Installation and Operation Instructions
Solar System with KPS1 Collectors
General Installation and Operation Instructions .…....……...…….…................................. 3
1 Supply of Mounting System ..……........……...……..………....……..……............................ 4
2 Sloping Roof Mount ..........................................………………………................................. 5
2.1 Preparation ...………………………………………....………............................................ 6
2.1.1 Roof anchor installation for sloping roofs ..……………………................................ 6
2.1.2 Installation with roof anchors and rafters ………………………............................... 6
2.1.3 Installation with roof anchors for slate, shingle or metal roofs ............................... 7
2.1.4 Installation with bolts for fixing rails onto a roof .................................................... 7
2.1.5 Installation with universal templates for Cembrit roofs ...................................... 9
2.2 Installing rails onto roof anchors ….........……………………………............................... 9
2.3 Collector mounting …………………………….………………………............................... 9
3 Connection Pipe Passage through a Roof …...…...…................................................... 10
4 Flat Roof Mount …………....……….…………………........................................................ 11
4.1 Overview ………..........…….……………….………………………................................. 11
4.2 Flat roof support mounting ………………….....………….............................................. 12
5 Hydraulic Connection …………………………………………………................................. 15
5.1 Collector connecting .......………………………………………………............................ 15
5.2 Collector interconnecting …………………..…………………………............................. 15
6 Temperature Probe Positioning …………………………………….................................... 16
7 Pump Station ………………………………………..........…………...................................... 17
8 Expansion Vessel Sizing and Working Pressure Calculation ………........................... 18
8.1 Expansion vessel sizing ……………………………...…………..................................… 18
8.2 Calculation of a system working pressure ……………..………................................… 18
8.3 Calculation of an expansion vessel preset pressure …………................................…. 18
8.4 Examples of calculating working pressure and expansion vessel pressure ...........…. 18
8.4.1 Example of calculating system working pressure ………......................…………. 18
8.4.2 Example of calculating expansion vessel pressure …………...................………. 18
9 Installation of Air Release Valves …………………..………….….................................…. 19
10 System Filling, Flushing, Leak Test and Air Bleeding …............................................. 20
10.1 Filling ……………………………………......………………………....................………. 20
10.2 Flushing …………………………………………........………………..................………. 20
10.3 Air bleeding …………………………….................……………….....................………. 20
10.4 Leak test ………………….............................….……………………....................……. 20
11 Commissioning …………..……...............................................................................……. 21
12 Operation, Checks and Maintenance ………........…………………...........................…. 21
13 Servicing and Warranty …………..................………………………….........................…. 21
14 Technical Data .…...…...................................................…...….....................…............… 22
15 Connection dimensions…………………..……...........................................................…. 24
16 Annual Check Description ............................................................................................. 25
17 Service sheet ..................................................................................................................... 26
REGULUS KPS1 Flat Solar Collectors are designed for
solar domestic hot water heating (DHW), support- and
pool heating with solar energy. Solar radiation pene
trates the glass and is intercepted by an efficient absorp
tion layer applied on an aluminium absorber. The heat
is then transferred into heat transfer fluid. The absorber
is sealed in a compact frame with high quality thermal
insulation. The collectors are designed for year round
operation, that’s why they work in a separate primary
circuit filled with antifreeze heat carrier.
The collectors are not intended for direct water
heating. If different heat transfer fluid is used
than specified by the manufacturer, irreversible
damage to the collector may be done.
Transport, handling and storing
Collectors shall be transported in their original packing,
in upright position (standing on their shorter side) or lying
horizontal with glass upwards, stack of max. 10 pieces
on a pallet.
During handling the collector glass shall be always fac
ing upwards.
Please check the condition of the collector upon re
ception from your supplier or forwarder. Later claimed
mechanical damage (frame, glass, connection) will be
refused.
When stored, the collector shall not be exposed to rain
and its absorber exposed to solar radiation.
Scope of supply
1. KPS1 Collector
2. Instruction manual
3. Warranty Certificate
4. Commissioning form - info for the Manufacturer
General instructions for installation
The installation and commissioning must be done by a
trained worker or a specialized company.
During installation and before commissioning, it is nec
essary to cover collectors in order to avoid overheating
and possible burn injury to the installer.
Prior to installation, conditions set by the roofing man
ufacturer and the max. permissible roof load shall be
checked.
Mounting method for solar collectors shall always
respect local conditions, i.e. roof inclination and weath
er influence on the overall load on the collector. Kindly
consult the fixing method with a structural statics expert.
During installation the collectors and accessories shall
be handled carefully. Defects caused by improper han
dling or DIY installation are not cover by warranty.
Generally valid rules and standards for occupational
safety shall be respected during installation. This con
cerns mainly technicians walking on a roof and the se
curing the area against objects falling down from a roof.
Only REGULUS fixing elements may be used. Other
fixing elements may be used only with a written approval
by REGULUS company.
Collectors shall not be exposed to solar radiation until
commissioned. The absorption surface may get dam
aged.
Collectors shall be installed and operated in compliance
with this Manual and with respective generally valid rules
and norms.
Collector placing
The collector must be placed outdoors. The glass
absorption surface should be orientated to South, with
deviations not over 45° (Southwest or Southeast). For a
year round operation the right inclination angle is 40°-
50°, for summer operation smaller inclination is better
(30°). The collector may be placed also vertically (90°
inclination, e.g. on an outer wall) which is ideal for winter
operation.
Collectors shall be installed with the sheath upwards as
marked.
A collector inclination shall not be less than 20°. On
inclined roofs it is recommended to install solar
collectors as close to the roof ridge as possible.
Should this solution be impossible, then protec
tions against snow slide shall be installed above
the collectors.
The numbers of roof anchors shown in the Mounting Kits
for Fixing and Connecting Regulus Solar Collectors are
designed for the following load:
Max. permissible snow and wind load ≤ 1,8 kN/m2
Max. permissible wind load - negative pressure
≤ 1,0 kN/m2
The customer/user shall be informed about this fact prior
to starting installation of a solar system. If a higher load
than shown above is expected in the area in question, a
statics expert shall be consulted and more roof anchors
designed, or other measures taken that would ensure
safe collector fixing. Regulus refuses any responsibility
for damage caused by wrong design of collector fixing.
Lightning protection
Lightning protection is obligatory for solar systems.
When installed on a roof, collectors must be wired
to lightning protection equipment. Czech norm ČSN EN
62 305 shall be observed.For other countries check with
local authorities.
GENERAL INSTALLATION AND OPERATION INSTRUCTIONS
Mounting kits for fixing and connecting KPS1 solar collectors
Code
Connection kit for a KPS1
(G3/4“ M inlet and outlet, 2 plugs, G3/8“F for air vent valve, sheath for solar temperature sensor)
7710
Fixing kit for one KPS1 collector
*[for 4 anchors or 2 supports+1 strut]]
12178
Fixing and interconnection kit for 2 KPS1 collectors
*[for 6 anchors or 3 supports+1 strut]
12179
Fixing and interconnection kit for 3 KPS1 collectors
*[for 8 anchors or 4 supports+1 strut]
12180
Fixing and interconnection kit for 4 KPS1 collectors
*[for 10 anchors or 5 supports+1 strut]
12181
Fixing and interconnection kit for 5 KPS1 collectors
*[for 10 anchors or 5 supports+1 strut]
12182
* Roof fixing and interconnection kits are necessary to create a hydraulically connected collector array fixed to 2
mounting rails. The kits contain interconnecting fittings with insulation, two mounting rails, fastening material for
mounting collectors onto the rails. They do not involve any roof anchors, supports, struts. These shall be select
ed from the following chart by the roof type and roofing material.
Supports and strut for flat and sloping roof installation
Code
Triangle support 15°
11979
Triangle support 25°
10975
Triangle support 45°
6859
Strut incl. screws for triangle supports for flat roofs
9563
Supports for sloping roof installation
Code
Triangle support 15°
10748
Triangle support 25°
8805
Triangle support 45°
10094
Triangle support 60°
9631
Anchors for various roofing types
Code
Stainless steel anchor for slate roofs
11574
Anchor for pantiles - hot-dip galvanized steel
7929
Stainless-steel anchor for pantiles
6857
Stainless steel anchor for pantiles - rafter mounted, incl. self tapping screws
10159
Bolt for fixing rails onto a roof
7320
1. DELIVERY OF MOUNTING SYSTEM
Flat plate collector
16277
2
Roof anchor with M8 bolt with special head for rails
6857 or other,
depending on
roofing type
Triangle supports for inclination adjustment, suitable for anchors for sloping roofs - 15°, 25°,
45° and 60° angle
11748, 8805,
10094, 9631
Interconnecting pipes
Fixing and interconnection kits
No. of collectors (kit code)
Item code
1
2
3
4
5
(12178) (12179) (12180) (12181) (12182)
3
Aluminum rail, 2 pieces
1.12 m
2.21 m
3.32 m
4.42 m
5.52 m
6949
4
M8 nut for the rails
4 pcs
8 pcs
12 pcs
16 pcs
20 pcs
6925
5
M8×20 bolt with allen head
4 pcs
8 pcs
12 pcs
16 pcs
20 pcs
12136
6
Retaining side bracket for KPS
4 pcs
8 pcs
12 pcs
16 pcs
20 pcs
12141
7
Retaining bracket for collector bottom
2 pcs
4 pcs
6 pcs
8 pcs
10 pcs
11690
8
Compression nut and ring for collector inter
connection
-
2 pcs
4 pcs
6 pcs
8 pcs
7629
9
Insulation 35 mm diam., 19 mm thick
0.5 m
0.75 m
1 m
1.5 m
2 m
7188
10
Base rail emd plug
4 pcs
4 pcs
4 pcs
4 pcs
4 pcs
11773
Insulation tape
0.8 m
1 m
1.5 m
2 m
2.5 m
7227
1
8
3
2
6
7
5
4
9
10
2. SLOPING ROOF MOUNT
Fig. 1 Collector installation on a sloping roof
Expansion mount and interconnection kits for 1 KPS1+ANT solar collector
Code
Expansion mount and interconnection kit for 1 KPS1+ and KPC1+ solar collector
12183
2.1 Prior to installation
Prior to installation of solar collectors, select a suitable
position respecting the following conditions:
• roof facing South
• roof inclination (25°- 45°)
• unshaded place
• accessible for servicing
• permissible roof load
• shortest possible distance between the collectors and
(accumulation) tank
Further have ready the necessary material, tools and
safety equipment for working on a roof.
Check if the roofing manufacturer offers roof hooks and
if the roof warranty will not be violated.
2.1.1 Installation with roof anchors and au
xiliary boards
Prior to installing anchors on auxiliary boards, the fo
llowing shall be ensured:
• The auxiliary board length shall exceed the length of
the rail by at least 200 mm on each end.
• The auxiliary board width shall be between 100 and
200 mm.
• It shall be 30 mm thick
• The height of the auxiliary board from the counter
batten shall be equal to the batten thickness which
can be reached by underlying the auxiliary board (see
Fig. 3).
Installation
• Remove roofing so that auxiliary boards can be
inserted (approx. distance between boards 1600-1800
mm). For roof tiles, just shifting them upwards in the
length of the auxiliary board is sufficient (see Fig. 4).
• Fix the auxiliary boards to battens so that the distribu
tion of anchors resembles the positions in Fig. 2. At
the same time screw the boards so high that the roof
anchor does not hinder placing the roof tile with the
right overlap (see Fig. 8).
• Hang the roof anchors onto the auxiliary board
respecting their distribution shown in Fig. 2.
• Fix the anchors using stainless steel screws.
2.1.2 Installation with roof anchors for rafters
For tiled roofs, rafter anchors can be used. Either a fixed
(not adjustable) stainless-steel hook (Fig.7a) can be
used, or an adjustable aluminum anchor (Fig. 7b) that
enables horizontal shift of the anchor along the fixing
40
30
10
30
30
auxiliary board
battens
counter batten
rafter
waterproofing membrane
underlay
No. of collectors Total length
No. of anchors
2 211 cm 6
3 319 cm 8
4 428 cm 10
5 536 cm 10
70.5
~35
~35
~35
~35
~35
~35
~65
~65
83
83
89.5
89.5
89.5
93
93
93
60
60
60
60
70.5
83
89.5
93
room for an auxiliary board
counter batten
rafter
roof battens
Fig. 3: Underlay to match thick battens
Fig. 4: Remove roof tiles to fix the board
Fig. 2: Layout of roof anchors
auxiliary board width is
100 - 200 mm
board. For this anchor type also the rail fixing height can
be adjusted.
Installation
• Remove roofing in places where anchors shall be fixed
(Fig. 6). The distance between anchors is defined in
Fig. 2.
• Cut the counter batten used for fixing the waterproo
fing membrane.
• Prior to the installation itself, use an underlay for
anchors according to the thickness of battens and
counter battens so that the anchors installed do not
hinder proper positioning of the roof tiles.
• Fix all the other roof anchors in the same way.
• When installing roof anchors, maintain a direction
parallel to the roofing (horizontal).
2.1.3 Installation with roof anchors for shin
gle or metal roofs
• Depending on the number of collectors, measure and
calculate the positions for fixing roof anchors (Fig. 2).
Such places shall be selected for mounting where
anchors can be fixed sufficiently into the roof frame
(rafter or similar).
• Prior to fixing the anchor, apply suitable silicone
putty on the contact surface (adjacent to the roofing)
in order to prevent water leaking, or possibly use a
sealing method recommended by the roofing manu
facturer.
• Simply lay the anchor onto the roof tiles and fix it with
stainless-steel bolts.
If the roofing is made of e.g. copper or zinc‑pla
ted iron, then the anchor contact surface shall be
isolated using suitable underlay (rubber). Other
wise there is a risk of contact corrosion.
2.1.4 Installation using bolts for fixing rails
onto a roof
This method of installation is preferably used for roofs of
bitumen corrugated sheets like Gutta or Onduline etc., or
for corrugated eternit or metal sheets.
Installation:
• Depending on the number of collectors, locate the
places for drilling holes and installing bolts into the
roofing (Fig. 7d). Pre-drill 6 mm holes into a rafter or
another massive wooden roof element for the bolts.
Holes should be always drilled in the crest
of the roofing wave, not in its valley, to avoid
leakage.
• The bolt shall be screwed into a rafter or another
massive wooden roof element using spanner No. 7.
• After screwing the bolt in, put on the rubber seal (Fig.
7d) and using a washer and nut, seal the drilled hole.
counter
batten
rafter
roof
battens
waterproofing membrane
a
• Then mount the U-shaped bracket (Fig. 9) on the
bolt, between two nuts with a washer.
• Then M8 bolt with floating head (for rails) shall be
mounted into the other end of the bracket. First insert
the floating head into the groove of the rail, and then
tighten the bolt together with the rail to the U-shaped
bracket using a nut and a serrated washer.
Fig. 5: Fixing an auxiliary board and roof anchors
Fig. 6: Opening the space for anchor fixing
Fig. 7: Basic overview of fixing elements
150
80
125
≈160
35
Ø 10
40
45
150
7
5
RIGHT
10 - 30 mm
Fig. 8: Right anchor position with roof tiles
c) Stainless steel roof anchor for metal or slate roofing
steel for pantiles
a) Stainless steel anchor on rafter, for pantiles,
incl.
screws
b) Roof anchor of stainless steel or zinc-plated
steel for pantiles
70
ø 9
80
130
40
40
9
d) Roofing bolt for rail fixing
RIGHT !
2.2 Fixing rails on roof anchors
• have ready two rails in the length required for the
number and type of collectors to be installed.
• Align the travelling screw head (Fig. 9) with the hori
zontal rail and shift the rail onto it, or shift the screws
into the rail first and fix to the anchors. Use serrated
lock washers to fix the nuts.
• Align the rails so that they lie in parallel to roof tiles.
The diagonal between the rails must be of the same
length: D1 = D2 (Fig. 10).
• Then tighten the nuts on fixing bolts.
2.3 Collector mounting
Collectors shall be covered during mounting.
Installation:
• Insert safety retaining brackets (Fig. 11) into the
bottom rail, 2 brackets per collector.
• Insert the retaining brackets into the bottom rail about
100 mm from the collector edge.
• Lay the first collector carefully on the rails and align it
in the brackets.
Collectors shall be placed on the rails with
marking upwards. The distance between the
bottom edge of the collector and of the base rail
depends on the design and size of the retaining
brackets. The collector bottom edge is by circa
75 mm lower.
• The distance between the collector edge and the end
of the bottom rail is B = 35 mm (Fig. 12)
roof anchor
top / bottom rail
M8 bolt with
travelling head
parallel
D1
D2
Fig. 9: Fixing the rail onto the roof anchors
Fig. 10: Alignment of base rails
• Insert nuts into both the rails (Fig. 13). Put the retai
ning side brackets on the rails and fix the collector
using M8x20 bolts.
• Lay the following collector next to the first one, main
taining a sufficient gap. Then put on the threaded
fittings (Fig. 15, pos. 9) and push the collector to the
already mounted one until stop. Hold the fitting with a
spanner to prevent turning and tighten the nuts. More
on this in chapter 5 Hydraulic Connection.
• Continue mounting further collectors in the same way
(see page 15).
Fig. 11: Inserting safety retaining brackets
Safety retaining bracket
Rails
~100 mm
B
14
~100 mm
~800 mm
Fig. 12: Distance between the safety retaining brackets
For passing the connection pipes through a roof
e.g. ventilation tiles can be used, where the hole
is modified according to the diameter of the pipe
with insulation. Anyway standards of the roofing
manufacturer shall be respected for pipe passage
through a roof.
3. CONNECTION PIPE PASSAGE THROUGH A ROOF
5 – M8 nut for rail
6 – M8x20 allen head bolt
7 – Retaining bracket
Fig. 13: Fixing the retaining brackets
Fig. 14: Pipe passing through ventilation tile
4.1 - Overview
Pos.
Item
Code
1
Flat plate collector
16277
2
Triangular support
Number of collectors (number of supports needed)
6859,
10975,
11979
1 (2)
2 (3)
3 (4)
4 (5)
5 (5)
3
Strut incl. bolts for triangular support
9563
Interconnection pipes
Fixing and interconnecting kits
Number of collectors (kit code)
Item
code
1 (12178) 2 (12179) 3 (12180) 4 (12181) 5 (12182)
4
Aluminum base rail, 2 pieces
1.12 m
2.21 m
3.32 m
4.42 m
5.52 m
6949
5
M8 nut for the base rail
4 pcs
8 pcs
12 pcs
16 pcs
20 pcs
6925
6
M8x20 bolt (allen head)
4 pcs
8 pcs
12 pcs
16 pcs
20 pcs
12136
7
Retaining side bracket
4 pcs
8 pcs
12 pcs
16 pcs
20 pcs
12141
8
Retaining bracket for collector bottom
2 pcs
4 pcs
6 pcs
8 pcs
10 pcs
11690
9
Compression nut and ring for collector interconnection
-
2 pcs
4 pcs
6 pcs
8 pcs
7629
10
Insulation 35 mm diam., 19 mm thick
0.5 m
0.75 m
1 m
1.5 m
2 m
7188
11
Base rail end plug
4 pcs
4 pcs
4 pcs
4 pcs
4 pcs
11773
Insulation tape
0.8 m
1 m
1.5 m
2 m
2.5 m
7227
3
2
1
8
9
6
7
5
4
10
11
4. FLAT ROOF MOUNT
Fig. 15 Collector installation on a flat roof
Expansion mount and interconnection kits for 1 solar collector
Code
Expansion mount and interconnection kit for 1 KPS1
12183
4.2 - Flat roof support mounting
A flat roof support consist of two base rails, triangular
supports and one strut.
The number of triangular supports depends on the num
ber of collectors. One strut is sufficient for supports for
up to 5 collectors.
Installation:
• Lay two rails in parallel on the mounting surface, their
pitch shall be 1660 mm.
• The diagonals between the rails shall be of the same
length: D1 = D2 (Fig. 16)
• Insert the M8 bolt with a special head (Fig. 18) into the
rail grooves.
cca 350 mm
D2
2
4
4
1660 mm
T strut
base rails
L strut
D1
Fig. 16: Aligning the rails and mounting the first triangular support
• Assemble the triangular supports that come partially
screwed together (Fig. 17). Fix the loose support ends
with a bolt (Fig. 17) and tighten all connections.
• Locate the positions to fix triangular supports. The
distance of the first triangular support from the end of
the rail shall be about 350 mm..
• Fix the L-support of the triangle to the base rail using
screws, serrated lock washers and nuts for rails (Fig.
18) and tighten the connections.
• Install the next triangular support in the same way. Its
distance is the same as that of the roof anchors in
Fig. 2.
• Install the strut between the two triangular supports
(Fig. 19). Following Fig. 19, insert special M8 nuts into
the triangle support rail. Then lay the strut onto the
rails and fix it with M8x12 bolts with washers (Fig. 19).
• Continue assembling the remaining triangular supp
orts with a pitch as shown in Fig. 2. Adjust this distan
ce so that the pitch of the triangular supports is similar
to that of roof anchors in Fig. 2.
After fixing the strut and other supports, kip the
entire structure into the position intended for
collector installation. (The strut is upright, T rail
of each triangular support lies on the ground.)
spanner No.13
3
2
c
Fig. 19: Strut installation
Fig. 20: Installation of further supports.
Fig. 18: Assembly using special bolts.
Fig. 17: Assembly using special bolts.
Special nut
for rails
rail
M8x12 bolt with
allen head
L strut
Secure the support structure either by screwing it into
the roof, or applying a burden.
In no event the permissible roof load shall be
exceeded. Consulting a statics expert in advan
ce is necessary. A damaged roof must be re-
insulated by a specialist.
Fix the collectors to the rails in the same man
ner as if installing on an inclined roof (see point
2.4).
Minimum distance between collector arrays see Fig. 22.
Flat roof mount
up to 8m high
roof
1 collector
290 kg
2 collectors
580 kg
3 collectors
870 kg
4 collectors
1160 kg
5 collectors
1450 kg
Fig. 21: Static safety (burden)
twice the height
winter
sun
solar
collector
height
25°
solar
collector
Fig. 22: Minimum distance between collector arrays
5.1 - Connecting the collectors
For collector mounting follow the instructions in chapter
5.2. Fasten the first collector and lay the following one
next to the first one, maintaining a sufficient gap. Then
put the threaded fittings on both the upper and lower
outlets and push the collector to the already mounted
one until stop. Hold the fitting with a spanner (Fig. 24)
to prevent turning, and tighten the nuts. Continue in the
same way with further collectors.
Put the insulation on the threaded fittings only
after a successful leak test.
5.2 - Interconnecting the collectors
Hydraulic interconnection of collectors shall be done
according to Fig. 23a. Maximum of 5 collectors may be
connected with threaded fittings in a row. If there are
more than 5 collectors in a row, a compensator shall be
installed in the middle of the array. With a compensator,
max. of 10 collectors in a row may be installed. The con
necting pipes shall be lead the shortest way. The recom
mended pipe diameters and flow rates through collector
arrays are shown in Tab. 1.
Collectors may be also connected as shown in Fig.
23b. This kind of connection is permitted when up to 3
collectors are used and the max. flow rate is 1 l/min/
collector. Then the cold liquid inlet is at one side bottom
and the hot liquid outlet is at the same side top. Both the
other ends shall be plugged..
A brass elbow shall be installed at the inlet to the collec
tor array with a transition to the interconnection piping.
At the outlet from the collector array, a brass pipe cross
shall be installed that will enable connection to collector
piping. The brass elbow, pipe cross and plugs are invol
ved in Regulus connection kit, code 7710.
All solar components must be carefully and safely sea
led and must be made of material resistant to glycol and
temperatures up to 160 °C. For connection piping we
recommend using KOMBIFLEX stainless-steel flexible
pipes, or copper pipes joined by soldering.
5. HYDRAULIC CONNECTION
Fig. 23a:
The recom
mended
method of
collector
intercon
necting
Fig. 23b:
Alternative
one-sided
connection
method
Fig. 24: Col
lector con
necting (the
pic. shows
connection
of the upper
fitting; the
lower fitting
shall be
connected
and tighte
ned in the
same way.)
Connection type Max.
recomm.
flow rate
Connecting pipe
Copper
Kombiflex
array x collector
1
1 × 1
2 l/min
Cu 15 × 1
DN 12
2
1 x 2 series
4 l/min
Cu 15 × 1
DN 16
3
1 x 3 series
6 l/min
Cu 18 × 1
DN 16
4
1 x 4 series
8 l/min
Cu 18 × 1
DN 20
5
1 × 5 series
10 l/min Cu 22 × 1
DN 20
6
2 × 3 parallel
12 l/min Cu 22 × 1
DN 25
8
2 × 4 parallel
16 l/min Cu 28 × 1,5 DN 25
9
3 × 3 parallel
18 l/min Cu 28 × 1,5
DN 25
10
2 × 5 parallel
20 l/min Cu 28 × 1,5 DN 25
12
3 × 4 parallel
24 l/min Cu 28 × 1,5
-
Max. 30 m of the inlet and outlet piping together.
Fig. 26: Position of a temperature sensor
In no event plastic tubes can be used for inlet/outlet
piping as they do not meet the operation requirements
for solar systems.
Pipes for collectors can be lead through disused chim
neys, ventilation shafts or grooves in a wall. In order to
prevent high thermal losses through convection, open
shafts shall be properly sealed. Also thermal dilatation
shall be remembered and pipes fitted with compensators
or other compensation elements.
Piping shall be connected to the house earthing.
Pipes of the solar system must be fitted with
thermal insulation e.g. of SOLARFLEX type, so
that thermal dissipation from the pipes does not deteri
orate a total efficiency of the solar system. The thermal
insulation must be resistant to temperatures up to 160
°C, for outdoor piping also a UV protection is essential
as well as non-deliquescence of the material. For indoor
piping, the thermal insulation should be at least 13 mm
thick, for outdoor piping at least 19 mm.
Place the thermal probe into the pocket X-piece at the
outlet from the last collector, see pic. 26.
A twisted wire 2x1 mm2, non-shielded should be used,
separated from power cables.
Its maximum length is 100 m. Minimize the number of
electrical boxes a terminal blocks.
connection length: up to 25 m cross section: 0.25 mm2
connection length: up to 50 m cross section: 0.5 mm2
connection length: up to 100 m cross section: 1.0 mm2
• the thermal and mechanical resistance of the wire
used shall correspond to the environs the wire passes
through.
6. TEMPERATURE SENSOR POSITIONING
Tab. 1: Recommended pipe diameters
AV23 Flow rate regulator with
indicator 2-12 l/min, 3/4“
3/8” air discharge valve and
3/8” ball valve up to 160°C
Fig. 25 Possible collector connections
The pump station shall be installed in accordance with
the respective manual.
Regulus pump stations contain the principal components
shown in Fig. 27:
1 - Ball valve on flow line (red frame thermometer,
0-120 °C dial), with check valve
2 - Ball valve on return line (blue frame thermometer,
0-120 °C dial), with check valve
3 - Safety unit protects the installation from
overpressure. It involves a 6 bar safety valve,
manometer and G ¾” connection to expansion
tank.
7. SOLAR PUMP STATION
4 - Air eliminator
5 - Circulation pump
6 - Flow control screw
7 - Filling valve
8 - Flowmeter
9 - Drain valve
10 - Safety valve spillway connection
Safety valves are always included in pump stations.
If no pump station is used in the installation, the solar
system shall be equipped with a 6 bar safety valve,
resistant up to 160 °C.
No shut-off valve shall be installed between a safety
valve and collectors.
Fig. 27: Solar Pump Station
1
2
3
4
5
6
7
8
9
10
(Tab. 2 is valid for height up to 20 m only, otherwise the
size shall be calculated.)
8.1 - Expansion vessel sizing
A solar expansion vessel shall be sized for a temper
ature difference between the min. winter temperature
and the max. summer temperature. The working range
of expansion vessels is from -10 °C to +130 °C. Further
it shall be able to contain fluid volume of all collectors
in case of stagnation (max. collector temperature at
no flow and high sunshine intensity). In solar systems
with forced circulation such pressure expansion vessels
shall be only used that are fitted with a propylene-glycol
resistant membrane and whose min. working pressure is
at least 6 bar. Installation shall be done in a position with
the diaphragm flooded. In case the hear carrier starts
boiling, the diaphragm mustn’t get in touch with steam!
The recommended size of an expansion vessel see
Table 2.
Tab. 2: Expansion vessel recommended size. Max. 30 m
of the inlet and outlet piping together.
8.2 - Calculation of a system working pressure
The pressure in the solar system is calculated using the
relation
p = 1.3 + (0.1 h)
p…pressure in a solar system [bar]
h…height from a pressure gauge to the middle of a col
lector field [m]
Adjust the pressure by discharging solar liquid after the
pressure test is done.
8.3 - Calculation of expansion vessel preset
pressure
Before filling the system, adjust the initial overpressure
in the expansion vessel to a value by 0.5 bar below the
calculated system pressure.
p exp = p - 0.5 [bar]
In order to set the pressure, use a current car-tyre pres
sure gauge of a suitable pressure range.
The expansion vessel has a current tyre valve under its
lid.
8.4 - Examples of calculating working pres
sure and expansion vessel pressure
8.4.1 - An example of calculating system working
pressure
The height from a pressure gauge to the middle of a
collector:
h = 10 m
Pressure in the solar system (the solar system is to be
pressurized to this value):
p =1.3 + (0.1 h) = 1.3 + (0.1 . 10) = 2.3 bar
8.4.2 - An example of calculating expansion vessel
pressure
Before filling the system, the preset pressure in the
expansion vessel shall be adjusted to the value of:
p exp = p - 0.5 = 2.3 - 0.5 = 1.8 bar
Number of
collectors
Expansion vessel
size
Max. piping
length
3
18
Max. 30 m of
the inlet
and outlet
piping
together
4
25
5
40
6
50
8
50
9
80
10
80
12
100
8. EXPANSION VESSEL SIZING AND WORKING PRESSURE CALCULATION
Fig. 28: Expansion vessel
Install the air vent to the highest point of the system.
Should there be more places with a risk of air pockets,
air vents should be installed also there.
It is recommended to amend the air vent with a local
pipe widening that calms down the stream and helps in
good separating bubbles from the fluid (see Fig. 30).
A ball valve shall be always installed under the auto
matic air vent valve, so that the automatic air vent can
be closed after the system commissioning. Solar liquid
leaks can be avoided in case of system stagnation.
For an efficient removal of bubbles from the system it is
advisable to fit the pump station with an air eliminator
(see Fig. 29).
9. INSTALLATION OF AIR RELEASE VALVES
Fig. 29: Air eliminator
Fig. 30: Horizontal air eliminator
and an automatic air eliminator
The below listed procedures are valid when a Regulus
pump station is used.
10.1 Filling
• for safety reasons, you should only fill the collectors
when there is no direct irradiation from the sun
(or cover the collectors)
• in order to fill the system, use a filling device with a
reservoir for solar liquid and a filling pump (see Fig. 31)
• attach the filling hose to the feed valve and open the
valve completely
• please use antifreeze solar fluid Regulus - Solarten
Super to fill the system
• attach the return hose to the bleed valve and open the
valve completely
• close the integrated ball valve in the flowmeter (the
groove in the flowmeter‘s adjusting screw must be
horizontal).
• open the check valve (valves - two for a twin-pipe
solar pump station) above the pump by turning the ball
valve by 45° (intermediate position between open and
closed)
• pour sufficient quantity of solar fluid into the reservoir
of the filling device, turn on the filling pump and fill the
solar system.
10.2 Flushing
• flush the solar system for at least 15 minutes using
the filling device. In order to bleed air and possible
impurities from the system perfectly, open shortly the
integrated ball valve of the flowmeter from time to time
(the groove vertically).
10.3 Air bleeding
• with the filling pump running, close the bleed valve and
increase the pressure up to about 5 bar
• close the feed valve and turn off the filling pump, open
the regulation screw on the flowmeter (groove horizon
tally), do not disconnect the filling pump hoses!
• set the circulation pump(s) to the highest speed and
repeat switching on and off to air-bleed the system (an
air-free pump works almost noiselessly)
• watch the system pressure and when it starts falling,
increase it by turning on the filling pump and opening
the feed valve to 5 bar
• repeat air bleeding so long until the float in the flowme
ter‘s regulation valve takes a steady position during
pump operation and bubbles stop appearing in the
flowmeter. After that, let the circulation pump run for at
least 5 minutes.
10. SYSTEM FILLING, FLUSHING, LEAK TEST AND AIR BLEEDING
• in case an automatic air vent/s is/are used anywhere in
the solar system, close this valve after air bleeding.
10.4 Leak test
• examine the whole system at 5 bar pressure (all con
nections, solar collectors, valves etc.), no visible leaks
are allowed. Leave the system under pressure for at
least 2 hours, then examine the system once again
• consider the test result successful if no leaks appear
and/or no noticeable pressure drop appears in the
system
• set the working pressure by point 8.2 Calculation of
system working pressure
• set the pump to a suitable speed and set the flow by
the flowmeter and data in Tab. 1
• disconnect the hoses of the filling device and screw
caps on the feed and bleed valves
• open entirely the ball valve(s) above the pump
• after several days of operation, air-bleed the system
again.
Do not flush the system with water. Since it is impossible
to empty it completely, a risk of frost damage appears.
Fig. 31: Filling a solar system
• Adjust the solar controller.
• Select an appropriate hydraulic variant in the controller
menu. Check the controller settings and adjust parame
ters.
During solar controller setup, activate the re
spective safety functions (collector protection,
night recooling).
11. COMMISSIONING
• uncover the collectors
• place a sufficiently sized vessel (to hold the entire solar
fluid volume) under the safety valve spillway
• check if the circulation pump switches when the preset
temperature difference between solar collectors and
secondary circuit is reached
The solar system offers unmanned and almost main
tenance-free operation. Despite that, it is important to
check the right functioning of the system within the first
days of operation. First of all the temperature, system
pressure and pump operation shall be checked. Once
a year, preferably during a sunny day, it is necessary to
check the working order and tight fixing of the collectors,
verify the system tightness and pressure (incl. pressure
in the expansion vessel) and the pump operation. At
least once in every 2 years the heat carrying fluid shall
be checked for its antifrost properties. The system shall
be always replenished with the same fluid as the original
filling was.
The system must not be replenished with water.
Always use solar liquid supplied by Regulus.
Service or maintenance of the appliance may be done
exclusively by an authorized person, holder of a valid
authorization issued by Regulus, spol. s r.o.
Regulus offers warranty for this product under the condi
tions specified in the Warranty Certificate. The Warranty
Certificate is an integral part of the documents supplied
with the product.
In case you wish to claim warranty, please contact your
system supplier - installer.
12. OPERATION, CHECKS AND MAINTENANCE
13. SERVICING AND WARRANTY
Dimensions and Weight
height × width × thickness
2037 × 1036 × 90 mm
connection width
1086 mm
total area
2.110 m2
aperture area
1.907 m2
absorber area
1.887 m2
empty weight
38 kg
Glass
material
tempered prismatic glass
thickness
3,2 mm
Absorber
material
aluminium, thickness 0.5mm
surface finish
Cermet
design
harp type, laser welded
connection pipes material
copper
connection pipes dimension
4 × Ø 22 mm × 0.7 mm
absorber tube material
copper
absorber tube dimension
9 × Ø 8 mm × 0.5 mm
max. working pressure
10 bar
max. working temperature
110 °C
stagnation temperature
200 °C
heat carrier
solution of monopropylene glycol in water, 1:1, 1.40 l
recommended flow rate
60 – 120 l/h
Thermal Insulation
material
mineral wool
insulation thickness
40 mm
Frame
material
aluminum alloy
color
RAL 7039
back plate
zinc-plated sheet iron , 0.5 mm thick
Momentary efficiency per aperture / absorber area
η0a
0.777
a1a
4.35 W/m2K
a2a
0.0073 W/m2K2
tested by ISO 9806:2013
14. DATA SHEET FOR KPS1 SOLAR COLLECTOR
Graf tlakové ztráty kolektoru
Graf účinnosti kolektoru přes plochu apertury
Momentary collector effi ciency over the aperture area
for 1000 W/m2 insolation.
KPS1 Collector power output in zero point for G=1000 W/m2 is 1481 W.
Collector pressure drop
Diagram of collector power output
16. DESCRIPTION OF PROCEDURES FOR ANNUAL PREVENTION CHECKS
Warning: Prevention examination and eventual
intervention may be carried out by a qualified
person only. Any work on electric wiring may be
done by an authorized electrician only.. Maxi
mum care shall be taken during checks. In case
the procedure requires a person to get on a roof, a fall
arrest is necessary.
Check procedures
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
Check the pressure in expansion vessel, replenish if necessary
Check system visually for leaks
Check the collector glazing cleanness, wash if necessary
Check ambient trees for possible shading
Check pipe insulation
Check the proper flow rate
Check temperature probes
Check the quality of antifreeze liquid (with a refractometer)*
Check the heat carrier pressure, replenish if necessary
Check the controller settings
Check for possible error messages in the controller and their reason
Check wiring
Check backup heating function (el. heating rod, gas-fired boiler)
Check the magnesium anode rod in the tank, substitute if necessary
(see Instruction Manual)
Check the function of all system valves and fittings
Check the collector fixing
If needed, check the pressure in the heating system expansion vessel
If needed, clean the filter and de-aerate the heating system
Preventive training in system maintenance and controller setting
for the operating staff
*If the test result shows the necessity, fill new heat carrier.
This Service Action Form is intended to register service intervention done. Entries may be recorded by an authorized
servicing company only.
17. SERVICE ACTION FORM
This Service Action has been carried out by an authorized servicing company
Date of Service Action:
..……………………………………………………………………………….
Name of the servicing company:
…………………….……………….………………...……….……………….
Address of the servicing company:
…………………………………………………………………………………
…………………………………………………………………………………
…………………………………………………………………………………
Name of the servicing person:
.………………………………………………………………….…………….
Contact phone:
…….…………………………………………………………………………..
Description of the intervention:
.…………………………………………………………………………….….
.………………………………………………………………………………..
.………………………………………………………………………………..
………………………………………………………………………………...
…………………………………………………………………………………
…………………………………………………………………………………
……..……………………………………………...…………………………..
…………………………………………………………………………………
Signature of the person who has carried out the service action: ...............….……………………………………..
This Service Action has been carried out by an authorized servicing company
Date of Service Action:
..……………………………………………………………………………….
Name of the servicing company:
…………………….……………….………………...……….……………….
Address of the servicing company:
…………………………………………………………………………………
…………………………………………………………………………………
…………………………………………………………………………………
Name of the servicing person:
.………………………………………………………………….…………….
Contact phone:
…….…………………………………………………………………………..
Description of the intervention:
.…………………………………………………………………………….….
.………………………………………………………………………………..
.………………………………………………………………………………..
………………………………………………………………………………...
…………………………………………………………………………………
…………………………………………………………………………………
……..……………………………………………...…………………………..
…………………………………………………………………………………
Signature of the person who has carried out the service action: ...............….……………………………………..
This Service Action has been carried out by an authorized servicing company
Date of Service Action:
..……………………………………………………………………………….
Name of the servicing company:
…………………….……………….………………...……….……………….
Address of the servicing company:
…………………………………………………………………………………
…………………………………………………………………………………
…………………………………………………………………………………
Name of the servicing person:
.………………………………………………………………….…………….
Contact phone:
…….…………………………………………………………………………..
Description of the intervention:
.…………………………………………………………………………….….
.………………………………………………………………………………..
.………………………………………………………………………………..
………………………………………………………………………………...
…………………………………………………………………………………
…………………………………………………………………………………
……..……………………………………………...…………………………..
…………………………………………………………………………………
Signature of the person who has carried out the service action: ...............….……………………………………..
©2018 We reserve the right to errors, changes and improvements without prior notice.
REGULUS spol. s r.o.
E-mail: [email protected]
Web: www.regulus.eu
v1.1-04/2019