curved radius zone.
This results in a max. available width of 188
mm.
Usage conditions for various I-section girders
Doka series walings
Width x
height
[mm]
Unsecured
Max. width = 165
mm
Secured centrally
(necessary from 12%)
Max. width = 165
mm
Multi-purpose waling WS10
Top50
153 x 100
Yes
Yes
Multi-purpose waling WU12
Top50
163 x 120
Yes
Yes
Facade waling WU14
172 x 140
Yes 1)
Yes 1)
Multi-purpose waling SL-1
WU16
183 x 160
Yes 1)
Yes 1)
System beam SL-1
226 x 240
No
No
Tr777-200-01
Tr777-201-01
Tr770-201-03
A
Selection of I-girders
Width x
height
[mm]
Unsecured
Max. width = 165
mm
Secured at side
(necessary from 12%)
Max. width = 150
mm
I 380
149 x 380
Yes
Yes
I 425
163 x 425
Yes
No
IPE 300
150 x 300
Yes
Yes
IPE 330
160 x 330
Yes
No
IPBI 140
140 x 133
Yes
Yes
IPBI 160
160 x 152
Yes
No
IPB 140
140 x 140
Yes
Yes
IPB 160
160 x 160
Yes
No
Tr777-202-01
Tr777-203-01
User Information Load-bearing tower Staxo 100
General remarks
77
999804302 - 02/2018
Intermediate level made up with multi-purpose walings
Intermediate levels made up from multi-purpose wal-
ings permit the transfer of horizontal loads. The possi-
bilities for using multi-purpose walings for this purpose
are as follows:
▪ Connection of a back-stay
▪ Support against / anchoring to the structure
▪ Formation of a truss of cross-braced horizontal multi-
purpose walings
Assembly
➤Insert Coupler WS10 250 into the Staxo
100 frame
and bolt it into position.
➤Set the multi-purpose waling on the coupler.
➤Clamp the Multi-purpose waling WS10 to the cou-
pler.
➤Set the next Staxo
100 frame on the coupler and bolt
it into position.
The scope of supply of the Coupler WS10 250 includes:
▪ 2 hexagon bolts M16x80
▪ 2 hexagon bolts M16x160
▪ 4 washers 16
▪ 4 hexagon nuts M16 (self-locking)
Note:
As an alternative to the bolts, it is also possible to
establish the connection between coupler and
Staxo
100 frame using Spring locked connecting pins
16mm.
A Coupler WS10 250
B Multi-purpose waling WS10
A Coupler WS10 250
B Multi-purpose waling WS10
C Staxo
100 frame
98043-200-01
B
A
98043-201-01
A
B
C
A Coupler WS10 250
B Multi-purpose waling WS10
C Staxo
100 frame
98043-202-01
A
B
C
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Transporting, stacking and storing
Doka pallet for Staxo/Aluxo
Storage and transport device for Staxo, Staxo 100 or
Aluxo frames (max. 20 frames per pallet):
▪ durable
▪ stackable
Suitable transport appliances:
▪ crane
▪ pallet stacking truck
▪ forklift truck
Other features:
▪ Integral lashing strap for fixing the tower frames
▪ The connection sleeves on the frames remain
extended.
▪ 1.20
m wide - ideal for transporting by truck
Loading the transport device
➤Unwind the lashing strap from the Doka pallet for
Staxo/Aluxo.
➤Fix the connection sleeves of the Staxo or Aluxo
frames in the extended position, using the yellow
security spring.
➤Insert the legs of the frames into the location holes.
➤Depending on the height of the frames, pull the lash-
ing strap either around the cross profile or (with
1.80m frames) around the top ladder-rung profile,
hook it into the belt hook and tighten it carefully.
Utilise the benefits of Doka multi-trip packaging
on your site.
Multi-trip packaging such as containers, stacking pal-
lets and skeleton transport boxes keep everything in
place on the site, minimise time wasted searching for
parts, and streamline the storage and transport of sys-
tem components, small items and accessories.
Max. load-bearing capacity: 750
kg
Permitted imposed load: 1630
kg (max. 3 stacked pal-
lets)
NOTICE
▪ Multi-trip packaging items that each contain
very different loads must be stacked with
the heaviest ones at the bottom and the
lightest ones at the top!
▪ The rating plate must be in place and clearly
legible.
98003-246-01
CAUTION
➤It is not allowed to mix frames of different
heights!
A Security spring (yellow)
0.90m frames
1.20m frames
1.80m frames
NOTICE
Overtightening the lashing strap can damage
the cross profiles of the load-bearing tower
frames.
NOTICE
On pallets with 'open' belt hooks that are being
used for 1.80m high frames, the lashing strap
MUST always be in the position shown.
Version with 'closed' belt hook
Version with 'open' belt hook
B Belt hook
C Cross profile
D Lashing strap
9225-201-01
A
9225-215-01
B
B
9225-216-01
B
9225-217-01
B
D
C
9225-220-01
D
B
9225-207-02
C
User Information Load-bearing tower Staxo 100
General remarks
79
999804302 - 02/2018
Using Doka pallets for Staxo/Aluxo as storage
units
Storage of filled pallets
Storage of empty pallets
Using Doka pallets for Staxo/Aluxo as
transport devices
Lifting by crane
Repositioning by forklift truck or pallet stacking
truck
NOTICE
▪ The pallets at the bottom of the stack must
be completely and uniformly filled.
▪ Make sure that the connection sleeves are
fixed in place and that the lashing strap is in
the right position and is correctly tensioned.
Max. number of pallets
Type of frame
Stacked on the site
(outdoors); floor gra-
dients of up to 3%
Stacked in the ware-
house; floor gradients
of up to 1%
Aluxo frame 1.20m
2
4
Aluxo frame 1.80m
1
3
Staxo / Staxo
100
frame 0.90m
4
4
Staxo / Staxo
100
frame 1.20m
3
3
Staxo / Staxo
100
frame 1.80m
2
3
NOTICE
▪ When empty pallets are stacked, the lash-
ing straps must be wound around the verti-
cal profiles, attached to the belt hook and
tensioned.
Type of
frame
Max. number of pallets
Stacked on the site
all
17
Stacking in the warehouse
all
27
WARNING
Do not attach the lifting chain to the Staxo or
Aluxo frames!
The lashing strap is not designed to be used for
hoisting loads – risk of rupture!
➤The lifting chain may only be attached to the
4 slinging points on the Doka pallet for
Staxo/Aluxo.
NOTICE
▪ Multi-trip packaging items may only be lifted
one at a time.
▪ Use a suitable lifting chain
(e.g. Doka 4-part chain 3.20m).
Do not exceed the permitted load-bearing
capacity.
▪ Spread-angle β max. 30°!
NOTICE
▪ The forks of the transport appliances may
only be placed beneath the cross profiles of
the Doka pallet for Staxo/Aluxo!
▪ Push stacker-truck forks as far apart as pos-
sible.
C Cross profile
9225-218-01
9225-219-01
C
C
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Doka skeleton transport box
1.70x0.80m
Storage and transport devices for small items:
▪ durable
▪ stackable
Suitable transport appliances:
▪ crane
▪ pallet stacking truck
▪ forklift truck
To make the Doka skeleton transport box easier to load
and unload, one of its sidewalls can be opened.
Using Doka skeleton transport boxes
1.70x0.80m as storage units
Max. n° of boxes on top of one another
Using Doka skeleton transport boxes
1.70x0.80m as transport devices
Lifting by crane
Repositioning by forklift truck or pallet stacking
truck
The forks can be inserted under either the broadside or
the narrowside of the containers.
Max. load: 700
kg (1540
lbs)
Permitted imposed load: 3150
kg (6950
lbs)
NOTICE
▪ Multi-trip packaging items that each contain
very different loads must be stacked with
the heaviest ones at the bottom and the
lightest ones at the top!
▪ Rating plate must be in place and clearly
legible
Outdoors (on the site)
Indoors
Floor gradient up to 3%
Floor gradient up to 1%
2
5
It is not allowed to stack empty
pallets on top of one another!
NOTICE
▪ Multi-trip packaging items may only be lifted
one at a time.
▪ Only lift the boxes when their sidewalls are
closed!
▪ Use a suitable lifting chain
(e.g. Doka 4-part chain 3.20m).
Do not exceed the permitted load-bearing
capacity.
▪ Spread-angle β max. 30°!
9234-203-01
User Information Load-bearing tower Staxo 100
General remarks
81
999804302 - 02/2018
Doka multi-trip transport box
1.20x0.80m galv.
Storage and transport devices for small items:
▪ durable
▪ stackable
Suitable transport appliances:
▪ crane
▪ pallet stacking truck
▪ forklift truck
Multi-trip transport box partition
Different items in the Multi-trip transport box can be
kept separate with the Multi-trip transport box partitions
1.20m or 0.80m.
Possible ways of dividing the box
Using Doka multi-trip transport boxes as
storage units
Max. n° of boxes on top of one another
Using Doka multi-trip transport boxes as
transport devices
Lifting by crane
Repositioning by forklift truck or pallet stacking
truck
The forks can be inserted under either the broadside or
the narrowside of the containers.
Max. load: 1500
kg (3300
lbs)
Permitted imposed load: 7850
kg (17305
lbs)
NOTICE
▪ Multi-trip packaging items that each contain
very different loads must be stacked with
the heaviest ones at the bottom and the
lightest ones at the top!
▪ Rating plate must be in place and clearly
legible
A Slide-bolt for fixing the partition
Tr755-200-02
A
Multi-trip transport
box partition
Lengthways
Crossways
1.20m
max. 3 partitions
-
0.80m
-
max. 3 partitions
Outdoors (on the site)
Indoors
Floor gradient up to 3%
Floor gradient up to 1%
3
6
It is not allowed to stack empty
pallets on top of one another!
NOTICE
▪ Multi-trip packaging items may only be lifted
one at a time.
▪ Use a suitable crane suspension tackle
(e.g. Doka 4-part chain 3.20m).
Do not exceed the permitted load-bearing
capacity.
▪ Spread angle β max. 30°!
Tr755-200-04
Tr755-200-05
9206-202-01
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Doka stacking pallet 1.55x0.85m and
1.20x0.80m
Storage and transport devices for long items:
▪ durable
▪ stackable
Suitable transport appliances:
▪ crane
▪ pallet stacking truck
▪ forklift truck
Using Doka stacking pallets as storage units
Max. n° of units on top of one another
Note:
How to use with bolt-on castor set:
Always apply the fixing brake when the container is
‘parked’.
When Doka stacking pallets are stacked, the bottom
pallet must NOT be one with a bolt-on caster set
mounted to it.
Using Doka stacking pallets as transport
devices
Lifting by crane
Repositioning by forklift truck or pallet stacking
truck
Max. load: 1100
kg (2420
lbs)
Permitted imposed load: 5900
kg (12980
lbs)
NOTICE
▪ Multi-trip packaging items that each contain
very different loads must be stacked with
the heaviest ones at the bottom and the
lightest ones at the top!
▪ Rating plate must be in place and clearly
legible
Outdoors (on the site)
Indoors
Floor gradients of up to 3%
Floor gradients of up to 1%
2
6
It is not allowed to stack empty
pallets on top of one another!
NOTICE
▪ Multi-trip packaging items may only be lifted
one at a time.
▪ Use a suitable crane suspension tackle
(e.g. Doka 4-part chain 3.20m).
Do not exceed the permitted load-bearing
capacity.
▪ Load the items centrically.
▪ Fasten the load to the stacking pallet so that
it cannot slide or tip out.
▪ Spread angle β max. 30°!
a
Doka stacking pallet 1.55x0.85m
max. 4.5
m
Doka stacking pallet 1.20x0.80m
max. 3.0
m
NOTICE
▪ Load the items centrically.
▪ Fasten the load to the stacking pallet so that
it cannot slide or tip out.
92815-2 -01
24
a
=
=
User Information Load-bearing tower Staxo 100
General remarks
83
999804302 - 02/2018
Doka accessory box
Storage and transport devices for small items:
▪ durable
▪ stackable
Suitable transport appliances:
▪ crane
▪ pallet stacking truck
▪ forklift truck
The Doka accessory box is the tidy, easy-to-find way of
storing and stacking all interconnection and form-tie
components.
Doka accessory boxes as storage units
Max. n° of boxes on top of one another
Note:
How to use with bolt-on castor set:
Always apply the fixing brake when the container is
'parked'.
When Doka accessory boxes are stacked, the bottom
box must NOT be one with a bolt-on castor set mounted
to it.
Doka accessory box as transport devices
Lifting by crane
Repositioning by forklift truck or pallet stacking
truck
The forks can be inserted under either the broadside or
the narrowside of the containers.
Bolt-on castor set B
The Bolt-on caster set
B turns the stacking pallet into a
fast and manoeuvrable transport device.
Suitable for drive-through access openings >
90
cm.
The Bolt-on caster set
B can be mounted to the follow-
ing multi-trip packaging items:
▪ Doka accessory box
▪ Doka stacking pallets
Max. load: 1000
kg (2200
lbs)
Permitted imposed load: 5530
kg (12191
lbs)
NOTICE
▪ Multi-trip packaging items that each contain
very different loads must be stacked with
the heaviest ones at the bottom and the
lightest ones at the top!
▪ Rating plate must be in place and clearly
legible
Outdoors (on the site)
Indoors
Floor gradient up to 3%
Floor gradient up to 1%
3
6
It is not allowed to stack empty
pallets on top of one another!
NOTICE
▪ Multi-trip packaging items may only be lifted
one at a time.
▪ Use a suitable lifting chain
(e.g. Doka 4-part chain 3.20m).
Do not exceed the permitted load-bearing
capacity.
▪ Spread angle β max. 30°!
Follow the directions in the 'Bolt-on castor set
B' Operating Instructions!
92816-206-01
999804302 - 02/2018
General remarks
User Information Load-bearing tower Staxo 100
Removing and refitting the connection sleeve
Removing
➤Using e.g. a tie rod, push the connection sleeve
upwards until it hits the stop.
➤Use a screwdriver to press the spring out of the way.
➤Pull out the connection sleeve as far as the stop.
➤Stick a pointed object (e.g. a nail) into the hole in the
connection sleeve until the spring no longer reaches
over the stop.
➤Completely pull out the connection sleeve.
Safely stow away the loose connection sleeve so that it
can be reinstalled in the Staxo 100 frame when work is
finished.
Installation
➤Use a screwdriver to press the spring out of the way.
➤Push the connection sleeve into the frame tube from
below, until it hits the stop (make sure that the spring
(A) is in the right position)
➤Use a screwdriver to press the rear stop out of the
way.
➤Keep pushing in the connection sleeve until the
spring snaps into place.
➤Press the yellow locking spring towards the outside.
This fixes the connection sleeve in the frame.
The Staxo 100 frame is now back in its as-delivered
condition.
98003-301-01
98003-301-02
98003-301-03
98003-301-04
A
98003-313-01
98003-313-02
98003-313-03
User Information Load-bearing tower Staxo 100
Structural design
85
999804302 - 02/2018
Structural design
Preconditions for use
▪ Working wind of 0.2
kN/m2 (64.4
km/h) is considered
▪ Separate proof must be provided, by a suitably
skilled person, regarding the foundation. Particular
attention must be paid here to the ground-bearing
pressure!
▪ Intermediate anchoring planes may be necessary
while the towers are being erected.
▪ The calculated values are in line with the 'Type test
for Staxo 100' and thus also with EN
12812 and
EN
1993.
▪ In all cases which differ from the stated boundary
conditions, the type-test must be used as the basis
for the dimensioning calculation, to ensure adequate
stability.
Such deviations may be due to:
- variations in height
- different wind loads
- different inter-frame spacings
- additional horizontal loads
- single legs
- larger screw-jack extension lengths
- inclined load-bearing tower
▪ On multi-plane towers with different inter-frame
spaces, it is always the smallest inter-frame space
that determines the design load.
Inclination adjustment
▪ Inclination adjusted with a centering strip (e.g. hexa-
gon bolt M20x230) or Swivel bearing plate for Screw
jack U-head = Screw-jack U-head not restrained.
▪ Inclination adjusted with a wooden wedge or 'Com-
pensating plate' = no effect on the restraint situation.
- e.g. with Wedge for screw jack U-head or Staxo
wedge support
Founding with the 'Compensating plate'
Ranges of use for top-held systems
Ranges of use for free-standing systems
For each 1% angle of inclination, increase the minimum
imposed loads by +10% (max. +160%).
This fulfils the local proof against slippage between the
Compensating plate and the concrete (μk = 0.33).
Set-up configurations
Superstructure configuration
Max. influence width of the secondary beams for the superstructure:
50 cm
NOTICE
▪ The 'Compensating plate' must be placed
on concrete only.
▪ For the proof against slippage between the
Compensating plate and the concrete, a
friction coefficient of 0.33 must be assumed.
Height of load-bearing tower
Dynamic pressure
h ≤ 15 m
qk ≤ 1.3 kN/m2
15 m < h ≤ 21 m
qk ≤ 0.8 kN/m2
As tower
Number of frame planes = 2
With multiple towerframe-planes
Number of frame planes ≥ 3
Top-held systems
Free-standing systems
Head units restrained
Double primary beams H20 or
Single primary beam I tec 20
Multipurpose walings
Head units not restrained
Swivel bearing plate
for Screw-jack U-head
Single primary beam H20
Superstructure with
spindle struts
9661-232-01
98003-304-01
98003-305-01
98024-226-01
98003-328-01
98003-329-01
98024-227-01
98003-330-01
999804302 - 02/2018
Structural design
User Information Load-bearing tower Staxo 100
Permitted leg loads
Free-standing systems (without back-stay, without holding device)
Top-held systems (e.g. enclosed space, or with back-stay)
Frame size [m]
Screw-jack extension lengths
[cm]
at top and bottom respectively
Inter-frame
space [m]
N° of frame planes
connected to one
another by diagonal
crosses (multi-plane
tower)
Max. height [m] of
load-bearing tower
without intermediate
anchoring
(Intermediate anchor-
ing planes may be
necessary while the
towers are being
erected)
Permitted leg load [kN]
Unbraced
Braced
Head units
restrained
Head units
not restrained
V
H
V
H
up to 1.80
30
70
≥ 1.5
≥ 2
7.8
63
1
55
1
11.4
56
1
—
—
13.2
53
1
—
—
≥ 1.0
≥ 3
7.8
62
1
54
1
≥ 5
13.2
56
1
—
—
up to 1.20
30
45
≥ 1.0
≥ 3
7.8
83
1
—
—
≥ 5
15
75
1
—
—
≥ 0.6
≥ 5
7.8
77
1
—
—
≥ 8
15
65
1
—
—
Frame size [m]
Screw-jack extension lengths
[cm]
at top and bottom respectively
Inter-frame
space [m]
N° of frame planes
connected to one
another by diagonal
crosses (multi-plane
tower)
Max. height [m] of
load-bearing tower
without intermediate
anchoring
(Intermediate anchor-
ing planes may be
necessary while the
towers are being
erected)
Permitted leg load [kN]
Unbraced
Braced
Head units
restrained
Head units
not restrained
up to 1.80
30
70
≥ 1.5
≥ 2
3.2
67
60
20
70
61
up to 1.20
30
45
≥ 1.5
≥ 2
2.1
89
—
20
94
—
≥ 1.0
≥ 3
2.1
87
—
21
93
—
≥ 0.6
≥ 5
2.1
87
—
21
91
—
up to 1.20
(with 0.90 in
top and bottom
'storeys')
25
45
≥ 1.5
≥ 2
3.5
105
—
20
98
—
≥ 1.0
≥ 2
10
103
—
≥ 3
20
98
—
≥ 0.6
≥ 5
20
96
—
▪ Permitted leg load where 2 Doka beams I
tec
20
are used as primary beams in conjunction with
Staxo
100: 60
kN
▪ Permitted leg load where 2 Doka beams I
tec
20
are used as primary beams in combination with
Staxo 100 and a Dokaplex intermediate sheet (size:
160
x 210
mm, thickness: 18 or 21
mm): 70
kN
▪ Permitted leg load where 2 Doka beams I
tec
20
are used as primary beams in combination with
Staxo 100 and an intermediate sheet of thickness
t=8
mm: 80
kN
The intermediate sheets have to be secured so that
they cannot drop down, for example with suitable
lengths of adhesive tape.
NOTICE
▪ Secure the load-bearing tower against slip-
page and tipover, in all situations!
▪ Ensure that all loads are applied centrally!
User Information Load-bearing tower Staxo 100
Structural design
87
999804302 - 02/2018
Bracing
D Swivel coupler 48mm
F
Split nut B
T
Heavy-duty screw jack 70
V Heavy-duty screw jack 70 top
Y Extra bracing is only necessary if the screw-jack heads are not
connected with one another by way of the formwork base.
Z
Scaffold tube 48.3mm
98003-288-01
V
Y
D
Z
Z
D
F
Y
98003-288-02
Z
T
Z
D
D
F
999804302 - 02/2018
Component overview
User Information Load-bearing tower Staxo 100
Component overview
[kg]
Article n°
Staxo 100 frame 0.90m
24.0 582302000
Staxo 100 frame 1.20m
28.0 582301000
Staxo 100 frame 1.80m
37.0 582300000
Staxo 100-Rahmen
Diagonal cross 9.060
3.1 582322000
Diagonal cross 9.100
4.1 582772000
Diagonal cross 9.150
5.2 582773000
Diagonal cross 9.165
5.7 582627000
Diagonal cross 9.175
6.1 582334000
Diagonal cross 9.200
6.6 582774000
Diagonal cross 9.250
7.7 582775000
Diagonal cross 9.300
9.0 582323000
Diagonal cross 12.060
4.0 582324000
Diagonal cross 12.100
4.6 582610000
Diagonal cross 12.150
5.7 582612000
Diagonal cross 12.165
6.1 582628000
Diagonal cross 12.175
6.3 582335000
Diagonal cross 12.200
6.9 582614000
Diagonal cross 12.250
8.3 582616000
Diagonal cross 12.300
9.3 582325000
Diagonal cross 18.100
6.1 582620000
Diagonal cross 18.150
6.9 582622000
Diagonal cross 18.165
7.3 582629000
Diagonal cross 18.175
7.8 582336000
Diagonal cross 18.200
7.8 582624000
Diagonal cross 18.250
9.1 582626000
Diagonal cross 18.300
10.3 582326000
Diagonalkreuz
Diagonal cross H 9.100
5.7 582337000
Diagonal cross H 9.150
7.2 582338000
Diagonal cross H 9.200
9.3 582339000
Diagonal cross H 9.250
11.3 582340000
Diagonal cross H 12.100
5.8 582341000
Diagonal cross H 12.150
7.5 582342000
Diagonal cross H 12.200
9.3 582343000
Diagonal cross H 12.250
10.5 582344000
Diagonalkreuz H
U-head D
6.7 582709000
Gabelkopf D
4-way screw-jack head
10.4 582638000
Vierwegkopfspindel
Screw jack U-head
9.2 582636000
Kopfspindel
Heavy-duty screw jack 70 top
9.2 582327000
Lastspindel 70 oben
Split nut B
2.0 582634000
Spannmutter B
Clamping plate D
2.0 502709030
Klemmplatte D
Wing nut 15.0
0.31 581961000
Flügelmutter 15,0
Locking rod 15.0 330mm
0.48 582641000
Quetschteil 15,0 330mm
Dokamatic table Staxo spindle connector
3.9 582347000
Staxo-Spindelanschluss Dokamatic-Tisch
Galvanised
Galvanised
Delivery condition: folded closed
Galvanised
Delivery condition: folded closed
Galvanised
Length: 20 cm
Width: 22 cm
Height: 37 cm
Galvanised
Height: 86 cm
Galvanised
Height: 74 cm
Galvanised
Height: 106 cm
Galvanised
Galvanised
Length: 24 cm
Width: 9 cm
Galvanised
Length: 10 cm
Height: 5 cm
Width-across: 27 mm
Galvanised
Width-across: 24 mm
Galvanised
Length: 20.7 cm
999804302 - 02/2018
User Information Load-bearing tower Staxo 100
Component overview
Wedge for screw jack ..... %
0.46 176071000
Spindelkeil ..... %
Staxo 100 spindle adapter
3.4 582351000
Staxo 100-Spindeladapter
Super plate 15.0
1.1 581966000
Superplatte 15,0
Staxo wedge support WS10
8.7 582796000
Staxo-Keilauflager WS10
Staxo wedge support WU12/14
12.2 582350000
Staxo-Keilauflager WU12/14
Swivel bearing plate for screw jack U-head
5.2 582799000
Gelenkaufsatz Kopfspindel
Screw jack foot
9.0 582637000
Fußspindel
Heavy-duty screw jack 70
8.8 582639000
Lastspindel 70
Heavy-duty screw jack 130
13.0 582711000
Lastspindel 130
Compensating plate
1.2 582239000
Ausgleichsplatte
Staxo 100 single leg 0.90m
20.2 582305000
Staxo 100 single leg 1.20m
21.5 582304000
Staxo 100 single leg 1.80m
17.0 582303000
Staxo 100-Einzelstiel
Doka floor prop Eurex 60 550
47.0 582650000
Doka-Deckenstütze Eurex 60 550
Extension Eurex 60 2.00m
21.3 582651000
Verlängerung Eurex 60 2,00m
Coupler Eurex 60
8.6 582652000
Kupplungsstück Eurex 60
Length: 20 cm
Width: 16 cm
Galvanised
Height: 26 cm
Galvanised
Height: 6 cm
Diameter: 12 cm
Width-across: 27 mm
Galvanised
Length: 31 cm
Width: 15 cm
Height: 23 cm
Galvanised
Length: 35.6 cm
Width: 15 cm
Height: 33.6 cm
Galvanised
Length: 20.8 cm
Width: 15.0 cm
Height: 14.4 cm
Galvanised
Height: 69 cm
Galvanised
Height: 101 cm
Galvanised
Height: 173 cm
Orange
Black
Diameter: 30 cm
Galvanised
Aluminium
Length: 345 - 555 cm
Powder-coated blue
Aluminium
Length: 250 cm
Aluminium
Length: 100 cm
Diameter: 12.8 cm
999804302 - 02/2018
Component overview
User Information Load-bearing tower Staxo 100
U-head Eurex 60
2.9 582656000
Gabelkopf Eurex 60
4-way head Eurex 60
4.5 582655000
Vierwegkopf Eurex 60
Plumbing strut Eurex 60 550
42.5 582658000
Justierstütze Eurex 60 550
Prop head Eurex 60 Top50
7.1 582665000
Stützenkopf Eurex 60 Top50
Connector Eurex 60 IB
4.2 582657500
Verbindungsstück Eurex 60 IB
Plumbing strut shoe Eurex 60 EB
8.0 582660500
Justierstützenfuß Eurex 60 EB
Swivel coupler 48mm Eurex 60
1.0 582654000
Drehkupplung 48mm Eurex 60
Plumbing strut 340 IB
16.7 588696000
Justierstütze 340 IB
Plumbing strut 340 IB EF
14.9 588247500
Justierstütze 340 IB EF
Plumbing strut 540 IB
30.7 588697000
Justierstütze 540 IB
Plumbing strut 540 IB EF
28.9 588250500
Justierstütze 540 IB EF
Strut shoe EB
0.93 588946000
Strebenschuh EB
Galvanised
Length: 22 cm
Width: 20 cm
Height: 12 cm
Galvanised
Length: 25 cm
Width: 21 cm
Height: 21 cm
Powder-coated blue
Aluminium
Length: 343 - 553 cm
Galvanised
Height: 50 cm
Galvanised
Length: 15 cm
Width: 15 cm
Height: 30 cm
Galvanised
Length: 31 cm
Width: 12 cm
Height: 33 cm
Galvanised
Width-across: 22 mm
Follow the directions in the "Fitting
instructions"!
Galvanised
Length: 190.8 - 341.8 cm
Galvanised
Length: 190.8 - 341.8 cm
Galvanised
Length: 310.5 - 549.2 cm
Galvanised
Length: 310.5 - 549.2 cm
Galvanised
Width: 8 cm
Height: 13 cm
999804302 - 02/2018
User Information Load-bearing tower Staxo 100
Component overview
Prop shoe EB
1.8 588245500
Stützenschuh EB
Universal dismantling tool
3.7 582768000
Universal-Lösewerkzeug
Removable folding tripod 1.20m
20.7 586145000
Stützbein 1,20m
Doka express anchor 16x125mm
0.31 588631000
Doka-Expressanker 16x125mm
Doka coil 16mm
0.009 588633000
Doka-Coil 16mm
Scaffold planking 30/100cm
7.4 582231000
Scaffold planking 30/150cm
10.6 582232000
Scaffold planking 30/200cm
13.5 582234000
Scaffold planking 30/250cm
16.4 582235000
Scaffold planking 30/300cm
19.5 582236000
Gerüstbelag
Scaffold planking 60/100cm with manhole
9.5 582311500
Scaffold planking 60/150cm with manhole
13.8 582312500
Scaffold planking 60/175cm with manhole
15.5 582333500
Scaffold planking 60/200cm with manhole
17.7 582313500
Scaffold planking 60/250cm with manhole
20.8 582314500
Scaffold planking 60/300cm with manhole
26.3 582315500
Gerüstbelag mit Durchstieg
Scaffold planking 60/60cm
6.1 582330500
Scaffold planking 60/100cm
9.5 582306500
Scaffold planking 60/150cm
13.6 582307500
Scaffold planking 60/175cm
15.5 582332500
Scaffold planking 60/200cm
17.8 582308500
Scaffold planking 60/250cm
22.2 582309500
Scaffold planking 60/300cm
26.2 582310500
Gerüstbelag
Staxo 100 toeboard
5.5 582329000
Staxo 100-Fußwehr
Staxo 100 planking strut 1.00m
6.1 582348000
Staxo 100 planking strut 1.50m
9.0 582349000
Staxo 100-Belagstrebe
Staxo front railing
10.5 582316000
Staxo-Stirngeländer
Staxo side railing 100
17.5 582317500
Staxo side railing 150
20.0 582318500
Staxo side railing 175
23.2 582331500
Staxo side railing 200
24.1 582319500
Staxo side railing 250
27.5 582320500
Staxo side railing 300
31.1 582321500
Staxo-Seitengeländer
Spring locked connecting pin 16mm
0.25 582528000
Federbolzen 16mm
Galvanised
Length: 20 cm
Width: 11 cm
Height: 10 cm
Galvanised
Length: 75.5 cm
Galvanised
Height: 120 cm
Delivery condition: folded closed
Galvanised
Length: 18 cm
Follow the directions in the "Fitting
instructions"!
Galvanised
Diameter: 1.6 cm
Galvanised
Aluminium
Aluminium
Galvanised
Length: 131 cm
Height: 15 cm
Galvanised
Width-across: 22 mm
Galvanised
Length: 140 cm
Height: 152 cm
Galvanised
Height: 152 cm
Galvanised
Length: 15 cm
999804302 - 02/2018
Component overview
User Information Load-bearing tower Staxo 100
Scaffold tube 48.3mm 0.50m
1.7 682026000
Scaffold tube 48.3mm 1.00m
3.6 682014000
Scaffold tube 48.3mm 1.50m
5.4 682015000
Scaffold tube 48.3mm 2.00m
7.2 682016000
Scaffold tube 48.3mm 2.50m
9.0 682017000
Scaffold tube 48.3mm 3.00m
10.8 682018000
Scaffold tube 48.3mm 3.50m
12.6 682019000
Scaffold tube 48.3mm 4.00m
14.4 682021000
Scaffold tube 48.3mm 4.50m
16.2 682022000
Scaffold tube 48.3mm 5.00m
18.0 682023000
Scaffold tube 48.3mm 5.50m
19.8 682024000
Scaffold tube 48.3mm 6.00m
21.6 682025000
Scaffold tube 48.3mm .....m
3.6 682001000
Gerüstrohr 48,3mm
Transition swivel coupler 48/76mm
1.9 582563000
Übergangsdrehkupplung 48/76mm
Swivel coupler 48mm
1.5 582560000
Drehkupplung 48mm
Normal coupler 48mm
1.2 682004000
Normalkupplung 48mm
Anchoring shoe for stair tower
3.4 582680000
Ankerschuh für Treppenturm
Cone screw B 7cm
0.86 581444000
Konusschraube B 7cm
Brace stirrup 8
2.7 582751000
Spannbügel 8
Rafter plate right
0.09 582521000
Rafter plate left
0.09 582522000
Sparrenpfettenanker
Handrail post 1.50m
12.4 582754000
Geländer 1,50m
Handrail clamp S
11.5 580470000
Schutzgeländerzwinge S
Handrail post T 1.80m
17.7 584373000
Einschubgeländer T 1,80m
Toeboard holder T 1.80m
0.53 584392000
Fußwehrhalter T 1,80m
Scaffold tube connection
0.27 584375000
Gerüstrohranschluss
Staxo 100 mounting gallows 40kg
7.5 582328000
Staxo 100-Montagegalgen 40kg
Galvanised
Galvanised
Width-across: 22 mm
Follow the directions in the "Fitting
instructions"!
Galvanised
Width-across: 22 mm
Follow the directions in the "Fitting
instructions"!
Galvanised
Width-across: 22 mm
Follow the directions in the "Fitting
instructions"!
Galvanised
Length: 22 cm
Width: 12 cm
Height: 22 cm
Red
Length: 10 cm
Diameter: 7 cm
Width-across: 50 mm
Galvanised
Width: 19 cm
Height: 46 cm
Width-across: 30 mm
Galvanised
Length: 17 cm
Galvanised
Galvanised
Height: 123 - 171 cm
Galvanised
Galvanised
Height: 13.5 cm
Galvanised
Height: 7 cm
Galvanised
Height: 258 cm
Follow the directions in the "Opera-
ting Instructions"!
999804302 - 02/2018
User Information Load-bearing tower Staxo 100
Component overview
Staxo 100 hoisting cable 40kg 30m
1.3 582346000
Staxo 100-Aufzugsseil 40kg 30m
Staxo 100 attaching cable 40cm
0.31 582345000
Staxo 100-Anschlagseil 40cm
Bracing for load-bearing towers
11.6 582795000
Abspannung für Traggerüste
Bracing waling connector WS10
2.7 582756000
Abspann-Riegelverbinder WS10
Spindle connecting plate T
3.1 584371000
Spindellasche T
Connecting pin 10cm
0.34 580201000
Verbindungsbolzen 10cm
Spring cotter 5mm
0.03 580204000
Federvorstecker 5mm
Secondary-beam stabiliser 1
1.6 586196000
Secondary-beam stabiliser 2
2.1 586197000
Querträgersicherung
Lifting rod 15.0
1.9 586074000
Umsetzstab 15,0
Retaining plate 15.0
1.8 586073000
Jochplatte 15,0
Universal plug R20/25
0.003 588180000
Kombi-Ankerstopfen R20/25
Coupler WS10 250
6.9 582688000
Kupplungsstück WS10 250
Winch 70
31.0 582779000
Zahnstangenwinde 70
Winch 125
63.8 582780000
Zahnstangenwinde 125
Staxo/d2 adapter frame
14.1 582781000
Staxo/d2-Adapter
Solid tire wheel
34.5 582573000
Vollelastikrad
Galvanised
Painted blue
Galvanised
Length: 46.7 cm
Galvanised
Width: 20 cm
Height: 25 cm
Galvanised
Length: 14 cm
Galvanised
Length: 13 cm
Galvanised
Height: 38.7 cm
Painted blue
Height: 57 cm
Follow the directions in the "Opera-
ting Instructions"!
Galvanised
Length: 17 cm
Width: 12 cm
Height: 11 cm
Blue
Diameter: 3 cm
Galvanised
Length: 35 cm
Width: 27 cm
Width-across: 24 mm
Painted blue
Height: 126 cm
Follow the directions in the "Opera-
ting Instructions"!
Painted blue
Height: 189 cm
Follow the directions in the "Opera-
ting Instructions"!
Painted blue
Length: 37 cm
Width: 36 cm
Height: 36 cm
Painted blue
Height: 45 cm
999804302 - 02/2018
Component overview
User Information Load-bearing tower Staxo 100
Heavy-duty wheel 15kN
33.0 582575000
Schwerlastrad 15kN
Double wheeled transporter
5.0 582558000
Zweirad-Transportroller
Shifting carriage TG
168.0 582778000
Hubwagen TG
Fork lift shifting device TG
83.0 582797000
Umsetzgerät TG für Stapler
Multi-purpose waling WS10 Top50 2.00m
38.9 580007000
Mehrzweckriegel WS10 Top50 2,00m
Doka personal fall-arrest set
3.6 583022000
Doka-Auffanggurt
Multi-trip packaging
Doka load-bearing tower pallet
64.6 582783000
Doka-Traggerüstpalette
Doka skeleton transport box 1.70x0.80m
87.0 583012000
Doka-Gitterbox 1,70x0,80m
Doka multi-trip transport box 1.20x0.80m
70.0 583011000
Doka-Mehrwegcontainer 1,20x0,80m
Multi-trip transport box partition 0.80m
3.7 583018000
Multi-trip transport box partition 1.20m
5.5 583017000
Mehrwegcontainer Unterteilung
Doka stacking pallet 1.55x0.85m
41.0 586151000
Doka-Stapelpalette 1,55x0,85m
Doka stacking pallet 1.20x0.80m
38.0 583016000
Doka-Stapelpalette 1,20x0,80m
Doka accessory box
106.4 583010000
Doka-Kleinteilebox
Painted blue
Height: 41 cm
Painted blue
Width: 57 cm
Galvanised
Length: 99 cm
Width: 152 cm
Height: 148 cm
Follow the directions in the "Opera-
ting Instructions"!
Galvanised
Length: 60 cm
Width: 113 cm
Height: 52 cm
Follow the directions in the "Opera-
ting Instructions"!
Painted blue
Follow the directions in the "Opera-
ting Instructions"!
Galvanised
Length: 180 cm
Width: 120 cm
Height: 29 cm
Galvanised
Height: 113 cm
Galvanised
Height: 78 cm
Steel parts galvanised
Timber parts varnished yellow
Galvanised
Height: 77 cm
Galvanised
Height: 77 cm
Timber parts varnished yellow
Steel parts galvanised
Length: 154 cm
Width: 83 cm
Height: 77 cm
999804302 - 02/2018
User Information Load-bearing tower Staxo 100
Component overview
Bolt-on castor set B
33.6 586168000
Anklemm-Radsatz B
Stacking strap 50
3.1 586156000
Stapelgurt 50
Painted blue
Powder-coated blue
Packaging unit: 2 pcs.
999804302 - 02/2018
Doka GmbH | Josef Umdasch Platz 1 | 3300 Amstetten | Austria | T +43 7472 605-0 | F +43 7472 66430 | [email protected] | www.doka.com
Near to you, worldwide
Doka is one of the world leaders in developing, manu-
facturing and distributing formwork technology for use in
all fields of the construction sector.
With more than 160 sales and logistics facilities in over
70 countries, the Doka Group has a highly efficient dis-
tribution network which ensures that equipment and
technical support are provided swiftly and profession-
ally.