Document ID: 1MRS757810
Issued: 2018-08-31
Revision: C
Product version: 2.0
© Copyright 2018 ABB. All rights reserved
This document and parts thereof must not be reproduced or copied without written
permission from ABB, and the contents thereof must not be imparted to a third party,
nor used for any unauthorized purpose.
The software or hardware described in this document is furnished under a license and
may be used, copied, or disclosed only in accordance with the terms of such license.
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or
product names mentioned in this document may be trademarks or registered
trademarks of their respective holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
www.abb.com/substationautomation
The data, examples and diagrams in this manual are included solely for the concept or
product description and are not to be deemed as a statement of guaranteed properties.
All persons responsible for applying the equipment addressed in this manual must
satisfy themselves that each intended application is suitable and acceptable, including
that any applicable safety or other operational requirements are complied with. In
particular, any risks in applications where a system failure and/or product failure
would create a risk for harm to property or persons (including but not limited to
personal injuries or death) shall be the sole responsibility of the person or entity
applying the equipment, and those so responsible are hereby requested to ensure that
all measures are taken to exclude or mitigate such risks.
This product has been designed to be connected and communicate data and
information via a network interface which should be connected to a secure network.
It is the sole responsibility of the person or entity responsible for network
administration to ensure a secure connection to the network and to take the necessary
measures (such as, but not limited to, installation of firewalls, application of
authentication measures, encryption of data, installation of anti virus programs, etc.)
to protect the product and the network, its system and interface included, against any
kind of security breaches, unauthorized access, interference, intrusion, leakage and/or
theft of data or information. ABB is not liable for any such damages and/or losses.
This document has been carefully checked by ABB but deviations cannot be
completely ruled out. In case any errors are detected, the reader is kindly requested to
notify the manufacturer. Other than under explicit contractual commitments, in no
event shall ABB be responsible or liable for any loss or damage resulting from the use
of this manual or the application of the equipment.
This product complies with the directive of the Council of the European Communities
on the approximation of the laws of the Member States relating to electromagnetic
compatibility (EMC Directive 2014/30/EU) and concerning electrical equipment for
use within specified voltage limits (Low-voltage directive 2014/35/EU). This
conformity is the result of tests conducted by ABB in accordance with the product
standard EN 60255-26 for the EMC directive, and with the product standards EN
60255-1 and EN 60255-27 for the low voltage directive. The product is designed in
accordance with the international standards of the IEC 60255 series.
Dangerous voltages can occur on the connectors, even though the
auxiliary voltage has been disconnected.
Non-observance can result in death, personal injury or substantial
property damage.
Only a competent electrician is allowed to carry out the electrical
installation.
National and local electrical safety regulations must always be
followed.
The frame of the protection relay has to be carefully earthed.
When the plug-in unit has been detached from the case, do not touch
the inside of the case. The relay case internals may contain high
voltage potential and touching these may cause personal injury.
The protection relay contains components which are sensitive to
electrostatic discharge. Unnecessary touching of electronic
components must therefore be avoided.
Whenever changes are made in the protection relay, measures should
be taken to avoid inadvertent tripping.
Table of contents
Section 1
Introduction.......................................................................5
This manual........................................................................................5
Intended audience..............................................................................5
Product documentation.......................................................................6
Product documentation set............................................................6
Document revision history............................................................. 6
Related documentation..................................................................7
Symbols and conventions...................................................................7
Symbols.........................................................................................7
Document conventions..................................................................7
Functions, codes and symbols...................................................... 8
Section 2
Relay engineering process.............................................15
Monitoring and control system structure...........................................16
Standard configuration concept........................................................17
Workflow...........................................................................................19
Section 3
PCM600 tool...................................................................23
Connectivity packages......................................................................24
PCM600 and IED connectivity package version...............................24
Installing connectivity packages.................................................. 25
Installing connectivity packages by using the connectivity
package installer.................................................................... 25
Installing connectivity packages by using Update Manager...25
Activating connectivity packages.................................................26
PCM600 projects..............................................................................27
Technical key....................................................................................27
IEC 61850 naming conventions to identify an IED...................... 28
Setting the technical key..............................................................30
Communication between PCM600 and the protection relay............ 33
Setting up IP addresses.............................................................. 34
IED Update.......................................................................................35
Prerequisites for local and remote updates.................................35
Updating firmware or language................................................... 36
Section 4
Setting up a project........................................................ 39
Creating a new project......................................................................39
Building the plant structure...............................................................40
Inserting an IED................................................................................41
Inserting an IED in online mode.................................................. 42
Table of contents
REC615 and RER615
1
Engineering Manual
Inserting an IED in offline mode.................................................. 49
Inserting an IED from the template directory...............................51
Inserting an IED by importing a .pcmi file....................................53
Setting the IED IP address in a project.............................................54
COM600S project.............................................................................56
Selecting communication port for configuration...........................57
Importing a 615 series protection relay in a COM600S project...57
Using the Web HMI.......................................................................... 61
Managing IED users.........................................................................61
PCM600 project's IEC 61850 version identification..........................64
Section 5
Protection and control engineering................................ 65
Application Configuration tool...........................................................65
Function blocks............................................................................66
Signals and signal management................................................. 67
Function block execution parameters..........................................68
Execution order and feedback loops........................................... 69
Configuration parameters............................................................70
Connections and variables.......................................................... 71
Hardware channels......................................................................71
Online monitoring........................................................................ 72
Validation.....................................................................................73
Validation when creating an application configuration........... 73
Validation on demand.............................................................73
Validation when writing to the protection relay....................... 74
Configuration load calculation..................................................... 74
Parameter Setting tool......................................................................75
Configuration parameter..............................................................76
Setting parameter........................................................................76
Setting group............................................................................... 76
Parameter import and export.......................................................76
Parameter organization............................................................... 77
Signal Matrix tool..............................................................................77
Load Profile tool................................................................................79
Opening and closing Load Profile tool.........................................79
Load Profile tool user interface....................................................82
Information fields......................................................................... 83
Fault Record tool.............................................................................. 83
Opening and closing Fault Record tool....................................... 83
Fault Record tool interface.......................................................... 85
IED Compare....................................................................................86
Starting IED Compare................................................................. 86
IED Compare tool interface......................................................... 86
Control blocking example............................................................ 89
Table of contents
2
REC615 and RER615
Engineering Manual
Single-line diagram engineering.......................................................91
Diagrams in Graphical Display Editor..........................................91
Display window and sequence order......................................92
Symbol library.........................................................................93
Supported single-line diagram symbols................................. 93
HMI display raster layout and text font selection....................94
Text handling..........................................................................95
Adding static text....................................................................95
Adding select buttons.............................................................96
Adding measurands............................................................... 97
Adding a busbar..................................................................... 98
Adding symbols into a display page.......................................98
Drawing lines to create links...................................................99
Bay configuration engineering...................................................100
Linking process objects........................................................100
Creating a complete HMI display page................................ 102
Template export and import............................................................103
Exporting a template..................................................................103
Importing a template..................................................................104
HMI event filtering...........................................................................104
Starting HMI event filtering........................................................ 104
Setting visibility of HMI events...................................................104
Searching events.......................................................................105
Saving event filter configuration................................................ 105
Section 7
IEC 61850 communication engineering....................... 107
IEC 61850 protocol references and pre-conditions........................ 107
IEC 61850 interface........................................................................107
IEC 61850 interface in the protection relay............................... 113
GOOSE data exchange........................................................113
Function view for IEC 61850 in PCM600...................................114
Station configuration description file types................................ 115
IEC 61850 engineering process..................................................... 115
Exporting SCL files from PCM600.............................................117
Exporting SCD files.............................................................. 117
Exporting ICD or CID files.................................................... 119
Engineering vertical and horizontal communication.................. 120
Importing SCL files to PCM600................................................. 122
Importing SCD files.............................................................. 123
Importing ICD or CID files.................................................... 125
Writing communication configuration to the IED........................125
Table of contents
REC615 and RER615
3
Engineering Manual
Configuration migration................................................ 127
Configuration migration workflow................................................... 127
Preconditions for configuration migration....................................... 128
Backup creation..............................................................................128
Migrating the IED configuration...................................................... 128
Reengineering the migrated configuration......................................130
Reengineering in the Application Configuration tool..................130
Example of reengineering LED connections........................ 131
Reengineering in the Parameter Setting tool.............................135
Reengineering in the IEC 61850 Configuration tool.................. 136
Reengineering in the Communication Management Tool......... 136
Checking and updating DNP3 points .................................. 136
Checking and updating Modbus points ............................... 136
Checking and updating IEC 60870-5-103 points .................137
Reengineering in the HMI event filtering tool.............................137
Reengineering in Graphical Display Editor ...............................137
Section 9
Glossary....................................................................... 139
Table of contents
4
REC615 and RER615
Engineering Manual
The engineering manual contains instructions on how to engineer the protection relays
using the different tools in PCM600. The manual provides instructions on how to set
up a PCM600 project and insert relays to the project structure. The manual also
recommends a sequence for engineering of protection and control functions, LHMI
functions as well as communication engineering for IEC 61850 and other supported
protocols.
1.2
Intended audience
This manual addresses system and project engineers involved in the engineering
process of a project, and installation and commissioning personnel, who use technical
data during engineering, installation and commissioning, and in normal service.
The system engineer must have a thorough knowledge of the application, protection
and control equipment and the configured functional logic in the relays. The
installation and commissioning personnel must have a basic knowledge of handling
electronic equipment.
1MRS757810 C
Section 1
Introduction
REC615 and RER615
5
Engineering Manual
Product documentation set
Planning &
purchase
Engineering
Installation
Commissioning
Operation
Maintenance
Decommissioning,
deinstallation & disposal
Quick start guide
Quick installation guide
Brochure
Product guide
Operation manual
Installation manual
Connection diagram
Engineering manual
Technical manual
Communication protocol manual
IEC 61850 Engineering guide
Point list manual
GUID-7414985D-2433-46E4-B77B-CCE64F6FC8D0 V2 EN
Figure 1:
The intended use of documents during the product life cycle
Product series- and product-specific manuals can be downloaded
from the ABB Web site http://www.abb.com/relion.
1.3.2
Document revision history
Document revision/date
Product series version
History
A/2013-09-17
1.0
First release
B/2015-03-06
1.1
Content updated to correspond to the
product series version
C/2018-08-31
2.0
Content updated to correspond to the
product series version
Download the latest documents from the ABB Web site
http://www.abb.com/substationautomation.
Section 1
1MRS757810 C
Introduction
6
REC615 and RER615
Engineering Manual
Product series- and product-specific manuals can be downloaded from the ABB Web
site http://www.abb.com/substationautomation.
1.4
Symbols and conventions
1.4.1
Symbols
The caution icon indicates important information or warning related
to the concept discussed in the text. It might indicate the presence of
a hazard which could result in corruption of software or damage to
equipment or property.
The information icon alerts the reader of important facts and
conditions.
The tip icon indicates advice on, for example, how to design your
project or how to use a certain function.
Although warning hazards are related to personal injury, it is necessary to understand
that under certain operational conditions, operation of damaged equipment may result
in degraded process performance leading to personal injury or death. Therefore,
comply fully with all warning and caution notices.
1.4.2
Document conventions
A particular convention may not be used in this manual.
•
Abbreviations and acronyms are spelled out in the glossary. The glossary also
contains definitions of important terms.
•
The example figures illustrate the IEC display variant.
•
Menu paths are presented in bold.
Select Main menu/Settings.
•
LHMI messages are shown in Courier font.
To save the changes in nonvolatile memory, select Yes and press
.
•
Parameter names are shown in italics.
The function can be enabled and disabled with the Operation setting.
•
Parameter values are indicated with quotation marks.
The corresponding parameter values are "On" and "Off".
•
Input/output messages and monitored data names are shown in Courier font.
When the function starts, the START output is set to TRUE.
1MRS757810 C
Section 1
Introduction
REC615 and RER615
7
Engineering Manual
Functions, codes and symbols
All available functions are listed in the table. All of them may not be applicable to all
products.
Table 1:
Functions included in the relays
Function
IEC 61850
IEC 60617
IEC-ANSI
Protection
Three-phase non-directional
overcurrent protection, low stage,
instance 1
PHLPTOC1
3I> (1)
51P-1 (1)
FPHLPTOC1
F3I> (1)
F51P-1 (1)
Three-phase non-directional
overcurrent protection, high stage,
instance 1
PHHPTOC1
3I>> (1)
51P-2 (1)
Three-phase non-directional
overcurrent protection, instantaneous
stage, instance 1
PHIPTOC1
3I>>> (1)
50P/51P (1)
Three-phase non-directional
overcurrent protection, instantaneous
stage, instance 2
PHIPTOC2
3I>>> (2)
50P/51P (2)
Three-phase directional overcurrent
protection, low stage, instance 1
DPHLPDOC1
3I> -> (1)
67-1 (1)
FDPHLPDOC1
F3I> -> (1)
F67-1 (1)
Three-phase directional overcurrent
protection, low stage, instance 2
DPHLPDOC2
3I> -> (2)
67-1 (2)
FDPHLPDOC2
F3I> -> (2)
F67-1 (2)
Three-phase directional overcurrent
protection, low stage, instance 3
DPHLPDOC3
3I> -> (3)
67-1 (3)
Three-phase directional overcurrent
protection, low stage, instance 4
DPHLPDOC4
3I> -> (4)
67-1 (4)
Three-phase directional overcurrent
protection, high stage, instance 1
DPHHPDOC1
3I>> -> (1)
67-2 (1)
Three-phase directional overcurrent
protection, high stage, instance 2
DPHHPDOC2
3I>> -> (2)
67-2 (2)
Three-phase directional overcurrent
protection, high stage, instance 3
DPHHPDOC3
3I>> -> (3)
67-2 (3)
Three-phase directional overcurrent
protection, high stage, instance 4
DPHHPDOC4
3I>> -> (4)
67-2 (4)
Non-directional earth-fault protection,
low stage, instance 1
EFLPTOC1
Io> (1)
51N-1 (1)
FEFLPTOC1
FIo> (1)
F51N-1 (1)
Non-directional earth-fault protection,
high stage, instance 1
EFHPTOC1
Io>> (1)
51N-2 (1)
Non-directional earth-fault protection,
instantaneous stage, instance 1
EFIPTOC1
Io>>> (1)
50N/51N (1)
Directional earth-fault protection, low
stage, instance 1
DEFLPDEF1
Io> -> (1)
67N-1 (1)
FDEFLPDEF1
FIo> -> (1)
F67N-1 (1)
Directional earth-fault protection, low
stage, instance 2
DEFLPDEF2
Io> -> (2)
67N-1 (2)
FDEFLPDEF2
FIo> -> (2)
F67N-1 (2)
Directional earth-fault protection, low
stage, instance 3
DEFLPDEF3
Io> -> (3)
67N-1 (3)
Table continues on next page
Section 1
1MRS757810 C
Introduction
8
REC615 and RER615
Engineering Manual
Directional earth-fault protection, low
stage, instance 4
DEFLPDEF4
Io> -> (4)
67N-1 (4)
Directional earth-fault protection, high
stage, instance 1
DEFHPDEF1
Io>> -> (1)
67N-2 (1)
Directional earth-fault protection, high
stage, instance 2
DEFHPDEF2
Io>> -> (2)
67N-2 (2)
Directional earth-fault protection, high
stage, instance 3
DEFHPDEF3
Io>> -> (3)
67N-2 (3)
Directional earth-fault protection, high
stage, instance 4
DEFHPDEF4
Io>> -> (4)
67N-2 (4)
Transient / intermittent earth-fault
protection, instance 1
INTRPTEF1
Io> -> IEF (1)
67NIEF (1)
Admittance-based earth-fault
protection, instance 1
EFPADM1
Yo> -> (1)
21YN (1)
Admittance-based earth-fault
protection, instance 2
EFPADM2
Yo> -> (2)
21YN (2)
Admittance-based earth-fault
protection, instance 3
EFPADM3
Yo> -> (3)
21YN (3)
Wattmetric-based earth-fault
protection, instance 1
WPWDE1
Po> -> (1)
32N (1)
Wattmetric-based earth-fault
protection, instance 2
WPWDE2
Po> -> (2)
32N (2)
Wattmetric-based earth-fault
protection, instance 3
WPWDE3
Po> -> (3)
32N (3)
Harmonics-based earth-fault
protection, instance 1
HAEFPTOC1
Io>HA (1)
51NHA (1)
Multifrequency admittance-based
earth-fault protection, instance 1
MFADPSDE1
Io> -> Y (1)
67YN (1)
Multifrequency admittance-based
earth-fault protection, instance 2
MFADPSDE2
Io> -> Y (2)
67YN (2)
Negative-sequence overcurrent
protection, instance 1
NSPTOC1
I2> (1)
46 (1)
Negative-sequence overcurrent
protection, instance 2
NSPTOC2
I2> (2)
46 (2)
Phase discontinuity protection,
instance 1
PDNSPTOC1
I2/I1> (1)
46PD (1)
Residual overvoltage protection,
instance 1
ROVPTOV1
Uo> (1)
59G (1)
Residual overvoltage protection,
instance 2
ROVPTOV2
Uo> (2)
59G (2)
Three-phase undervoltage protection,
instance 1
PHPTUV1
3U< (1)
27 (1)
Three-phase undervoltage protection,
instance 2
PHPTUV2
3U< (2)
27 (2)
Three-phase undervoltage protection,
instance 3
PHPTUV3
3U< (3)
27 (3)
Three-phase overvoltage protection,
instance 1
PHPTOV1
3U> (1)
59 (1)
Table continues on next page
1MRS757810 C
Section 1
Introduction
REC615 and RER615
9
Engineering Manual
Three-phase overvoltage protection,
instance 2
PHPTOV2
3U> (2)
59 (2)
Three-phase overvoltage protection,
instance 3
PHPTOV3
3U> (3)
59 (3)
Positive-sequence undervoltage
protection, instance 1
PSPTUV1
U1< (1)
47U+ (1)
Negative-sequence overvoltage
protection, instance 1
NSPTOV1
U2> (1)
47O- (1)
Loss of phase (undercurrent),
instance 1
PHPTUC1
3I< (1)
37 (1)
Loss of phase (undercurrent),
instance 2
PHPTUC2
3I< (2)
37 (2)
Frequency protection, instance 1
FRPFRQ1
f>/f<,df/dt (1)
81 (1)
Frequency protection, instance 2
FRPFRQ2
f>/f<,df/dt (2)
81 (2)
Three-phase thermal protection for
feeders, cables and distribution
transformers, instance 1
T1PTTR1
3Ith>F (1)
49F (1)
Circuit breaker failure protection,
instance 1
CCBRBRF1
3I>/Io>BF (1)
51BF/51NBF (1)
Circuit breaker failure protection,
instance 2
CCBRBRF2
3I>/Io>BF (2)
51BF/51NBF (2)
Three-phase inrush detector,
instance 1
INRPHAR1
3I2f> (1)
68 (1)
Master trip, instance 1
TRPPTRC1
Master Trip (1)
94/86 (1)
Master trip, instance 2
TRPPTRC2
Master Trip (2)
94/86 (2)
Multipurpose protection, instance 1
MAPGAPC1
MAP (1)
MAP (1)
Multipurpose protection, instance 2
MAPGAPC2
MAP (2)
MAP (2)
Multipurpose protection, instance 3
MAPGAPC3
MAP (3)
MAP (3)
Multipurpose protection, instance 4
MAPGAPC4
MAP (4)
MAP (4)
Multipurpose protection, instance 5
MAPGAPC5
MAP (5)
MAP (5)
Multipurpose protection, instance 6
MAPGAPC6
MAP (6)
MAP (6)
Load-shedding and restoration,
instance 1
LSHDPFRQ1
UFLS/R (1)
81LSH (1)
Load-shedding and restoration,
instance 2
LSHDPFRQ2
UFLS/R (2)
81LSH (2)
Fault locator, instance 1
SCEFRFLO1
FLOC (1)
21FL (1)
Three-phase power directional
element, instance 1
DPSRDIR1
I1-> (1)
32P (1)
Three-phase power directional
element, instance 2
DPSRDIR2
I1-> (2)
32P (2)
Power quality
Current total demand distortion,
instance 1
CMHAI1
PQM3I (1)
PQM3I (1)
Voltage total harmonic distortion,
instance 1
VMHAI1
PQM3U (1)
PQM3V (1)
Voltage variation, instance 1
PHQVVR1
PQMU (1)
PQMV (1)
Table continues on next page
Section 1
1MRS757810 C
Introduction
10
REC615 and RER615
Engineering Manual
Voltage unbalance, instance 1
VSQVUB1
PQUUB (1)
PQVUB (1)
Control
Circuit-breaker control, instance 1
CBXCBR1
I <-> O CB (1)
I <-> O CB (1)
Circuit-breaker control, instance 2
CBXCBR2
I <-> O CB (2)
I <-> O CB (2)
Disconnector control, instance 1
DCXSWI1
I <-> O DCC (1)
I <-> O DCC (1)
Disconnector control, instance 2
DCXSWI2
I <-> O DCC (2)
I <-> O DCC (2)
Disconnector control, instance 3
DCXSWI3
I <-> O DCC (3)
I <-> O DCC (3)
Disconnector control, instance 4
DCXSWI4
I <-> O DCC (4)
I <-> O DCC (4)
Disconnector control, instance 5
DCXSWI5
I <-> O DCC (5)
I <-> O DCC (5)
Disconnector control, instance 6
DCXSWI6
I <-> O DCC (6)
I <-> O DCC (6)
Disconnector control, instance 7
DCXSWI7
I <-> O DCC (7)
I <-> O DCC (7)
Disconnector control, instance 8
DCXSWI8
I <-> O DCC (8)
I <-> O DCC (8)
Disconnector position indication,
instance 1
DCSXSWI1
I <-> O DC (1)
I <-> O DC (1)
Disconnector position indication,
instance 2
DCSXSWI2
I <-> O DC (2)
I <-> O DC (2)
Earthing switch indication, instance 1
ESSXSWI1
I <-> O ES (1)
I <-> O ES (1)
Earthing switch indication, instance 2
ESSXSWI2
I <-> O ES (2)
I <-> O ES (2)
Earthing switch indication, instance 3
ESSXSWI3
I <-> O ES (3)
I <-> O ES (3)
Earthing switch indication, instance 4
ESSXSWI4
I <-> O ES (4)
I <-> O ES (4)
Earthing switch indication, instance 5
ESSXSWI5
I <-> O ES (5)
I <-> O ES (5)
Earthing switch indication, instance 6
ESSXSWI6
I <-> O ES (6)
I <-> O ES (6)
Earthing switch indication, instance 7
ESSXSWI7
I <-> O ES (7)
I <-> O ES (7)
Earthing switch indication, instance 8
ESSXSWI8
I <-> O ES (8)
I <-> O ES (8)
Autoreclosing, instance 1
DARREC1
O -> I (1)
79 (1)
Autoreclosing, instance 2
DARREC2
O -> I (2)
79 (2)
Synchronism and energizing check,
instance 1
SECRSYN1
SYNC (1)
25 (1)
Automatic transfer switch, instance 1
ATSABTC1
ATSABTC1
ATSABTC1
Condition monitoring
Circuit-breaker condition monitoring,
instance 1
SSCBR1
CBCM (1)
CBCM (1)
Circuit-breaker condition monitoring,
instance 2
SSCBR2
CBCM (2)
CBCM (2)
Trip circuit supervision, instance 1
TCSSCBR1
TCS (1)
TCM (1)
Trip circuit supervision, instance 2
TCSSCBR2
TCS (2)
TCM (2)
Fuse failure supervision, instance 1
SEQSPVC1
FUSEF (1)
60 (1)
Fuse failure supervision, instance 2
SEQSPVC2
FUSEF (1)
60 (1)
Runtime counter for machines and
devices, instance 1
MDSOPT1
OPTS (1)
OPTM (1)
Voltage presence, instance 1
PHSVPR1
PHSVPR(1)
PHSVPR(1)
Voltage presence, instance 2
PHSVPR2
PHSVPR(2)
PHSVPR(2)
Table continues on next page
1MRS757810 C
Section 1
Introduction
REC615 and RER615
11
Engineering Manual
Three-phase current measurement,
instance 1
CMMXU1
3I (1)
3I (1)
Three-phase current measurement,
instance 2
CMMXU2
3I (2)
3I (2)
Sequence current measurement,
instance 1
CSMSQI1
I1, I2, I0 (1)
I1, I2, I0 (1)
Sequence current measurement,
instance 2
CSMSQI2
I1, I2, I0 (2)
I1, I2, I0 (2)
Residual current measurement,
instance 1
RESCMMXU1
Io (1)
In (1)
Three-phase voltage measurement,
instance 1
VMMXU1
3U (1)
3V (1)
Three-phase voltage measurement,
instance 2
VMMXU2
3U (2)
3V (2)
Residual voltage measurement,
instance 1
RESVMMXU1
Uo (1)
Vn (1)
Sequence voltage measurement,
instance 1
VSMSQI1
U1, U2, U0 (1)
V1, V2, V0 (1)
Sequence voltage measurement,
instance 2
VSMSQI2
U1, U2, U0 (2)
V1, V2, V0 (2)
Three-phase power and energy
measurement, instance 1
PEMMXU1
P, E (1)
P, E (1)
Three-phase power and energy
measurement, instance 2
PEMMXU2
P, E (2)
P, E (2)
Single-phase power and energy
measurement, instance 1
SPEMMXU1
SP, SE (1)
SP, SE (1)
Single-phase power and energy
measurement, instance 2
SPEMMXU2
SP, SE (2)
SP, SE (2)
Frequency measurement, instance 1
FMMXU1
f (1)
f (1)
Frequency measurement, instance 2
FMMXU2
f (2)
f (2)
Load profile record, instance 1
LDPRLRC1
LOADPROF (1)
LOADPROF (1)
Other
Minimum pulse timer (2 pcs), instance
1
TPGAPC1
TP (1)
TP (1)
Minimum pulse timer (2 pcs), instance
2
TPGAPC2
TP (2)
TP (2)
Minimum pulse timer (2 pcs, second
resolution), instance 1
TPSGAPC1
TPS (1)
TPS (1)
Minimum pulse timer (2 pcs, minute
resolution), instance 1
TPMGAPC1
TPM (1)
TPM (1)
Pulse timer (8 pcs), instance 1
PTGAPC1
PT (1)
PT (1)
Pulse timer (8 pcs), instance 2
PTGAPC2
PT (2)
PT (2)
Time delay off (8 pcs), instance 1
TOFGAPC1
TOF (1)
TOF (1)
Time delay off (8 pcs), instance 2
TOFGAPC2
TOF (2)
TOF (2)
Time delay on (8 pcs), instance 1
TONGAPC1
TON (1)
TON (1)
Table continues on next page
Section 1
1MRS757810 C
Introduction
12
REC615 and RER615
Engineering Manual
Time delay on (8 pcs), instance 2
TONGAPC2
TON (2)
TON (2)
Set-reset (8 pcs), instance 1
SRGAPC1
SR (1)
SR (1)
Set-reset (8 pcs), instance 2
SRGAPC2
SR (2)
SR (2)
Move (8 pcs), instance 1
MVGAPC1
MV (1)
MV (1)
Move (8 pcs), instance 2
MVGAPC2
MV (2)
MV (2)
Move (8 pcs), instance 3
MVGAPC3
MV (3)
MV (3)
Move (8 pcs), instance 4
MVGAPC4
MV (4)
MV (4)
Move (8 pcs), instance 5
MVGAPC5
MV (5)
MV (5)
Move (8 pcs), instance 6
MVGAPC6
MV (6)
MV (6)
Move (8 pcs), instance 7
MVGAPC7
MV (7)
MV (7)
Move (8 pcs), instance 8
MVGAPC8
MV (8)
MV (8)
Generic control point (16 pcs),
instance 1
SPCGAPC1
SPC (1)
SPC (1)
Generic control point (16 pcs),
instance 2
SPCGAPC2
SPC (2)
SPC (2)
Remote generic control points,
instance 1
SPCRGAPC1
SPCR (1)
SPCR (1)
Local generic control points, instance
1
SPCLGAPC1
SPCL (1)
SPCL (1)
Generic up-down counters, instance 1
UDFCNT1
UDCNT (1)
UDCNT (1)
Generic up-down counters, instance 2
UDFCNT2
UDCNT (2)
UDCNT (2)
Generic up-down counters, instance 3
UDFCNT3
UDCNT (3)
UDCNT (3)
Analog value scaling, instance 1
SCA4GAPC1
SCA4 (1)
SCA4 (1)
Analog value scaling, instance 2
SCA4GAPC2
SCA4 (2)
SCA4 (2)
Analog value scaling, instance 3
SCA4GAPC3
SCA4 (3)
SCA4 (3)
Analog value scaling, instance 4
SCA4GAPC4
SCA4 (4)
SCA4 (4)
Analog value scaling, instance 5
SCA4GAPC5
SCA4 (5)
SCA4 (5)
Analog value scaling, instance 6
SCA4GAPC6
SCA4 (6)
SCA4 (6)
Analog value scaling, instance 7
SCA4GAPC7
SCA4 (7)
SCA4 (7)
Analog value scaling, instance 8
SCA4GAPC8
SCA4 (8)
SCA4 (8)
Analog value scaling, instance 9
SCA4GAPC9
SCA4 (9)
SCA4 (9)
Analog value scaling, instance 10
SCA4GAPC10
SCA4 (10)
SCA4 (10)
Analog value scaling, instance 11
SCA4GAPC11
SCA4 (11)
SCA4 (11)
Analog value scaling, instance 12
SCA4GAPC12
SCA4 (12)
SCA4 (12)
Integer value move, instance 1
MVI4GAPC1
MVI4 (1)
MVI4 (1)
Integer value move, instance 2
MVI4GAPC2
MVI4 (2)
MVI4 (2)
Daily timer function, instance 1
DTMGAPC1
DTMGAPC1
DTMGAPC1
Daily timer function, instance 2
DTMGAPC2
DTMGAPC2
DTMGAPC2
Programmable buttons (4 buttons)
FKEY4GGIO1
FKEY4GGIO1
FKEY4GGIO1
Table continues on next page
1MRS757810 C
Section 1
Introduction
REC615 and RER615
13
Engineering Manual
REC615 and RER615
Engineering Manual
Relay engineering process
PCM600 is used for various tasks in the protection relay engineering process.
•
Relay engineering management
•
Organizing the bay protection relays in the structure of the substation by
defining voltage levels and bays below the substation. PCM600 manages
the project.
•
Configuring the protection relay functions (for example, protection and
control functions) by using the Application Configuration tool.
•
Configuring the parameters and setting values for the protection relay itself
and for the process functions by using the Parameter Setting tool.
•
Drawing single-line diagrams and making links to dynamic process values
by using Graphical Display Editor. The single-line diagrams are displayed
in LHMI and WHMI on the bay protection relay.
•
Configuring connections between the application configuration function
blocks and physical hardware inputs and outputs by using the Signal Matrix
tool or the Application Configuration tool.
•
Configuring the events shown on the LHMI using the HMI Event Filtering
tool.
•
Reusing configurations from older protection relay versions using the
Configuration Migration tool.
•
Communication management
•
IEC 61850 station communication engineering is done using the internal
IEC 61850 Configuration tool or the separate IET600. PCM600 interacts
with IET600 by importing and exporting SCL files.
•
Configuring the GOOSE receiving data connections to the protection
relay's application configuration function blocks by using the Application
Configuration tool and the Signal Matrix tool.
•
Configuring protocol data mapping for IEC 60870-5-101/104, Modbus or
DNP3 with the Communication Management tool.
•
Configuring the sampled values (process bus) between the devices using
the Application Configuration tool and IEC 61850 Configuration tool.
•
Record management
•
Generating overviews on the available (disturbance) recordings in all
connected protection relays by using the Disturbance Handling tool.
•
Manually reading the recording files (in the COMTRADE format) from the
protection relays by using the Disturbance Handling tool or automatically
by using the PCM600 Scheduler.
•
Managing recording files with the Disturbance Handling tool.
1MRS757810 C
Section 2
Relay engineering process
REC615 and RER615
15
Engineering Manual
Creating recording file content overview reports for fast evaluation with
assistance of the Disturbance Handling tool.
•
Using the Fault Record tool to read fault records from the protection relay,
save records to a PC and clear old records.
•
Using the Load Profile tool to read load profile records from the protection
relay, save records to a PC and clear old records.
•
Service management
•
Monitoring the selected signals of a protection relay for commissioning or
service purposes by using the Signal Monitoring tool and Event Viewer tool
(including audit trail).
There are also additional functions for managing projects and organizing user rights.
•
PCM600 user management
•
Organizing users regarding their rights, profiles and passwords to use
different tools and functions in the tools.
•
Defining allowed activities for user profiles to use tools in PCM600.
Once the engineering of the protection relay is finished, the results must be written to
the protection relay.
The connection between the physical IED and PCM600 is established via an Ethernet
link on the front or rear port on the protection relay.
2.1
Monitoring and control system structure
The monitoring and control system for electrical substations contains a number of
devices for various purposes.
The maximum size of a project is 180 devices. However, in order to
maintain good performance and usability of the tool, it is
recommended to divide one big project into multiple smaller PCM600
projects.
Section 2
1MRS757810 C
Relay engineering process
16
REC615 and RER615
Engineering Manual
GUID-414609A0-5B40-453F-83D4-4551B2894023 V1 EN
Figure 2:
Principle structure of a monitoring and control system for a substation
The monitoring and control system can be divided into three main parts.
•
Bay level devices
•
Station communication
•
Station level devices
All three parts require specific engineering and configuration.
A plant structure is used to identify each device in its location within the substation
organization. The plant structure is a logical image of the substation and the bays
within the substation. The organization structure for the devices may differ from the
structure of the primary equipment in the substation.
In PCM600 it is possible to set up a hierarchical structure of five levels for the device
identification.
•
Project
•
Substation = name of the substation
•
Voltage level = identifies to which grid type or part the device belongs in the
substation
•
Bay = bay within the voltage level
•
IED = the selection of the IED that is used in the bay; it is possible to insert several
IEDs within a bay, for example, one control device and two protection relays
2.2
Standard configuration concept
The product series covers protection relays developed for the protection of medium
voltage applications. Every product has predefined application-specific software
called standard configuration that contains protection, control, supervision and
measurement function blocks and default logical connections; for more information,
1MRS757810 C
Section 2
Relay engineering process
REC615 and RER615
17
Engineering Manual
see the application manuals. The product also includes the standard configuration
specific default single-line diagram.
The standard configuration software consists of connections between an application's
functions developed according to the needs of a particular functional application. The
inputs and outputs are similarly assigned to a default set of connections such as
position indication and Master trip. The alarm LEDs are assigned to default
connections based on the order number.
Current and voltage channels for protection and measurement
functions are fixed as a part of standard configuration and cannot be
reassigned with Signal Matrix or Application Configuration in
PCM600.
The single-line diagram consists of an application-specific general arrangement of a
single-line diagram that includes position indications and the selection of controllable
objects and measurements.
The content of the standard configuration depends on the intended functional
application. The standard configurations also have selectable software options, which
are selected when ordering the protection relay. Some of the software options are
related to the protection relay hardware.
The standard configurations can be used as is, but they can also be modified by using
the PCM600. The standard configuration itself can be modified or extended by using
the Application Configuration tool, the Signal Matrix tool and the communication
configuration tools. The single-line diagram can also be modified with Graphical
Display Editor.
All functions and application logic included in a standard configuration of the
protection relay can be in use at the same time.
However, by removing unused function blocks from the configuration with the
Application Configuration in PCM600, more resources in the protection relay become
available for other purposes.
•
More advanced user application logic with Application Configuration
•
Extensive use of GOOSE sending and receiving
•
Increasing the amount of data reported for IEC 61850 clients
Section 2
1MRS757810 C
Relay engineering process
18
REC615 and RER615
Engineering Manual
Make GOOSE connections
Export SCL files
from PCM 600
Import SCL files to
IET 600
and do
signal engineering
.
Export updated
SCL files from
IET 600
Import SCL files
600
Start
ACT
SMT
PST
GDE
SMT
CMT
ACT
Export
SCD
IET600
Import
SCD
IED
WRITE
End
Configure IED functionality
Parametrization
Signal engineering
Create single line diagram
for local HMI
Save the work
between the
different steps
Project
Create plant structure and
insert IED objects
IEC 61850
DNP3
Modbus
Write configuration to IED
IEC 61850
Configuration tool
to PCM
IEC 60870-5-101/104
GUID-C45BA34E-9036-4AE3-A677-5B9B47168992 V1 EN
Figure 3:
Protection relay engineering workflow proposal based on practical
experience and dependencies of the steps
It is possible to follow a different sequence based on the information available at the
time when the project is started. This means that several iterations may be needed to
complete the project.
Setting up a PCM600 project
•
The plant structure is built according to the substation structure.
The maximum size of a project is 180 IEDs. However, in order to
maintain good performance and usability of the tool, it is
1MRS757810 C
Section 2
Relay engineering process
REC615 and RER615
19
Engineering Manual
recommended to divide one big project into multiple smaller
PCM600 projects.
•
To add a protection relay to a project, a suitable Connectivity package is needed.
Protection relays can be added either while connected or disconnected or through
other means such as an IED template.
•
IED objects are uniquely named within the PCM600 project.
Application configuration in the Application Configuration tool
•
Protection and control functions can be configured as needed.
•
The configuration made in the Application Configuration tool is saved to make
the interfaces and signals available for other engineering tools within PCM600,
for example, for the Parameter Setting tool.
Parameter setting and configuration in the Parameter Setting tool
•
Configuration parameters such as CT and VT conversion values of the
transformer module are checked by the tool.
•
If needed, the setting values are checked and adjusted with the Parameter Setting
tool.
Single-line diagram configuration in Graphical Display Editor
•
It is possible to create a single-line diagram for the switching devices in the bay.
•
Measurements can be included when needed.
•
The dynamic elements are linked to the functions created in the Application
Configuration tool; for example, a breaker object is linked to the circuit breaker
control function.
LHMI engineering
•
The LEDs are configured with Application Configuration.
•
The LED behavior is defined with Parameter Setting.
Communication protocol engineering
•
The communication engineering details are protocol-dependent.
•
The connectivity package creates the IEC 61850 configuration for vertical
communication automatically and it is directly suitable, in most cases, for IEC
61850 client configuration. Either IEC 61850 Configuration tool or IET600 is
needed for configuring horizontal and vertical communication.
•
The Communication Management tool is used for other protocols; for example
Modbus.
Section 2
1MRS757810 C
Relay engineering process
20
REC615 and RER615
Engineering Manual
The protection relay restarts automatically when writing a relay
configuration where changes have been made. It is not possible to
communicate with the protection relay during restart.
1MRS757810 C
Section 2
Relay engineering process
REC615 and RER615
21
Engineering Manual
Protection and Control IED Manager PCM600 offers all the necessary functionality
to work throughout all stages of the protection relay life cycle.
•
Planning
•
Engineering
•
Commissioning
•
Operation and disturbance handling
•
Functional analysis
The whole substation configuration can be controlled and different tasks and
functions can be performed with the individual tool components. PCM600 can
operate with many different topologies, depending on the customer needs.
PCM600 is used to conduct complete engineering and configuration activities needed
for the bay level protection relays.
Connectivity Packages are separate software packages that provide type and version
information to PCM600. Further Connectivity Packages assist the tool with
communications.
PCM600 uses IEC 61850 over Ethernet to communicate with bay devices. This
communication allows PCM600 to configure and monitor the devices. In addition to
IEC 61850 the devices have optional communications protocols and hardware to
connect to station engineering tools. PCM600 provides the ability to export the
configuration of the devices or an entire substation in a standard file format which
enables station engineering in separate IEC 61850 System Configuration tools.
A PC with PCM600 can be connected to any 615 series protection relay within a
station by using the Ethernet connection. The connection can also be used for service
and maintenance purposes. In addition, the connection is used to handle disturbance
records from the protection relays.
The modern-day protection relays are designed using the concept of the IEC 61850
standard. This is primarily in regards to how functions within the protection relay are
modelled and how the protection relay is represented in the substation. See the IEC
61850 parameter list for the list of logical nodes available in the protection relay and
observe how they follow the structure and rules as defined in part 7 of the standard.
The engineering of the used communication protocols is a separate task and an
addition to the engineering of protection and control functions.
PCM600 can be used for different purposes throughout the protection relay life cycle.
A set of special tools is available for different applications.
1MRS757810 C
Section 3
PCM600 tool
REC615 and RER615
23
Engineering Manual
The applications can be organized into groups.
•
Relay engineering
•
Communication engineering
•
Record management
•
Device monitoring and diagnostic
For more information, see the PCM600 documentation.
3.1
Connectivity packages
A connectivity package is a software component that consists of executable code and
data which enables system tools to communicate with a protection relay. Connectivity
packages are used to create configuration structures in PCM600. The latest PCM600
and connectivity packages are backward compatible with older protection relay
versions.
A connectivity package includes all the data which is used to describe the protection
relay. For example, it contains a list of the existing parameters, data format used, units,
setting range, access rights and visibility of the parameters. In addition, it contains
code which allows software packages that use the connectivity package to properly
communicate with the protection relay. It also supports localization of text even when
it is read from the protection relay in a standard format such as COMTRADE.
Update Manager is a tool that helps in defining the right connectivity package versions
for different system products and tools. Update Manager is included with the products
that use connectivity packages.
3.2
PCM600 and IED connectivity package version
•
Protection and Control IED Manager PCM600 Ver.2.9 or later
•
REC615 Connectivity Package Ver.2.0 or later
•
RER615 Connectivity Package Ver.2.0 or later
Download connectivity packages from the ABB Web site
http://www.abb.com/substationautomation or directly with Update
Manager in PCM600.
Section 3
1MRS757810 C
PCM600 tool
24
REC615 and RER615
Engineering Manual
Installing connectivity packages
•
Install connectivity packages either by running the installer which can be
downloaded on the ABB Website or by using Update Manager when a network
connection is available.
Download connectivity packages from the ABB Web site
http://www.abb.com/substationautomation or directly with Update
Manager in PCM600.
3.2.1.1
Installing connectivity packages by using the connectivity package
installer
1.
Close PCM600.
2.
Run the ABB IED Connectivity Package RE_6xx Ver. n.msi installer.
(n = version number)
3.
To install the connectivity package, follow the steps in the connectivity package
installation wizard.
3.2.1.2
Installing connectivity packages by using Update Manager
1.
In PCM600, click Help and select Update Manager.
Run Update Manager with administrator rights.
GUID-7A72A86C-7F41-4342-AAF3-CF34E8279B4E V3 EN
Figure 4:
Running Update Manager as an administrator
2.
Select Get Connectivity Packages from the menu on the left column.
3.
Select all the required connectivity packages.
4.
Click Download and Install.
The status bar shows the installation status.
1MRS757810 C
Section 3
PCM600 tool
REC615 and RER615
25
Engineering Manual
GUID-CD8A9C2A-0CF0-451F-A820-82482C646EB3 V1 EN
Figure 5:
Selecting the connectivity packages
3.2.2
Activating connectivity packages
The relay connectivity package has to be installed before it can be activated in Update
Manager.
1.
Select Manage Connectivity Packages from the menu on the left column to
access the installed connectivity packages.
2.
Browse the tree structure to find the correct product.
3.
Select the connectivity package version from the drop-down list beside the
product name.
Always use the latest version of the connectivity package.
4.
Click Apply to activate the connectivity package.
GUID-D1589AEE-6898-436E-90C3-26AF299A940D V4 EN
Figure 6:
Selecting the connectivity package versions
Section 3
1MRS757810 C
PCM600 tool
26
REC615 and RER615
Engineering Manual
PCM600 recognizes the installed connectivity packages during start-up, and the
corresponding IED types are available in PCM600 when starting a new project.
3.3
PCM600 projects
A typical project in PCM600 contains a plant structure including one or several IED
objects, where each IED object contains the engineering data created or modified
using the different PCM600 tools.
Several projects can be created and managed by PCM600, but only one project can be
active at a time.
Regardless the protocol used in installation for each project, the IEC 61850 version
must be selected when adding the first IED to plant structure. After the initial
selection, all IEDs in plant structure use the selected version, either Edition 1 or
Edition 2. In case the IEC 61850 is not used for station bus, the default version can be
applied. By default, the IEC 61850 version of PCM600 is Edition 1. The protection
relay's IEC 61850 version is by default Edition 2.
With PCM600, it is possible to do various tasks.
•
Open existing projects
•
Import projects
•
Create new projects
•
Export projects
•
Delete projects
•
Rename projects
•
Copy and paste projects
The extension of the exported project file is .pcmp. The files are only used for
exporting and importing projects between PCM600s.
3.4
Technical key
Both a physical IED and an IED object in PCM600 have a technical key. The technical
key in the protection relay and PCM600 must be the same, otherwise it is not possible
to download a configuration.
Each IED in a PCM600 project must have a unique technical key. Therefore, it is not
possible to set the same technical key for several IEDs in the same PCM600 project.
The protection relay is delivered with a factory default technical key.
The validation of the technical keys between PCM600 and the
1MRS757810 C
Section 3
PCM600 tool
REC615 and RER615
27
Engineering Manual
protection relay does not occur if the protection relay contains the
factory default technical key.
The technical key property in PCM600 corresponds to the IED name
attribute in SCL files. Avoid changing the IED name attribute outside
PCM600, because data in PCM600 may get lost when importing the
SCL files.
The technical key must be the same for the communication between the protection
relay and PCM600. The technical key can be read from the protection relay and
updated to PCM600, or the PCM600 technical key can be written to the protection
relay. Alternatively, a user-defined technical key can be defined.
When writing a configuration to the protection relay, PCM600 checks for a mismatch
between the IED object and the physical IED technical key.
GUID-653F00D4-EA39-45A2-BF0D-5BF2B15F3BEA V3 EN
Figure 7:
Reboot suggestion
Ensure that the IED object in PCM600 has the same IP address as the
physical IED that is intended to be connected through the technical
key concept.
Change the technical key for an IED object in the Object Properties
dialog box in PCM600.
3.4.1
IEC 61850 naming conventions to identify an IED
This section is only valid when the IEC 61850 standard is used for station bus
communication. The IEC 61850 naming conventions to identify an IED are only valid
when the IEC 61850 standard is used for station bus communication. According to the
IEC 61850-6, the SCL model allows two kinds of project designations in the object
properties: a technical key and a user-oriented textual designation.
Section 3
1MRS757810 C
PCM600 tool
28
REC615 and RER615
Engineering Manual
Technical key is used in engineering drawings and for signal identifications. This
is contained in the attribute name as an identification of each object. If the value
is used as a reference to an object, it is contained in an attribute name starting with
a string denoting the reference target object type and ending with the string
Name. The technical key is used within SCL for referencing to other objects. The
name is a relative identification within a hierarchy of objects. The maximum
characters allowed for a technical key is 28 for IEC 61850 Edition 1 and 60 for
Edition 2 projects.
•
User-oriented textual designation is contained in the desc attribute. Attributes are
not allowed to contain carriage return, line feed, tab, greater than, less than,
double quotes or ampersand characters. The semantics of desc must also be
relative within an object hierarchy. The maximum length is 100.
PCM600 takes care of these two possibilities. The two possible signal designations are
available per object in the Object Properties for all the hierarchical levels beginning
with the station as the highest level.
The technical key is automatically generated based on the rules and type
specifications of IEC 61346 and the extended definitions assigned for substations by
a technical committee. The technical key is shown in the Object Properties dialog box
under SCL Technical Key or Technical Key.
•
The station is predefined by “AA1" where 1 is the index. To get the real station
name that is used, it is possible to rename the SCL Technical Key for the station
as the name used by the project. To minimize the word length, a short form should
be used, because this name is used also in the transmitted messages to identify the
events, for example.
•
The voltage level. In the example it is 20 kV and J1 is selected from the list below
SCL Technical Key in the Object Properties dialog box.
•
The bay and the IED are appended with the coding defined in the IEC 61346
standard and the substation definition lists. In the example, the Bay SCL
Technical Key part is Q03 and IED is A1.
The user-oriented textual designation is visible in the Plant structure view for each
object. It is the name given by default or changed by using the Rename function.
1MRS757810 C
Section 3
PCM600 tool
REC615 and RER615
29
Engineering Manual
GUID-45BBD7D0-9094-4E43-9EA5-44B939B1196E V3 EN
Figure 8:
PCM600: IEC 61850 signal designation concept
The created technical key for the full path name of the IED would be:
AA1J1Q03A1.
•
AA1 = substation in the project
•
J1 = voltage level from 20 to 30 kV
•
Q03 = the third bay in the voltage level
•
A1 = first IED in the bay Q03
3.4.2
Setting the technical key
The maximum length of technical key is 28 characters for Edition 1
and 60 characters for Edition 2.
1.
In the Plant Structure view, right-click the IED and select Set Technical Key
in IED.
Section 3
1MRS757810 C
PCM600 tool
30
REC615 and RER615
Engineering Manual
GUID-04793346-E7EC-4C62-9F2A-6F6E6E1C5001 V3 EN
Figure 9:
PCM600: Setting the technical key on the IED level
A dialog box opens to inform about the technical key concept.
1MRS757810 C
Section 3
PCM600 tool
REC615 and RER615
31
Engineering Manual
GUID-A7DB8816-0CB4-46FF-B778-728D64662578 V1 EN
Figure 10:
Technical key information
2.
Click OK.
The technical key is read from the IED and the Set Technical Key dialog box
opens.
Section 3
1MRS757810 C
PCM600 tool
32
REC615 and RER615
Engineering Manual
GUID-2DD837B5-6B0B-48BE-A907-A838C34908E7 V1 EN
Figure 11:
Setting the technical key
3.
In Set Technical Key dialog box, select the technical key to be used. There are
three alternatives.
•
Use the existing technical key in the IED
•
Use the existing technical key defined for the IED object in PCM600
•
Set a user-defined technical key, which changes the technical key for both
the physical IED and IED object in PCM600
4.
Click OK to confirm the selection.
It is not possible to set a user-defined name or select the
Technical key in IED if the value is the same as already given
to another IED object in the PCM600 project. An error message
is displayed if this happens.
3.5
Communication between PCM600 and the protection
relay
The communication between the protection relay and PCM600 is independent of the
used communication protocol within the substation or to the NCC.
All communication is done over Ethernet using either IEC 61850 or FTP/FTPS
protocol.
1MRS757810 C
Section 3
PCM600 tool
REC615 and RER615
33
Engineering Manual
Each protection relay has an Ethernet interface connector on the front and optionally
on the rear side as well. The Ethernet connector can be used for communication with
PCM600.
When an Ethernet-based station protocol is used, the same Ethernet port and IP
address can be used for PCM600 communication.
Two basic variants have to be considered for the connection between PCM600 and the
protection relay.
•
Direct point-to-point link between PCM600 and the protection relay's front port
•
Indirect link via station LAN or from remote via network
1.
If needed, the IP address for the protection relay is set.
2.
A PC or workstation is set up for a direct link (point-to-point), or the PC or
workstation is connected to the LAN/WAN network.
3.
The protection relays' IP addresses in the PCM600 project are configured for each
protection relay to match the IP addresses of the physical IEDs.
4.
Technical keys of the IEDs in PCM600 project are configured for each protection
relay to match the technical keys of the physical IEDs.
For successful protection relay engineering and usage, check the workstation firewall
TCP and UDP port configurations, especially for IEC 61850 and FTP. Other protocols
are not used for engineering and/or they are optional.
Table 2:
Ports that must be open in the firewall for different protocols
Protocol
TCP port
File Transfer Protocol (FTP and FTPS)
20, 21
IEC 61850
102
Web Server HTTP
80
Web server HTTPS
443
Simple Network Time Protocol (SNTP)
123
Modbus TCP
502
DNP TCP
20000
3.5.1
Setting up IP addresses
The IP address and the corresponding subnet mask can be set via LHMI for the rear
Ethernet interface in the protection relay. Each Ethernet interface has a default factory
IP address when the complete protection relay is delivered. The configured rear port
IP address is preserved if a new communication card with Ethernet is installed or the
communication card is replaced.
Section 3
1MRS757810 C
PCM600 tool
34
REC615 and RER615
Engineering Manual
The protection relay's front port IP address is fixed to “192.168.0.254”
and it cannot be modified.
1.
Set the IP address for the protection relay's rear port and the corresponding
subnet mask via the LHMI path Configuration/Communication/Ethernet/
Rear port.
Table 3:
Default IP address for the rear port and the corresponding subnet mask
IP address
Subnet mask
192.168.2.10
255.255.255.0
Communication fails if the IP addresses of the front and the rear port
belong to the same subnet.
When using redundant Ethernet (HSR or PRP), configure all devices
in the network before connecting cables to ports LAN A and LAN B.
Avoid using the LAN A or LAN B ports on redundant communication
modules while changing the Switch mode parameter.
3.6
IED Update
The firmware update tool is used for patching the IED firmware and for adding or
replacing additional languages to the IED. Update packages are provided by Customer
Support. The update tool can be used either locally or remotely.
It is recommended to take a backup of the IED configuration before starting the
update. This can be done by using the Read from IED function from the IED context
menu in PCM600. The user needs to be authorized before using the tool. User
credentials are asked if the default administrator password has been changed.
Administrator or engineer credentials are needed for authorization.
3.6.1
Prerequisites for local and remote updates
Local update
•
Use of the front port is recommended when updating locally. Remove the IED
from the network especially with redundant network topologies (HSR/PRP).
Remote update
1MRS757810 C
Section 3
PCM600 tool
REC615 and RER615
35
Engineering Manual
Communication is recommended to be secured either by setting up a VPN
connection or enabling secure communication in the IED via LHMI
(Configuration/Authorization/Remote Update) while updating remotely.
•
Remote update can be enabled in the IED either via the LHMI (Configuration/
Authorization/Security/Remote Update) or by an administrator in the
Parameter Setting tool in PCM600 (IED Configuration/Configuration/
Authorization/Remote Update to be able to update remotely. If the IED is in
local control mode, remote update proceeds only after a confirmation is received
from the user.
•
Remote update has to be disabled manually after the update, if wanted.
•
Remote update only works when the IED is connected from the rear port with a
custom IP address.
3.6.2
Updating firmware or language
1.
Select the update mode.
•
Firmware
•
Language
2.
Select the update package and click Next.
Section 3
1MRS757810 C
PCM600 tool
36
REC615 and RER615
Engineering Manual
GUID-82D67F9A-3D54-474D-BBEE-CA9620EB663A V2 EN
Figure 12:
Choosing the update mode and package
3.
Select the network interface controller, for example, the PC's integrated Ethernet
communication card or an external Ethernet adapter, connected to the IED and
click OK.
GUID-AF43F861-54EB-4F5E-B745-38994F6A423A V1 EN
Figure 13:
Selecting the network interface controller
4.
When updating remotely, wait for 30 seconds for the local user confirmation
before proceeding with the update.
•
The local user can cancel the update via the LHMI by pressing
during
the 30 second window.
•
IED use is allowed after the update is completed successfully.
1MRS757810 C
Section 3
PCM600 tool
REC615 and RER615
37
Engineering Manual
GUID-82BB575B-99D9-4C84-B35E-FB85D8465323 V1 EN
Figure 14:
Waiting for local user confirmation with remote update
GUID-31FD0CB0-CFBC-48AB-BF96-D3F9436DBDEE V1 EN
Figure 15:
Completing the update
Section 3
1MRS757810 C
PCM600 tool
38
REC615 and RER615
Engineering Manual
Setting up a project
4.1
Creating a new project
1.
Start PCM600.
2.
To see the projects that are currently available in the PCM databases, select File/
Open/Manage Project on the menu bar.
The Open/Manage Project window is displayed.
3.
Click Projects on my computer.
4.
Click New Project.
5.
If there are currently projects or object tools open, a confirmation dialog box
opens.
•
Click Yes to close the open projects. A Create New Project dialog box
opens.
GUID-F7D1FC0A-CFD5-4A4C-900C-E1F90DEDF3BF V2 EN
Figure 16:
New Project dialog box
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
39
Engineering Manual
IEC09000375 V2 EN
Figure 17:
Creating a new project
6.
In the Project Name box, give a name for the project.
The project name must be unique.
7.
Optionally, write a description of the project in the Description box.
8.
Click Create.
PCM600 sets up a new project that is listed under Projects on my computer.
4.2
Building the plant structure
Building a plant structure is useful when a complete grid with an
essential number of IEDs has to be built.
1.
Create a new plant structure in one of the alternative ways.
Section 4
1MRS757810 C
Setting up a project
40
REC615 and RER615
Engineering Manual
Right-click the Plant Structure view, point to New and select Create
from Template.
•
Right-click the Plant Structure view, point to New and select General
and select the element either IED Group or Substation.
2.
On the View menu, select Object Types.
3.
Select the needed elements and drag them into the plant structure.
GUID-2848A9FA-0084-45F1-8C7C-C3E5FC679F25 V3 EN
Figure 18:
The start of a project with IEDs placed but not renamed
4.
Rename each level in the structure by the names/identifications used in the grid.
•
Right-click the level and select Rename.
•
Rename the levels in the Object Properties view.
4.3
Inserting an IED
The context menu or the Object Types view shows the available IEDs that can be
inserted, on the bay level, into the plant structure according to the installed
connectivity package.
It is possible to do various tasks in the plant structure.
•
Insert either offline or online IED
•
Import a template IED that is available in the template library as a .pcmt file
•
Import a preconfigured IED available as a .pcmi file
PCM600 uses two kinds of IED files: .pcmt and .pcmi. Both files
include the complete IED configuration but their usage differs.
The .pcmt files are always accessed through the PCM600 template
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
41
Engineering Manual
manager while the .pcmi files are meant for sharing the IED instances
between different PCM600 users enabling quick import/export
directly from the plant structure context menu.
IEC 61850 Edition 1 and Edition 2 IEDs cannot be used
simultaneously in the same PCM600 project. The first inserted IED
determines the IEC 61850 version for the whole project.
4.3.1
Inserting an IED in online mode
To set up an IED online, the protection relay must be connected to PCM600.
When the protection relay is already connected to PCM600, PCM600 can read the
order number directly from the relay. It is possible to read the full configuration from
the relay by using the Read from IED function.
1.
In the Plant Structure view, right-click the bay, point to New, point to the relay
application area such as Motor Protection IEDs and select the protection relay
type to be inserted.
Alternatively, drag an IED from the Object Types view to the
bay level.
Section 4
1MRS757810 C
Setting up a project
42
REC615 and RER615
Engineering Manual
GUID-60CF9708-4953-4285-93FD-5B96D15745E7 V3 EN
Figure 19:
Selecting the protection relay type
2.
On the Configuration mode selection page, select Online Configuration and
click Next.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
43
Engineering Manual
GUID-C4812BC7-2379-4BC8-A9B3-B0664B668BCF V3 EN
Figure 20:
Configuration mode selection
3.
On the Communication protocol selection page, select the communication
protocol from the IED protocol list and click Next.
Section 4
1MRS757810 C
Setting up a project
44
REC615 and RER615
Engineering Manual
GUID-43A069B0-B21F-4058-A6A0-E034F18BB5BE V3 EN
Figure 21:
Communication protocol selection
4.
On the IEC61850 communication protocol page, select the port from the Port
list.
•
If the rear port is selected, type the correct IP address (of the physical
protection relay to be configured) to the IP address box.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
45
Engineering Manual
GUID-CD327D94-C6E9-4864-9A24-DA5556F023D4 V2 EN
Figure 22:
Communication port and IP address
Communication configuration is now defined.
5.
Click Next to scan/read the order code of the protection relay.
6.
On the Order code detection page, click Next.
GUID-C7A331F8-1F10-4D6C-906F-FFC8578B3555 V3 EN
Figure 23:
Order code detection
Section 4
1MRS757810 C
Setting up a project
46
REC615 and RER615
Engineering Manual
On the Configuration selection page, select the configuration type and click
Next.
•
Select Empty Configuration to create an empty configuration.
•
Select Example Configuration to import any existing example
configuration.
Click Browse to select the .pcmi/.pcmt file that has the example
configuration.
•
Select Standard Configuration to generate a default configuration.
GUID-B8C75430-D477-455F-8CE3-B54B3052E6D8 V3 EN
Figure 24:
Configuration selection page
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
47
Engineering Manual
GUID-2EAD9C28-6C56-4CB4-8CF7-7B0621A7DCDC V2 EN
Figure 25:
Importing example configurations
8.
On the Version selection page, select the IEC 61850 version and click Next.
Regardless of the protocol used in the installation for each
project, the IEC 61850 version must be selected when adding the
first protection relay to the plant structure. After the initial
selection all protection relays in the plant structure use the
selected version, either Edition 1 or Edition 2.
9.
The Setup complete page shows the summary of the protection relay's IED type,
version, IP address and the selected order number. Click Finish to confirm the
configuration and conduct the insertion.
Section 4
1MRS757810 C
Setting up a project
48
REC615 and RER615
Engineering Manual
GUID-BCFEB0FB-7CE9-43B5-AFA9-6A396078AF40 V3 EN
Figure 26:
Setup complete
To cancel the insertion, click Cancel.
If an error is found on the Setup Complete Page, it is not
possible to go back and make modifications. If an error is
detected, cancel the insertion by clicking Cancel and insert the
IED again.
10.
From the Plant structure view, check that PCM600 has turned online the IED
that was inserted to the bay level.
Data cannot be scanned from the protection relay and
proceeding is prevented if the IED is not online or if the IP
address is not correct.
4.3.2
Inserting an IED in offline mode
When the protection relay is not available or is not connected to PCM600, engineering
can be done offline. The offline configuration in PCM600 can be written to the
protection relay later when it is connected.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
49
Engineering Manual
Working in the offline mode has an advantage compared to online mode in that the
preparation for the configuration can be started even though the protection relay is not
available.
1.
In the Plant Structure view, right-click the bay, point to New, point to the IED
application area such as Remote Monitoring and Control IEDs or Recloser
Protection and Control IEDs.
Alternatively, drag an IED from the Object Types view to the
bay level.
2.
On the Configuration mode selection page, select Offline Configuration and
click Next.
Setting up an IED in the offline mode is similar as in the online mode; however,
with the offline mode it is not necessary to type the correct IP address in the
Communication port and IP address dialog box.
GUID-3629E365-57F1-41B8-A16F-811F5D218AD2 V3 EN
Figure 27:
PCM600: Configuration Mode Selection Wizard
3.
On the Order Code selection page, select the correct order codes and click
Next.
Ensure that the order code is correct. PCM600 verifies later that
the order code matches with the relay. If the order code digits
related to the configuration, I/O or version do not match with the
Section 4
1MRS757810 C
Setting up a project
50
REC615 and RER615
Engineering Manual
relay, PCM600 does not allow writing the configuration to the
device. If other digits in the order code do not match, PCM600
informs about the mismatch with a dialog.
GUID-6EB85C58-4EF4-4672-A3B2-92CB07EAC98A V3 EN
Figure 28:
IED order code selection
4.
On the Configuration Selection Page, select the configuration type and click
Next.
•
Select Empty configuration to create an empty configuration.
•
Select Example configuration to import any existing example
configuration.
Click Browse to select the .pcmi/.pcmt file that has the example
configuration.
•
Select Standard configuration to generate a default configuration.
5.
On the Version Selection page, select the IEC 61850 version and click Next to
generate the functions.
6.
The Setup Complete Page shows the summary of the IED type, version, IP
address and the selected order number. Click Finish to confirm the
configuration and conduct the insertion.
4.3.3
Inserting an IED from the template directory
IED templates can be used for replicating IEDs with same order code in PCM600
projects. Template includes IED application configuration, graphical display
configuration (single-line diagram), communication protocol mappings and
parameters. An IED in the plant structure can be exported as a template (.pcmt file).
The template library can be built from all the exported IED templates.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
51
Engineering Manual
It is also possible to insert an IED from the template library to create a new IED in the
plant structure. After a template IED has been imported, the IP address, the Caption
in IED's Object Properties and the Technical Key that corresponds to the physical
IED have to be changed.
A template IED can be inserted only when the bay is selected in the
plant structure.
1.
In the Plant structure view, select the bay, right-click, point to New and select
Create from template.
The Create New Object from Template dialog box opens.
GUID-A5D22ADA-02A5-43F8-BA02-52A4A915D7EA V2 EN
Figure 29:
PCM600: Selecting an IED from the template library
2.
Select the IED from the list of available IEDs.
3.
Click the icon on the right column in the list of available templates.
The Template Properties dialog box opens.
Section 4
1MRS757810 C
Setting up a project
52
REC615 and RER615
Engineering Manual
GUID-9230A349-8DCF-4495-A79F-500124D74E71 V3 EN
Figure 30:
PCM600: Template information
4.
Check and verify the template information and click Close to close the dialog
box.
The Create New Object from Template dialog box is displayed.
5.
Delete, import or create a template by clicking the corresponding button.
•
To delete the selected template, click Delete Template.
•
To import a template from the selection window, click Import Template.
•
To insert the selected IED to the bay, click Create.
It is possible to insert more than one IED from the Create New
Object from Template dialog box. The dialog box remains
open until Close is clicked .
6.
Click Close when finished.
4.3.4
Inserting an IED by importing a .pcmi file
It is possible to create a new IED object in the plant structure by importing a .pcmi file.
1.
In the Plant Structure view, right-click the bay and select Import.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
53
Engineering Manual
A .pcmi file can be imported only when the bay is selected in the
plant structure.
GUID-E4F6149B-A672-4128-901E-995B70BB4F30 V3 EN
Figure 31:
Importing IED configuration
2.
In the Import dialog box, select the .pcmi file to be imported and click Open.
After importing, the IED object is created in the plant structure.
After the .pcmi file has been imported, the IP address, the name and the technical key
that correspond to the physical IED have to be changed.
4.4
Setting the IED IP address in a project
The IP address and subnet mask of the IED object in PCM600 must match the front
and rear port of the protection relay (physical IED) to which the PC is connected. The
IP address of the protection relay can only be set via the LHMI or Parameter Setting
tool in PCM600. The PC and protection relay need to be on the same subnet.
There are two alternatives to set the IP address of an IED object in PCM600.
•
On the first page of the wizard when including a new IED into a project.
•
In the IP address box of the IED's Object Properties dialog box.
Section 4
1MRS757810 C
Setting up a project
54
REC615 and RER615
Engineering Manual
GUID-BAB14777-F3F3-4112-921F-9F22D5A66DFC V2 EN
Figure 32:
Alternative 1: Setting the IP address on the first wizard page
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
55
Engineering Manual
GUID-6BE9DC1E-86E5-464F-B9AD-4B782F3D360C V4 EN
Figure 33:
Alternative 2: Setting the IP address in IED's Object Properties dialog
box
Choosing between the two ways depends on when the IP address is set. Typing the IP
address via the IED's Object Properties dialog box is possible at any time while
entering it via the configuration wizard can only be done when adding the IED object.
1.
In the Plant Structure view, select the IED to which the IP address is to be
entered.
2.
On the View menu, select Object Properties.
Object Properties dialog box is opened.
3.
Type in the IP address to the IP Address row.
4.5
COM600S project
The 615 series connectivity package supports SAB600. A 615 series protection relay
is imported as a 615 series device. It is also possible to import a full PCM600 project
including several 615 series devices to SAB600. In this case, PCM600 project
information is imported to SAB600 using a SCD file.
The 615 series device supports several functions in COM600S.
•
Controlling the switchgear
•
Monitoring the measured values
•
Reading disturbance recordings
•
Setting parameters
Section 4
1MRS757810 C
Setting up a project
56
REC615 and RER615
Engineering Manual
Selecting communication port for configuration
When a relay is configured to a PCM600 project, the connection between the relay and
the tool can be established using a point-to-point link between the relay front port and
the computer or by connecting the computer to the relay rear port over an Ethernet
station bus. In PCM600, the front or rear communication port can be selected from the
project structure.
When using the front port, DHCP server functionality must be activated in the
computer network adapter settings to get the IP address from the relay. Alternatively,
the computer network adapter IP address can be set manually to the same subnet range
as the front port.
GUID-6B209BB8-F07E-4414-B404-EA33CEB71DB2 V1 EN
Figure 34:
Communication port options
•
Check that the settings are correct to ensure successful configuration access to the
relay.
•
Computer port settings must match relay settings (IP address, subnet mask,
DHCP).
•
Any firewall in the computer or in the network must pass required
communication services.
•
When using the front port and switching the connection from the computer
to another relay, it takes some time before the computer refreshes the relay's
MAC address for front port IP address automatically. The MAC address
can also be reset manually by clearing the computer ARP table.
4.5.2
Importing a 615 series protection relay in a COM600S project
1.
Create a PCM600 project including several IEDs.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
57
Engineering Manual
GUID-4E814E6D-55D5-4612-88A8-115EF4F61BEB V3 EN
Figure 35:
Creating a PCM600 project including several IEDs
2.
Export the SCD file from PCM600.
In the Plant structure view, select the substation, right-click and select Export.
Section 4
1MRS757810 C
Setting up a project
58
REC615 and RER615
Engineering Manual
GUID-7B828D99-0BDE-4949-A94A-97DF751D0E3E V2 EN
Figure 36:
Exporting SCD file from PCM600 and importing it to SAB600
3.
Import the SCD configuration into the SAB600 project.
In the Project Explorer view, right-click the IEC61850 OPC Server object and
select SCL Import.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
59
Engineering Manual
GUID-70E8B187-FADA-4657-9BC7-223FDA7374ED V2 EN
Figure 37:
Importing the SCD configuration into the SAB600 project
4.
In the SCL Import view, click Select File to select the SCD file exported from
PCM600.
GUID-6F47B4AD-B956-4F77-A6A2-DE6F4A71D607 V2 EN
Figure 38:
Creating a new IED into SAB600 project
Section 4
1MRS757810 C
Setting up a project
60
REC615 and RER615
Engineering Manual
Check the default settings in the SCL Import view and change the settings if
they are not suitable.
The default settings in the SCL Import dialog should be correct in most cases.
6.
Click Import to import the SCD file.
7.
Check the IP address on the IEC 61850 subnetwork and change it if needed.
When the SCD file is directly exported from PCM600, it uses the IP address of
the PCM600 computer, not the COM600S.
The communication towards the protection relays is now ready. For information on
how to finalize the single-line diagram and enable parameter setting through
COM600S HMI, see COM600S documentation.
4.6
Using the Web HMI
WHMI is disabled by default, and has to be activated in the protection relay
configuration. As secure communication is enabled by default, the WHMI must be
accessed from a Web browser using the HTTPS protocol.
1.
To enable the WHMI, select Main menu/Configuration/HMI/Web HMI
mode via the LHMI.
2.
Reboot the relay for the change to take effect.
3.
Log in with the proper user rights to use the WHMI.
To establish a remote WHMI connection to the protection relay,
contact the network administrator to check the company rules for IP
and remote connections.
Disable the Web browser proxy settings or make an exception to the
proxy rules to allow the protection relay's WHMI connection, for
example, by including the relay's IP address in Internet Options/
Connections/LAN Settings/Advanced/Exceptions.
For more information on the WHMI, see the operation manual.
4.7
Managing IED users
IED user authorization is disabled by default. IED user passwords can be changed in
LHMI, WHMI and using the IED Users tool in PCM600.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
61
Engineering Manual
Local passwords can be changed only via the LHMI. Remote
passwords can be changed via the LHMI or WHMI or with PCM600.
If the IED-specific Administrator password is forgotten, ABB can provide a onetime
reliable key to access the IED. For support, contact ABB. The recovery of the
Administrator password takes a few days.
1.
Enable IED user authorization at Main Menu/Configuration/Authorization/
Passwords in LHMI or WHMI.
2.
Use the IED Users tool in PCM600 to change the passwords.
This tool cannot be used to add or change users.
GUID-DF4E526E-401B-47A4-B002-2B67DCB79776 V1 EN
Figure 39:
Changing the password using the IED User Management tool
3.
Set the object property values in PCM600 to make the communication between
the IED and PCM600 work, if the remote authentication has been enabled.
Table 4:
Object properties to change
Object Properties field
Value
Is Authentication Disabled
False
Is Password used
True
Password
Write the correct password
Section 4
1MRS757810 C
Setting up a project
62
REC615 and RER615
Engineering Manual
GUID-9F776089-8442-49CF-9153-A142BC48862E V1 EN
Figure 40:
Object properties
When communicating with the protection relay with PCM600 tools and with the
relay authentication enabled, the relay username and password must be given
when prompted. When setting the technical key, the username and password
must be given twice.
GUID-0F5E5C0E-30AF-4025-8AE0-462A05561772 V1 EN
Figure 41:
User login
If the PCM600 authentication has been enabled in PCM600
System Settings, a relay user can be linked to the current
PCM600 user by selecting the Remember me check box in the
Login dialog. After that, the user credentials are no longer asked
at tool communication as logging in PCM600 also provides the
authentication credentials to the protection relay.
1MRS757810 C
Section 4
Setting up a project
REC615 and RER615
63
Engineering Manual
PCM600 project's IEC 61850 version identification
The IEC 61850 version of a PCM600 project can be identified from the Object
Properties pane of the project.
To change the IEC 61850 version Edition 1 of an IED to Edition 2, the configuration
has to be written to the IED from a PCM600 project that has the IEC 61850 version
Edition 2. A dialog box notifies on the difference of the versions.
GUID-76919861-F55B-489A-B031-A78229ADDDB2 V1 EN
Figure 42:
IEC 61850 version change
Section 4
1MRS757810 C
Setting up a project
64
REC615 and RER615
Engineering Manual
Protection and control engineering
5.1
Application Configuration tool
Application Configuration tool is used to modify an application configuration for a
protection relay and is based on IEC 61131-3 Function Block Diagrams.
The function blocks are dedicated to different functions.
•
Control related functions
•
Protection related functions
•
Monitoring functions
•
Communication
For more information on the function blocks, see the technical manual.
Most function blocks are mapped as logical nodes according to the IEC 61850
standard. See the IEC 61850 parameter list for more information.
If a function block is removed with Application Configuration, the
function related data disappears from the menus as well as from the
IEC 61850 data model, with the exception of some basic function
blocks, which are mandatory and thus cannot be removed from the
relay configuration by removing them from the Application
Configuration.
Other function blocks are not mapped as logical nodes; for example, logical gates.
The basic features of Application Configuration tool include the ability to organize a
configuration into several MainApplications as well as providing different
application programming features.
•
Organize an application configuration
•
Organize an application configuration into a number of logical parts
(MainApplication)
•
Organize a MainApplication over a number of pages
•
Features for programming an application configuration
•
Insert function blocks, make connections and create variables
•
Include the hardware I/O channels directly to the application configuration
•
Calculate the execution order automatically by clicking Calculate
execution order on the toolbar.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
65
Engineering Manual
Document the application configuration: such as, make printouts
•
Save application configurations as templates in an application library to
reuse them in other protection relays (Function blocks and related logic can
be fully or partially reused depending on the functionality available in the
other protection relay)
•
Validate the application configuration during the configuration process on
demand and while writing the application configuration to the protection
relay
For instructions on how to perform the different tasks in PCM600, see
PCM600 online help.
5.1.1
Function blocks
Function blocks are the main elements of an application configuration. They are
designed for a various number of functions and organized into groups according to
type. The different function block types are shown in the Object Types view.
Function block data can be modified with the Application Configuration tool.
•
User-defined names can be given for function blocks and signals.
Signals that have a user-defined name created with the
Application Configuration tool are only visible in the Parameter
Setting tool if the relay configuration is written to the protection
relay and read back to PCM600. Otherwise, the default signal
name is shown in the Parameter Setting tool.
If possible, set the user-defined name to a signal before
connecting the signal to other function blocks.
•
IEC 61850, ANSI or IEC 60617 symbol standard can be set.
•
IEC or ANSI naming style can be set.
•
Function blocks can be locked.
•
Visibility for execution order, cycle time and instance number can be set.
•
Signals can be managed.
•
Boolean inputs and outputs can be inverted.
Section 5
1MRS757810 C
Protection and control engineering
66
REC615 and RER615
Engineering Manual
GUID-74FFF952-C539-422D-BC40-EF4AA5C279FB V2 EN
Figure 43:
Application Configuration tool: function block overview
1
Connection(s)
2
User-defined function block name
3
Function block, selected (red)
4
Function block name
5
Function block, locked
6
Hardware, binary output channel
7
Hardware, programmable LED
8
Hardware, binary input channel
9
Hardware, analog input channel
10
User-defined signal name
11
User-defined input variable
12
Execution order
13
Cycle time
14
Instance number
5.1.2
Signals and signal management
The function block has a set of input and output signals. The placement of function
block signals is from left to right. Input signals are placed on the left and output signals
on the right.
Function blocks can contain more signals than needed in that application part. Unused
signals can be hidden to get a clear picture.
Signals are located up and down on both sides of the middle position. When there is
space left, some signals may be moved up or down for better visibility and connection
routing.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
67
Engineering Manual
Boolean input and output signals may need to be inverted to fulfil the logic. The
Application Configuration tool supports the adding of inversion logic to a binary
signal.
All input signals have a default value that is used when the signals are not connected
in the configuration.
5.1.3
Function block execution parameters
Three function block execution parameters have an influence on the runtime
execution of the function block within the application configuration.
•
Execution order
•
Cycle time
•
Instance number
Each time a new function block is inserted, these parameters are shown in the Function
Block Instance dialog box in the Application Configuration tool. The three parameters
are selectable and not selectable depending on the function block type. The cycle time
is predefined to one value. The instance number is a counter for the total possible
number of function blocks of that type used within the application configuration.
The Execution Order and Instance Number are a combination that is predefined
within a product. It is possible to select a pair out of the list.
Section 5
1MRS757810 C
Protection and control engineering
68
REC615 and RER615
Engineering Manual
GUID-4129D712-CD43-4729-8FE4-27FFE758D151 V1 EN
Figure 44:
Application Configuration tool: an example of function block
organization parameters
The Cycle Time is automatically set and it cannot be modified.
To automatically calculate the execution order, click Calculate
Execution Order on the tool bar.
5.1.4
Execution order and feedback loops
It is possible to draw multi-layer configuration logic that contains feedback loops with
the Application Configuration tool. The execution order of logic functions is
calculated automatically in the Application Configuration tool, but the execution
order can also be set manually. If the automatically calculated value causes the
function to be executed one task cycle time after the other logic functions in the same
loop, the execution order number can be set manually to prevent delays, for example,
in output activation.
To perceive accurate time stamps from binary input signals to
function blocks, direct logic connection should be used in the
Application Configuration tool. Due to internal execution order, time
stamps may not be accurate if additional logic is used to connect
priority signals to function blocks.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
69
Engineering Manual
Example shows a simple situation where the execution order causes one cycle time
delay if the NOT port is executed in the order determined by the automatic calculation.
GUID-F8162182-FF21-467A-AEB9-23284CB3FABD V1 EN
Figure 45:
Feedback loop situation with automatically calculated execution
orders
By setting a smaller execution number than in the AND port to where the NOT port
is connected, it is possible to fix the execution order of all functions in a loop so that
they are handled in the same task.
GUID-0C12B88A-0ABE-49DE-9A44-05D213D04922 V1 EN
Figure 46:
Feedback loop situation with manually fixed execution order for NOT
port
Execution number can be changed by right-clicking the function and selecting
Change CycleTime ExecOrder.
After manually defining the execution number, the function is no longer part of the
automatic execution order calculation. The function can be included back to the
automatic calculation by right-clicking the function and selecting Include FB in
calculation.
5.1.5
Configuration parameters
Configuration parameters can be viewed and set with the Parameter Setting tool.
Section 5
1MRS757810 C
Protection and control engineering
70
REC615 and RER615
Engineering Manual
Connections and variables
A connection is the link or "wire" between function block outputs and inputs.
There are rules and methods for making connections.
•
Drag a line between two signals
•
Link two signals by using variables
It is possible to search and replace variable names in Application
Configuration tool.
Connect the variables to a destination, for example to a function block
or a hardware output channel. The connectivity package
automatically removes the orphan variables which are not connected
to any destination.
Connection validation
A connection is only useful or even possible between two signals of the same base
attribute type.
GUID-720C9C93-AB56-4AEB-AF72-7E136E62A87F V1 EN
Figure 47:
Application Configuration tool: an error message of a signal
mismatch for a connection
5.1.7
Hardware channels
Hardware channels can only be connected to a function block input or output. A
hardware connection can be established with the Application Configuration tool or
Signal Matrix tool.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
71
Engineering Manual
When a hardware channel is connected, a graphical symbol appears in the Application
Configuration tool. The connection is also displayed in the Signal Matrix tool with a
cross mark. Hardware channels are always visible in the Signal Matrix tool.
GUID-40339889-3049-4C50-BA8F-8C3EB9A54C4D V1 EN
Figure 48:
Application Configuration tool: HW signal channels
There are three types of supported hardware channels.
•
Binary input channels
•
Binary output channels
•
Analog input channels
Hardware input channel can be used as often as needed. A hardware binary output
channel is taken from the list of available channels when a new channel is requested.
This prevents using the same hardware binary output channel twice.
5.1.8
Online monitoring
The online monitoring enables the continuous monitoring of the signal or channel
values in the configuration. In the “Online monitoring” mode, the configuration
cannot be edited in the Application Configuration tool.
Online monitoring can be started by clicking the Work online button in the toolbar. If
the application configurations in the IED and PCM600 are the same, the online
monitoring starts. The online monitoring ends and the tool returns to the configuration
mode if the Work Offline button is clicked.
Online monitoring cannot be started if the application configuration in
IED and PCM600 are different.
Section 5
1MRS757810 C
Protection and control engineering
72
REC615 and RER615
Engineering Manual
In some cases when the function block input is directly mapped to the
function block output, the input is internally forced to the correct value
depending of the function block's settings. This kind of function block
design is present in control blocks, setting group handling and tap
changer.
5.1.9
Validation
Validation checks the application configuration for errors based on the rules that
govern the creation of the application at three different times.
•
During the logic creation, while making a connection or placing a function block
•
On demand by starting the validation
•
When writing the application configuration to the protection relay
5.1.9.1
Validation when creating an application configuration
Validation is made when creating the application configuration.
•
A connection between two input or two output signals is not possible
•
A connection between two different data types is not possible: for example, from
a binary output to an analog input
5.1.9.2
Validation on demand
The validity of an application configuration can be checked by clicking Validate
Configuration in the toolbar. The Application Configuration tool checks the
application configuration for formal correctness. The found problems are divided into
warnings and errors.
•
Warnings, marked with a yellow warning icon
•
Example: a variable connected to an output signal that is not connected
•
Example: if an output from a higher execution order function is connected
to inputs of lower execution order function
•
Errors, marked with a red circle with a cross
•
Example: unconnected hardware output
Warnings do not prevent writing to the protection relay. However, errors must be
corrected before writing the application configuration to the protection relay. The
application configuration can be saved and the Application Configuration tool can be
closed with open errors, but the application configuration cannot be written to the
protection relay.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
73
Engineering Manual
These problems are listed in the Output view under the Application Configuration
tab. Double-clicking the error or warning row navigates to the MainApplication/
Page/Area, where the problem was identified.
GUID-5779E523-6B82-4447-85E8-CAAA87141B6F V1 EN
Figure 49:
Application Configuration tool: validation on demand
5.1.9.3
Validation when writing to the protection relay
When writing the application configuration to the protection relay, an automatic
validation is performed. The validation is the same as the manually demanded
validation. Errors abort the writing.
5.1.10
Configuration load calculation
Connectivity package calculates an estimated application configuration load every
time it is saved in the Application Configuration tool or written to IED. This
functionality prevents too complex configurations from being used and possibly
risking IED protection functionality.
Calculation results are divided into three different sections which are OK, Warning
and Error. If the calculation result is 105% or more, the configuration is too large for
the IED to handle and PCM600 prevents writing the configuration to the IED. If the
configuration load is more than 100%, PCM600 gives a warning not to add
Section 5
1MRS757810 C
Protection and control engineering
74
REC615 and RER615
Engineering Manual
functionality to the configuration. The configuration is written to the IED if the result
is inside or below the warning range.
Some inaccuracy exists between the calculated load estimate and the actual load of an
IED when considering all parameters. This is why PCM600 does not prevent the
writing immediately when the estimated load exceeds 100%. The IED supervises its
performance continuously and indicates with self-supervision warning code 2 if an
actual performance risk is detected. It is recommended to verify the configuration load
also with an actual IED and actual settings when exceeding the calculation result of
90% or when using GOOSE on a larger scale.
The calculation result is only visible in PCM600 output window
inside Logging tab.
GUID-98B74959-AAEC-449F-8973-09E1F4A6010F V1 EN
Figure 50:
Configuration load result: an example of nearby maximum capacity
5.2
Parameter Setting tool
Configuration parameters and settings parameters can be changed with LHMI,
WHMI or with the Parameter Setting tool in PCM600.
Some parameters are only visible in the Parameter Setting tool and
some only in LHMI.
A common writing from PCM600 to the protection relay, where
parameters are changed in the Parameter Setting tool, overwrites any
parameter changes made locally with LHMI.
All parameters listed and displayed in the parameter list can be sorted into two groups.
•
Configuration parameters
•
Setting parameters
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
75
Engineering Manual
Configuration parameter specifies the operation mode of an application function or of
the protection relay. These are basic configurations that are normally configured only
once and then not modified again. The protection relay configures itself during start-
up according to the given configuration parameter values.
5.2.2
Setting parameter
Setting parameter (short form: “setting”) is a parameter that can be changed in the
protection relay at runtime.
5.2.3
Setting group
Nearly all settings used by the protection relay for protection application functions are
organized into a group of settings. Up to six setting groups can be configured with
different values.
The protection relay supports the selection of a setting group at runtime.
5.2.4
Parameter import and export
The parameter export and import function can be utilized, for example, when the
protection relay's parameters are set using the WHMI instead of PCM600. The relay
settings engineered with PCM600 can be exported to XRIO files and imported to the
WHMI. The WHMI can be used to write the settings to the protection relays. The
WHMI can also be used to read the relay setting parameters and to export those to files,
which can be used by PCM600.
The exporting and importing of settings is sensitive to the protection
relay's content. Settings are exported and imported for one protection
relay at a time. The export files of a specific protection relay can be
exchanged between PCM600, WHMI and the actual physical IED. To
avoid errors and to efficiently manage the exporting and importing of
settings, for example, in a substation with several protection relays,
ensure that the names of the export files identify the protection relay
to which the file should be imported.
The parameter import/export functionality is available via the File menu when the
Parameter Setting tool is open.
Section 5
1MRS757810 C
Protection and control engineering
76
REC615 and RER615
Engineering Manual
GUID-4A63FE0D-7846-4387-A5D3-BD7B4F519A76 V2 EN
Figure 51:
Parameter import/export
5.2.5
Parameter organization
The organization of parameters into a tree structure becomes visible in the Plant
Structure by expanding the setting tree.
5.3
Signal Matrix tool
The Signal Matrix tool is used to make cross-references between the physical I/O
signals and function blocks and for the GOOSE signal input engineering.
The Application Configuration tool is used for adding or removing
function blocks, for example, GOOSE receiving function blocks.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
77
Engineering Manual
GUID-50BC48B0-574F-4DD8-9678-67A0954D1C13 V1 EN
Figure 52:
Signal Matrix: operation principles
A binary input channel can be connected to one or more function block inputs. If a
binary input channel is connected to several different function blocks in the
Application Configuration tool, the connection appears as glue logic in Signal Matrix.
A binary output channel can only be activated from one function block output. If it is
activated from more than one function block output, the glue logic has to be used.
Glue logic means inserting a logical gate (OR and AND blocks) between the binary
input and the function blocks or between the function blocks and the binary output
channel. This can be engineered with the Signal Matrix tool.
Section 5
1MRS757810 C
Protection and control engineering
78
REC615 and RER615
Engineering Manual
Connections made with the Signal Matrix tool are automatically also
shown in the Application Configuration tool.
GUID-6788DE03-BB9A-4A02-9DF6-D1645A8F4C4B V1 EN
Figure 53:
Signal Matrix: a connection between binary input channels to binary
input signals
The Signal Matrix tool has a separate sheet for each possible combination.
•
Binary inputs
•
Binary outputs
•
Analog inputs
•
Functions
•
GOOSE
5.4
Load Profile tool
Load Profile tool is used for reading load profile records of COMTRADE format from
a protection relay, clearing old records and viewing records via an external
COMTRADE viewer. The default viewer included with PCM600 is Wavewin, but a
third party viewer can be used.
5.4.1
Opening and closing Load Profile tool
•
To open the Load Profile tool, click Load Profile Tool on the context menu of an
IED node inside the PCM600 project tree.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
79
Engineering Manual
GUID-F8120497-31C8-4F8B-BBE8-D1338CF4E4E6 V1 EN
Figure 54:
Opening the Load Profile tool
•
To close the Load Profile tool, click the Close button in the tool.
The Load Profile tool runs in the same process as PCM600 but in a separate
window. Multiple instances of the tool can be run at the same time. Any open tool
instances are closed without confirmation when PCM600 is closed.
Section 5
1MRS757810 C
Protection and control engineering
80
REC615 and RER615
Engineering Manual
GUID-4B275369-045F-4407-89A2-44071839699D V1 EN
Figure 55:
Load Profile tool
By default, the Load Profile tool uses the \PCMDataBases\LPR directory as a
saving target directory.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
81
Engineering Manual
Load Profile tool user interface
GUID-4B275369-045F-4407-89A2-44071839699D V1 EN
Figure 56:
Load Profile tool interface
Table 5:
Available actions on the user interface
Action
Description
Local Path
Default local path (C:\PCMDataBases\LPR) is the location from which the records
are shown on the Load Profile tool. It is also the default path for saving records.
Local Path field also allows the user to change the target location where the records
are saved. The grid of the Load Profile tool shows only the records in the default local
path including unsaved records in the temp path (C:\Temp\Load\Profile Tool)
if there are any. Therefore changing the default local path allows the user to save
records at the specified location on the local machine but the user is not be able to
see those records in the grid of the Load Profile tool.
Load
Clicking the Load button downloads all available records from C:\LDP\COMTRADE
directory in the protection relay to a temporary folder C:\Temp\LoadProfileTool
on the local machine. In this temporary folder, the target file name is constant, and
loading again overwrites the file. An unsaved record is deleted when the tool is
closed.
Save
Clicking the Save button moves the records to the default or specified local path,
Load transfers the records to a temporary folder. Each load profile record comprises
two files with file extensions .dat and .cfg.
Clicking Save adds a time stamp to the file names and moves the two files pertaining
to the record to the default or specified folder. Saving another record creates a new
record in addition to the old ones.
Clear
Clicking the Clear button clears record from either the Load Profile tool or protection
relay or both. Before deleting the records, a confirmation dialog box is shown.
Open
Select any record and click Open to view the record in Wavewin, provided that this
external software is installed. Additionally, any record row can be double-clicked to
view that record.
Table continues on next page
Section 5
1MRS757810 C
Protection and control engineering
82
REC615 and RER615
Engineering Manual
To sort the record rows by any column click a column header.
Close
Clicking the Close button closes this instance of the tool. Any open instance is finally
closed when the whole PCM600 is closed.
File
All the actions are also available on the tool through File drop-down menu.
5.4.3
Information fields
The IP box shows the IP address of the selected IED and the Local Path box shows
the selected location for reading or viewing records.
In the record grid, the name, creation time, modification time and size of each record
are shown. The times and dates shown in the grid are the times when the files have
been read rather than the original date stamps in the device.
GUID-82E7859C-3C2B-43F1-83C3-7AA8087C569C V1 EN
Figure 57:
Information fields
5.5
Fault Record tool
The Fault Record tool is used for reading the fault records from the protection relay
and it is included in the connectivity packages. The tool makes analyzing the fault
records easier by showing them separately in their own user control components. It
also includes save, copy and clear functions where all the fault records are saved or
copied in text format for later viewing or cleared from the protection relay or the tool.
The fault record is saved to a local PC with the default name
FaultRecords.txt. Revise the file name before saving to avoid
overriding the old record.
5.5.1
Opening and closing Fault Record tool
•
To open the Fault Record tool, right-click an IED node in the PCM600 project
tree and select Fault Record Tool.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
83
Engineering Manual
GUID-ABADC35C-7326-48FC-97A0-91BF4D3F78F0 V2 EN
Figure 58:
Opening the Fault Record tool
•
To close the Fault Record tool, click the Close button in the tool.
The Fault Record tool runs in the same process as PCM600 but in a separate
window. Multiple instances of the tool can be run at the same time. Any open tool
instances are closed without confirmation when PCM600 is closed.
The Fault Record tool is a connectivity package tool. The main functionality is divided
into three parts: reading the fault record parameters from the protection relay,
displaying their names, values and units on the user interface and saving them to a text
file. It is also possible to clear all the fault records from both the tool and the protection
relay and copy the fault records either individually or all at once to a word processor.
Section 5
1MRS757810 C
Protection and control engineering
84
REC615 and RER615
Engineering Manual
Fault Record tool interface
GUID-F27BFF9C-DB85-430C-8B80-5ECE3A4E3D35 V1 EN
Figure 59:
Fault record tool
Table 6:
Available actions on the user interface
Action
Description
Read
Clicking the Read button reads all available fault records from the protection relay
into the tool. User has the option to read 1 fault record, 20 fault records or all fault
records. The Read button opens up a progress bar to indicate an ongoing read
operation.
Click the Cancel button on the Read progress bar to cancel the read operation. On
operation completion, the available fault records are shown in the record grid.
Click the + icon to expand and view record details.
Save
Click Save to save the fault records on the local machine as .txt file.
Clear
Record can be cleared from either the Fault record tool or the protection relay or
both. Before deleting the records, a confirmation dialog box is shown.
Close
Clicking the Close button closes this instance of the Fault Record tool. Any open
instance is finally closed when the whole PCM600 is closed.
File
File menu for Save and Exit actions.
Edit
Copy All in the Edit menu allows to copy all the fault records which can then be
pasted to a word processor and saved on the local machine without having to save
the records as a .txt file.
Additionally the user can select any particular fault record and right-click to copy the
selected record.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
85
Engineering Manual
IED Compare is used to compare the IED configuration of two same type of IEDs. It
generates a text report which lists the differences in the IED configuration. IED
Compare provides an option to compare an IED configuration stored in PCM600, IED
or .pcmi file. IED Compare can compare certain types of IED configurations and
parameters.
•
Application configuration
•
Display configuration
•
GOOSE receive configuration
•
Parameters
Application comparison also compares the system function blocks.
Display comparison compares two display pages with a delta of two
pixels.
Detailed instructions are shown in PCM600 documentation.
5.6.1
Starting IED Compare
•
Start IED Compare in the context menu in plant structure.
1.
In the PCM600 plant structure, right-click Substation, Voltage level, Bay
or IED.
2.
Select IED Compare.
•
Start IED Compare from the PCM600 main menu.
1.
Select Substation, Voltage level, Bay or IED in the PCM600 plant
structure.
2.
On the PCM600 menu bar, point to Tools and select IED Compare.
5.6.2
IED Compare tool interface
The comparison report shows differences in the configuration of two IEDs. Hardware,
application, display, GOOSE and parameter configuration differences are grouped
and listed under the corresponding headings.
Section 5
1MRS757810 C
Protection and control engineering
86
REC615 and RER615
Engineering Manual
GUID-EE5D5DED-7160-49DE-BEA6-76A74E3BAD4A V1 EN
Figure 60:
Compare options
Each configuration group can be expanded or collapsed by clicking the plus (+) or
minus (-) button next to it in the result grid.
The reports must be read from left to right row-wise.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
87
Engineering Manual
GUID-86DCA146-0A7F-4E7B-A0BD-3248C1140EF3 V1 EN
Figure 61:
Compare report
Table 7:
Acronyms used in a report
Acronym
Description
DA
Data attribute
DO
Data object
IED
Intelligent electronic device
LN
Logical node
SIG
Signal
All of the relay’s logical nodes are set with Test mode. Test mode is selected through
one common parameter via the HMI path Tests/IED test. By default, Test mode can
only be set locally through LHMI. Test mode is also available via IEC 61850
communication (LD0.LLN0.Mod).
Table 8:
Test mode
Test mode
Description
Protection BEH_BLK
Normal mode
Normal operation
FALSE
IED blocked
Protection working as in “Normal mode” but ACT
configuration can be used to block physical
outputs to process. Control function commands
blocked.
TRUE
IED test
Protection working as in “Normal mode” but
protection functions are working in parallel with
test parameters.
FALSE
IED test and blocked
Protection working as in “Normal mode” but
protection functions are working in parallel with
test parameters. ACT configuration can be used to
block physical outputs to process. Control function
commands blocked.
TRUE
Section 5
1MRS757810 C
Protection and control engineering
88
REC615 and RER615
Engineering Manual
The mode of all logical nodes located under CTRL logical device are set with Control
mode. Control mode is selected via the HMI or PCM600 path Configuration/
Control/General. By default, Control mode can only be set locally through
LHMI.Control mode inherits its value from Test mode but Control mode ”On”,
“Blocked” and “Off” can also be independently set. Control mode is also available via
IEC 61850 communication (CTRL.LLN0.Mod).
Table 9:
Control mode
Control mode
Description
Control BEH_BLK
On
Normal operation
FALSE
Blocked
Control function commands blocked
TRUE
Off
Control functions disabled
FALSE
According to IEC 61850, the physical outputs to process should be blocked when
device is set to blocked or test blocked mode. The usage depends heavily on the actual
ACT configuration. In the protection blocking example the main trip from
TRPPTRC1 is blocked, and in the control blocking example the CBXCBR1 is
blocked. Both comply to the IEC 61850. In real applications some of PTRC’s might
also be used for signalling purposes (GOOSE) and blocking and interlocking via IO.
The physical outputs to process can be blocked with “IED blocked” and “IED test and
blocked” modes. If physical outputs need to be blocked, the application configuration
must block signals or function blocks that affect primary apparatuses. Blocking
scheme needs to use the BEH_BLK output of the PROTECTION function block.
TRPPTRC1
BLOCK
OPERATE
RST_LKOUT
TRIP
CL_LKOUT
Protection
BI_SG_2
BI_SG_3
BI_SG_4
BI_SG_5
BI_SG_6
SG_LOGIC_SEL
SG_1_ACT
SG_2_ACT
SG_3_ACT
SG_4_ACT
SG_5_ACT
SG_6_ACT
BEH_TEST
BEH_BLK
TRPPTRC1_TRIP
GUID-CAF67CB2-774E-4122-A235-D07F8768B202 V1 EN
Figure 62:
Master trip TRPPTRC blocked using Protection function block
BEH_BLK output
5.7.1
Control blocking example
The physical outputs to process can be blocked with “Blocked” mode. If physical
outputs need to be blocked, the application configuration must block signals or
function blocks that affect primary apparatuses. Blocking scheme needs to use
BEH_BLK output of CONTROL function block.
1MRS757810 C
Section 5
Protection and control engineering
REC615 and RER615
89
Engineering Manual
GUID-190D6D90-44B9-42B4-8505-7497F1AAA2E2 V1 EN
Figure 63:
Circuit breaker control CBXCBR1 blocked using Protection function
block BEH_BLK output
Section 5
1MRS757810 C
Protection and control engineering
90
REC615 and RER615
Engineering Manual
For information on LED operation modes supported by the protection
relay, see the technical manual.
6.1
Single-line diagram engineering
A single-line diagram of the protection relay can be designed by using the Graphical
Display Editor tool of PCM600. The single-line diagram is modelled according to the
IEC 61850 standard in the Graphical Display Editor.
6.1.1
Diagrams in Graphical Display Editor
The Graphical Display Editor is used for various tasks.
•
Creating HMI display raster layouts
•
Adding static text
•
Adding measurands
•
Adding busbars
•
Adding symbols onto display page
•
Drawing lines (creating a link)
•
Adding buttons to control ACT application with SPCGGIO
1MRS757810 C
Section 6
LHMI engineering
REC615 and RER615
91
Engineering Manual
GUID-4286BBCC-F0E2-4779-9C03-6AAEB2F69143 V2 EN
Figure 64:
Graphical Display Editor: active view
1
HMI display page
2
Object types
3
Protection relay's HMI display window
The Graphical Display Editor has a stationary symbol library window on the left side
of the view. The window is empty when no page exists for the protection relay. A
default single-line diagram presentation is displayed if standard configurations are
used.
Additional single-line diagram HMI display pages can be added or removed with the
Add Display Page or Remove Display Page commands in the Graphical Display
Editor menu.
6.1.1.1
Display window and sequence order
The HMI pages are handled according to rules.
Section 6
1MRS757810 C
LHMI engineering
92
REC615 and RER615
Engineering Manual