Rowlinson Premier Potting Station Assembly Instructions
Text of the manual
7. High level shelf
Position each shelf bracket just below the shelf back board on the inside of the posts. Allow a gap at the back of the
bracket for the hook board to sit between the posts, flush to the back edge of the posts. Secure the each bracket using
2 x40mm screws. when both brackets are in place fix the hook boa
3. Front rails
Position the front rails between the side panels secure through the pre-drilled holes using 2 x 90mm screws at each end
of each rail.
1. Back and side panels
Insert the back panel into the rebate on the back leg of each side panel. If necessary use a rubber mallet to tap into place.
Secure each side panel in place using 2 x 90mm screws. Screw