Percussion Play Cadenza Installation Instructions
Read Online
Read the Percussion Play Cadenza Installation Instructions online using the built-in PDF viewer.
Text of the manual
1. Attach the steel legs to the
base of the instrument with
the M8 Nyloc Nuts and 2 part
security caps. (1.1) (See
Assembly Guide)
Install Instrument
with 1.5m free space
(from widest point)
around it.
1.5m
Ground Fixed
KS2 - 400mm
Ground Surface
KS1,2
KS1 - 550mm
KS1 – 700mm
KS2 – 850mm
Installation Instructions
2. Attach Ground Fixing posts
to legs(1.2) (See Ground Fix
Post Installation Sheet)
5. Once happy with location
of the Instrument, fill holes
using rapid hardening
concrete. Be sure to compact
concrete around legs and
leave to dry according to
manufactures guidelines.
3.Excavate 1 hole for the
Steel legs 250mm diameter
by 400-550mm deep
depending on Key stage, in
desired location upon
decision from customer.
4. Locate (lower) legs into
holes making sure they are
vertical and level prior to
concreting in place.
(1.1)
(1.2)
Components:
M10x200 Bolt
x2
M10 Nut
x4
6. Attach the 1 pair of beater
to the saddle strap on the leg.
(1.3)
Ground Fix
Components:
(1.3)
14 Kg
Pair Small Red
Beaters X1
Cadenza
Page 1 of 3
1.5m
Weight of heaviest part 7kg (Cadenza)
BS EN 1176
M8 Nyloc Nut
x4
M6x20 Security Screw
x2
M6 Saddle Strap
x1
2 Part Cover Cap
x4
Spares available from
percussionplay.com or from your
local distributor
Metric
Conversion:
250mm/ 10”
400mm/ 15 3/4”
550mm/ 21
21/32”
700mm/ 27 9/16”
850mm/ 33
15/32”
1.5m/ 59”
2 Part Cover Cap X4
M10 Nut X4
M10x200 Threaded Bar X2
Saddle Strap X1
M6x20 Pin torx X2
M8 Nyloc nut X4
PPCADE FRONT
PPCADE SIDE
Ground Fixed
Assembly Guide PPCADE
(1.1)
M10x200 Bolt
x2
M10 Nut
x4
Ground Fix
Components:
14 Kg
Pair Small Red
Beaters X1
Cadenza
Page 2 of 3
BS EN 1176
Thread Lock Solution
Required (Not Supplied)
Thread Lock Solution
Required (Not Supplied)
Instrument
Components:
M8 Nyloc Nut
x4
M6x20 Security Screw
x2
M6 Saddle Strap
x1
2 Part Cover
Cap
x4
TX 30 Driver Bit
x1
TX 40 Driver Bit
x1
Tools:
Spares available from
percussionplay.com or from your
local distributor
Ground Fix Post Installation
M10x200 Bolt
x2
x4
400mm min depth
Cadenza
Page 3 of 3
BS EN 1176
Metric Conversion:
50mm/ 2”
250mm/ 10”
350mm/ 14”
400mm/ 16”
450mm/ 18”
Insert M10x 150 Threaded
bar into pre drilled holes
in Ground Fixing Post
Fix M10x 200 Threaded bar
in place using M10 Nuts
Excavate 6 holes with a
250mm diameter tapering
down to 350mm diameter
and 450mm depth
Compact base of hole with
50mm of aggregate.
Lower ground Fix post
attached to instrument
into hole (check
instrument straight and
level before filling with
concrete)
Fix hole with fast drying
concrete to manufacturers
specifications.
450
50
350
250
Aggregate
Concrete
1
2
3
4
Foundations should not present a hazard. These foundations are recommended as a
guide, for more information on foundation details for various surface see Part 7 of BS EN
1176.
5