DSE 333 Operation And Maintenance
Text of the manual
AUTOMATIC TRANSFER SWITCH
PANEL (ATS) DSE 333
1 Phase 230V
3 Phase 400V
OPERATION AND MAINTENANCE
Stephill Generators Ltd
Wallis close
Park Farm South
Wellingborough
Northants
NN8 6AG
Tel : +44 (0)1933 677911
Fax: +44 (0)1933 677916
E-mail : [email protected]
Web : www.stephill-generators.co.uk
LOAD SWITCHING CONTROL
5
6.0
OPERATION
5
6.1
AUTOMATIC MODE OF OPERATION
5
6.1.1
WAITING IN AUTO MODE
5
6.1.2
STARTING SEQUENCE
5
6.1.3
GENERATOR ON LOAD
5
6.1.4
STOPPING SEQUENCE
6
6.2
MANUAL OPERATION
6
6.2.1
STARTING SEQUENCE
6
6.2.2
GENERATOR OFF LOAD
6
6.2.3
GENERATOR ON LOAD
6
6.2.4
TRANSFER BUTTONS OPERATION
6
6.2.5
STOPPING SEQUENCE
6
6.3
TEST ON LOAD OPERATION
7
6.3.1
STARTING SEQUENCE
7
6.3.2
GENERATOR ON LOAD
7
6.3.3
STOPPING SEQUENCE
7
7.0
MODULE DISPLAY
7
7.1
BACKLIGHT
7
7.2
PROTECTIONS
7
7.2.1
GENERATOR
7
7.2.2
MAINS
8
7.3
PLANT BATTERY
8
8.0
SYSTEM TEST
8
9.0
FRONT PANEL CONFIGURATION
8
9.1
ACCESSING THE FRONT PANEL EDITOR (FPE)
9
9.2
EDITING A PARAMETER
9
9.3
ADJUSTABLE PARAMETERS (CONFIGURATION EDITOR)
9
9.4
SCHEDULER SETTING
10
10
CHECK LIST FOR AUTOMATIC OPERATION
10
11
WARRANTY
10
1 PHASE ATS WIRING (STEPHILL)
11
1 PHASE ATS WIRING 100A+ (ATS)
12
3 PHASE ATS WIRING DSE 333 (ATS)
13
3 PHASE ATS WIRING DSE 333 (STEPHILL)
14
ATS – GENERATOR – MAINS INTERCONNECTION WIRING DSE 333
15
ATS Panel should only be installed, maintained or serviced by a qualified electrician.
The generator set may start without warning whilst in AUTO mode.
Before undertaking any service or maintenance work, ensure the mains and generator supply are
isolated and generator is switched to off.
The generator is supplied with the battery disconnected/isolated for safety reasons and should not
be re-connected until all connections have been made.
Because of the nature of the equipment and the permanent mains connection, the terminals within
the generator may be LIVE even if the generator itself is not running.
2 INSTALLATION
Make sure that the Generator is at least one metre away from any building during operation.
Operate in a well ventilated unconfined area, so that fumes can be properly dispersed.
Silencer outlet should be facing an open area to prevent fumes being recirculated.
Consideration will also need to be made for refuelling and maintenance.
If installing in a confined area please consult manufacturer.
2.1 ELECTRICAL INSTALLATION
2.2 AC Wiring
Please ensure the correct cross sectional area of cable between the Alternator/Panel and
Distribution board used is adequate to carry the full rated continuous output of the generator,
allowing for de-rating in high ambient temperatures. Please consult IEE regulations as per the
correct sizing of cable and other issues regarding wiring. Flexible cable is recommended for
alternator connections allowing for a generous loop before the cable enters the alternator terminal
box because of the vibration caused by the set starting. If this is not possible a terminal box can be
fitted nearby and flex fitted between this and the generator terminal box. These precautions will not
be needed when fixing to a control box which is not attached to the Alternator. Please refer to
Wiring diagram.
2.3 DC WIRING
For the DC wiring we recommend 1.5mm if the generator is more than 10Meters away please
consult manufacturer for cable sizing. Please refer to Wiring diagram.
3 START GUIDE
Note For full instructions download handbook on DSE website http://www.deepseaplc.com/home/
This section provides a quick start guide to the module’s operation.
3.1 DISPLAY PAGES
It is possible to scroll to display the different pages of information by repeatedly operating the scroll
button
Once selected the page will remain on the LCD display until the user selects a different page or after
an extended period of inactivity, the module will revert to the status display.
When scrolling manually, the display will automatically return to the Status page if no buttons are
pressed for the duration of the configurable LCD Page Timer.
If an alarm becomes active while viewing the status page, the display shows the Alarms page to draw
the operator’s attention to the alarm condition.
At power up, the display will show the software version, and then display the default display screen,
which will display Mains instrumentation.
3.2 STATUS
Displays voltage operational status information
Example:
3.3 INSTRUMENTATION
The instrumentation page contains the following information
Generator Voltage L1-N
Generator Voltage L-L
Generator Frequency
Mains Voltage L1-N
Mains Voltage L-L
Mains Frequency
Load current (A)
Battery Voltage Example:
3.4 ALARMS
Lists any current alarms
Example