GoFit ELEVATED CHIN UP STATION Assembly Instructions

Specifications

Brand: GoFit
Category: Fitness Equipment
Model: ELEVATED CHIN UP STATION (Assembly Instructions)
File Type: PDF
File Size: —
Pages: 4

Read Online

Read the GoFit ELEVATED CHIN UP STATION Assembly Instructions online using the built-in PDF viewer.

Text of the manual

Prior to assembly, confirm that

all parts are included in box: -2 Side Bars (C-shaped) -1 Curved Bar (2 halves) -1 Straight Bar (2 halves) -1 Leverage Bar -2 Eyebolts -2 Self-seating Bolts -3 Hex Bolts with Lock Nuts -12 Lock Washers -1 Hex Bolt with Capped Nut -4 Capped Nuts -1 Metal Wedge Tools required: -Adjustable Wrench ELEVATED CHIN UP STATION For questions or missing parts, please contact GoFit at 888-530-4441 ©2012 GOFIT, L.L.C. TULSA, OK Adjustable Height

ELEVATED CHIN UP STATION

For questions or missing parts, please contact GoFit at 888-530-4441 ©2012 GOFIT, L.L.C. TULSA, OK With pointed end down, slide Metal Wedge downward, behind door frame/moulding. Position bottom edge of Plastic Leverage Bar into the installed safety wedge, guiding it down to securely rest on top of door frame/moulding. Properly installed, the Metal Wedge helps keep the Leverage Bar resting on the door frame/moulding. Before each exercise, always check that the Leverage bar is resting on the door frame/moulding.

Place Self-Seating Bolts through holes

on Leverage Bar as shown­—one Bolt for each Side Bar. Side Bars will rest in indentions on Leverage Bar. Put Bolt through hole on Side Bar (adjust height by choosing one of 3 holes). Place Lock Washer on Bolt; thread on Lock Nut. Repeat for each Side Bar. Secure Nuts with wrench. Note: Shown with Leverage Bar attached at center holes. (adjust height by choosing higher or lower holes on Side Bars). Step 1 Step 2 Step 3 GoFit Elevated Chin up Station—Fully assembled Fully assembled—Shown in Push Up Position 1 Shown in Push Up position ELEVATED CHIN UP STATION Step 6 Position Curved Bar as shown in fully assembled photo (make sure the Capped Nut-side of Curved Bar is facing out towards the handles). Line up holes in Curved Bar with holes in Side Bars; slide Eye Bolt through holes as shown. Step 5 Slide two halves of Curved Bar together (small end into larger end). Line up holes and put Bolt through hole on Curved Bar. Place Lock Washer on Bolt; thread on Capped Nut. Step 4 Slide two halves of Straight Bar together (small end into larger end). Line up holes and put Bolt through hole on Straight Bar. Place Lock Washer on Bolt; thread on Lock Nut. For questions or missing parts, please contact GoFit at 888-530-4441 ©2012 GOFIT, L.L.C. TULSA, OK DO NOT tighten Bolts fully until you reach Step 10 to allow for assembly and leveling.

Place Lock Washer onto Hex Bolt end;

thread on Lock Nut. Repeat for each Hex Bolt on each Side Bar as shown. Step 8 Position Straight Bar as shown in fully assembled photo. Line up Straight Bar holes with Side Bar holes; slide Hex Bolt with Lock Washer through holes as shown. Step 7 Place Lock Washer onto Eye Bolt end; thread on Short Capped Nut. Repeat for each Eye Bolt on each Side Bar. Step 10 Put Chin Up Station in Push Up Position on a flat surface to level. Then securely tighten all Nuts with wrench. Fully assembled Chin Up Station shown to the left for reference. Easy In-Out Installation Standing on non-hinge side of doorway, put Leverage Bar through doorway while moving it upward—position it above moulding to securely hang on door frame. Position bottom edge of Leverage Bar into the installed metal wedge, then guide Chin Up Station down until it securely rests on top of door frame/moulding. Make sure the protective Foam End Pieces on the non-hinge side of doorway, are in full contact with and resting against the two side door frame mouldings. Fully Assembled Metal wedge ELEVATED CHIN UP STATION For questions or missing parts, please contact GoFit at 888-530-4441 ©2012 GOFIT, L.L.C. TULSA, OK

Other Fitness Equipment Manuals