Percussion Play Cadenza Installation Instructions

Specifications

Brand: Percussion Play
Category: Musical Instrument
Model: Cadenza (Installation Instructions)
File Type: PDF
File Size: —
Pages: 3

Read Online

Read the Percussion Play Cadenza Installation Instructions online using the built-in PDF viewer.

Text of the manual

1. Attach the steel legs to the

base of the instrument with the M8 Nyloc Nuts and 2 part security caps. (1.1) (See Assembly Guide) Install Instrument with 1.5m free space (from widest point) around it. 1.5m Ground Fixed KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 – 700mm KS2 – 850mm Installation Instructions 2. Attach Ground Fixing posts to legs(1.2) (See Ground Fix Post Installation Sheet) 5. Once happy with location of the Instrument, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines. 3.Excavate 1 hole for the Steel legs 250mm diameter by 400-550mm deep depending on Key stage, in desired location upon decision from customer. 4. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place. (1.1) (1.2) Components: M10x200 Bolt x2 M10 Nut x4 6. Attach the 1 pair of beater to the saddle strap on the leg. (1.3) Ground Fix Components: (1.3) 14 Kg Pair Small Red Beaters X1 Cadenza Page 1 of 3 1.5m Weight of heaviest part 7kg (Cadenza) BS EN 1176 M8 Nyloc Nut x4 M6x20 Security Screw x2 M6 Saddle Strap x1 2 Part Cover Cap x4 Spares available from percussionplay.com or from your local distributor Metric Conversion: 250mm/ 10” 400mm/ 15 3/4” 550mm/ 21 21/32” 700mm/ 27 9/16” 850mm/ 33 15/32” 1.5m/ 59”

2 Part Cover Cap X4

M10 Nut X4 M10x200 Threaded Bar X2 Saddle Strap X1 M6x20 Pin torx X2 M8 Nyloc nut X4 PPCADE FRONT PPCADE SIDE Ground Fixed Assembly Guide PPCADE (1.1) M10x200 Bolt x2 M10 Nut x4 Ground Fix Components: 14 Kg Pair Small Red Beaters X1 Cadenza Page 2 of 3 BS EN 1176 Thread Lock Solution Required (Not Supplied) Thread Lock Solution Required (Not Supplied) Instrument Components: M8 Nyloc Nut x4 M6x20 Security Screw x2 M6 Saddle Strap x1 2 Part Cover Cap x4 TX 30 Driver Bit x1 TX 40 Driver Bit x1 Tools: Spares available from percussionplay.com or from your local distributor

Ground Fix Post Installation

M10x200 Bolt x2 x4 400mm min depth Cadenza Page 3 of 3 BS EN 1176 Metric Conversion: 50mm/ 2” 250mm/ 10” 350mm/ 14” 400mm/ 16” 450mm/ 18” Insert M10x 150 Threaded bar into pre drilled holes in Ground Fixing Post Fix M10x 200 Threaded bar in place using M10 Nuts Excavate 6 holes with a 250mm diameter tapering down to 350mm diameter and 450mm depth Compact base of hole with 50mm of aggregate. Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete) Fix hole with fast drying concrete to manufacturers specifications. 450 50 350 250 Aggregate Concrete 1 2 3 4 Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176. 5

Other Musical Instrument Manuals