D-Link NPP-C61BLK242 Hardware Quick Installation Manual

Text of the manual

This document will guide you through the basic installation

process for your new D-Link Unshielded Patch Panel. Hardware Quick Installation Guide Unshielded Patch Panel Quick Installation Guide Building Networks for People

D-Link Unshielded Patch Panel Quick Installation Guide

2 ENGLISH About This Guide This guide contains step-by-step instructions for setting up your D-Link Unshielded Patch Panel. Please note that the model you have purchased may appear slightly different from those shown in the illustrations. Product Overview Front Panel Figure 1. Unshielded Patch Panel Front Color Coding Information T568A T568B Pin 1 White/Green Pin 1 White/Orange Pin 2 Green Pin 2 Orange Pin 3 White/Orange Pin 3 White/Green Pin 4 Blue Pin 4 Blue Pin 5 White/Blue Pin 5 White/Blue Pin 6 Orange Pin 6 Green Pin 7 White/Brown Pin 7 White/Brown Pin 8 Brown Pin 8 Brown Table 1. Wire Color Code A. To connect a cable to the Unshielded Patch Panel, first take the end of the cable wiring and strip approximately 30 mm off the cable jacket. (Figure 2) B. Separate the wires into 4 pairs. Installation Figure 2. C. Take off the support bar before punching wires. (Figure 3) D. Follow the IDC color code for T568A or T568B wiring. (Table 1) Use the impact tool to punch in and connect the wires to the IDC. (Figure 4) E. Lock the support bar onto the rear of the panel. (Figure 5) F. Use a twist tie to secure the cable tightly onto the support bar. Repeat this process for each cable you wish to connect. (Figure 6) Figure 3. Figure 4. Figure 5. Figure 6. Support bar Cable tie Cut outside Ver. 1.00(WW) 2013/03/12 GAAHA1Y1100003

Other Switch Manuals