Termodinamik ECS 70 Manual 

Text of the manual

H E AT I N G S Y S T E M S

ECS 70 / 85 / 100 / 150 / 200 / 250 / 300 / 350 / 400 500 / 600 / 700 / 800 / 900 / 1000 ECS STEEL BODY CENTRAL HEATING HOT WATER BOILER all-guides com

ECS 85 ECS 100

ECS 150 ECS 200 Heat power kcal/h 70.000 85.000 100.000 150.000 200.000 kW 81,4 98,8 116,2 174,3 232,4 Heat input kcal/h 76.500 92.600 109.900 164.800 219.800 kW 88,9 107,6 127,7 191,5 255,5 Max. Operating Temperature oC 105 105 105 105 105 Temperature control range oC 30-90 30-90 30-90 30-90 30-90 Firing chamber pressure mbar 0,5 0,5 0,6 1,2 1,6 Max. Operating pressure bar Test Pressure bar Boiler water capacity lt 194 194 232 307 433 Shaft diameter mm 200 200 200 200 220 Firing chamber dimensions 430 430 430 430 482 L 678 678 828 1110 1109 Input-Output Water Connections Inch 2" 2" 2" 2" 2 1/2" Shaft exit temperature range oC 170-195 170-195 170-195 170-195 170-195 MODELS Unit ECS 250 ECS 300 ECS 350 ECS400 ECS 500 Heat power kcal/h 250.000 300.000 350.000 400.000 500.000 kW 290,6 348,7 406,8 464,9 581,1 Heat input kcal/h 274.700 329.700 384.600 439.600 549.500 kW 319,3 383,2 447 510,9 638,6 Max. Operating Temperature oC 105 105 105 105 105 Temperature control range oC 30-90 30-90 30-90 30-90 30-90 Firing chamber pressure mbar 2,4 3,3 4,2 4,5 4,8 Max. Operating pressure bar Test Pressure bar Boiler water capacity lt 454 454 510 633 791 Shaft diameter mm 220 220 220 250 250 Firing chamber dimensions 535 535 535 688 688 1189 1189 1379 1248 1563 Input-Output Water Connections Inch 2 1/2" 2 1/2" 2 1/2" 3" 3" Shaft exit temperature range oC 170-195 170-195 175-195 175-195 175-195 5 5 5 5 5 5 5 5 5 5 7,5 7,5 7,5 7,5 7,5 7,5 7,5 7,5 7,5 7,5  

ECS 600 ECS 700 ECS 800 ECS 900 ECS 1000

Heat power kcal/h 600.000 700.000 800.000 900.000 1.000.000 kW 697,3 813,6 929,8 1046 1162,2 Heat input kcal/h 659.300 769.200 879.100 989.000 1.099.000 kW 766,3 894 1021,7 1149,4 1277,3 Max. Operating Temperature oC 105 105 105 105 105 Temperature control range oC 30-90 30-90 30-90 30-90 30-90 Firing chamber pressure mbar 5,3 5,9 6,4 7 7,5 Max. Operating pressure bar 5 5 5 5 5 Test Pressure bar 7,5 7,5 7,5 7,5 7,5 Boiler water capacity lt 846 969 1232 1306 1446 Shaft diameter mm 300 300 350 350 350 Firing chamber dimensions  738 738 820 820 820 L 1583 1853 1776 2015 2265 Input-Output Water Connections Inch 3" 3" 4" 4" 4" Shaft exit temperature range oC 175-195 175-195 175-195 175-195 175-195

GENERAL DIMENSIONS AND TECHNICAL SPECIFICATIONS

 I Shaft J Going Turning K Expansion Going L Filling Discharging Operating Pressure (bar) Test Pressure (bar) Water Capacity (L) Weight (kg) 200 R2" R11/4" R3/4" 5 7.5 190 420 200 R2" R11/4" R3/4" 5 7.5 194 420 200 R2" R11/4" R3/4" 5 7.5 232 460 200 R2" R11/4" R3/4" 5 7.5 307 510 220 R21/2" R1/2" R3/4" 5 7.5 433 775 220 R21/2" R1/2" R3/4" 5 7.5 454 860 220 R21/2" R1/2" R3/4" 5 7.5 454 860 220 R21/2" R1/2" R3/4" 5 7.5 510 935 250 R3" R2" R3/4" 5 7.5 633 1350 250 R3" R2" R3/4" 5 7.5 791 1485 300 R3" R2" R3/4" 5 7.5 846 1590 300 R3" R2" R3/4" 5 7.5 969 1710 350 R4" R21/2" R3/4" 5 7.5 1232 2030 350 R4" R21/2" R3/4" 5 7.5 1306 2260 350 R4" R21/2" R3/4" 5 7.5 1446 2490

Central System Going Water Connection

3 Boiler Flange 9 Shaft Pipe 4 Front Lid 10 Back Lid 5 Central System Turning Water Connection 11 Bursting Lid 6 Safety Line 12 Filling – Discharging GENERAL INFORMATION This product, running on liquid or gas fuels, is a three-pass steel central heating boiler which generates water at maximum 90C for heating purposes. Thanks to its three-pass design, the heat generated as a result of burning the fuel is transferred to heat transfer fluid and the heat loader decreases thanks to heat transfer surface and the life span of the boiler increases. Since the amount of NOX found in the smoke reaching to the shaft under lower temperatures decreases in parallel with the decrease in temperature, the burning efficiency increases and the harm given to the environment is minimized. The life span of the appliance is 10 years.

Please read the instructions and warnings in this manual before installation of the

boiler and operation of the appliance. The use of appliance not recommended by the manufacturing company and not specified in this manual may cause fire, electric shock and injuries. Spare parts and accessories not certified and not purchased from authorized services can damage your boiler. ELECTRIC SHOCK RISK Please do not try to open the electronic control unit or fix it. Otherwise, this may pose a threat in terms of life safety and result in the invalidity of the warranty of your appliance. The exterior surface sheets of the boiler are hot during operation. In order to prevent burning risks, please avoid direct contact to hot surfaces and use gloves. Please contact only AUTHORIZED SERVICES OF TERMODİNAMİK for the control, technical service, electrical and mechanical maintenance of your appliance. There are arcing and sparking parts in the boiler and burner. Please do not store blasting and flammable liquids and gasses in the boiler room. Make sure to operate your appliance using only a grounding plug. If the power cable or other electric connections are damaged, do not operate the boiler. Improper installation and not performing the routine maintenances may result in injuries and even fatalities and damages on the appliance. The manufacturing company cannot be held liable for the damages due to improper use of the appliance if this manual is not followed. In case smoke is coming out of the boiler, stop the operation of the appliance, cut off its power and immediately contact AUTHORIZED SERVICES OF TERMODİNAMİK. The front lid of the boiler should be properly closed before operating the appliance. Please do not let the persons, who do not know how the appliance operates, handle the appliance. If this appliance shall be sold to another party, the operating manual should be delivered to the new user along with the appliance. Please do not use any heating liquid other than hot water.

Please do not use the boiler for the purposes not intended. This appliance has been

designed to generate water at maximum 90C for the heating system. The boiler room should be in compliance with the specifications and regulations related to the discharge of waste gas. For the operation of the ECS boilers in compliance with gas-burning appliances and efficiency directives, please use EN 676 (gas fuel) or EN 267 (liquid fuel) certified boilers. Make sure the boiler room is properly ventilated for efficient burning and safe use. Install the boiler at a distance of 20 cm from the floor and on a durable and fireproof surface which can bear the weight of the boiler. Please do not operate the boiler if any of its part is in water. Please contact the authorized technical service for evaluation and replacement of the relevant parts. It is recommended to install an emergency power switch outside the boiler room which stops the operation of the boiler and cuts off the gas feeding. If the system shall be operated using a type of fuel heavier than air (e.g. LPG), make sure to take additional precautions. In case of any fuel leakage, please use systems that allow for the discharge of such fuel from the boiler room and automatically cuts the fuel feeding. Please consider that waters with high hardness levels will cause calcification. Malfunctions and decreased performance due to calcification, Problems resulting from the use of appliance in different areas not suitable for technical properties (industrial use, etc.), Problems caused by using water other than tap water (artesian water, waste water, etc.), are not covered by Warranty. If you smell gas; Turn off all natural gas appliances and valves. Ventilate the area by means of opening all doors and windows. Turn off the main valve. Do not smoke, flick lighters or light matches. Do not touch electric switches. Do not turn on or off equipments. Do not plug out your devices. Do not use or allow for the use of the door bell. Please do not use your telephone since it can spark. Immediately evacuate the area where the gas is leaked. Please do to try to repair the breakdown yourself. Symptoms of CO (carbon monoxide) poisoning: Headache, perceptual disorder, loss of muscular control, fatigue, visual impairment, dizziness, nausea, loss of consciousness.

EXEMPLARY INSTALLATION CHART

Closed Expansion Tank and Detailed Pipe Installation 1 Central System Turning 2 Central System Going 3 Safety Line 4 1st Circulation Pump 5 2nd Circulation Pump (Extra) 6 Expansion Tank 7 Valve (for the 1st Pump) 8 Valve (for the 1st Pump) 9 Valve (for the 2nd Pump) 10 Valve (for the 2nd Pump) 11 Filling Valve

EXEMPLARY INSTALLATION CHART

Open Expansion Tank and Detailed Pipe Installation 1 Central System Turning 2 Central System Going 3 Safety Going 4 1st Circulation Pump 5 2nd Circulation Pump (Extra) 6 Expansion Tank 7 Valve (for the 1st Pump) 8 Valve (for the 1st Pump) 9 Valve (for the 2nd Pump) 10 Valve (for the 2nd Pump) 11 Filling Valve 12 Fittings 13 Safety Turning 14 Messenger Pipe

INSTALLATION OF THE APPLIANCE

Keep the boiler in its package and on the pallet until the place it will be installed is defined. Leave the boiler to the place of installation defined before. Open the package of the boiler on the pallet. Remove the boiler from the pallet as in the order described below: - Lift the left side of the boiler and place its left foot. - Lift the other side of the boiler and place its right foot. - Slide the boiler to the back and place it securely. Make sure you do not hit the ground or pallet with the boiler and do not drop the boiler. Check the foot levels of the boiler. - If necessary, adjust the levels of the feet. - Do not replace the feet completely. MODEL Minimum Ground Sizes ECS 70 1080 X 960 X 200 mm ECS 85 1080 X 960 X 200 mm ECS 100 1080 X 1110 X 200 mm ECS 150 1080 X 1400 X 200 mm ECS 200 1210 X 1400 X 200 mm ECS 250 1210 X 1530 X 200 mm ECS 300 1210 X 1530 X 200 mm ECS 350 1210 X 1710 X 200 mm ECS 400 1460 X 1580 X 200 mm ECS 500 1460 X 1920 X 200 mm ECS 600 1510 X 1940 X 200 mm ECS 700 1510 X 2110 X 200 mm ECS 800 1610 X 2160 X 200 mm ECS 900 1610 X 2400 X 200 mm ECS 1000 1610 X 2560 X 200 mm

The assembly of the system and putting it into use should be performed in accordance

with the current regulation, standard and this manual. A proper installation circuit should be installed in order to protect the boiler against flue gas condensation. Power connections should be installed in accordance with the current standards and regulations. Water and fuel pipes should never be used as ground connection. Shaft connections should be installed in accordance with standards and regulations. The distance between the boiler and the shaft as well as the number of the ells used should be kept at a minimum. The shaft should be isolated against condensation. The entire system (shaft, electric, water, fuel) should be checked against leaks following the assembly. The entire weight of the big and heavy burners should be lifted by well adjusted supports instead of the boiler’s front lid. Check for gas leaks before turning on the boiler, if you suspect there might be a leak, do not turn on the boiler before resolving the problem. Only for propane burning boilers – A certain smell has been put into your propane feeder so any gas leaks can be noticed. - Propane gas accumulates at spots close to the ground, therefore should you notice smell at such spots, do not fire up the burner. - Assign an expert to operate the propane fueled burners. - Check your boiler and pipes which the gas goes through for leaks at least once a year. CONTROL PANEL

CLEANING AND MAINTENANCE

Annual periodic maintenance must be performed by AUTHORIZED SERVICES OF TERMODİNAMİK to ensure the boiler and all components operate efficiently and safely. When Cleaning: The main power supply should be turned off. The power of the circulation pump should be cut off. Turn off the gas valve (fuel line). Make sure that the boiler surfaces are not hot. Open the front lid of the boiler. Take out the turbulators and clean them. Clean the burning chamber and the pipes’ inner surfaces with the pipe brush. Check the front and rear sealing components. Place the turbulators back in after cleaning. Turn on the fuel line. Turn on the main power supply. When the Burner Indicates Malfunctioning, Before Calling the Authorized Service, Ensure: The system is able to receive power, Minimum gas pressure is available, Fuel valves are on, The system’s water level and the pressure are at normal levels. If the system operates using liquid fuel, the boiler heat transfer surfaces should be cleaned at least once a month. This duration may be shorterand the cleaning frequency may increase depending on the factors like the quality of the fuel used, accuracy of the burning adjustment done and shaft draft. Have the AUTHORIZED SERVICES OF TERMODINAMIK perform the controls specified in the maintenance instructions on the next page. This is critical to ensure both a safe and efficient operation of the boiler and your life safety.

BOILER MAINTENANCE PLAN

PIPING Piping on the boiler Check if there is any leakage in the piping system on the boiler and system. Make sure there are pipe bearing supports are located where needed. Ventilation Check all ventilation pipes and their connections. Gas Check if there is any gas leakage in all as pipes. Check if the pipes are outworn. Make sure all pipes are supported with bearing hangers. SYSTEM Visual Check the complete system for visual abnormalities. Functional Test all functions of the system (heating, safety, hot water (if available)). ELECTRICAL Connections Check the electrical connection cables. Make sure the connections are secured. Safety fuse Make sure a proper safety fuse connection is established. Test the operation of the fuse. On-off switches and Plugs Check the compatibility of on-off switches and plugs and if they are functional. Smoke and CO Detector Make sure this appliance is installed and properly functions. If necessary, replace its batteries. BURNING CHAMBER AND BOILER Burning Chamber Clean the burning room if necessary (Vacuum cleaner,etc.) Boiler Burning Chamber Check the boiler barrel and perform the maintenance of boiler burning chamber as specified in the manual.

Other Boiler Manuals