zarges Z600 S-PLUS Assembly And Usage Instructions
Read Online
Read the zarges Z600 S-PLUS Assembly And Usage Instructions online using the built-in PDF viewer.
Text of the manual
09/2016 No. 291358
Assembly and Usage Instructions
Z 600 S-PLUS mobile scaffold tower with stabilisers
Z 600 S-PLUS folding scaffold unit COMPACT
en
1 General information..........................................................................4
1.1 Introduction .......................................................................................4
1.2 Manufacturer ....................................................................................4
1.3 Type approval.....................................................................................4
1.4 Warranty ............................................................................................4
1.5 Date of issue......................................................................................5
1.6 Copyright and trademark rights.......................................................5
1.7 Intended use .....................................................................................5
1.8 Improper use.....................................................................................5
2 Assembly ..........................................................................................6
2.1 Safety regulations..............................................................................6
2.2 Usage regulations ............................................................................8
2.3 Working on electrical equipment with the scaffold unit..................8
2.4 Other applicable safety instructions ................................................9
2.5 Technical data....................................................................................9
2.6 General assembly instructions for the Z 600 S-PLUS mobile
scaffold tower with stabilisers........................................................10
2.7 Overview of scaffolding types Z 600 S-PLUS mobile scaffold
tower with stabilisers......................................................................15
2.8 General assembly instructions for the Z 600 S-PLUS folding
scaffold unit COMPACT...................................................................17
2.9 Overview of scaffolding types Z 600 S-PLUS folding scaffold
unit COMPACT.................................................................................24
2.10 Note on dismantling the scaffold tower.........................................25
2.11 Basic dimensions............................................................................26
2.12 Identification....................................................................................28
2.13 Parts list incl. ballasting.................................................................29
2.14 Assembly drawings..........................................................................37
3 Structural safety regulations .......................................................... 39
3.1 General information .......................................................................39
3.2 Attaching the ballast.......................................................................39
3.3 Attaching the anti-twist device .......................................................39
3.4 Maintenance, servicing, storage and cleaning ..............................40
3.5 Testing the scaffold unit components.............................................40
4 Spare parts...................................................................................... 42
5 Notes............................................................................................... 44
These assembly and usage instructions apply exclusively to the scaffold units
described therein.
The notes on safety and the rules and regulations for handling scaffold units apply
to the scaffold towers referred to in this documentation.
The operating companies accept responsibility for the following points:
• adherence to local, regional and national regulations
• observance of the regulations (laws, ordinances, guidelines etc.) for safe handling
listed in these assembly and usage instructions
The operating company must ensure that the assembly and usage instructions are
available to the operating personnel and that the instructions, information, warnings
and safety regulations they contain are strictly observed.
If you require further information or if specific problems occur which are not
covered in sufficient detail in these assembly and usage instructions, please contact
the manufacturer directly (see Section 1.2).
1.2 Manufacturer
ZARGES GmbH
Tel.: +49 8 81 / 68 71 00
Fax: +49 8 81 / 68 72 95
PO Box 16 30
Email: [email protected]
82360 Weilheim Internet: http://www.zarges.de
1.3 Type approval
The scaffold units described below have been tested by TÜV Süd (German Technical
Control Board South).
1.4 Warranty
The scope, period and form of the warranty are stipulated in the manufacturer's
sales and delivery conditions. The assembly and usage instructions valid at the time
of delivery apply to all warranty claims arising from insufficient documentation.
The following applies above and beyond the sales and delivery conditions: the
manufacturer accepts no liability for damage to the scaffold units arising from one
of more of the following:
• ignorance of or failure to observe these assembly and usage instructions
• insufficiently qualified or instructed operating personnel
• the use of parts other than original spare parts.
The operator bears sole responsibility for ensuring:
• that the safety regulations are adhered to,
• that improper use (see Section 1.8), faulty setting up and impermissible operation
are excluded and thus
• ensuring that the equipment is put to its intended use (see Section 1.7) and
• that the scaffold units are operated in accordance with the application conditions
defined in the contract.
1.5 Date of issue
The date of issue of these English assembly and usage instructions is
01 September 2016.
1.6 Copyright and trademark rights
The copyright to these assembly and usage instructions lies with the manufacturer.
The manufacturer also reserves all further rights, in particular in the case of the
granting of a patent or utility patent registration.
Any infringement of the conditions described above will result in liability for
damages!
1.7 Intended use
The scaffold units listed in these assembly and usage instructions may only be used
as scaffolding in accordance with the stipulations of EN 1004 and the overview of
models in these assembly and usage instructions.
1.8 Improper use
Misuse - that is, any use of the scaffold units documented in these assembly and
usage instructions which deviates from that described in Section 1.7 - shall be
deemed improper use as defined by the Product Safety Act.
This also applies to failure to observe the standards and guidelines listed in these
assembly and usage instructions.
2.1 Safety regulations
1.
Do not stand on the frame
of the folding unit! Use only
platforms, the rungs or
a climbing aid to climb
the scaffold unit.
2. The stipulations of EN 1004 “Mobile work platforms” apply to the structural
safety, erection and use of the aforementioned scaffold units.
3. The scaffold units may only be assembled and used by persons who are
familiar with these assembly and usage instructions.
4. At least two persons are required for the assembly and dismantling of the
scaffold unit. (Applies to all mobile scaffold towers with a platform height
exceeding 2.50 m)
5.
Only undamaged and fault-free original spare parts
for the manufacturer's scaffold system referred to in
the inspection certificate may be used. Before using
the scaffold units, all parts must be examined for
correct assembly and functionality.
6.
max.
12,0 m
max.
8,0 m
In accordance with EN 1004, the maximum platform
heights are limited to 8 m in enclosed spaces and 12 m
outdoors. For the scaffold units described in these
assembly and usage instructions, the maximum
platform height in enclosed spaces is 10 m.
7. The use of lifting tackle on the scaffold unit is not permitted.
8. During assembly and dismantling of the scaffold unit, platforms or scaffold
planks must be laid out completely at a distance of 2 m as assembly aids.
Where scaffold planks are used, they must extend 500 mm beyond the
scaffold unit on each side. Standing on guardrails or braces is prohibited.
This also applies during assembly and dismantling.
9.
The scaffold units may only be erected vertically on
a horizontal and level subsurface with sufficient load-
bearing capacity. If necessary, insert load-distributing
pads under the unit.
10. For information on the use of chassis beams, ballast weights, stabilisers
and stand-off brackets to warranty stability, see these assembly and usage
instructions.
11. Work on the working platform is only permitted with complete 3-part
side protection, that is, guard-rail frames, knee protection and peripheral
toeboards. Toeboards are not necessary on the rest platforms.
For wall-side assembly of the scaffold unit, stand-off brackets
can also be used for ballasting (accessory, Order No. 42920).
13. Working on several working platforms simultaneously is not permitted.
14. The permissible load capacity of the scaffold unit with evenly-distributed
load is 2.0 kN/ m² (in accordance with EN 1004 - scaffolding category 3).
15.
There may be no persons, material or tools on the
platform when the scaffold unit is moved. Avoid
collisions. The scaffold unit may only be moved by hand,
in longitudinal or diagonal direction and on a firm,
level surface free of obstacles. The scaffold unit must
not be moved at more than normal walking speed.
16. Moving the scaffold unit with the assistance of
vehicles (e.g. fork lifts) is prohibited. The scaffold unit must not be lifted,
pulled or pushed using a fork lift.
17. The surface on which the scaffold unit is moved must be able to
accommodate its weight.
18.
Bridging the gap between scaffold units and buildings
by means of planks etc. is not permitted.
The scaffold unit must not be used as a stair tower
to reach other constructions.
19.
For use outdoors or in open buildings, the scaffold unit
must be moved into a wind-protected area where wind
strengths exceed 6 (on the Beaufort scale), in the case
of an oncoming storm and when work has been
completed, or it must be protected against tipping
with other suitable measures (e.g. anchoring). At wind
strengths exceeding 6 on the Beaufort scale (12m/s),
it becomes perceptibly difficult to walk forwards.
20. Before using the scaffold unit, its vertical alignment must be checked and
corrected if necessary.
21. The scaffold unit must be checked for correct and complete set-up.
2.2 Usage regulations
1.
Personnel must ascend to work platforms from the
inside only.
2. Personnel must not brace themselves against the side panels while working.
3. Jumping on the platforms is prohibited.
4. The generation of horizontal loads which could cause the scaffold unit to tip
over, for example through work on adjacent constructions, is prohibited.
5. Particular attention must be paid to wind conditions which might cause the
scaffold unit to tip over when it is used in buildings open to the passage of
wind, in uncovered buildings or at the corners of buildings.
6. The platform height must not be increased with the aid of ladders, crates
or other devices.
7. Tools and materials may only be handed upwards. Always take the weight
of tools and materials into consideration to avoid overloading the work
platform. The person handing the load upwards must not let go of it until
the person receiving it has a firm hold on it.
8. Scaffold units with swivel castors can be wheeled to their final location after
assembly. The floor/ground gradient must not exceed 3%. Avoid all knocks
and impacts. When the scaffold unit is in its final position, the alignment
must be checked again.
9. When moving the scaffold unit, always take care that it does not touch any
live equipment.
10. Electrical tools (drills etc.) may only be operated on the scaffold unit at Safety
Extra Low Voltage (48 V), with protective insulation (separation transformer)
or if they are connected with a ground fault circuit interrupter with a residual
current of 30 mA. The stipulations of BGI 594 must be complied with.
11. Tools and materials must be stored on the work platform in such a way that
there is a passageway of 20 cm at the sides of the work platform.
2.3 Working on electrical equipment with the scaffold unit
The scaffold unit must not be used to perform work on or in the vicinity of
unprotected live equipment unless
• the section of the equipment in question has been disconnected,
• the section of the equipment in question has been secured against being switched
back on,
• the section of the equipment in question has been checked to ensure that it is
not live,
• the section of the equipment in question has been short-circuited with
a grounding bar and
• the section of the equipment in question has been shielded against adjacent live
parts.
2.4 Other applicable safety instructions
The stipulations of DGUV information sheet 201-011 "Instructions for the Handling
of Work Scaffolds and Protection Scaffolds" apply for the inspection, assembly and
use of the scaffold unit.
BGR 165 and BGI 594 "Safety rules for the use of electrical equipment in the case of
increased electrical hazard" apply when using electrical equipment on the scaffold
unit.
2.5 Technical data
Z 600 S-PLUS mobile scaffold tower with stabilisers, single platform 0.75 x 1.80 m / 2.50 m / 3.00 m
Approved in accordance with EN 1004
Scaffolding category 3
Permissible load in accordance with scaffolding category 3
200 kg/m²
Maximum total load of the scaffold unit
202 kg / 286 kg / 346 kg
Maximum platform load
202 kg / 286 kg / 346 kg
Maximum platform height
13.20 m
Z 600 S-PLUS mobile scaffold tower with stabilisers, double platform 1.35 x 1.80 m / 2.50 m / 3.00 m
Approved in accordance with EN 1004
Scaffolding category 3
Permissible load in accordance with scaffolding category 3
200 kg/m²
Maximum total load of the scaffold unit
404 kg / 572 kg / 692 kg
Maximum platform load
404 kg / 572 kg / 692 kg
Maximum platform height
13.20 m
Z 600 S-PLUS folding scaffold unit COMPACT, single platform 0.85 x 1.80 m
Approved in accordance with EN 1004
Scaffolding category 3
Permissible load in accordance with scaffolding category 3
200 kg/m²
Maximum total load of the scaffold unit
202 kg
Maximum platform load
202 kg
Maximum platform height
13.55 m
Z 600 S-PLUS folding scaffold unit COMPACT, double platform 1.45 x 1.80 m
Approved in accordance with EN 1004
Scaffolding category 3
Permissible load in accordance with scaffolding category 3
200 kg/m²
Maximum total load of the scaffold unit
202 kg
Maximum platform load
202 kg
Maximum platform height
13.55 m
2.6 General assembly instructions for the Z 600 S-PLUS mobile scaffold tower with stabilisers
The illustrations show a set-up with single platform. Assembly is identical for
a double platform. Assembly is identical for all platform lengths (1.80 m / 2.50 m /
3.00 m).
For the height of the push-on
end frame (1 m or 2 m), see
“Overview of scaffolding types
Z 600 S-PLUS mobile scaffold
tower with stabilisers” on
page 15.
1. Insert the swivel
castors into the
push-on end frame
and fasten them with
omega springs.
The horizontal braces are
only required for specific
scaffolding types, (see
“Overview of scaffolding types
Z 600 S-PLUS mobile scaffold
tower with stabilisers” on
page 15).
2a. Connect push-on end
frame with horizontal
braces.
Attach horizontal
braces to the first rung.
The basic braces are
only required for specific
scaffolding types, (see
“Overview of scaffolding types
Z 600 S-PLUS mobile scaffold
tower with stabilisers” on
page 15).
2b. Connect push-on
end frame with basic
braces.
Attach basic braces
above and below the
first rung.
3. Attach and fasten the
2 m push-on end frame
on both sides.
1
2
2
The diagonal braces are
only required for scaffolding
types with 1 m push-on end
frame, (see “Overview of
scaffolding types Z 600 S-PLUS
mobile scaffold tower with
stabilisers” on page 15).
4.
Insert diagonal braces.
1
2
5.
Insert both advanced
guardrails on the top
rung and lock.
1
2
Insert platform and
lock it at two opposite
points.
1
2
7.
Align the scaffold unit
using a spirit level.
8.
Fit all four stabilisers.
For the position of the
stabilisers, see “Basic
dimensions” on page 26.
1
2
3
9.
Attach the ballast
weights, if required.
For ballast weights, see
“Parts list incl. ballasting” on
page 29.
10. Repeat steps 4, 6 and 7
until the scaffold height
is reached.
11. Attach the top platform
in the centre and lock it
at two opposite points.
3
1
1
2
12. Insert both end
toeboards (U-profiles
are open towards
the top).
13. Push in the side
toeboards on
both sides.
14. Hook in stirrup step.
2.7 Overview of scaffolding types Z 600 S-PLUS mobile scaffold tower with stabilisers
1 m push-on end frame
The following scaffold towers are equipped with 1 m push-on end frames above
the swivel castors.
Length
Braces / platform
Rungs
1.80 m
2.50 m
3.00 m
Single platform
52235
52236
52237
a1
a2
h1
h2
p1
1 to 5
1 to 5
1 to 1
1 to 1
7
52255
52256
52257
52275
52276
52277
52295
52296
52297
a1
a2
b1
b2
p1
1 to 5
1 to 5
1 to 1
1 to 1
7
52315
52316
52317
Double platform
52435
52436
52437
a1
a2
h1
h2
p1
1 to 5
1 to 5
1 to 1
1 to 1
7
52455
52456
52457
52475
52476
52477
a1
a2
b1
b2
p1
1 to 5
1 to 5
1 to 1
1 to 1
7
52495
52496
52497
52515
52516
52517
b1
h1
h2
b2
a2
p1
a1
Legend
a: Diagonal brace
b: Basic brace
h: Horizontal brace
p1: bottommost platform
2 m push-on end frame
The following scaffold towers are equipped with 2 m push-on end frames above the
swivel castors.
Length
Braces / platform
Rungs
1.80 m
2.50 m
3.00 m
Single platform
52225
52226
52227
h1
h2
p1
1 to 1
1 to 1
3
52245
52246
52247
52265
52266
52267
52285
52286
52287
b1
b2
p1
1 to 1
1 to 1
3
52305
52306
52307
52325
52326
52327
Double platform
52425
52426
52427
h1
h2
p1
1 to 1
1 to 1
3
52445
52446
52447
52465
52466
52467
52485
52486
52487
b1
b2
p1
1 to 1
1 to 1
3
52505
52506
52507
52525
52526
52527
b1
h1
h2
b2
p1
Legend
b: Basic brace
h: Horizontal brace
p1: bottommost platform
2.8 General assembly instructions for the Z 600 S-PLUS folding scaffold unit COMPACT
The illustrations show a set-up with single platform. Assembly is identical for
a double platform.
1. Insert the swivel
castors into the folding
unit and fasten them
with omega springs.
2. Pull the folding unit
out fully until the
hinge snaps into
place audibly.
The following step only applies
for specific scaffolding types,
(see “Overview of scaffolding
types Z 600 S-PLUS folding
scaffold unit COMPACT” on
page 24).
3a. Fasten the horizontal
brace to the lowest
rung.
The following step only applies
for specific scaffolding types,
(see “Overview of scaffolding
types Z 600 S-PLUS folding
scaffold unit COMPACT” on
page 24).
3b. Insert platform at the
lowest rung and lock it
at two opposite points.
1
2
For the height of the push-on
end frame (1 m or 2 m), see
“Overview of scaffolding types
Z 600 S-PLUS folding scaffold
unit COMPACT” on page 24.
4.
Attach and fasten the
push-on end frame on
both sides.
1
2
2
The following steps, 5aa to
5ac, only apply for specific
scaffolding types, (see
“Overview of scaffolding types
Z 600 S-PLUS folding scaffold
unit COMPACT” on page 24).
5aa. Insert advanced
guardrail at the top
rung on the folding
frame side and lock.
1
2
5ab. Insert platform and
lock it at two opposite
points.
1
2
5ac. Insert advanced
guardrail at the top
rung on the opposite
side from the folding
frame and lock.
1
2
The following step only applies
for specific scaffolding types,
(see “Overview of scaffolding
types Z 600 S-PLUS folding
scaffold unit COMPACT” on
page 24).
5b. Insert the diagonal
brace at rung 2.
1
2
The next step only applies for
the following folding frames,
(see “Overview of scaffolding
types Z 600 S-PLUS folding
scaffold unit COMPACT” on
page 24):
• 53161
• 53241
6.
Insert horizontal brace
at rung 6 on the side
opposite the folding
frame.
Align the scaffold unit
using a spirit level.
8.
Fit all four stabilisers.
For the position of the
stabilisers, see “Basic
dimensions” on page 26.
1
2
3
9.
Attach the ballast
weights, if required.
For ballast weights, see
“Parts list incl. ballasting” on
page 29.
10. Attach and fasten the
2 m push-on end frame
on both sides.
1
2
2
11. Insert both advanced
guardrails and the
platform (see steps 5aa
to 5ac).
12. Repeat steps 10 to 11
until the scaffold height
is reached.
13. Attach the top platform
in the centre and lock it
at two opposite points.
3
1
1
2
14. Insert both end
toeboards (U-profiles
are open towards
the top).
15. Push in the side
toeboards on
both sides.
16. Hook in stirrup step.
2.9 Overview of scaffolding types Z 600 S-PLUS folding scaffold unit COMPACT
1 m push-on end frame
The following scaffold towers are equipped with a 1 m push-on end frame above
the folding unit.
Type
Braces / platform
Rungs
53099
h1
p1
1 to 1
5
53199
53131
53231
53151
53251
53171
53271
53191
53291
53111
53211
p1
h1
Legend
h: Horizontal brace opposite the folding unit
p1: bottommost platform
2 m push-on end frame
The following scaffold towers are equipped with a 2 m push-on end frame above
the folding unit.
Type
Braces / platform
Rungs
53121
a1
p1
2 to 6
8
53221
a1
p1
2 to 6
8
53141
a1
p1
2 to 6
8
53241
a1
h2
p1
2 to 6
6 to 6
8
53161
a1
h2
p1
2 to 6
6 to 6
8
53261
a1
p1
2 to 6
8
53181
a1
p1
2 to 6
8
53281
a1
p1
2 to 6
8
53101
a1
p1
2 to 6
8
53201
a1
p1
2 to 6
8
2.10 Note on dismantling the scaffold tower
To dismantle the scaffold tower, follow the steps for assembly in reverse order.
Before commencing dismantling, the necessary platforms or scaffold planks for
assembly personnel must be used again and laid flat for personnel to stand on.
No part of the scaffold tower (braces, platforms etc.) may be removed before
the levels above have been completely dismantled.
p1
a1
h2
Legend
a: Diagonal brace opposite the folding unit
h: Horizontal brace opposite the folding unit
p1: bottommost platform
2.11 Basic dimensions
Z 600 S-PLUS mobile scaffold tower with stabilisers
60°
60°
A
B
675
1800 / 2500 / 3000
3378
C
1350
3393 / 4093 / 4593
3393 / 4093 / 4593
3978
A [mm]
B [mm]
C [mm]
Height-adjustable swivel castor (42917)
min.
479
1085
2344
Height-adjustable swivel castor (42917)
max.
772
1378
2637
Z 600 S-PLUS folding scaffold unit COMPACT
45°
45°
A
B
675
850
1800
3016
4141
C
1275
1450
4141
3616
A [mm]
B [mm]
C [mm]
Height-adjustable swivel castor (42759)
min.
472
1593
2852
Height-adjustable swivel castor (42759)
max.
622
1743
3002
4 003 866 429045
42904
4 0 0 3 8 6 6 4 2 9 0 7 5
42907
1
2
3
4
B
A
A
Type plate for folding frame and push-on end frame
1
Article number
2
Maximum permissible load
3
Maximum platform height
4
EAN code
B
Type plate for all components apart from the folding
frame and push-on end frame (e.g. braces, platforms)
6
A
B
2.13 Parts list incl. ballasting
The parts list contains the designations of the individual parts, the corresponding
weights, the article numbers of the individual parts, the number of individual parts
contained in the complete scaffold tower and the article number of the complete
scaffold tower. It also lists the required ballast for each scaffold tower.
Z 600 S-PLUS mobile scaffold tower with stabilisers, single platform 0.75 x 1.80 m
Scaffold size [m]
0.75 x 1.80
Working height 1) [m]
approx.
3.40
4.50
5.35
6.45
7.30
8.40
9.25
10.40
11.20
12.35
13.20
Weight [kg]
75.2
117.8
145.4
158.6
186.2
199.4
234.6
247.8
275.4
288.6
316.2
Parts list
Order No.
52225
52235
52245
52255
52265
52275
52285
52295
52305
52315
52325
Push-on end frame 1m
42905
-
2
-
2
-
2
-
2
-
2
-
Push-on end frame 2m
42904
2
2
4
4
6
6
8
8
10
10
12
Advanced guardrail
42837
2
2
4
4
6
6
8
8
10
10
12
Trapdoor platform
42931
1
1
2
2
3
3
4
4
5
5
6
End toeboard
42913
-
2
2
2
2
2
2
2
2
2
2
Side toeboard
42943
-
2
2
2
2
2
2
2
2
2
2
Diagonal brace
42937
-
2
-
2
-
2
-
2
-
2
-
Horizontal brace
42935
2
2
2
2
2
2
-
-
-
-
-
Basic brace
42886
-
-
-
-
-
-
2
2
2
2
2
Triangular stabiliser
42850
-
4
4
4
4
4
4
4
4
4
4
Swivel castor Ø 200 mm
with height adjuster
42917
4
4
4
4
4
4
4
4
4
4
4
Stirrup step
42940
1
1
1
1
1
1
1
1
1
1
1
Ballast weights
Per swivel castor; attachment to stabiliser
Indoor use
42912
0
0
0
0
0
0
0
0
0
0
0
Outdoor use
42912
0
0
0
0
0
2
x
x
x
x
x
1) With max. swivelled-out swivel castors 42917 (adjustment range: 30 cm)
x: not permissible
Please use anti-twist device 42865 for stabilisers to prevent wilful twisting
of the stabilisers. Anti-twist devices are prescribed by EN 1004, Point 7.7.1.
Z 600 S-PLUS mobile scaffold tower with stabilisers, single platform 0.75 x 2.50 m
Scaffold size [m]
0.75 x 2.50
Working height 1) [m]
approx.
3.40
4.50
5.35
6.45
7.30
8.40
9.25
10.40
11.20
12.35
13.20
Weight [kg]
85.9
132.5
168.8
182.8
219.1
233.1
277.8
291.8
328.1
342.1
378.4
Parts list
Order No.
52226
52236
52246
52256
52266
52276
52286
52296
52306
52316
52326
Push-on end frame 1m
42905
-
2
-
2
-
2
-
2
-
2
-
Push-on end frame 2m
42904
2
2
4
4
6
6
8
8
10
10
12
Advanced guardrail
42838
2
2
4
4
6
6
8
8
10
10
12
Trapdoor platform
42910
1
1
2
2
3
3
4
4
5
5
6
End toeboard
42913
-
2
2
2
2
2
2
2
2
2
2
Side toeboard
42914
-
2
2
2
2
2
2
2
2
2
2
Diagonal brace
42908
-
2
-
2
-
2
-
2
-
2
-
Horizontal brace
42907
2
2
2
2
2
2
-
-
-
-
-
Basic brace
42887
-
-
-
-
-
-
2
2
2
2
2
Triangular stabiliser
42850
-
4
4
4
4
4
4
4
4
4
4
Swivel castor Ø 200 mm
with height adjuster
42917
4
4
4
4
4
4
4
4
4
4
4
Stirrup step
42940
1
1
1
1
1
1
1
1
1
1
1
Ballast weights
Per swivel castor; attachment to stabiliser
Indoor use
42912
0
0
0
0
0
0
0
0
0
0
0
Outdoor use
42912
0
0
0
0
1
3
x
x
x
x
x
1) With max. swivelled-out swivel castors 42917 (adjustment range: 30 cm)
x: not permissible
Please use anti-twist device 42865 for stabilisers to prevent wilful twisting
of the stabilisers. Anti-twist devices are prescribed by EN 1004, Point 7.7.1.
Z 600 S-PLUS mobile scaffold tower with stabilisers, single platform 0.75 x 3.00 m
Scaffold size [m]
0.75 x 3.00
Working height 1) [m]
approx.
3.40
4.50
5.35
6.45
7.30
8.40
9.25
10.40
11.20
12.35
13.20
Weight [kg]
94.7
143.5
187.0
201.8
245.3
260.1
321.8
327.6
371.1
385.9
429.4
Parts list
Order No.
52227
52237
52247
52257
52267
52277
52287
52297
52307
52317
52327
Push-on end frame 1m
42905
-
2
-
2
-
2
-
2
-
2
-
Push-on end frame 2m
42904
2
2
4
4
6
6
8
8
10
10
12
Advanced guardrail
42839
2
2
4
4
6
6
8
8
10
10
12
Trapdoor platform
42933
1
1
2
2
3
3
4
4
5
5
6
End toeboard
42913
-
2
2
2
2
2
2
2
2
2
2
Side toeboard
42944
-
2
2
2
2
2
2
2
2
2
2
Diagonal brace
42938
-
2
-
2
-
2
-
2
-
2
-
Horizontal brace
42936
2
2
2
2
2
2
-
-
-
-
-
Basic brace
42888
-
-
-
-
-
-
2
2
2
2
2
Triangular stabiliser
42850
-
4
4
4
4
4
4
4
4
4
4
Swivel castor Ø 200 mm
with height adjuster
42917
4
4
4
4
4
4
4
4
4
4
4
Stirrup step
42940
1
1
1
1
1
1
1
1
1
1
1
Ballast weights
Per swivel castor; attachment to stabiliser
Indoor use
42912
0
0
0
0
0
0
0
0
0
0
0
Outdoor use
42912
0
0
0
0
1
4
x
x
x
x
x
1) With max. swivelled-out swivel castors 42917 (adjustment range: 30 cm)
x: not permissible
Please use anti-twist device 42865 for stabilisers to prevent wilful twisting
of the stabilisers. Anti-twist devices are prescribed by EN 1004, Point 7.7.1.
Z 600 S-PLUS mobile scaffold tower with stabilisers, double platform 1.35 x 1.80 m
Scaffold size [m]
1.35 x 1.80
Working height 1) [m]
approx.
3.40
4.50
5.35
6.45
7.30
8.40
9.25
10.40
11.20
12.35
13.20
Weight [kg]
94.5
120.7
190.5
197.1
242.5
248.5
293.9
300.5
345.9
352.5
397.9
Parts list
Order No.
52425
52435
52445
52455
52465
52475
52485
52495
52505
52515
52525
Push-on end frame 1m
42902
-
2
-
2
-
2
-
2
-
2
-
Push-on end frame 2m
42901
2
2
4
4
6
6
8
8
10
10
12
Advanced guardrail
42837
2
2
4
4
6
6
8
8
10
10
12
Trapdoor platform
42931
1
1
2
2
3
3
4
4
5
5
6
Platform without trapdoor
42932
1
1
2
2
3
3
4
4
5
5
6
End toeboard
42911
-
2
2
2
2
2
2
2
2
2
2
Side toeboard
42943
-
2
2
2
2
2
2
2
2
2
2
Diagonal brace
42937
-
2
-
2
-
2
-
2
-
2
-
Horizontal brace
42935
2
2
2
2
2
-
-
-
-
-
-
Basic brace
42886
-
-
-
-
-
2
2
2
2
2
2
Triangular stabiliser
42850
-
-
4
4
4
4
4
4
4
4
4
Swivel castor Ø 200 mm
with height adjuster
42917
4
4
4
4
4
4
4
4
4
4
4
Stirrup step
42940
1
1
1
1
1
1
1
1
1
1
1
Ballast weights
Per swivel castor; attachment to stabiliser
Indoor use
42912
0
0
0
0
0
0
0
0
0
0
0
Outdoor use
42912
0
0
0
0
0
2
3
x
x
x
x
1) With max. swivelled-out swivel castors 42917 (adjustment range: 30 cm)
x: not permissible
Please use anti-twist device 42865 for stabilisers to prevent wilful twisting
of the stabilisers. Anti-twist devices are prescribed by EN 1004, Point 7.7.1.
Z 600 S-PLUS mobile scaffold tower with stabilisers, double platform 1.35 x 2.50 m
Scaffold size [m]
1.35 x 2.50
Working height 1) [m]
approx.
3.40
4.50
5.35
6.45
7.30
8.40
9.25
10.40
11.20
12.35
13.20
Weight [kg]
110.0
141.8
218.4
236.2
292.8
319.0
375.6
393.4
450.0
467.8
524.4
Parts list
Order No.
52426
52436
52446
52456
52466
52476
52486
52496
52506
52516
52526
Push-on end frame 1m
42902
-
2
-
2
-
2
-
2
-
2
-
Push-on end frame 2m
42901
2
2
4
4
6
6
8
8
10
10
12
Advanced guardrail
42838
2
2
4
4
6
6
8
8
10
10
12
Trapdoor platform
42910
1
1
2
2
3
3
4
4
5
5
6
Platform without trapdoor
42930
1
1
2
2
3
3
4
4
5
5
6
End toeboard
42911
-
2
2
2
2
2
2
2
2
2
2
Side toeboard
42914
-
2
2
2
2
2
2
2
2
2
2
Diagonal brace
42908
-
2
-
2
-
2
-
2
-
2
-
Horizontal brace
42907
2
2
2
2
2
-
-
-
-
-
-
Basic brace
42887
-
-
-
-
-
2
2
2
2
2
2
Triangular stabiliser
42850
-
-
4
4
4
4
4
4
4
4
4
Swivel castor Ø 200 mm
with height adjuster
42917
4
4
4
4
4
4
4
4
4
4
4
Stirrup step
42940
1
1
1
1
1
1
1
1
1
1
1
Ballast weights
Per swivel castor; attachment to stabiliser
Indoor use
42912
0
0
0
0
0
0
0
0
0
0
0
Outdoor use
42912
0
0
0
0
0
0
0
x
x
x
x
1) With max. swivelled-out swivel castors 42917 (adjustment range: 30 cm)
x: not permissible
Please use anti-twist device 42865 for stabilisers to prevent wilful twisting
of the stabilisers. Anti-twist devices are prescribed by EN 1004, Point 7.7.1.
Z 600 S-PLUS mobile scaffold tower with stabilisers, double platform 1.35 x 3.00 m
Scaffold size [m]
1.35 x 3.00
Working height 1) [m]
approx.
3.40
4.50
5.35
6.45
7.30
8.40
9.25
10.40
11.20
12.35
13.20
Weight [kg]
122.4
156.4
243.8
262.4
329.8
357.6
425.0
443.6
511.0
529.6
597.0
Parts list
Order No.
52427
52437
52447
52457
52467
52477
52487
52497
52507
52517
52527
Push-on end frame 1m
42902
-
2
-
2
-
2
-
2
-
2
-
Push-on end frame 2m
42901
2
2
4
4
6
6
8
8
10
10
12
Advanced guardrail
42839
2
2
4
4
6
6
8
8
10
10
12
Trapdoor platform
42933
1
1
2
2
3
3
4
4
5
5
6
Platform without trapdoor
42934
1
1
2
2
3
3
4
4
5
5
6
End toeboard
42911
-
2
2
2
2
2
2
2
2
2
2
Side toeboard
42944
-
2
2
2
2
2
2
2
2
2
2
Diagonal brace
42938
-
2
-
2
-
2
-
2
-
2
-
Horizontal brace
42936
2
2
2
2
2
-
-
-
-
-
-
Basic brace
42888
-
-
-
-
-
2
2
2
2
2
2
Triangular stabiliser
42850
-
-
4
4
4
4
4
4
4
4
4
Swivel castor Ø 200 mm
with height adjuster
42917
4
4
4
4
4
4
4
4
4
4
4
Stirrup step
42940
1
1
1
1
1
1
1
1
1
1
1
Ballast weights
Per swivel castor; attachment to stabiliser
Indoor use
42912
0
0
0
0
0
0
0
0
0
0
0
Outdoor use
42912
0
0
0
0
0
0
0
x
x
x
x
1) With max. swivelled-out swivel castors 42917 (adjustment range: 30 cm)
x: not permissible
Please use anti-twist device 42865 for stabilisers to prevent wilful twisting
of the stabilisers. Anti-twist devices are prescribed by EN 1004, Point 7.7.1.
Z 600 S-PLUS folding scaffold unit COMPACT, single platform 0.85 x 1.80 m
Scaffold size [m]
0.85 x 1.80
Working height 1) [m]
approx.
3.75
4.60
5.70
6.55
7.65
8.50
9.60
10.45
11.60
12.40
13.55
Weight [kg]
76.4
123.6
147.8
169.6
189.8
216.0
231.8
249.6
273.8
291.6
315.8
Parts list
Order No.
53099
53121
53131
53141
53151
53161
53171
53181
53191
53101
53111
Folding frame unit
42947
1
1
1
1
1
1
1
1
1
1
1
Push-on end frame 1m
42905
2
-
2
-
2
-
2
-
2
-
2
Push-on end frame 2m
42904
-
2
2
4
4
6
6
8
8
10
10
Advanced guardrail
42837
2
2
4
4
6
6
8
8
10
10
12
Trapdoor platform
42931
1
1
2
2
3
3
4
4
5
5
6
Platform without trapdoor
42932
-
1
-
1
-
1
-
1
-
1
-
End toeboard
42913
-
2
2
2
2
2
2
2
2
2
2
Side toeboard
42943
-
2
2
2
2
2
2
2
2
2
2
Diagonal brace
42937
-
1
-
1
-
1
-
1
-
1
-
Horizontal brace
42935
1
-
1
-
1
1
1
-
1
-
1
Basic brace
42886
-
-
-
-
-
1
-
-
-
-
-
Triangular stabiliser
42850
-
4
4
4
4
4
4
4
4
4
4
Swivel castor Ø 150 mm
with height adjuster
42759
4
4
4
4
4
4
4
4
4
4
4
Stirrup step
42940
1
-
1
-
1
-
1
-
1
-
1
Ballast weights
Per swivel castor; attachment to stabiliser
Indoor use
42912
0
0
0
0
0
0
0
0
0
0
0
Outdoor use
42912
4
0
0
1
3
8
x
x
x
x
x
1) With max. swivelled-out swivel castors 42759 (adjustment range: 15 cm)
x: not permissible
Please use anti-twist device 42865 for stabilisers to prevent wilful twisting
of the stabilisers. Anti-twist devices are prescribed by EN 1004, Point 7.7.1.
Z 600 S-PLUS folding scaffold unit COMPACT, double platform 1.45 x 1.80 m
Scaffold size [m]
1.45 x 1.80
Working height 1) [m]
approx.
3.75
4.60
5.70
6.55
7.65
8.50
9.60
10.45
11.60
12.40
13.55
Weight [kg]
97.3
161.4
189.4
225.0
250.7
284.0
312.0
345.3
373.3
406.6
434.6
Parts list
Order No.
53199
53221
53231
53241
53251
53261
53271
53281
53291
53201
53211
Folding frame unit
42948
1
1
1
1
1
1
1
1
1
1
1
Push-on end frame 1m
42902
2
-
2
-
2
-
2
-
2
-
2
Push-on end frame 2m
42901
-
2
2
4
4
6
6
8
8
10
10
Advanced guardrail
42837
2
2
4
4
6
6
8
8
10
10
12
Trapdoor platform
42931
1
1
2
2
3
3
4
4
5
5
6
Platform without trapdoor
42932
1
3
2
4
3
5
4
6
5
7
6
End toeboard
42911
-
2
2
2
2
2
2
2
2
2
2
Side toeboard
42943
-
2
2
2
2
2
2
2
2
2
2
Diagonal brace
42937
-
1
-
1
-
1
-
1
-
1
-
Horizontal brace
42935
1
-
1
1
1
-
1
-
1
-
1
Triangular stabiliser
42850
-
4
4
4
4
4
4
4
4
4
4
Swivel castor Ø 150 mm
with height adjuster
42759
4
4
4
4
4
4
4
4
4
4
4
Stirrup step
42940
1
-
1
-
1
-
1
-
1
-
1
Ballast weights
Per swivel castor; attachment to stabiliser
Indoor use
42912
0
0
0
0
0
0
0
0
0
0
0
Outdoor use
42912
1
0
0
0
0
x
x
x
x
x
x
1) With max. swivelled-out swivel castors 42759 (adjustment range: 15 cm)
x: not permissible
Please use anti-twist device 42865 for stabilisers to prevent wilful twisting
of the stabilisers. Anti-twist devices are prescribed by EN 1004, Point 7.7.1.
2.14 Assembly drawings
Z 600 S-PLUS mobile scaffold tower with stabilisers
The assembly structure illustrated is merely an example. The actual structure
of the scaffold unit may differ.
1
2
3
4
5
8
7
6
1
Advanced guardrail
2
Side toeboard
3
Push-on end frame
4
Triangular stabiliser
5
Horizontal brace
6
Swivel castor
7
Diagonal brace
8
End toeboard
Z 600 S-PLUS folding scaffold unit COMPACT
The assembly structure illustrated is merely an example. The actual structure
of the scaffold unit may differ.
1
2
3
4
5
6
9
8
7
1
Advanced guardrail
2
Side toeboard
3
Push-on end frame
4
Folding unit
5
Triangular stabiliser
6
Swivel castor
7
Platform
8
Diagonal brace
9
End toeboard
Structural safety regulations
3.1 General information
Chassis beams and stabilisers ensure that the scaffold tower is stable. However,
depending on the place of deployment (indoor / outdoor use), these may need to
be fitted with ballast weights.
For the ballasting, see “Parts list incl. ballasting” on page 29 (lower section of the
tables)
3.2 Attaching the ballast
Where the ballast weights are attached and how many of them are required depend
on the specific set-up and platform height of the scaffold unit.
On mobile scaffold towers with stabilisers, ballast weights with fastening clamps
(Order No. 42912) must be used. The ballast weights must be attached as close as
possible to the foot of the stabiliser or on the foot of the scaffold unit (scaffold unit
types 53099 and 53199).
3.3 Attaching the anti-twist device
To prevent the stabilisers being twisted unintentionally, they should be secured with
the anti-twist device (Order No. 42865). One end of the anti-twist device is attached
to the stabiliser, the other to the first rung.
3.4 Maintenance, servicing, storage and cleaning
The scaffold unit can be cleaned using water with a little household cleaning agent
added. Paint spots can be removed using turpentine.
Cleaning agents must not be allowed to seep into the soil.
• Dispose of used cleaning fluids in accordance with the applicable environmental
regulations.
Lubricating moving parts
• Lubricate all moving parts (height adjusters, bearings of the swivel castors,
fasteners) with normal lubricating oil. Select a thin-bodied oil when using the
scaffold unit in winter.
• Dispose of oil-soaked cleaning cloths in accordance with the relevant
environmental protection regulations.
WARNING
Danger of falling due to slippery tread surfaces!
Lubricating oil on tread surfaces causes falls and injuries.
Wipe off superfluous oil.
Transportation and storage
• Store scaffold unit components in such a way that they cannot be damaged.
• Store scaffold unit components so that they are protected against the effects
of weathering.
• During transport to and from the place of storage, the scaffold unit components
must be secured to prevent sliding and impact.
• Do not throw the scaffold unit components when loading them.
3.5 Testing the scaffold unit components
If defects are ascertained, the affected components must not be used again.
Push-on end frame
• Check for warping, crushing and cracks.
Braces (diagonal / guardrails)
• Check for warping, crushing, cracks and correct functioning of the fastening
elements.
Platform
• Check for warping, crushing, cracks and correct functioning of the fastening
elements.
• Check the condition of the wood.
• Check the trapdoors for correct functioning.
• Check the condition of the wood.
• Check the toeboards for cracking.
Swivel castors
• Check the castor for smooth running and check that the brake stops the castor
rolling or twisting.
• In the case of swivel castors with height adjusters, also check that the height
adjusters move easily.
• Check the drop-out protection (wing bolt, securing plug) on the chassis beams
and base frame.
Stop springs
• Check for warping, crushing, cracks and correct seating.
Folding frame unit,
single platform
42947
Folding frame unit,
double platform
42948
Push-on end frame
1 m, single platform
42905
Push-on end
frame 1 m,
double platform
42902
Push-on end
frame 2 m,
single platform
42904
Push-on end
frame 2 m,
double platform
42901
Trapdoor
platform
1.80 m
2.50 m
3.00 m
42931
42910
42933
Platform without
trapdoor
1.80 m
2.50 m
3.00 m
42932
42930
42934
Diagonal brace
1.80 m
2.50 m
3.00 m
42937
42908
42938
Distinguishing feature: a blue claw
Horizontal brace
1.80 m
2.50 m
3.00 m
42935
42907
42936
Distinguishing feature: a grey claw
43
en
Designation
Art. No.
Figure
Designation
Art. No.
Figure
Basic brace
1.80 m
2.50 m
3.00 m
42886
42887
42888
Advanced guardrail
1.80 m
2.50 m
3.00 m
42837
42838
42839
End toeboard
0.75 m
1.35 m
42913
42911
Side toeboard
1.80 m
2.50 m
3.00 m
42943
42914
42944
Triangular stabiliser
42850
Ballast weight
42912
Swivel castor
Ø 200 mm with
height adjuster
42917
Swivel castor
Ø 150 mm with
height adjuster
42759
Anti-twist device
42865
Stirrup step
42940