IBC V-10 Manual
Read Online
Read the IBC V-10 Manual online using the built-in PDF viewer.
Text of the manual
Handling the touchscreen
The touchscreen responds to a light finger touch on the screen. Use only a stylus or a clean
finger to interact with the touchscreen. Using sharp or metallic objects will cause damage.
If the touchscreen is:
Left unattended, the screens will step back one screen at a time in 10-minute intervals.
The pop-up windows will also step back automatically in 2-minute intervals.
Not activated for a user-defined period (10 minutes by default), the Home screen dims
to save power.
Controller's USB port
Be aware that the USB port is not designed to power user devices that require and draw high
amperage. Rather, it is designed for software updates and for downloading log error text files.
Powering such devices via the USB port may result in a blank controller screen, and thus
require a system reboot.
Power saving
The Backlight setting is a power saving feature. Use the slide bar to set the screen backlight
level (brightness). Also, you can program the screen to dim after a specified time of touchless
interaction.
1.0 Overview of the controller
5
1.1 Controller's menu screens
6
1.2 Who is the manual for?
7
1.3 Power-up sequence and operational states/cycles
7
1.4 Getting to know the controller’s interface
8
1.4.1 Home
8
1.4.2 Setup
8
1.4.3 Status
9
1.4.4 More
13
2.0 Operating concepts
17
2.1 Domestic hot water (DHW)
17
2.1.1 DHW opt out in a multiple boiler network
17
2.2 Reset heating
18
2.2.1 Standard reset heating (default)
19
2.2.2 Advanced reset heating
21
2.3 Set Point
22
2.4 External Control
23
2.5 Zone Of
24
2.6 Setting load priority
24
2.7 Combining loads
26
2.7.1 Basic mode load combining (default) - recommended
26
2.7.2 Full mode load combining
27
2.8 Setting the supply differential in heating modes
29
2.9 Operational settings in the Setup menu: temperature ranges and defaults
30
2.10 Operational settings in the Advanced Setup menu: temperature ranges and defaults 32
3.0 Wiring
39
3.1 Boiler pump
39
3.2 Thermostats
40
3.3 Load pumps or valves
41
3.4 Sensors
41
3.5 Alarm contacts
42
3.6 External control
42
3.7 Multiple boilers: wiring and networking
43
3.7.1 Methods for networking a group of boilers
43
3.7.2 Internet connectivity
44
3.7.3 Ethernet switch device (recommended)
44
3.7.4 BoilerNet two-wire CAN bus daisy chain cabling
44
3.8 Wiring checklist
47
4.0 Settings loads
49
4.1 Configuring loads using Setup (recommended)
49
4.1.1 Configuring a load on a boiler
50
4.1.2 Syncing zones with "Zone Of"
51
4.1.3 Changing an assigned control mode on a load type
51
4.1.4 Removing an assigned control mode from a load
52
4.1.5 Changing settings in a load
52
4.2 Setting loads using Advanced Setup
52
4.3 Setting up an external control load
53
4.4 Setting up external control to control water temperature in a single boiler or in each
boiler wired on a network
54
4.5 Combining two loads to service two loads at the same time
55
4.5.1 Combining loads using "basic mode"
55
4.5.2 Combining loads using "full mode"
56
5.0 Configuring multiple boiler systems
57
5.1 Checklist for configuring multiple boilers
57
5.2 Configuring a master boiler
57
5.3 Configuring a subordinate boiler
58
5.4 Confirming network programming was successful
59
5.5 Confirming number of boilers available and firing on the network
59
5.6 Assigning fixed IP addresses to boilers on a network using a switch not connected
to the internet
59
5.7 Using the master to control a group of IBC boilers with 5-button-type controllers
via a BACnet gateway
60
5.8 Setting up an IBC air handler to send data to an IBC boiler to control its reset
heating curve
60
6.0 Start-up
61
6.1 Start-up checklist
61
6.2 Testing the ignition safety shutoff
62
6.3 Testing the Hi-limit temperature function
62
6.4 Testing the low water cutoff (LWCO) function
62
2
Section: Contents
7.0 Optional - Setup for Internet access
65
7.1 Connecting a boiler’s controller to an IP network
65
8.0 Updating boiler controller software
67
8.1 Updating software in a boiler that has no internet access
67
8.2 Updating software in a boiler that has internet access
68
9.0 Other operating procedures
69
9.1 Testing the fan operation
69
9.2 Testing the firing rate
70
9.2.1 Testing the high fire
70
9.2.2 Testing the low fire
70
9.3 Calibrating the fan
71
9.4 Performing a manual pump purge
71
9.5 Limiting the minimum and maximum firing rate of the boiler
71
9.6 Adjusting the space heating temperature
72
9.7 Adjusting the domestic hot water temperature
72
9.8 Checking the water flow in the boiler
72
9.9 Setting overrides
72
9.10 Backing up and restoring a boiler's configuration and settings
74
9.10.1 Backing up a boiler's configuration and settings
74
9.10.2 Loading boiler configuration and settings from a device onto another boiler
74
9.11 Restricting access to areas in a controller
75
9.12 Switching a boiler to unoccupied "away" mode
75
9.13 Resetting configured settings to factory defaults
75
9.14 Changing and updating date and time
76
9.14.1 Setting up date and time to update automatically in a boiler connected to the
Internet
76
9.14.2 Changing the default date and time in a boiler not connected to the Internet
76
9.15 Changing default error lockout time periods
77
9.16 Changing default units of measurement displayed on the controller's screens
77
9.17 Setting the venting material
77
9.18 Programming a replacement touchscreen controller
78
10.0 Troubleshooting
79
10.1 Viewing errors
79
10.2 Clearing errors
79
3
10.3 List of touchscreen controller error messages
79
10.4 Backing up (exporting) error logs
85
10.5 Deleting or clearing an error log
85
10.6 Resetting a boiler after a SIM module ignition lockout
85
10.7 Resetting a boiler after a LWCO lockout
85
10.8 Resetting a boiler after a hi-limit temperature lockout
86
11.0 Definition of terms
87
Appendices
93
Controller Board Layout
93
Internal wiring diagram VX series boilers
94
Wiring diagram - Opt Out DHW
95
Sequence of Operation - VX series boilers
96
Index
97
4
Section: Contents
1.0 Overview of the controller
The controller provides overall management of boiler operations such as self-diagnostics, easy load
parameter adjustments, burner operation, safety management systems, call for heat management and
load priority.
Figure 1 Touchscreen controller's features
* Not applicable to the VX series
** Networking of up to 4 boilers in the VX series
1.1 Controller's menu screens
The diagram below shows the controller's four menu options and associated submenus:
Figure 2 Map of the controller's menus and submenus
6
Section: Introduction and overview of the features in the V10 controller
1.2 Who is the manual for?
While this manual is primarily written for heating professionals, some of the content may be useful for
building managers and homeowners; for example, information about setting overrides.
1.3 Power-up sequence and operational states/cycles
When a boiler is first energized, the controller runs through a power-up sequence that takes
approximately 90 seconds. During this time, the controller completes a self-diagnostic, then loads all
previous settings. When power is restored after a power interruption, the boiler automatically resumes
operation with all the previously stored values.
The controller has five states during normal operation as well as an error state for problem detection:
Figure 3 Stages of controller operation
For a detailed work flow and sequence of operation, see Sequence of Operation - VX series boilers on
page 96.
7
1.2 Who is the manual for?
1.4 Getting to know the controller’s interface
The controller's main screen displays four menus: Home, Setup, Status, and More.
1.4.1 Home
The Home screen displays basic boiler status information such as a title bar
with boiler model number and boiler ID as well as its current operating state.
Other information shown includes the load currently being serviced (if any) and
a list of current operating values. The colored background on the status bar
represents different boiler states (see Status Bar Color on page 12).
If one or more errors occur in the boiler, an "Error Logs" button will display on
the Home screen. You can select the Error Logs button to view the current
error log. You can also view other logs to help detect recurring errors. Once you
have corrected the error(s), you need to clear the error(s) (
> Clear Errors).
This enables you to check for any unresolved errors still present in the system.
1.4.2 Setup
Tip
Our Setup feature is not only a quick way to configure a boiler, but is designed to cover
95% of operational requirements.
Setup walks you through a basic setup of the controller. You can configure a boiler’s parameters
using default values, including all the appropriate values to operate each load type under most
operating conditions. If you wish, you can change these default settings later. For instructions on
using Setup, see Configuring loads using Setup (recommended) on page 49.
In Setup, you can configure up to four loads with the following control modes:
DHW (domestic hot water)
Reset Heating
Set Point
Ext. Control
Zone of
When you select a control mode, the controller automatically loads the appropriate factory default
settings. For more information on control modes, see Operating concepts on page 17.
8
Section: Introduction and overview of the features in the V10 controller
The Status menu displays the following options that enable installers to identify problems:
Boiler Status
Boiler Information
Load Status
SIM Menu
Error Logs
Sensor and Channels
Clear errors
Network Information
1.4.3.1 Boiler Status
The Boiler Status screen lists key operational parameters and their current readings.
1.4.3.2 Boiler Information
Boiler Information lists basic information such as the controller software version and the boiler
model. You can also test fan operation here. For instructions, see Testing the fan operation on
page 69.
1.4.3.3 Load Status
Load Status displays a menu screen with six possible selections to display the current status
details for the four individual loads, operating load statistics, and operational load profiles (graphs)
for each load.
You can view:
Operational information on each load (loads 1-4).
A status screen that lists the run time statistics for the boiler including specifics for each
load.
A load profile screen that displays each load, showing a bar graph profile of the time the
boiler is firing at various throttle levels.
9
1.4.3 Status
1.4.3.4 Safety and Ignition Module (SIM) Menu
The SIM reports sensor readings and information on the status bar. In the controller's SIM
menu, you can:
View Status - Provides an overview of the burner, gas valve, ignitor and venting.
Perform a Hi-Limit Test - Test the maximum supply cutoff temperature on the boiler. If
the SIM detects a high limit temperature, the boiler enters a lockout state. For
instructions, see Testing the Hi-limit temperature function on page 62.
Perform a Module Reset - Lockouts are typically 5 minutes, depending on the ignition
error. Use the Module Reset function to clear a lockout quickly. For instructions, see
Resetting a boiler after a SIM module ignition lockout on page 85.
Perform a LWCO Test - Test the low water cutoff to protect against low water in a boiler.
If the SIM detects low water, the boiler enters a lockout state. For instructions, see
Testing the low water cutoff (LWCO) function on page 62.
Figure 4 Comparing SIM modules
Note
The SIM+ module is installed in SL 85, 115, 160 and 199 G3 boilers as well as in the
VX boilers while the SIM module is installed in the SL 260 G3, SL 399 G3, and EX
series of boilers.
10
Section: Introduction and overview of the features in the V10 controller
About Status indicators
The SIM’s two status LEDs indicate the operating status as shown in the table below.
LED 1
LED 2
State
Description, LED status indication
Rapid Flash
Rapid Flash
Power up or
Resetting
Startup checks and initialization
Off
Off
Standby
LED 1 Off = No Flame or Sparking
LED 2 = Burner-On Call state
Off
On
Pre-Purge
or Inter-
Purge
LED 1 Off = No Flame or Sparking
LED 2 = Burner-On Call state
On
On
Heating
LED 1 On = Flame detected
LED 2 = Burner-On Call state
Rapid Flash
On
Igniting
LED 1 flashing = Electrode Sparking
LED 2 = Burner-On Call state
Off
Flashing
Lockout
An operating limit was exceeded or a sequence
failed or an external sensor fault was detected.
Flash
Alternately
with LED 2
Flash
Alternately
with LED 1
Fail-Safe
A critical internal fault was detected. Fail Safe
requires a power cycle.
Table 1 LED status indicators
1.4.3.5 Error logs
The controller records all errors present at the time of an error event in a log.
These logs date back to the original power-up, organized by date, time,
classification, and type. For every error record, there is a "Details" button that
provides:
Minor errors. An abnormal condition exists that does not present an
immediate safety hazard.
Major errors. A condition exists that may be a safety hazard. The boiler
enters an extended purge then the fan and pump are stopped. The boiler
must be checked and restarted. Exception: The Ign. Trials Exceeded
error will time-out for one hour before the system attempts re-ignition.
11
1.4.3 Status
System faults. Faults typically related to the touchscreen controller.
SIM Status. Operating SIM status errors. See About Status indicators on page 11.
On the Error Logs screen, you can:
View one or more errors. See Viewing errors on page 79.
Clear errors. See Clearing errors on page 79.
Save an error log to an SD card or USB stick. See Backing up (exporting) error logs on
page 85.
Delete or clear all entries in an error log. See Deleting or clearing an error log on page 85.
1.4.3.6 Sensors and Channels
This screen provides information screens on:
Sensors - The Sensors status screen displays the current active value for each of the
temperature and pressure (e.g., water flow rate, VS load duty cycle and the altitude)
sensors. If a:
Temperature sensor is not connected to the controller the text ‘n/c’ is displayed.
Pressure sensor is not connected to the controller, ‘0’ is displayed.
ATD Channels - (Analog to-Digital conversion) Lists the raw, unfiltered input values from
the analog inputs.
1.4.3.7 Clear Errors
Errors are triggered when a sensor detects that the boiler is operating outside its limits. If more
than one error/alarm is present, the status bar slowly rotates though the various alarm states.
Status Bar
Color
Description
Green
Normal state - boiler is operating within its limits.
Yellow
Warning error - When the controller detects an error.
Red
Alarm - Unresolved condition or error detected while the boiler is firing or
preparing to fire that results in the boiler shutting down and entering a lock-out
state. To change these error lockout periods, see Changing default error
lockout time periods on page 77.
For minor errors, the boiler will lock out for 5 minutes, and then attempt
to restart automatically.
For major errors, the boiler will lock out for 60 minutes after 3
unsuccessful ignition attempts, and then attempt to restart.
Table 2 Status bar background colors
12
Section: Introduction and overview of the features in the V10 controller
Note that "System" errors do not typically result in a boiler lock-out state. If the controller detects a
single "system" error, it will typically continue operation, recording the event in the controller's error
log. For more serious "system" errors, or if many system errors occur within a short period of time
(about 10 seconds), the controller will treat the event as a major error, or will restart to try to clear
the problem.
Tip
Once the errors have been rectified, we recommend clearing errors using the "Clear
Errors" button on the Home screen because it is faster than a power cycle.
1.4.3.8 Network Information
The Network Information screen displays setup information related to:
Internet connectivity such a boiler's IP address and MAC address. For instructions on
connecting a boiler to the internet, see Optional - Setup for Internet access on page 65.
Internet data networks (BACnet) (not applicable for the VX series of boilers).
Multiboiler networking (Boiler ID, Master boiler, network ID, available boilers online in a
network, and network boilers that are firing).
1.4.4 More
When you select the More menu, you will be provided with options that enable you to configure the
boiler.
User Settings
Advanced Setup
Test Operation
System Settings
Network Settings
Installer Options
Engineer Options
13
1.4.4 More
1.4.4.1 User Settings
This screen enables the user (installer, homeowner, site manager) to set or adjust:
Date & Time - Choose NTP Server or Internal. The controller must be
connected to the Internet for the NTP Server selection to work
properly. For instructions, see Changing and updating date and time
on page 76.
Overrides - Typically, temperature overrides for a load are used to
reduce temperatures during night-or-away hours to achieve fuel
savings. Conversely, you can use overrides to increase temperatures
for defined time periods in a day. This may be useful for certain
commercial applications where short-term high temperature DHW
service is desired. If using temperature overrides:
For Reset Heating loads, the Indoor Setpoint temperature setting is overridden for
the programmed time periods.
In setpoint loads, the Boiler Supply temperature setting is overridden.
In DHW loads, the DHW Tank Setpoint is overridden. The DHW Boiler Supply
temperature is also overridden to keep the difference between the Boiler Supply
and the DHW Tank Setpoint temperature the same when the override is in effect.
Note
The automated override feature will not work for DHW with simple
aquastat control where the DHW Tank Setpoint temperature has no
effect.
For instructions, see Setting overrides on page 72.
Backlight - Set the level of screen brightness to suit the lighting in the space. And to
save power, you can set the DIM time that controls how long the screen remains lit after
touch screen interaction.
Units - Configure which units of measurement (metric or imperial) are displayed in the
controller's screens (see Changing default units of measurement displayed on the
controller's screens on page 77).
Clean the Screen - Enables the touchscreen to be de-activated (will not respond to
touch) for 60 seconds while the screen is being cleaned. Care must be taken not to
scratch the screen while cleaning. Spray cleaning solution on a damp soft cloth, not
directly onto the screen.
14
Section: Introduction and overview of the features in the V10 controller
1.4.4.2 Advanced Setup
Advanced Setup provides access to the full functionality of the system for the
advanced installer. Installers can access and configure the following:
Loads 1-4: Assign load types to up to four Loads. For instructions on
assigning one or more loads, see Settings loads on page 49.
Multiboiler: Set up a boiler to operate as part of a group of boilers (multi-
boilers) at a site. For instructions on how to set up multiple boilers, see
Configuring multiple boiler systems on page 57.
Load Combining: Set up two loads of compatible temperature to run
simultaneously. For information on this feature, see Combining loads on
page 26. For instructions on setting up two loads, see Combining two
loads to service two loads at the same time on page 55.
1.4.4.3 Test Operation
In the "Test Operation" screen, you can test the fan operation and check the venting for any
blockage or leakage. The "Fan Test Heat Out" entry box allows the fan to be activated
independently and set to speeds corresponding to the entered Heat Out value. You can use the
"Fan Test Heat Out" feature when a boiler is not heating. If the boiler is heating, you can check that
the heat output values correspond. For example, for all models (excluding the G3 models), the fan
heat output MBtu should be close to the heat output. For instructions, see Testing the fan operation
on page 69.
1.4.4.4 System Settings
The System Settings screen provides the following options:
Site Settings. Use to access generic boiler operating parameters that
are not specific to a load. Parameters include load control types (pumps
or control valves), boiler pump purge time, manual pump purge, and the
variable speed (VS) output control settings. For instructions, see
Performing a manual pump purge on page 71.
Licensing. Use to activate special add-on software packages such as
BACnet.
Backup and Restore. Use to back up or restore the boiler’s complete
controller configuration and settings to/from a USB memory stick or SD-
card inserted into the controller. For instructions, see Backing up and
restoring a boiler's configuration and settings on page 74.
Software Update. Use to update the controller’s software via an SD memory card, a USB
memory stick or via the Internet. For instructions, see Updating boiler controller software on
page 67.
15
1.4.4 More
Restart Boiler. Use to initiate a full boiler controller restart that takes approximately two
minutes to complete. If you have replaced a fan or performed a software update, you can
calibrate the fan via this option. For instructions, see Calibrating the fan on page 71.
Reset Factory Defaults. Use to restore all operating parameters to factory default
settings. Settings that will not be reset include network, Date and Time, error logs and
operating history (see Resetting configured settings to factory defaults on page 75).
1.4.4.5 Network Settings
This screen is used for:
Assigning boiler IDs and other network setup to support multiboiler operation. Note that
you can also assign boiler IDs for master and subordinate boilers in the Advanced Setup
> Multiboiler screen (see Configuring multiple boiler systems on page 57).
Registering for access to the IBC V10 Internet Portal (see Optional - Setup for Internet
access on page 65).
Setting up a master boiler to control 5-button controllers via BACnet (see Using the
master to control a group of IBC boilers with 5-button-type controllers via a BACnet
gateway on page 60).
Enabling communication between a boiler and an air handler. Enables an air handler to
transmit the indoor and outdoor temperatures to an IBC boiler for controlling its reset
heating curve. See Setting up an IBC air handler to send data to an IBC boiler to control
its reset heating curve on page 60.
1.4.4.6 Installer Options
For the advanced installer, "Installer Options" (password protected) provides options to:
Perform troubleshooting adjustments in the field such as adjusting the
firing rate (see Limiting the minimum and maximum firing rate of the
boiler on page 71).
Calibrate the touchscreen. Over time the touch pad calibration can
drift slightly resulting in the touch locations being out of line with the
displayed touch points such as buttons or entry boxes. Touchpad
calibration resolves these alignment issues.
Enable user lock. Restricts access to areas in the controller with
password protection. See Restricting access to areas in a controller
on page 75.
1.4.4.7 Engineer Options
This option is password protected, reserved for IBC’s technical support staff for troubleshooting
boilers connected to the IBC V-10 portal.
16
Section: Introduction and overview of the features in the V10 controller
2.0 Operating concepts
This section contains important information about the control strategies used in the controller to deliver
space heating, domestic hot water (DHW), pool heating, garage heating, and snow-melting. Depending
on heating requirements, strategies will include the use of these control modes: DHW, Reset Heating,
Setpoint, Ext. Control, and Zone Of.
Other topics covered relate to multi-load systems that can have varying temperature loads: low
temperature loads and loads with high thermal mass. Topics include the controller's load priority, load
combining, and supply differentials - rules, logic, and settings used to provide added levels of protection.
All load settings come with factory defaults. You can change these defaults to suit the application and
heating requirements.
2.1 Domestic hot water (DHW)
In a single boiler, the system gives priority to servicing a call for DHW before switching to other loads
to service calls for heat (see Setting load priority on page 24). In two-sided piping, DHW mode operates
by simultaneously turning off the boiler pump and turning on the DHW boiler pump, diverting fluid flow
and heat production directly to the tank; the same applies to one-sided piping if all loads are 'off' on the
boiler loop, and "Boiler pump" is set to "On" in the DHW load.
Default settings for the DHW load are suitable for residential applications. It may be necessary to
change these settings to satisfy commercial requirements.
For information on wiring DHW, see Sensors on page 41.
2.1.1 DHW opt out in a multiple boiler network
Note
If a DDC system or other external control is used to operate individual boilers, the DHW opt-
out feature is unavailable.
When set as a dedicated DHW load, an indirect storage water heater can call up a boiler to "opt out" to
service DHW. In a multi-boiler network, one or more dedicated DHW boilers can be programmed to
"opt out" of the heating load, enabling the remaining boilers to continue heating uninterrupted. Multiple
DHW opt-out boilers can respond to a high demand in DHW in buildings with multiple bathrooms, for
example. If opt-out boilers are in the process of making DHW when the master boiler receives a
setpoint or heating call, other subordinate boilers on the network will switch to servicing that load.
DHW "opt-out" boilers cannot be configured as the master boiler without DHW operation disrupting the
boiler network. Opt-out loads are programmed on the opt-out subordinate boilers only. When an opt-out
load is active, the boiler is not available to the network, and will switch on the opt-out pump directly.
2.2 Reset heating
In a typical hot water heating system, a thermostat in a building signals a call for heat, causing the
boiler to circulate hot water to that space until the thermostat setting is reached. This can be
inefficient, requiring several burn on/off cycles, which may overshoot or undershoot the
requirement, due to heat loss and outdoor temperature variation. That is, the amount of heat lost in
a building changes according to the outdoor temperature. And the greater the difference between
the temperature inside and the temperature outside, the greater the heat loss.
Figure 5 Heat loss vs outdoor temperature
The controller's Reset Heating or outdoor reset mode is a way of balancing the heat lost in a
building with the heat supplied to the building. The Reset Heating mode uses a temperature
management algorithm to automatically adjust or "reset" the supply/outlet water temperature to
compensate for the differing rates of heat loss that a building experiences as the outdoor
temperature changes.
Note
Reset Heating mode requires the installation of an outdoor temperature sensor (supplied
with boiler).
The controller's default Set Point mode sets the boiler temperature to accommodate the estimated
coldest day of the year. However, the controller's Reset Heating mode will promote energy savings
by adjusting the higher setting down based on the outdoor temperature at any particular time of day.
When applied to IBC's condensing boilers, the Reset Heating mode enables efficiency benefits by
lowering the required circulating water temperature, so that cooler water returns to the boiler
(promoting more condensation). Its temperature control uses lower water heating temperatures for
outdoor temperatures above the coldest day expected.
18
Section: Operating concepts
The Reset Heating mode provides a greater degree of heating efficiency and comfort compared with
Set Point heating, which relies on the temperature of the return water to fire or shut down.
Figure 6 Potential heat loss from house
Ensure that the outdoor sensor is appropriately located, typically on the north face of the building away
from any heat source. If there is no signal from the outdoor sensor, the controller assigns a default 32
°F/0 °C value for the outdoor design temperature, and adopts the appropriate temperature target from
the relevant reset curve.
IBC's controller offers two reset heating methods for controlling the supply/outlet water temperature:
1. "Standard" reset heating (default) that uses a two-point reset heating ratio.
2. Advanced reset heating that uses a characteristic reset curve ratio.
2.2.1 Standard reset heating (default)
Standard reset uses two points in the reset heating ratio to determine the outlet water temperature.
The illustration below shows the relationship of the two points: The supply/outlet water temperature
will rise linearly with a decrease in the outdoor temperature until the coldest expected temperature is
reached, called the "Design Outdoor" temperature setting. The supply/outlet water temperature
changes based on the straight line between the two points.
19
2.2.1 Standard reset heating (default)
Figure 7 Standard "straight-line" reset heating
To determine these two points, and for the system to accurately control the supply/outlet water
supply, set the:
Design Supply ° – defines the desired boiler outlet water temperature to occur on the
coldest day for the building location. Corresponds to the Design Outdoor air temperature
appropriate for the geographic location. Consult the ACCA manual J to calculate the
Design Outdoor air temperature to perform heat loss calculations and to determine the
heating loads of the home or building.
High Limit° - defines the highest (maximum) water temperature allowed to prevent
overheating, or damage to piping or flooring.
Minimum Supply° - defines the minimum starting supply/outlet water temperature.
Summer Shutdown°- defines the cut-off level for outdoor temperature that prevents further
heating. The boiler ignores a call for heat.
We recommend using "Setup" to program standard reset heating. For a list of standard reset
heating settings, see Operational settings in the Setup menu: temperature ranges and defaults on
page 30.
Note
Thermostats and zone valves - Typical room thermostats simply provide a call for heat.
They do not control the circulating water temperature from the boiler. Adjustment of a
room thermostat from 72 °F/22 °C to 86 °F/30 °C will make no difference to the
delivered temperature if the floor slab has stabilized at the boiler temperature
determined by the reset curve.
20
Section: Operating concepts
2.2.2 Advanced reset heating
Advanced Reset heating offers greater control of air temperature in a building, and can be more
accurate than standard reset heating. More parameter settings are available that allow the reset
heating curve to extend down to much lower target supply water temperatures. This is useful for
radiant heat emitters such as floors.
Configure Advanced Reset via Advanced Setup >set up a load as Reset Heating> Choose an
emitter > OK>Scroll down to Advanced Reset > tap Off > then On > Save. A list of all available
settings for Advanced Reset appear. For a list of advanced setup settings, see Operational settings in
the Advanced Setup menu: temperature ranges and defaults on page 32.
Below is an illustration of how different emitters determine the characterized heating "curve" by
delivering heat to an area at a different rate or amount as the outdoor temperature changes.
Figure 8 Characterized heating curve in advanced reset heating
Fin-tube baseboard
IBC Air handler
Cast iron radiator
Low mass radiant floor
High mass radiant floor
21
2.2.2 Advanced reset heating
To establish or "characterize" a heating curve to an application to deliver a more accurate level of
heating, specify the following:
Type of emitter - Once the emittter is selected the controller loads the factory defaults.
Design Supply ° – the desired boiler outlet temperature to occur on the coldest day. Use
this temperature when performing heat loss calculations.
Design Outdoor ° – the coldest expected outdoor air temperature typically experienced at
the installation site. Use this temperature when performing heat loss calculations.
Design Indoor ° - the desired and comfortable temperature to be maintained in the space or
building. Use this setting when performing heat loss calculations.
The Indoor Setpoint °- the lowest supply target temperature corresponding to the Design
Indoor temperature. Indoor Setpoint° can be set to the same temperature as the Design
Indoor°. Adjust the setting up or down to increase or reduce heating and to "fine tune" for
the most comfortable indoor temperature.
Tip
To increase heat, use the Indoor Setpoint° setting to adjust the water outlet
temperature, not the Design Indoor temperature setting.
Summer Shutdown - cut-off temperature level for further heating. We strongly recommend
using this feature with a value 5 °F-10 °F/3 °C-6 °C below the Indoor Setpoint ° to avoid
short cycling of the boiler during very low heating conditions. The controller must receive a
valid signal from the outdoor sensor, supplied with the boiler, for Summer Shutdown to
operate correctly.
When defining the above settings, factor in space or building heat loss. See also Setting the
supply differential in heating modes on page 29.
2.3 Set Point
Set point refers to the temperature set in the controller, not to the temperature read from a room
thermostat. Since the set point is measured at the temperature of water flowing (outlet) from the
supply temperature to the boiler, and not from the air surrounding a wall thermostat, the boiler may
shut down, thinking it has satisfied the set point while the required wall thermostat temperature may
not have been met.
22
Section: Operating concepts
The controller's reset mode adjusts the circulating
water temperature to maintain a steady and
comfortable indoor temperature. Indoor temperature
is compared with the preset operating range (set
point target), and if the temperature deviates (as
sensed by the room thermostat), the controller will
bring the temperature back to the set point limits.
For example, if the room temperature is 65°F and
the set point target range is 70°F-80°F, then the
controller will work to raise the room temperature
back to within that set point range. Since set point
regulates the target temperature based on the room
thermostat, an outdoor sensor is not required.
Figure 9 Controller compares set point target with
indoor temperature
To program the set point target range, set the:
Boiler Supply° – desired or fixed supply/outlet water temperature.
Maximum Supply° – the highest water temperature allowed to prevent overheating of the outlet
water temperature. Check that this temperature takes into account the construction and safety
requirements of each application (e.g., 140 °F/ 60°C maximum for in-slab radiant floor to avoid
thermal stress).
Supply Diff'l (differential) - Set the differential to prevent short cycling. The boiler will shut off
when the boiler supply water temperature minus half its differential falls below the boiler
Current Target°. The boiler will fire when the boiler supply water temperature plus its
differential rises above the boiler Current Target°. See Setting the supply differential in heating
modes on page 29.
Summer shutdown° - The cut-off temperature level that prevents further heating. Boiler ignores
a call for heat.
2.4 External Control
You can place the control of a load under an external electronic controller (such as a building
management or automation system). In external control mode, temperature management is controlled
by the building management system (BMS), consisting of one or more control panels wired to various
sensors and valves in a building. The BMS will determine the desired boiler set point for any given
building occupancy parameters.
23
2.4 External Control
When setting a load in external control mode, there are some key settings:
Set the boiler's maximum boiler supply and on/off differential temperatures. The boiler treats
these as high limit switches.
Burner On From - Use a thermostat or external control to control the supply of heat.
For guidance on wiring, see External control on page 42. For setup instructions, see Setting up an
external control load on page 53.
2.5 Zone Of
Boiler zone control enables you to set different spaces in a building with particular temperatures. If
you want different rooms or zones in a building to have the same temperature use the "Zone Of"
mode. This mode syncs the temperature, so that the temperature load settings in one area match
the "zone of" another area. These temperature load settings include matching load priority, target
and differential temperatures. If two rooms or zones in a building have different temperatures, use
the "load combining" strategy (see Combining loads on page 26).
Note
"Zone Of" is not available until one or more active loads have been set up in the system.
Zoned loads can operate independently or simultaneously.
You can use this method of zone control to maximize energy costs. For example, you can zone
bedrooms that need lower room temperatures to match another area in the house that is set at a low
temperature. For instructions on setting "Zone Of", see Syncing zones with "Zone Of" on page 51.
2.6 Setting load priority
Boiler load is the total "work" performed by a boiler. IBC's controller uses a priority algorithm to
coordinate or schedule the delivery of heat in multiple load systems. This type of planning strategy
temporarily turns off one or more loads based on given conditions in the system. As an example,
an intermittent heating load (e.g., space heating) is suspended until a call for a DHW load has
been satisfied. Loads declared as DHW receive significant, but not absolute priority.
Multiple heating loads of varying temperature targets run in sequence with the use of a mixing
valve. Each load is serviced at the minimum possible temperature, as opposed to running hot then
mixing down (with hardware). Consider Combining loads on page 26.
24
Section: Operating concepts
If using Setup, load priority is simplified with options "very low",
"low", "high" or "very high". There's more precision in Advanced
Setup, where you can enter numeric values between 20 and 90 for
a priority load. Note: The priority value has to be different for each
load, but the priority scale values do not need to add up to 100 –
they are relative only to each other. A higher numerical value
means a higher priority.
Consider priority values as minutes. The difference between two
load priority values is the number of minutes the higher priority
load will operate before switching back to the lower priority load.
For example, if DHW has a priority of 86 and the Set Point load
has a priority of 62, the DHW load will run for (86-62) 24 minutes
before switching to the simultaneously calling Set Point load.
Following the initial cycle, the competing loads will switch back
and forth after a further 10-minute interval pending satisfaction of
one or both loads.
Figure 10 Default priority values by load type in Installer Settings
Note
Ensure that loads are set with a minimum of 15-minute differential between competing
loads.
Example: If baseboards (set up with Reset Heating as Load 3) are not providing the desired
heat, you can bring on baseboard run time sooner by increasing the priority value relative to the
other declared loads (e.g., changing the Load 3 preset value from 43 to 50 or reducing another
load’s value). Temperature targets for the under-served load can also be raised, in this
example.
To cause repeated unequal run times; for example, constant 35 vs 5-minute runs, you need to
integrate an external load removing relay or timer on one of the heat calls. Do not set each load
to the top value, and avoid equal ratings.
25
2.6 Setting load priority
2.7 Combining loads
As a control strategy, load combining is used when two rooms or zones in a building have different
temperatures. Running two loads at compatible temperature settings at the same time provides
added efficiency and heating comfort. This feature allows two compatible loads to run
simultaneously; that is, they are "combined" to service their loads at the same time. To set
different rooms or zones in a building with the same temperature, see Syncing zones with "Zone
Of" on page 51.
The main principle for load combining is that the target temperature and the load’s minimum and
maximum supply temperatures (+/- differential temperature) in the primary and secondary loads
must overlap. With the boiler’s load priority scheme, load combining functions only while the
primary load is the active load. Note that any system or load temperature limits will still be in
effect.
In load combining there are two modes: Basic mode and Full mode. Basic mode should cover
most of the load combining applications. Use the full mode when the load is not using a mixing
valve. Suppressing the higher temperature rather than overshooting the lower temperature may be
required.
Note
For Reset Heating or External Control loads, the target temperature is dynamic.
Therefore, it is possible that as outdoor and/or indoor temperatures change, reset and
external control heating loads could switch in and out of compatible temperatures.
For instructions on using the Load Combining feature, see Combining two loads to service two
loads at the same time on page 55.
2.7.1 Basic mode load combining (default) - recommended
Basic (simple) mode allows any two of the four loads to be combined together by setting a
primary and secondary load.
Parameter
Default
Minimum
Maximum
Primary Load
Disabled
Load 1
Load 4
Secondary Load
Disabled
Load 1
Load 4
The boiler supplies a target water temperature based on the highest water temperature required
between both loads.
26
Section: Operating concepts
Let’s say a radiant floor is set at 120 °F and an air handler is set at 160 °F. When both load
types call for heat, the boiler will supply 160 °F. If only the load for radiant floor is calling, the
boiler will supply water temperature at 120 °F.
2.7.2 Full mode load combining
In Full mode load combining, there are six default parameter settings:
Parameter
Default
Minimum
Maximum
Primary Load
Disabled
Load 1
Load 4
Secondary Load
Disabled
Load 1
Load 4
Initial Delay
5 mins
2 mins
15 mins
Off Delay
5 mins
2 mins
15 mins
Retry Delay
10 mins
5 mins
60 mins
Maximum Throttle %
75 %
50 %
90 %
Primary
Load -
Highest
temperature
Set as the load that will control the boiler operation while Load Combining
is active. This load must have a higher initial priority than the Secondary
Load, and should have a higher water temperature requirement.
Secondary
Load -
Lowest
temperature
Set to the load that will be serviced simultaneously, in combination with the
Primary Load, if the conditions for Load Combining are met; that is, if the:
- Supply temperature requirements for the Primary Load are being met;
- Supply temperature is within the temperature range requirements of the
Secondary Load and the boiler has the capacity to service the Secondary
Load as determined by the Maximum Throttle % setting.
Initial Delay
The number of minutes after the Primary Load must initially be serviced
before the boiler can add the Secondary load. Allow sufficient time for the
Primary Load to stabilize before the boiler adds the Secondary load.
Off Delay
When the secondary load is added into combination service the supply
temperature should fall briefly below the allowed temperature range for the
Primary load. The Off Delay is the number of minutes after the loads have
been initially combined that the loads will continue to be combined
regardless of an under-temperature condition. Allow a long enough delay to
allow the boiler to drive the supply temperature up within the Primary load’s
27
2.7.2 Full mode load combining
target supply temperature range. The loads will be uncombined if the under
temperature condition persists after the Off Delay time. If the supply
temperature exceeds the requirements for either the Primary or Secondary
loads, the loads will no longer be combined.
Retry Delay
If the boiler removes the Secondary load from combined service because
load combining conditions are not followed, the Retry Delay is the number
of minutes the boiler waits before attempting to add the Secondary load
back into combination service.
Maximum
Throttle %
Maximum (percentage) of the boiler’s heat output below which load
combining is allowed to begin. If set at Maximum Throttle 75% for
example, the throttle needs to be operating at below 75% of the boiler's
heat output before the Secondary load is added into combined service. The
Maximum Throttle % has no effect once the loads have been combined.
Table 3 Default parameter settings in full mode load combining
Example of compatible load combining
Primary Load 140 °F to 180 °F
Secondary Load 150 °F to 170 °F
Initial Delay: 5 mins
Off Delay: 5 mins
Retry Delay: 10 mins
Maximum Throttle %: 75 %
The boiler will wait a minimum of 5 minutes (initial delay) after it begins servicing the
Primary load before adding the Secondary load.
The supply temperature must be between 150 °F and 170 °F (the compatible
temperature range for both loads), and the throttle is below 75%, before the secondary
load is added.
If the supply temperature rises above 170 °F, the load is dropped.
If the supply temperature is/or drops below 150 °F after the 5-minute "Off Delay", the
secondary load is also dropped.
If the secondary load is dropped, the boiler waits a minimum of 10 minutes (Retry
Delay) before attempting to add the Secondary load again. At this time, the supply
temperature must be between 150 °F and 170 °F.
28
Section: Operating concepts
Example of incompatible load combining
Primary Load 140 °F to 180 °F
Secondary Load 120 °F to 140 °F
Initial Delay: 5 mins
Off Delay: 5 mins
Retry Delay: 10 mins
Maximum Throttle %: 75 %
The secondary load temperature range of 120 °F to 140 °F is outside the range (does not overlap)
with the Primary load's supply temperature range of 140 °F to 180 °F. Load combining will be ignored,
and the loads sequentially serviced according to the system's priority rotation. "Not compatible" is
displayed on the Load Combining screen.
2.8 Setting the supply differential in heating modes
An on/off appliance, such as a boiler, must be operated with a differential to prevent short cycling.
When the supply water temperature drops below the low limit of the differential, the appliance is turned
on. The appliance continues to run until the temperature reaches the upper limit of the differential. If the
differential is set too wide, there can be large temperature swings, and if the differential is too narrow,
the appliance short cycles and operates inefficiently. To prevent short cycles and component wear-
and-tear, and to maintain boiler efficiency, you should set a differential.
Figure 11 Boiler turns on/off according to differential high and low limits
A differential is based on a boiler’s target temperature. For example, a boiler that has a target
temperature of 150°F will have a differential of 20° F (160° F being the half differential above the target
temperature and 140° F being the half differential below the target temperature). The boiler will shut off
when the supply water temperature is half the differential setting below the target temperature. It will
open when the supply water temperature is half the differential setting above the boiler target.
29
2.8 Setting the supply differential in heating modes
When you set the differential, check that the Maximum Supply ° is higher then the boiler supply plus
half its supply temperature differential to ensure the maximum supply takes account of the
construction and safety requirements of each application (e.g., 140 °F/60 °C maximum for typical
in-slab radiant floor to avoid thermal stress).
Ensure the range between the boiler supply and maximum supply temperatures is greater than one
half of the Supply Diff'l°. Suggested Supply Diff'l° settings: High mass radiant - 20 °F/11 °C.
Example: For radiant floor - Design Supply° is 125 °F, Maximum Supply° is 140 °F, and
Supply Diff'l° is 20 °F (half of which is 10 °F) works well.
For DHW, there is only one differential setting below the target temperature. For example, if the
target temperature for the DHW is 135 °F, the differential below the target temperature will be 125
°F.
2.9 Operational settings in the Setup menu: temperature
ranges and defaults
Operational settings in the Setup Menu
Mode
Setting
Description
Temp.
Range
Default
DHW
Tank
Setpoint°
Target temperature of DHW
95 °F-160 °F 140 °F
Boiler
Supply°
Target outlet water temperature
95 °F-185 °F 170 °F
Maximum
Supply°
Temperature limit to prevent overheating of
outlet water temperature
41 °F-190 °F 190 °F
Priority
Priority of the DHW load against other loads Very Low-
Very High
Very High
Pump Post
Purge
Time (seconds) the pump will operate after
satisfying call for DHW
0-900
seconds
180 secs
Boiler Pump See Boiler Pump on page 87.
On-Off
On
30
Section: Operating concepts
Operational settings in the Setup Menu
Mode
Setting
Description
Temp.
Range
Default
Reset
Heating
Emitter
Enter the device type used to emit heat:
high mass radiant system, low mass radiant
system, air handler, cast radiator, or
baseboard.
high mass
radiant
system
Design
Supply°
Desired boiler outlet temperature on the
coldest day
95 °F-185 °F 125 °F
Maximum
supply°
Maximum water temperature limit to prevent
overheating
41 °F-190 °F 140 °F
Minimum
Supply°
Starting outlet water temperature
70 °F-147 °F 80 °F
Design
outdoor
-76 °F-86 °F
14 °F
Priority
Priority of the Reset Heating load against
other loads
Very Low-
Very High
Low
Pump post
Purge
Time (seconds) the pump will operate after
satisfying call for heat
0-900
seconds
0
Summer
Shutdown°
Cut-off level for outdoor temperature that
prevents further heating
32 °F-122 °F 65 °F
Setpoint
Boiler
Supply°
Desired or target outlet water temperature
59 °F-185 °F 130 °F
Maximum
Supply°
Temperature limit to prevent overheating of
outlet water
41 °F-190 °F 145 °F
Summer
Shutdown°
Cut-off temperature level that prevents
further heating.
32 °F-122 °F 65 °F
Priority
Priority of the Set Point load against other
loads
Very Low-
Very High
High
Pump Post
Purge
Time (seconds) the pump will operate after
satisfying call for heat
0-900
seconds
0
Ext.
Control
Burner On
From
Type of control used to control boiler supply
of heat.
Thermostat
or Ext.
Control
Thermostat
Max.
Control°
(9.5VDC)
Temperature limit per maximum voltage
sent to the controller
32 °F-185 °F 160 °F
31
2.9 Operational settings in the Setup menu: temperature ranges and defaults
Operational settings in the Setup Menu
Mode
Setting
Description
Temp.
Range
Default
Min.
Control°
(2.1VDC)
Lowest temperature per minimum voltage
sent to the controller
32 °F-185 °F 100 °F
Maximum
supply
Maximum limit to prevent overheating
41 °F-190 °F 180 °F
Failsafe
enable
(if no signal boiler comes on - prevent no
heat occurring and ext. controller failure
Enabled or
Disabled
Disabled
Failsafe
setpoint
86 °F-185 °F 86 °F
Priority
Priority of the call for heat by external
control against other loads
Very Low -
Very High
High
Pump Post
Purge
Time (seconds) the pump will operate after
satisfying call for heat from external control
0-900
seconds
300 secs
Table 4 Temperature ranges and defaults in declared loads - Setup
2.10 Operational settings in the Advanced Setup menu:
temperature ranges and defaults
Operational settings in the Advanced Setup Menu
Mode
Setting
Description
Temp.
Range
Default
Reset
Heating
Current
Target°
95 °F-185 °F 130 °F
Emitter
Type of heating device used to transfer
heat in a building (radiant, air handler, cast
radiator, baseboard)
Boiler Pump See Boiler Pump on page 87.
On-Off
On
Design
Supply°
Desired boiler outlet temperature on the
coldest day
50 °F-190 °F 125 °F
Design
Outdoor°
Coldest expected outdoor temperature
typically experienced at the installation
site. Set the Design Outdoor Air
temperature correctly for the geographic
location; consult a local IBC wholesaler or
the heat loss calculation documentation
used in the design of the heating system.
-76 °F-86 °F
14 °F
32
Section: Operating concepts
Operational settings in the Advanced Setup Menu
Mode
Setting
Description
Temp.
Range
Default
Summer
Shutdown°
Cut-off level for outdoor temperature that
stops further heating
32 °F-122 °F 65 °F
Maximum
Supply°
Highest supply water temperature
70 °F-147 °F 70 °F
Minimum
Supply°
Lowest supply water temperature
70 °F-147 °F 70 °F
Supply Diff'l Boiler will shut off at half differential setting
when supply water temperature is half the
differential setting below the boiler Current
Target° and fire when the supply water
temperature is half half the differential
setting above the boiler Current Target°
3 °F-62 °F
20 °F
Ramp
Speed
See Ramp Speed on page 91.
1-10
3
Priority
See Priority on page 90.
20-90
28
Pump
Purge
See Pump Post Purge (sec) on page 90.
0-900
seconds
0
Indoor
From°
See Indoor ° From on page 89.
Indoor / Sec.
Loop
Indoor
Outdoor
From°
See Outdoor ° From on page 90.
Outdoor,
Sec. Loop,
DHW
Outdoor
Water
From°
See Water° From on page 92.
Outlet, Sec.
Loop, DHW
Burner On
From
Type of control used to control boiler
supply of heat.
Thermostat
or Ext.
Control
Thermostat
Advanced
Reset
Current
Target°
95 °F-185 °F 130 °F
(When
Advanced
Reset
check box
is
checked)
Emitter
Type of heating device used to transfer
heat in a building (radiant, air handler, cast
radiator, baseboard)
Boiler Pump See Boiler Pump on page 87.
On-Off
On
Design
Supply°
Desired boiler outlet temperature on the
coldest day
50 °F-190 °F 125 °F
33
2.10 Operational settings in the Advanced Setup menu: temperature ranges and defaults
Operational settings in the Advanced Setup Menu
Mode
Setting
Description
Temp.
Range
Default
Design
Outdoor°
Coldest expected outdoor temperature
typically experienced at the installation
site. Set the Design Outdoor Air
temperature correctly for the geographic
location; consult a local IBC wholesaler or
the heat loss calculation documentation
used in the design of the heating system.
-76 °F-86 °F
14 °F
Design
Indoor°
This setting only becomes available when
the Advanced Reset check box is
checked. The indoor air temperature used
that factors in the heat loss calculations for
the heating space.
41 °F-95 °F
72 °F
Indoor
Setpoint°
This setting only becomes available when
the Advanced Reset check box is
checked.
41 °F-95 °F
75 °F
Summer
Shutdown°
Cut-off level for outdoor temperature that
stops further heating
32 °F-122 °F 65 °F
Maximum
Supply°
Highest supply water temperature
70 °F-147 °F 70 °F
Minimum
Supply°
Lowest supply water temperature
70 °F-147 °F 70 °F
Supply Diff'l Boiler will shut off at half differential setting
when supply water temperature is half the
differential setting below the boiler Current
Target° and fire when the supply water
temperature is half half the differential
setting above the boiler Current Target°
3 °F-62 °F
20 °F
Ramp
Speed
See Ramp Speed on page 91.
1-10
3
Priority
See Priority on page 90.
Very Low-
Very High
Low
Pump
Purge
See Pump Post Purge (sec) on page 90.
0-900
seconds
0
Indoor
From°
See Indoor ° From on page 89.
Indoor / Sec.
Loop
Indoor
Outdoor
From°
See Outdoor ° From on page 90.
Outdoor,
Sec. Loop,
DHW
34
Section: Operating concepts
Operational settings in the Advanced Setup Menu
Mode
Setting
Description
Temp.
Range
Default
Water
From°
See Water° From on page 92.
Outlet, Sec.
Loop, DHW
Burner On
From
Type of control used to control boiler
supply of heat.
Thermostat
or Ext.
Control
Thermostat
Setpoint
Boiler Pump See Boiler Pump on page 87.
On-Off
On
Boiler
Supply°
Target outlet water temperature
59 °F-185 °F 130 °F
Maximum
Supply°
Temperature limit to prevent overheating of
outlet water
41 °F-190 °F 145 °F
Supply Diff'l Boiler will shut off at half differential setting
when supply water temperature is half the
differential setting below the boiler target
temperature and fire when the supply water
temperature is half the differential setting
above the boiler target
3 °F-62 °F
20 °F
Summer
Shutdown°
Cut-off level for further heating.
32 °F-122 °F 65 °F
Ramp
Speed
See Ramp Speed on page 91.
1-10
7
Priority
See Priority on page 90.
20-90
62
Pump Post
Purge (sec)
See Pump Post Purge (sec) on page 90.
0-900
seconds
0
Water°
From
See Water° From on page 92.
Outlet, Sec.
Loop, DHW
Burner On
From
Type of control used to control boiler
supply of heat.
Thermostat
or Ext.
Control
Thermostat
35
2.10 Operational settings in the Advanced Setup menu: temperature ranges and defaults
Operational settings in the Advanced Setup Menu
Mode
Setting
Description
Temp.
Range
Default
DHW
Boiler Pump See Boiler Pump on page 87.
On-Off
On
Boiler
Supply°
Target temperature for the outlet
95 °F-185 °F 170 °F
Maximum
Supply°
Limit to prevent overheating of supply
water
41 °F-190 °F 190 °F
Supply diff.
Boiler will shut off when the supply water
temperature is half the differential setting
below the boiler target temperature and fire
when the supply water temperature is half
the differential setting above the boiler
target
3 °F-62 °F
20 °F
Tank
Setpoint°
Target temperature of DHW
95 °F-160 °F 140 °F
Tank diff.
3 °F-62 °F
10 °F
Ramp
Speed
See Ramp Speed on page 91.
1-10
7
Priority
Priority of the DHW load against other
loads
20-90
87
Pump Post
Purge
See Pump Post Purge (sec) on page 90.
0-900
seconds
180 secs
Water°
From
See Water° From on page 92.
Outlet, Sec.
Loop, DHW
Outlet
Tank° From
Sec. Loop,
DHW
DHW
36
Section: Operating concepts
Operational settings in the Advanced Setup Menu
Mode
Setting
Description
Temp.
Range
Default
Ext.
Control
Boiler Pump See Boiler Pump on page 87.
On-Off
On
Burner On
From
Type of control used to control boiler
supply of heat.
Thermostat
or Ext.
Control
Thermostat
Max.
Control°
(9.5VDC)
Temperature limit per maximum voltage
sent to controller.
32°F-185°F
160°F
Min.
Control°
(2.1VDC)
Lowest temperature per minimum voltage
sent to controller.
32 °F-185 °F 100 °F
Maximum
Supply°
Limit to prevent overheating of
supply/outlet water
41°F-190°F
190°F
Supply Diff'l Boiler will shut off at half differential setting
when supply water temperature is half the
differential setting below the boiler target
temperature and fire when the supply water
temperature is half the differential setting
above the boiler target
3 °F-62 °F
20 °F
Ramp
Speed
See Ramp Speed on page 91.
1-10
7
Priority
Priority of the call for heat by external
control against other loads
20-90
65
Pump Post
Purge
See Pump Post Purge (sec) on page 90.
0-900
seconds
300 secs
Fail Safe
Enable
See Enable Failsafe SP on page 88.
Enabled /
Disabled
Disabled
Water°
From
See Water° From on page 92.
Outlet, Sec.
Loop, DHW
Water° From
Table 5 Temperature ranges and defaults in declared loads - Advanced Setup
37
2.10 Operational settings in the Advanced Setup menu: temperature ranges and defaults
Wiring and testing must be performed by experienced and trained professionals.
For reference, you can find wiring diagrams for the respective boiler in the Appendices on page 93. This
section includes the following topics:
Boiler pump
Thermostats
Load pumps or valves
Sensors
Alarm contacts
External control
Multiple boilers: wiring and networking
Wiring checklist
Note
For a boiler to fire, it needs an "enabler" across the
load such as a zone valve end switch, thermostat
switch, or jumper.
Figure 12 Controller's wiring strip
3.1 Boiler pump
For VX boilers, wire the boiler pump to its boiler pump harness lead. The image
below shows the boiler pump leads (yellow and white wires) located in the wiring
box behind the controller.
Figure 13 :
Field wiring box with yellow and white wires for primary pump - VX series
3.2 Thermostats
The controller is compatible with most common thermostats including simple single contact types
(for example, a mercury switch) as well as most power-stealing-type thermostats. The standard
connection for common thermostats provides a simple contact closure for the boiler (see the
electrical diagrams in the Appendices on page 93). For example, Therm 1 will activate Pump 1,
Therm 2 will activate Pump 2, etc (see Figure 12 ) .
The Therm. 24Vac (TB2 terminal 5) provides 24 volts AC to all thermostats (up to four). This
connects to the "R" terminal on the thermostat.
Each individual thermostat’s "W" terminal connects separately to one of the controller input
terminals: Therm. 1 (TB2: 5-6); to activate load one, close 5-6, Therm. 2 (TB2: 5-7); to
activate load 2, close 5-7, Therm. 3 (TB2: 5-8); to activate load 3, close 5-8, or Therm. 4
(TB2: 5-9); to activate load 4, close 5-9.
Power stealing thermostats take a small amount of current from the 24VAC to operate their
internal electronics. To complete the 24VAC circuit required to operate power stealing
thermostats, the controller includes an internal 2740 ohm resistor from the thermostat input
to ground.
This internal resistor limits the power available to the thermostat and for some models
additional power is required for proper operation. Thermostats that require this extra amount
of power (for example the Honeywell T8775) will have a resistor available from the
manufacturer capable of supplying the required power.
Connect the power resistor from the thermostat’s input terminal to the Therm. GND (TB2-10)
terminal.
Note
Some thermostats, for example those with WiFi circuits, may require their own 24V
power source.
40
Section: Wiring
3.3 Load pumps or valves
Note that TB1: 9-10 P/V power is prewired with 120VAC.
You can wire up to four load pumps to the load pump terminal labeled P/V1 (Pump/Valve1), P/V2,
P/V3, and P/V4 (see Figure 12 ). The top pair PV/V1 - 1 L(live) and 2 N(neutral) is reserved for Load 1,
the second pair PV/V2 - 3 L and 4 N is reserved for Load 2 etc.
Figure 14 Load pump terminal
The factory has pre-wired the terminal to use a 120VAC power supply, but it can be configured for other
voltage uses in the field. Note that the total loads running should not exceed 10 amps.
Note that any pump being directly switched by an IBC control board must draw less than 4 amps.
3.4 Sensors
Use a thermister (10K ohm type 2 sensor) wired to any of the following sensors at TB2:
Outdoor Sensor - 11 and 12 terminals
Indoor Sensor - 13 and 14 terminals
2nd Loop Sensor - 15 and 16 terminals
DHW sensor - You can use two methods for wiring DHW on a boiler controller:
Aquastat: Set up a call for heat for DHW by using an aquastat that is wired to a Therm 1,
2, 3, or 4 connection (see Figure 12 ).
DHW sensor: Use a DHW thermister (10K ohm type-2 sensor) to connect to the "DHW
Sensor" 17 and 18 terminal connections (see Figure 12 ). With this method, the Therm
connection corresponding to the DHW pump is not used.
41
3.3 Load pumps or valves
3.5 Alarm contacts
The controller provides a relay dry contact connection to indicate the boiler’s alarm state externally.
This can be used, for example, to connect to an external alarm panel or an indicator light. The
terminals on TB3 (see Figure 12 ) supply the wiring connection. To access the TB3 connection,
disconnect electrical power to the boiler, and remove the controller front cover.
The alarm contacts will normally be open
indicating that there is no alarm present. The
contacts are closed when an alarm state is
present and boiler operation has been
disabled. This corresponds to when the boiler
status bar on the display is red. The error that
was detected creating the alarm state is
recorded in the Error Log and displayed on the
boiler status bar.
Figure 15 Location of alarm contacts on front of controller
3.6 External control
Connections are provided at TB2 Ext. Cont. to receive a 0-10VDC or 4-20 mA signal for throttle
management (see Figure 12 ). The default configuration is 0-10VDC (JPA01A installed).
Note
Always disconnect electrical power to
the boiler before removing the circuit
board cover.
Figure 16 Relocating jumper
42
Section: Wiring
To switch over to 4-20 mA (JPA01B installed):
1. Remove the electrical box corner cover and the circuit board cover to access the jumpers on the
lower-right corner of the control circuit board.
2. Use needle-nose pliers to place the plastic jumper tabs.
3. Reinstall the cover, and then restore power to the boiler.
3.7 Multiple boilers: wiring and networking
Caution
Controllers must be powered off during boiler network wiring.
Network wiring should not run parallel to any nearby line voltage wiring.
Networking multiple IBC modulating condensing boilers at a plant site offers tangible energy savings.
Networked boilers produce exceptional "turn down" capability to match any building load demands.
IBC boiler networks are designed for single load applications and certain two-load systems. Three- or
four-load sequences (typically for residential scenarios) are generally not suitable for larger multi-boiler
applications.
You can connect up to 4 IBC boilers in the VX series and up to 24 IBC boilers in the SL G3 series and
EX series to operate as a single heating plant.
Other benefits of networking multiple boilers include:
System redundancy.
Removing a single boiler off-line for servicing without affecting the operation of the other boilers
on the network.
“Opting out” a single boiler from the heating load when called upon for DHW by an individual
indirect storage water heater.
3.7.1 Methods for networking a group of boilers
The methods that can be used for networking a group of boilers include:
1. (Recommended method) An Ethernet switch device.
2. BoilerNet two-wire CAN-bus daisy chain cabling.
3. Standard crossover cable for a simple 2-boiler network. A straight through ethernet cable will
fail. If this method is used, it will not be possible to connect to IBC's V10 portal, which allows
remote access to boilers.
Warning
Disconnect the electrical power to the boiler before removing the circuit board cover.
43
3.7 Multiple boilers: wiring and networking
3.7.2 Internet connectivity
If you build a network that is not connected to the internet, you can still assign manual IP
addresses to each boiler, that is, assign fixed IP addresses. For example, if using the simple 2-
boiler networking method, you will need to assign manual IP addresses to both boilers. For
instructions, see Assigning fixed IP addresses to boilers on a network using a switch not
connected to the internet on page 59.
3.7.3 Ethernet switch device (recommended)
Networking switch devices, purchased from any office supply or computer store, contain
multiple ports that enable you to connect multiple boilers via a network (Ethernet) cable.
Use a parallel Cat 5 cable with the switch device. The cable plugs into
each boiler’s Ethernet jack located at the back of the controller (see
Controller Board Layout on page 93).
3.7.4 BoilerNet two-wire CAN bus daisy chain cabling
Warning
Always power the boilers down prior to working on or installing the two-wire CAN bus.
Failure to do so will destroy the network chips on all the boiler control boards on the
network.
Note
The CAN bus method is suitable for small networks consisting of 2-3 boilers.
The boilers are configured in a daisy chain networked for communication and control via a
proprietary network called BoilerNet.
Use polarity-sensitive twisted 2-wire leads (CAN bus standard) to join one boiler to the next (to a
maximum of 24 boilers). Connection is made between the “Boiler Net” terminals near the base of
the TB2 terminal strip. Wiring between boilers needs to be a sequential “daisy chain” approach
(see Figure 17 ).
44
Section: Wiring
CAN bus interface that
communicates between
boilers.
The wire type and installation must comply with CAN bus standards
such as ISO 11898 and/or SAE J2284.
Cable
Polarity-sensitive twisted 2-wire leads (CAN bus standard) to join
one boiler to the next (to a maximum of 24 boilers). Connection made
between the "Boiler Net" terminals #19 and #20 (see Figure 12 ).
Specifications for the cable:
24 AWG shielded twisted pair
9 twists / ft
Capacitance 12.5pF/ft (cond./cond.)
Resistance 25.5 ohms/1000 ft
Network Wiring
Power down all boilers prior to connecting or disconnecting.
The "Boiler Net +" and "Boiler Net –" are polarity sensitive and
must not be crossed.
Network wiring must only be installed in a "Daisy Chain"
arrangement where network wiring goes from the first boiler to
the second to the third to the fourth, and so on.
If using shielded pair wire, ensure the shielding is only
grounded at one end of the "Daisy Chain". If the shielding is
grounded in multiple locations (i.e. at each boiler or at the first
and last boiler,) the shielding becomes ineffective and in some
cases increases the electromagnetic interference affecting
the communication signal.
The termination jumper (JA02) needs to be removed from the boiler
controller boards that are NOT the first or last boiler in the BoilerNet
chain. For example, in a two-boiler network, JA02 must be left
installed in both controls, and in a three-boiler network, the JA02
must be removed on the middle boiler only.
Terminators
Terminators must be removed from the middle boilers, and the wire
polarity must be correct at all the boilers.
Table 6 CAN bus setup requirements
45
3.7.4 BoilerNet two-wire CAN bus daisy chain cabling
3.7.4.1 Removing jumpers when networking three or more boilers
When three or more boilers are networked, removal of a circuit board jumper is necessary (as
illustrated below). Note on the illustration that you must not remove the jumpers from the boilers on
both ends of the networked boiler system.
Caution
Failure to remove the required jumpers may cause network instability.
Figure 17 Circuit board jumper removal
To remove jumpers:
1. Turn off power to the boilers.
2. Remove the control board covers from each intermediate
(non-terminating) boiler in the array.
3. Locate the jumper clips at the bottom right of the circuit
board. There are two of them. The jumper for configuring
multi-boiler operation is the JA02 shown in the drawing
below.
4. Pull this jumper clip straight away from the two pins on the
circuit board, and store it somewhere safe in case it might
be needed in the future. Common practice is to place it so
that it hangs onto the bottom pin only.
5. Replace the control board covers, and restore power to the boilers.
Figure 18 Jumper A02
46
Section: Wiring
3.8 Wiring checklist
The following provides useful checks to confirm that wiring is successful.
Checklist for Wiring
Check
Ensure the appropriate loads are set to "Off" or to an appropriate load type.
□
Ensure the pumps cycle on or off as expected.
□
Check for poor connection or voltage problems from flickering screens or intermittent calls
for heat.
□
An Ethernet cable is installed if requiring Internet for connection to the IBC V10 portal.
□
Ensure the DHW sensor is fully immersed in the well to prevent tank overheating.
□
Verify the sensor to control the DHW is fully engaged in terminal 17 and 18 (DHW).
□
If three or more boilers are networked using CAN bus, ensure that you have removed
appropriate jumpers from the center boilers. For instructions, see Removing jumpers when
networking three or more boilers on page 46.
□
47
3.8 Wiring checklist
4.0 Settings loads
IBC boiler networks are designed for single-load applications and certain two-load systems. A three- or
four-load sequential management strategy, popular on single boiler residential systems, does not
typically scale up to larger multi-boiler applications. Large systems imply significant thermal masses
that generally cannot change temperature quickly.
The IBC controller can control up to four load pumps that are zoned for the same temperature. However,
for multiple-temperature applications, you should use external mixing valves or injection control for
cooler demands, or IBC’s "Opt-out" strategy (for a description of the "opt out" feature, see Domestic hot
water (DHW) on page 17).
Note
For multi-boiler systems, you must configure the boiler network configuration before setting
loads. For instructions, see Configuring multiple boiler systems on page 57.
1. Leave loads in subordinate boilers set to Off (see Opt-out section for exceptions).
2. Set up and configure heat loads on the master boiler only. Use the Advanced Setup
menu to specify:
A set temperature (Setpoint) or
The reset heating curve.
The boiler will supply the "Design Supply Temperature" on the coldest days of
the year (as defined by the "Design Outdoor Temperature" appropriate to your
area; contact your heating wholesaler or contact IBC if unsure of this value).
The target temperature will change according to the outdoor sensor inputs.
IBC's controller is programmed with default settings and parameters typical of standard installation
conditions. You can use one of two methods for setting up loads:
Setup (recommended method) is a quick method for setting all the necessary parameters for
most single-boiler installations.
Advanced Setup is recommended for the advanced installer. For instructions, see Setting loads
using Advanced Setup on page 52.
4.1 Configuring loads using Setup (recommended)
As the boiler controller is equipped to automatically detect altitude this value will be set for you (see
> System Settings > Site Settings > Altitude).
Note
Zone Of is not available as an option until you have programmed a load with one of the
other control modes.
4.1.1 Configuring a load on a boiler
The "Select a load" menu screen appears displaying four possible loads. All loads are set to "Off"
to allow the system to be programmed to correspond to the installation’s specific wiring
connections.
To configure a load:
1. Tap
.
If the boiler has never been programmed, all loads will be set to "Off".
For example, if Load 1 is piped and wired (Load 1 = P/V1 & Therm.1) to heat a load type,
select "Load 1 - Off" button.
2. On the Select a load screen select a load (Load 1-4) > Select a control mode (e.g.,
Setpoint) > OK. To change the control mode, select the Change... button.
Note
Zone Of is not available as an option until you have programmed a load with
one of the other control modes.
If selecting:
Setpoint, DHW or Ext. Control, a settings screen is populated with pre-
programmed values appropriate for typical residential applications.
To change a value: Choose a setting > Using the number pad, enter a new value >
select OK. The temperature setting range is shown on the number pad popup. For
information on recommended settings, see Operating concepts on page 17.
Reset Heating > Choose an emitter type (e.g., H-Mass Radiant) > OK. The Reset
Heating screen is populated with default settings. Ensure that these settings will
work for the intended application, and change them if necessary. For information on
recommended settings, see Reset heating on page 18. Note that an outdoor sensor
must be installed for Reset Heating.
50
Section: Settings loads
3. Once all values are set as desired, tap Save.
4. Repeat steps for other loads connected to the boiler.
Date and time in the boiler are factory set. If the boiler is connected to the internet, date and
time will be updated automatically. If the boiler is not connected to the internet, you can
manually change the date and time (see Changing and updating date and time on page 76).
Setting the clock is necessary for boilers connected to the IBC V10 portal and for setting
overrides.
5. (optional) To change units (Imperial or Metric) on the boiler, go to
> User Settings >
Units > Choose preferred units > Save.
Note
After defining the loads, perform a manual pump purge to ensure air is purged. Go to
> System Settings > Site Settings > Set Manual Pump Purge to "On" > Save.
4.1.2 Syncing zones with "Zone Of"
To use the Zone Of control mode, you must have an active load set up. If you want to duplicate or
synchronize the configuration (load type and settings) of another active load, you can use "Zone Of".
Let’s say that Load 1 is already configured as a Setpoint load, and you want Load 3 to have the same
properties and settings as Load 1.
To synchronize the zone of Load 3 to match the zone of Load 1 (in our example, Setpoint):
1. Tap
to display the Select a load screen.
2. Tap Load 3 > choose Zone Of.
3. Tap Load 1 Setpoint > Save.
Load 3 is now synchronized with the same configuration as Load 1.
4.1.3 Changing an assigned control mode on a load type
If you are modifying a control mode on a load type and its settings, we recommend that you change the
control mode before you change any setting values to prevent changes from being lost.
1. To change a control mode, tap
> choose the load you wish to change.
2. If selecting:
a.
DHW, Setpoint, or Ext. Control, tap Change... > Save.
b. Reset Heating > choose an emitter > OK > Save.
51
4.1.2 Syncing zones with "Zone Of"
c. Zone Of > tap OK > select the control load that you wish to synchronize the current
load with> Save.
4.1.4 Removing an assigned control mode from a load
1. To change a control mode, go to
> choose the load you wish to change:
2. Choose a control mode (e.g., Reset Heating) > Tap Change... > Off > OK.
4.1.5 Changing settings in a load
After programming a controller, you can change the current settings of one or more loads.
Note
You can adjust the Outdoor design temperature in the Advanced Setup menu.
1. To change one or more settings in a load, tap
to display the Select a load screen.
2. Select a setting highlighted in blue > enter a new value/option > Save.
4.2 Setting loads using Advanced Setup
The Advanced Setup menu provides more options for the experienced installer. For a list of
operational settings in this menu, see Operational settings in the Advanced Setup menu:
temperature ranges and defaults on page 32.
1. Go to
> Advanced Setup.
If the boiler has never been programmed, all loads will be set to "Off".
2. On the Select a load screen, choose a load (Load 1-4) > Choose a control mode (e.g.,
Reset Heating) > OK. To change the control mode, select the Change... button.
Once a control mode is assigned, all the load’s parameters can be edited individually.
Note
"Zone Of" is not available as an option until you have programmed a load with
one of the other control modes.
52
Section: Settings loads
Setpoint, DHW or Ext. Control, the settings screen is populated with pre-programmed
values appropriately selected for typical residential applications. To change a default
value: Choose a setting > Using the number pad, enter a new value > select OK. For
information on recommended settings, see Operating concepts on page 17.
Reset Heating, choose an emitter type, and then OK. The Reset Heating screen is
populated with default settings. Check the pre-programmed values carefully to ensure
that they will work for the intended application. Change the settings, if necessary. For
information on recommended settings, see Reset heating on page 18.
3. Once all values are set as desired, tap Save.
4. Repeat steps for other loads connected to the boiler.
Note
To reset the controller's configuration to factory settings, see Resetting configured
settings to factory defaults on page 75.
To set up an IBC air handler to communicate the indoor and outdoor temperatures to enable the boiler
to control its reset heating curve, see Setting up an IBC air handler to send data to an IBC boiler to
control its reset heating curve on page 60.
Note
After defining the loads, perform a manual pump purge to ensure air is purged. Go to
> System Settings > Site Settings > Set Manual Pump Purge to "On" > Save.
4.3 Setting up an external control load
To set up external control (BMS) to manage a desired boiler set point:
1. Go to
> Advanced Setup.
If the boiler has never been programmed, all loads will be set to "Off".
2. On the Select a load screen, choose Ext. Control > OK. The settings screen is populated with
pre-programmed values appropriately selected for typical residential applications.
3. In the Burner on from field, choose either Thermostat or Ext. Control.
If set as "Thermostat" (dry-contact enabled), the boiler will wait for a call for heat from
the thermostat terminal associated with the load, and then look at the Ext. Cont.
terminals for the target water temperature signal.
53
4.3 Setting up an external control load
If set to "Ext.Cont.", the controller only uses the Ext. Cont. terminals to determine a
call for heat. If the voltage at the Ext. Cont. terminals is below 2.1VDC there is no
call for heat. If the voltage is at or above 2.1VDC, then there is a call for heat.
4. In the Minimum control field, set the minimum supply set point temperature from the BMS.
5. In the Maximum control field, set the maximum supply temperature for the BMS (e.g.,
182°F). Voltage 2.1VDC.
6. In the Maximum (boiler) supply field, enter the high limit for the BMS (e.g., maximum
190°F) Voltage 9.5VDC.
7. In the Water from field, for a:
Single boiler, choose Outlet > OK.
Multiboiler network, choose Sec. Loop > OK.
Buffer tank, choose DHW > OK.
8. Save.
4.4 Setting up external control to control water
temperature in a single boiler or in each boiler wired on
a network
The following procedure documents setup required when the external control is modulating the
boiler output only for a single boiler operation, or in a multiboiler system where system input from
the BMS is wired to each boiler. An IBC network cannot be used.
To set up external control:
1. Go to
> Advanced Setup.
If the boiler has never been programmed, all loads will be set to "Off".
2. On the Select a load screen, choose Ext. Control > OK. The settings screen is populated
with pre-programmed values appropriately selected for typical residential applications.
3. To change a default value: Choose a setting > Using the number pad, enter a new value >
OK. > Save.
4. To enter the firing rate, tap Installer Options > enter the default password 1445 > OK
>System Options > Enter the required minimum and maximum firing rate in the Minimum
Output and Maximum Output fields > OK > Save.
54
Section: Settings loads
4.5 Combining two loads to service two loads at the same
time
To enable the boiler to service two loads at the same time, you can combine loads using the
controller's basic mode or full mode. We recommend using the basic mode, which is the system
default. For information on "Full Mode", see Full mode load combining on page 27. Load combining
operates by this criteria:
The "primary" load is set at the highest temperature.
That both loads are set to operate within the same target temperature range (overlap of
temperature).
That the "secondary" load is configured with a lower initial priority than the "primary" load (we
recommend a priority difference of at least 15). If the secondary load’s running priority becomes
higher than the primary load, then it is serviced in the normal priority rotation, just as if the load
were not combined. The primary load will be dropped, and the secondary load will be serviced in
the normal priority rotation.
The steps described below illustrate a typical-load combination setup of DHW with reset heating,
using basic mode. In Setup, Load 1 is programmed as domestic hot water (DHW) and load 2 is
programmed as reset heating. Because DHW will have the highest temperature load, it will be set up
as the primary load. For examples of compatible and incompatible load settings, see Example of
compatible load combining on page 28.
4.5.1 Combining loads using "basic mode"
To combine two loads using " basic mode" :
1. Go to
> Advanced Setup > Load Combining.
The "Basic Mode" box is checked by default.
2. In the Primary Load field, tap Disabled > select the load type that will control boiler operation
(while load combining is active), in our example Load 1- DHW> OK.
3. In the Secondary Load field, tap Disabled > select the load type for the secondary load, in
our example, Load 2 - Reset Heating > OK.
A message appears reminding users that a mixing valve must be used in basic mode.
4. Tap Yes to confirm that a mixing valve has been installed >Save.
55
4.5 Combining two loads to service two loads at the same time
4.5.2 Combining loads using "full mode"
To combine two loads using " full mode" :
1. Go to
> Advanced Setup > Load Combining.
The "Basic Mode" box is checked by default. .
2. Uncheck the "Basic Mode" box. More parameters appear on the screen (may need to
scroll down): Initial Delay, Off Delay, Retry Delay, and Maximum Throttle.
Initial
Delay
Amount of time (minutes) between when the primary load is being serviced
and the secondary load is brought on to be serviced. For example, 5 equals 5
minutes.
Off Delay
Sets a delay between loads to prevent loads from coming off-on. Default is 5
minutes.
Retry
Delay
The system was unable to bring on a load because of a conflict with set
rules. Indicates the amount of time (default is 10 minutes) before the system
will attempt to service the secondary load.
Maximum
Throttle%
If say the throttle is set at 75% (default) and the boiler is already running over
75% of it full fire the secondary load will not be allowed to be serviced at the
same time. Once the boiler is running below 75% of its capacity, the
secondary load will be serviced.
3. In the Primary Load field, tap Disabled > select the load type that will control boiler
operation (while load combining is active), in our example Load 1- DHW> OK.
4. In the Secondary Load field, tap Disabled > select the load type for the secondary load, in
our example, Load 2 - Reset Heating > OK.
5. To change the Initial Delay default, tap 5 > from the number pad, pick a number > OK.
6. To change the Off Delay default, tap 5 > from the number pad, pick a number > OK.
7. To change the Retry Delay default, tap 10 > from the number pad, pick a number > OK.
8. To change the Maximum Throttle %, tap 75% > from the number pad, pick a number > OK
9. Tap Save to save the changes.
10. Check the Boiler Status screen. If the field indicates that it is out of temperature range, you
may need to adjust the temperature of one of the loads.
56
Section: Settings loads
5.0 Configuring multiple boiler systems
When configuring a network of boilers, you can assign a boiler as the "master" boiler, so that it can
control the other "subordinate" boilers on the network. This enables all heating loads to be set up via the
master boiler.
Some of the advanced features include the ability to assign a secondary master
boiler as a backup if communication from the "primary" master is disrupted.
Another safety feature provides the ability to configure a setpoint/supply
differential to maintain a set temperature in subordinate boilers in case
communication with the master boiler is disrupted. For more information on the
advanced settings for multi-boilers, scan the adjacent QR code.
5.1 Checklist for configuring multiple boilers
Checklist for Multi-boiler Setup
Check
Master boiler is configured (see "Configuring a master boiler" below).
□
Subordinate boilers are configured (see Configuring a subordinate boiler on page 58).
□
All subordinate boilers have a unique ID.
□
Master boiler designated and all boilers shown on the network (see Confirming network
programming was successful on page 59).
□
A secondary loop sensor is wired to the master boiler controller (see TB2: 15-16 at Figure 12
) and the heat load is mapped to the secondary loop sensor (Water From° set to Sec. Loop). □
5.2 Configuring a master boiler
You can assign a boiler among a group of boilers as the "master" boiler. When you configure a boiler
as the master boiler, it receives all sensor and dry contact call-for-heat signals, manages the
secondary pumps, and coordinates the firing of all boilers in the group.
To assign a boiler in a network as the master (lead) boiler:
1. Go to
> Advanced Setup > Multiboiler.
Note
Each boiler requires a unique Boiler ID within the range of 1-24 (0=offline).
2. In the Boiler ID field, tap 0 > On the number pad select 1 > OK to set the default value from 0
to 1. Note that the master can be assigned an ID between 1 and 24.
3. In the Master field, tap No > Yes (for Master boiler only – leave all other boilers set to
"No"). After assigning a master, the screen populates with these fields: Staging delay,
Rotation, Fixed Lead, Firing Order, Add Level (%), Drop Level (%), Opt Out box Types,
boilers Online, Boilers Available, Boilers Firing.
The Master Redundancy field is used to assign a secondary master should the master
boiler fail. For more information, click the QR code above.
4. (If desired) In the Staging Delay field, tap 8 (default staging delay in minutes), and on the
number pad, set the minimum delay time before the next boiler comes on line (must be at
minimum equal to time for closed-loop water to complete one full circuit of system. For
large mass systems, allow for two or more loop times).
Rotation is turned to "On" to balance the run time on each of the boilers. When Fixed Lead
is turned to "On", the master boiler will always be the first to answer a call for heat. If left to
"Off", the boiler on the network with the least run time will be the first respond to a call for
heat. Note that when Rotation is set to "On", Fixed Lead is treated as "Off".
5. (If desired) In the Rotation field, tap Off > On. This gives each boiler similar run times.
There is a 48-hour maximum allowable run time difference between boilers.
If prompted to restart, tap Cancel, and go back to the
> Advanced Setup >
Multiboiler.
6. (Applicable if Fixed Lead is set to "On" and Rotation is set to "Off) To promote more
balanced run times, in the Firing Order field > tap > First On / first Off > First on / last
off > OK. "First On / Last Off" allows for wider turndown ratios when a smaller model boiler
is chosen as a master of larger model boilers.
Tip: A quick way to check that the system is calling each boiler as configured,
change the "Staging Delay" to one minute.
7. Tap Save. The text "Master" should display in the Status bar.
5.3 Configuring a subordinate boiler
Each subordinate boiler requires a unique ID and the “Master Boiler” option must be set to “No”.
Subordinate boilers that will be controlled by the master boiler require some basic configuration.
To configure a subordinate boiler:
1. Go to
> Advanced Setup > Multiboiler.
2. In the Boiler ID field, tap 0 > On the number pad select a unique ID number (e.g. 2, 3 etc. -
"1" is typically reserved for the master boiler, but it can be assigned any number 1-24).
3. Ensure that Master is set to No > Save.
58
Section: Configuring multiple boiler systems
For information on using the more advanced features such as the "Opt Out" or Failsafe options, scan
the QR code at the beginning of this section.
5.4 Confirming network programming was successful
After assigning boiler IDs, the controller prompts you to restart. You can check that the master boiler is
now the designated master.
To check that the master boiler is the designated master:
1. Go to
> Advanced Setup > Multiboiler. Alternatively, go to
> Network
Information.
2. Scroll down to Boilers Online. The "Boilers Online" field should show the number of boilers
networked.
"Boilers available" means the number of boilers available for the master to call upon. For example,
there may be three boilers online ready to answer a call for heat, but when there is a call for DHW only
2 boilers will be available.
5.5 Confirming number of boilers available and firing on
the network
To check available boilers that are online/ firing on a network, go to
> Network Information > To
view all available/unavailable boilers and their network IDs, see Net. Boilers.
5.6 Assigning fixed IP addresses to boilers on a network
using a switch not connected to the internet
If you are connecting boilers on a network via a switch that is not connected to the internet, you will
need to manually assign IP addresses to each boiler; for example, in a 2-boiler network.
1. Go to
> Network Settings.
2. In the TCP/IP field, select Manual.
3. In the IP Address field, tap the IP address value, and on the number pad, enter an IP address >
OK. Most home routers will accept 192.168.0.1-254 or 192.168.1.1-254. If there is a possibility
that the network of boilers could have internet connectivity in the future, we recommend using
192.268.20.1-254 to avoid IP address conflicts.
59
5.4 Confirming network programming was successful
4. In the Net Mask field, enter 255.255.255.0. Leave "DNS Server" and "Gateway" as 0.0.0.0.
> Save.
5.7 Using the master to control a group of IBC boilers
with 5-button-type controllers via a BACnet gateway
1. Go to
> Network Settings.
2. Scroll down and check the CANbus Master check box > Save.
5.8 Setting up an IBC air handler to send data to an IBC
boiler to control its reset heating curve
The boiler determines a water setpoint target to send to the air handler. The air handler uses the
water temperature to run at a particular speed or output. If you have an IBC air handler connected to
one or more IBC boilers, you can set up the air handler to transmit data such as the indoor and
outdoor temperatures to enable the boiler to control its reset heating curve. The IBC air handler will
transmit these temperatures to any boiler connected to the local area network.
To set up data communication between an IBC air handler and IBC boiler to establish the reset
heating curve in the boiler, go to
> Network Settings > (Scroll down) Check the AHU
Comm. Enabled check box > Save. It may take a couple of minutes for data transmission to
complete.
60
Section: Configuring multiple boiler systems
For a boiler to fire, it needs an "enabler" across the load such as a zone valve end switch,
thermostat switch, or jumper.
When a boiler is first energized, the controller runs through a power-up sequence that takes
approximately one minute. During this time, the controller completes a self-diagnostic, and loads all
previous settings. When power is restored after a power interruption, the boiler automatically resumes
operation with all the previously stored values.
If commissioning a boiler with a new (replacement controller), see Programming a replacement
touchscreen controller on page 78.
6.1 Start-up checklist
Start-up Checklist
Check
Measured the inlet gas pressure. Refer to the boiler's Installation and Operating Instructions
manual.
□
Tested the flue gas (combustion test). Refer to the boiler's Installation and Operating
Instructions manual.
□
Tested the ignition system safety shutoff device. For instructions, see Testing the ignition
safety shutoff on page 62.
□
Tested the Hi Limit cutoff temperature functionality to ensure the sensor is working. For
instructions, see Testing the Hi-limit temperature function on page 62.
□
Tested the low water cutoff functionality to ensure that the sensor is working. For
instructions, see Testing the low water cutoff (LWCO) function on page 62.
□
Tested the pressure relief valve. For instructions, refer to the Installation and Operating
Instructions manual "Service and maintenance: Relief valve" section.
□
Checked that the exhaust pipe clamp is tight and secure (no leaking flue into the room).
Refer to the Installation and Operating Instructions manual "Installation: Exhaust vent
material" section.
□
Tested the flow by observing the supply and return delta temperature.
□
Verified that the correct pump is activated by the corresponding call for heat.
□
6.2 Testing the ignition safety shutoff
To test the ignition system safety shutoff device:
1. With the boiler in operation, shut off the gas control valve directly outside the boiler case.
2. Ensure that the boiler has shut off and the appropriate error information is displayed on the
controller.
3. To restart the boiler, reset the power or on the touchscreen controller, tap
>Clear
Errors > Yes.
6.3 Testing the Hi-limit temperature function
The hi-limit temperature function monitors the maximum supply temperature set in the safety
ignition module (SIM). If the water temperature exceeds the hi-limit temperature, the boiler goes into
a lockout condition, requiring a manual reset.
To test the Hi-limit function:
1. Go to
> SIM Menu > Hi-Limit Test > Read the instructions.
You will need to enter a cutoff temperature below the actual supply temperature value
currently displayed. For example, if the Supply Temp. value is 180°F, enter 170°F in the Cut
Off Temp. box.
2. Tap inside the Cut-Off Temp. box, and then tap a number value > OK.
The message: "Hi-Limit Detected" is displayed.
3. To reset the boiler, select the Reset button. The cutoff value reverts to normal upon reset.
The message: "The SIM module has been reset" is displayed.
4. Tap Close.
6.4 Testing the low water cutoff (LWCO) function
The LWCO function provides continuous protection against a low water incident. If the SIM detects
low water in the boiler it enters a lockout condition. Here, you will need to reset the boiler. To test
the LWCO on the boiler, you can also manually place the boiler in a lockout condition.
62
Section: Start-up
To test the LWCO function:
1. Press and hold the LWCO Test button for 5 seconds (located on top of the electrical box).
A message on the screen indicates that the boiler is in lockout mode.
2. Go to
> SIM Menu > LWCO Test > Read the instructions.
3. On the touchscreen controller, select the Reset button.
The message: "The SIM Module has been reset" is displayed.
4. Tap the Close button.
63
6.4 Testing the low water cutoff (LWCO) function
7.0 Optional - Setup for Internet access
At a site, you can set up internet access to enable you to monitor and control one or more boilers
remotely through IBC’s V10 Portal.
Figure 19 Benefits of gaining remote access to boilers via the IBC V10 portal
To set up remote access to boilers via the V10 portal, you must connect a boiler’s
controller to an IP network (see instructions below). Then you can register a boiler for
the V10 portal. For steps on how to register for access to the V10 portal, scan the
adjacent QR code.
7.1 Connecting a boiler’s controller to an IP network
The boiler must be properly connected to an IP network to enable web browser capability. You can do
this by using a router to connect the boiler’s local area network to the internet. The connection for the
boiler’s controller to an IP network is through the Ethernet jack located at the back of the controller
appliance (see Appendices on page 93). The controller supports standard 100 Base T data rates over
typical CAT5 or CAT6 wiring.
Note
Remote access via the Internet typically requires that the router have its port forwarding
settings configured to forward port 80 to the boiler’s local IP address.
When connecting to the boiler within the local area network, the boiler’s IP address will be the same
as listed on the controller’s Network Information screen.
There are two methods for connecting the boiler to an IP network:
1. Installing an Ethernet cable that connects from the boiler (RJ 45 Ethernet Jack) to the
router.
2. Purchasing and installing a wireless access point device connected to the Ethernet jack.
The wireless access point device must be configured to operate in client mode (to enable
the router to function as a wireless client).
There are many wireless access point devices on the market such as the TP-LINK AV500
Nano Powerline Adapter Starter kit. The adapter plugs into an electrical wall socket, and
connects to a router via an Ethernet cable.
Once an IP network connection is established, using one of the above methods, the router
automatically requests the IP address, Net Mask, Net Mask, and the default gateway as part of
the TCP/IP protocol configuration settings.
Warning
Ensure the boiler controller is configured with a "local" network IP address, with
access to the Internet through a properly configured and enabled firewall device. IBC
Technologies Inc. does not approve connecting the boiler controller directly to the
Internet using a "public" IP address, or connecting without a secure firewall device.
On the controller's "Network Settings" screen (
> Network Settings), the TCP/IP group of
parameters includes the basic settings required to connect to an IP network. By default DHCP is
selected.
When DHCP is activated the other four entries (IP address, the gateway, DNS server, and
Net Mask) are not required, and their entry boxes are disabled.
When assigning a boiler with a fixed IP address, tap "Manual" and manually enter the
boiler’s IP Address, Net Mask, DNS Server address and Gateway address.
66
Section: Optional - Setup for Internet access
8.0 Updating boiler controller software
This section describes the ways in which you can perform an software update in a boiler. When you
install software updates, the system checks if the boiler has the latest software version. If the system
detects that the boiler requires more than one software release update, the system installs each
software release update, from the oldest to the latest. To view the latest update in a boiler, on the
controller, go to
> Boiler Information > Software Release.
Tip
Consider updating a boiler with the latest software only if the new features are beneficial to
the operation of the boiler.
There are two methods for updating software in an IBC boiler:
1. Updating software in a boiler that has no internet access.
2. Updating software in a boiler connected to the internet.
8.1 Updating software in a boiler that has no
internet access
If the boiler has no internet access, updating software will involve the following three stages:
8.2 Updating software in a boiler that has internet
access
At the boiler site, insert the USB flash drive into the boiler controller, and use the menu to complete
the software update. When a software update is performed, the touchscreen controller is put into
"service" mode. This prevents the system from servicing loads.
1. At the boiler, remove active calls for heat. The home screen should show a "Standby"
status.
2. Carefully insert the USB stick or SD card into one of the ports on the left-hand side of the
controller (see ).
3. On the controller screen, tap
> System Settings > Software Update.
4. Select the appropriate device (SD-Card or USB).
5. If you do not get a response, select Cancel and try again.
The controller checks if a software update is required. If required, the system prompts you
for permission to proceed.
6. Select Yes>OK.
7. If you see a message "Could not mount flash device", select Cancel and try again. The
controller automatically restarts after loading the update, and the process takes a few
minutes.
8. To check that the controller has the latest software release, go to
> Boiler
Information > Software Release.
You should perform a fan calibration after a software update. For instructions, see Calibrating the
fan on page 71.
68
Section: Updating boiler controller software
9.0 Other operating procedures
This section describes other settings that heating professionals can use when operating, servicing, or
troubleshooting a boiler.
Testing the fan operation
Testing the firing rate
Calibrating the fan
Performing a manual pump purge
Limiting the minimum and maximum firing rate of the boiler
Adjusting the space heating temperature
Adjusting the domestic hot water temperature
Checking the water flow in the boiler
Setting Overrides
Backing up and restoring a boilers' configuration and settings
Restricting access to areas in a controller
Switching a boiler to unoccupied "away" mode
Resetting configured settings in a boiler to factory defaults
Changing and updating date and time
Changing default error lockout time periods
Changing default units of measurement displayed on the controller's screens
Setting the venting material
Programming a replacement touchscreen controller
9.1 Testing the fan operation
When a boiler is not heating, you can test its fan heat output. For all models (excluding the G3 models),
the fan heat output MBtu value should match closely the heat output MBtu value.
The test also includes the vent factor. A lower vent factor value indicates a shorter vent while a higher
vent factor value indicates a longer vent. These values are useful for troubleshooting issues such as a
blocked vent. To view the fan model, go to
> Boiler Information > Fan Type.
To test the fan’s heat output:
1. Go to
> Test Operation.
2. In the Fan Test: Heat Out field, tap 0 MBtu, then enter a heat value between 0 and 260 > OK.
Note that exiting the screen will stop the fan test.
3. To check if the heat output value and the fan heat output value correspond, go to
>
Boiler Status.
9.2 Testing the firing rate
You can test the firing rate if the fan is not operating, or if there is a low error flow, low air flow, or
low rpm error.
Fuel
High fire
Low fire
CO max
PPM
Range %
Target %
Range %
Target %
Natural Gas
9.0 - 10.0
9.5
8.2 - 9.2
8.7
<150
Propane
10.3 - 11.3
10.8
9.3 -10.3
9.8
< 250
Table 7 Combustion test target ranges - CO2 / Maximum CO
9.2.1 Testing the high fire
1. To run the boiler at high fire, you can set the heat-out value in manual mode to the maximum
MBH for the boiler. To do this: Go to
> Test Operation > Tap inside the Fan Test:
Heat Output box, and using the number pad, enter the maximum MBH > OK .
2. When the boiler reaches high fire, insert the combustion analyzer test probe into the flue gas
test port. Then verify that the CO2 reading is within the combustion test targets defined in
the table below. Make necessary adjustments to the high fire on the gas valve, as
necessary.
3. To exit the Test Operation screen, select Back.
9.2.2 Testing the low fire
1. To run he boiler at low fire, t the heat-out value in manual mode to the minimum MBH for the
boiler. To do this: Go to
> Test Operation > Tap the Fan Test: Heat Out box, and
using the number pad, enter the minimum MBH > OK.
2. Adjust the low fire according to the table below using a Torx 15 screwdriver. Turn the
screwdriver clockwise to raise the CO2% (to richen). Turn counter-clockwise to lower
CO2%. Start with ⅛ of a turn until you see the analyzer measure a change then only make
1/16 adjustments. If changing direction on this adjustment you may notice a significant
backlash.
3. To exit the Test Operation screen, select Back.
70
Section: Other operating procedures
9.3 Calibrating the fan
After replacing a fan or performing a software update, fan calibration is required.
1. Remove all calls for heat by pulling out the entire TB2 terminal block (see Figure 12 ).
2. Go to
> System Settings > Restart Boiler.
3. Tap Yes to "Restart the boiler".
4. Tap Yes to "Run the Fan Pressure Calibration on restart?".
A red bar appears across the bottom of the display and the boiler turns off, then restarts. During
calibration the status will display Offline. When the status returns to Standby, calibration is
complete.
5. Restore the calls for heat by reinserting TB2 terminal block.
6. Open the manual gas valve, and restore power to the boiler.
7. Check for leaks at the gas valve outlet and at the connection between the fan and heat
exchanger lid.
8. Confirm normal operation and install the cover to the boiler.
9.4 Performing a manual pump purge
After installing a boiler, you will need to perform a manual pump purge to ensure that air is fully
removed from the piping circuit.
1. After defining loads, go to
> System Settings > Site Settings > In the Manual Pump
Purge field, set to "On" . The manual pump purge runs until it is turned off, or when there is a
call for heat.
2. To shut off the manual pump purge, tap "On" to toggle to "Off".
9.5 Limiting the minimum and maximum firing rate of the
boiler
If a boiler is oversized for the specific installation, you can lower the maximum firing output. Or, if a
boiler is not able to stay operational at its lowest btu due to a high wind environment, you can raise the
minimum firing rate output.
To adjust the minimum or maximum firing range on a boiler:
1. Go to
> Installer Options > On the number pad, enter the default password 1445 > OK.
71
9.3 Calibrating the fan
2. (If applicable) Tap System Options > Tap the number value in the Minimum Output field
and enter a higher minimum output (e.g., if the minimum output is currently 10, enter 15) >
OK > Save.
3. (If applicable) Tap the number value in the Maximum Output field and enter a lower
maximum output (e.g., if the maximum output is currently 85, enter 80) > OK > Save.
9.6 Adjusting the space heating temperature
Ensure that a reset heating or set point load is set up in the controller. See Settings loads on page
49.
To adjust the space heating temperature in:
A Reset Heating load, go to
> Advanced Setup > Select the Reset Heating load >
tap Design supply temperature number value (default 125° F) > On the number pad choose
a value between 50° F and 190° F > OK > Save.
A Set Point load, go to
> Advanced Setup > Select the Set Point load > tap Boiler
Supply temperature value > On the number pad, choose a value between 59° F and 185° F
> OK > Save.The load pump must provide adequate water flow if the boiler pump is set to
OFF.
9.7 Adjusting the domestic hot water temperature
To adjust the domestic hot water temperature, go to
> Advanced Setup > Select the DHW
Tank setpoint temperature value > On the number pad, choose a number > OK > Save.
9.8 Checking the water flow in the boiler
To check the water flow in the boiler, go to
> Boiler Status > Flow Rate. Refer to the
Specifications table in the Installation and Operation instructions manual for the required flow rate.
9.9 Setting overrides
Note
Date and time must be set in the boiler for overrides to work. For instructions, see
Changing and updating date and time on page 76.
72
Section: Other operating procedures
You can set up overrides for a set point load in a boiler. For example, building managers may want to
set up overrides in the system so that domestic hot water is set up to heat the water to 140° C at night
to kill bacteria in the water. Alternatively, home owners may want to set up a DHW override so that the
water is extra hot for the morning.
To set up a temperature override for a DHW load:
1. Go to
> User Settings > Overrides.
Each load can have two automated (override) programs for each day of the week: Prog 1 and
Prog 2. Each program includes one override temperature that can be applied during two
separate programmable time periods, for example, in the morning and in the evening.
2. Tap the Edit button for the DHW load (the system is programmed to heat the DHW to 125 ° C).
3. Tap either Prog 1 or Prog 2 next to a day of the week, for example Monday.
Each period is defined by a start and an end time in 24-hour clock format. If the programmed
times overlap, Prog 1 will supersede Prog 2.
4. Tap the DHW Tank Setpoint value > On the number pad, enter a temperature value, for
example, 140° C > OK.
5. In the Start Time 1 field, tap 0:00 > Enter the hour and minutes, using the 24- hour format (e.g.,
01:00) > OK > OK to confirm.
6. In the End Timefield, tap 0:00 > Enter the hour and minutes, using the 24- hour format (e.g.,
04:00) > OK > OK to confirm.
7. Tap the Save button to save the settings in the selected program.
8. (Optional) Repeat steps 3-7 to configure program settings for the other days of the week.
9. When you have finished entering the necessary settings for the required program(s), tap the
Back button.
Temperature Override programming can be enabled or disabled for each load independently,
without affecting the temperature and time settings for each day of the week.
10. Tap the Enable box next to a load with a temperature override, so that it has a check mark in
the box.
11. Tap the Save button, and then tap the Back button to return to the Overrides screen.
12. Now, when you want to set the override, check the Enable box next to the DHW load that has
the override set up > Save.
Based on the programmed settings above, the system begin heating the DHW at 01:00 am to 140° C,
and will end at 04:00 am, and revert to heating the DHW at 125° C. This will continue every Monday
during the night until you uncheck the "Enable" box.
73
9.9 Setting overrides
9.10 Backing up and restoring a boiler's configuration
and settings
You can back up/restore a boiler’s complete controller configuration and settings to or from a USB
memory stick or SD-card that you can then load onto other boilers. This saves time when setting up
multiple boilers that will have the same configuration and settings.
9.10.1 Backing up a boiler's configuration and settings
1. Go to
> System Settings > Backup and Restore.
2. Choose This Boiler or Boiler Model:
"This Boiler" creates or loads a copy of the configuration for the specific single boiler.
"Boiler Model" creates or loads a copy/clone of the configuration. Creating a standard
boiler configuration allows for quick loading of settings into another boiler of the same
model.
3. Insert an SD card or USB Flash into one of the ports on the left-hand side of the controller.
4. Select the device (SD card or USB Flash).
5. Select Backup to save the boiler's configuration and settings to the chosen device.
9.10.2 Loading boiler configuration and settings from a device
onto another boiler
To load the configuration and settings backed up on a device to another boiler:
1. Go to
> System Settings > Backup and Restore.
2. Choose This Boiler or Boiler Model:
"This Boiler" creates or loads a copy of the configuration for the specific single boiler.
"Boiler Model" creates or loads a copy/clone of the configuration. Creating a standard
boiler configuration allows for quick loading of settings into another boiler of the same
model.
3. Insert the device containing the boiler configuration and settings into one of the ports on the
left-hand side of the controller.
4. Select the device (SD card or USB Flash).
5. Select Restore to save the configuration and settings from the USB stick to the chosen
boiler.
74
Section: Other operating procedures
9.11 Restricting access to areas in a controller
In the controller, you can restrict access to the boiler controls by enabling password access. When you
enable password protection, you are provided with an installer default password and a user default
password. These passwords cannot be changed. The installer password enables the heating
professional to access all options in the boiler. You can give the homeowner the user default
password, so that they can access User Settings.
To turn on password protection:
1. Go to
> Installer Options > User Lock.
2. Select On.The screen displays: User Password: 4321 and Installer Password: 1445.
3. Tap Save to enable password access.
When password protection is activated, the Installer password will be required to access the four loads
on the "Setup" menu, the "Advanced Setup", "System Settings", "Network Settings", and "Test
Operation" screens. The User password will be required on "User Settings" (under
).
The 'Security' password is permanent until it is turned "Off".
9.12 Switching a boiler to unoccupied "away" mode
You can reduce energy consumption by switching the boiler to "unoccupied" mode during holidays or
other away periods.
In unoccupied mode, the:
DHW load is turned off.
The circulating water temperature of a Reset Heating load is lowered by reducing the Indoor
Setpoint° to 50°F / 10°C.
Setpoint controlled loads are not adjusted through this process to avoid the potential for boiler
cycling as there is no linkage with the relevant thermostat.
To turn on unoccupied mode, go to
> User Settings > Remove the check mark from the
Occupied check box > Save.
To remove unoccupied mode, go to
> User Settings > Check the Occupied check box > Save.
9.13 Resetting configured settings to factory defaults
You can use the factory default reset function when the boiler gets into an error for unknown reason
or the error cannot be cleared. Or you simply want to reset all boiler settings to default.
75
9.11 Restricting access to areas in a controller
To reset default factory settings in a boiler:
1. Go to
> System Settings > Reset Factory Defaults.
2. If you are certain that you want to reset all settings, and lose all configured
(customized) settings in the controller, select Yes. The controller will take approximately
two minutes to reset to factory defaults.
9.14 Changing and updating date and time
The boiler is delivered factory-preset with date and time. Once the boiler is connected to the
internet, you can set up data and time to update automatically (e.g., for daylight savings). Setting
the date and time in a boiler is necessary for programming overrides and for boilers connected to the
IBC V10 portal. You can also manually change the factory default time (e.g., different time zone).
9.14.1 Setting up date and time to update automatically in a boiler
connected to the Internet
If the boiler is connected to the Internet or to a computer (e.g., a server set up on an internal
network that acts as the NTP time source), you can set up date and time to update its internal
clock automatically from an Internet time service.
1. Go to
> User Settings > Date & Time.
2. Select the NTP Server option. When NTP server is selected, the time in the controller
synchronizes daily with the NTP server.
3. In the Time field, tap the time (blue link) > On the Enter Time popup, and set the time in
hours and minutes (using the 24-hour format) > OK.
4. In the Date field, tap the date > On the Enter Date popup, enter the year/month/date >
Save.
5. In the Time Zone field, tap the zone > On the Time Zone popup, select your time zone >
OK.
6. Tap Save.
9.14.2 Changing the default date and time in a boiler not
connected to the Internet
If the boiler is not connected to the internet, there will be times when you need to manually
set/reset a boiler’s date and time. For example, if the boiler has been shutoff, or if there has been
a daylight saving time change.
76
Section: Other operating procedures
To set the date and time manually:
1. Go to
> User Settings > Date & Time.
2. Ensure that the Internal option (default) is selected. "Internal" refers to an internal clock used
for time keeping.
3. Set the Date & Time boxes, using the number pad.
4. (If required), tap the Time Zone field, and select an option.
5. Tap Save.
9.15 Changing default error lockout time periods
You can change the default lockout periods in mutes for major errors, interlock errors, minor errors and
warnings.
1. Go to
> Installer Options > On the number pad, enter the default password 1445.
2. Tap System Options > In one of the Error Lockout fields, tap the number value, and on the
number pad choose a value in the range indicated > OK > Save.
9.16 Changing default units of measurement displayed on
the controller's screens
You can set the controller to display imperial or metric units of measurement.
Go to
> User Settings > Units > Tap the desired unit(s) > Save.
9.17 Setting the venting material
The default setting for venting material in the controller is PVC. Other options include CPVC and PP.
Caution
If you change the venting setting, you are solely liable and responsible for selecting the
correct venting type.
To select a different venting type:
1. Go to the
> System Settings > Site Settings.
2. Scroll down to the Venting Material field, and select PVC.A popup is displayed indicating
Installer responsibility for selecting the correct venting type.
3. Carefully choose an option, then tap OK > Save.
77
9.15 Changing default error lockout time periods
9.18 Programming a replacement touchscreen
controller
After powering up a replacement touchscreen controller, you need to enter the correct boiler number
details. You can find the correct model number on the boiler’s rating plate.
1. On the touchscreen controller, tap the Boiler Model box, and from the dropdown list,
carefully select the correct boiler model number.
Note
Important: This is the only chance to enter the correct model number. If you save
an incorrect model number the board will be unusable, and you will have to buy
another controller.
2. Tap the Save button.
Note
Do not select the “Start” button to run the Self Test. This is for IBC staff use only.
3. Select "Setup" to set up the loads configured in the old boiler.
4. Check that the boiler has registered the thermostat connections correctly along with the
correct load types and settings.
5. Check that all pumps operate according to the previous controller.
6. Check the temperature sensor and pressure sensor readings.
78
Section: Other operating procedures
This section provides a list of controller error messages and possible way to resolve the errors. For
information on the types of errors, see Clear Errors on page 12. Note that disconnected wires or
defective sensors may be the cause of the error. Always check connections and wiring first.
Warning
Do not attempt to repair the control module (circuit board). If the control module is defective,
replace it immediately.
10.1 Viewing errors
If one ore more errors are displaying on the status bar, you can view more details by going to the Error
Logs screen.
1. Go to
> Error Logs button. Alternatively, go to
> Error Logs.
2. Tap an error log, and then tap the Details... button. The Error log displays all the errors present
at the time of the error event such as minor errors, major errors, and system faults.
Each error type is displayed as a dropdown that you can select to view the types of errors; for
example, selecting the "View minor errors dropdown may display "SIM: See SIM Status" as a
message.
Tip
Once the errors have been resolved, it is not necessary to wait for the lockout
period to end. See "Clearing Errors" below.
10.2 Clearing errors
When you clear an error, the system clears any error states and forces the controller to reassess the
boiler’s error status and to determine if any error state is still present.
To clear the error(s), go to
> Clear Errors > Yes.
10.3 List of touchscreen controller error messages
In the table below, we've included a list of error messages that you may encounter on a controller as well
as diagnostic steps to help you troubleshoot.
Diagnosis & Recommended
Troubleshooting
Ign. Trials Exceeded
Touch Screen Message:
Error – Ignition Failure after 3 tries Boiler has
failed to ignite on 3 successive attempts. Boiler
in lockout for one hour, then repeats
3-try seq. Consult service technician if error
recurs.
No spark when igniting.
Ignitor probe/flame sensor disconnected, dirty,
or old.
Check that ignitor lead is secure at the control
module and at the probe.
Burner is dirty from construction dust.
Insufficient gas pressure to the boiler.
Manual gas shutoff is closed or gas line not fully
purged.
Check for gas flow. Open manual gas shutoff
and reset boiler.
Gap between ignitor probe rods is too large or too
small.
While the boiler is operating, wiggle the gas
valve connector on the SIM module. If the boiler
stops and starts, you have a poor connection
between the gas valve connector and the SIM
module.
Adjust ignitor probe rod gap between 1/8th and
3/16th (3.2-4.7mm).
Spark, but no ignition.
Check spark module is sending power to gas
valve – close gas supply, then disconnect
(black) electric housing from face of gas valve,
gently spread plastic tabs to open, and look for
24VAC voltage during an ignition cycle.
With the gas valve cable connected, during an
ignition attempt, back probe the blue/brown
wires and look for 24VAC.
Replace module if no current is detected.
Boiler ignites, but shuts off at the end of the
ignition trial. Improperly grounded pressure
80
Section: Troubleshooting
Diagnosis & Recommended
Troubleshooting
vessel/ burner or unserviceable ignition lead or
spark module.
Ensure the pressure vessel is grounded.
Check the igniter probe/flame sensor is
electrically isolated from the vessel, and
its ceramic insulator is intact.
Replace ignition lead
Replace spark module
Vent Pressure
Check the flame signal. If the flame signal is
strong then the error may be caused by the
Pressure Switch opening.
Temp. Probe Error
Other message that may display
simultaneously: Water High Limit or Vent High
Limit.
Check the temperature probe and connection.
Check the wiring connection of the SIM module
connector.
Low Water Cutoff
See Resetting a boiler after a LWCO lockout on
page 85.
If the error persists, perform a manual reset:
> Clear Errors > Yes.
Roll Out Switch
Vent High Limit
The heat exchanger lid gasket may be damaged
or the nuts may not be tightened properly.
1. Check the connections to the Upper
Vessel High Limit switch (Roll Out
switch) at the back of the heat
exchanger.
2. If the switch has been tripped, reset it.
81
10.0 Troubleshooting
Diagnosis & Recommended
Troubleshooting
Low Air Flow
Other message that may display
simultaneously: Flame Sig/Vent Blk.
Check the flame signal at low fire. If the flame
signal is low then:
Check the low fire tuning. See the table
for Low Fire in the Commissioning
section for each boiler model.
Check the condition of the ignitor (e.g.,
bent, damaged or contaminated).
Check that the vent is clear of blockages.
Check that the gas valve is functioning
properly.
Check that the fan is functioning properly.
Other messages that may display
simultaneously: Check SIM status and Check
Ignition Module.
No/Low Water Flow
Reverse flow error
Check that the pumps are operating
correctly.
Install pump so it provides flow in the
correct direction.
Water High Limit
Check that the supply water temperature sensor
is connected and working properly.
Check wiring on the SIM module.
If this is satisfactory, check that the water
pumps are working properly.
See Resetting a boiler after a hi-limit
temperature lockout on page 86.
Vent High Limit
Other message that may display
simultaneously: Temp. Probe Error
Check the vent temperature sensor is connected
and working properly.
Check the wiring connection of the SIM module
connector.
If this is satisfactory, check that the water
pumps are working properly.
82
Section: Troubleshooting
Diagnosis & Recommended
Troubleshooting
Inlet Pres. Sensor
Check that the Inlet Pressure Sensor is
connected properly. It may need replacing.
Check the connector on the back of the circuit
board.
Other message that may display: Inlet Pres.
Sensor.
Ignition Module
Other message that may display
simultaneously: Low Module Current.
1. Check the gas flow. Open the manual
gas shutoff, if necessary.
2. See Resetting a boiler after a SIM module
ignition lockout on page 85.
See About Status indicators on page 11.
Low Water Pressure
Check for a plugged or dirty water sensor part.
Max deltaT Exceeded
This may be a temporary condition that may
clear automatically.
Check the Specifications table for the
boiler to ensure the maximum ΔT is not
exceeded.
The water flow in the pumps may be too
low. Check that the water pumps are
functioning properly.
Check the Specifications table that the
flow is higher than the minimum boiler
flow rate. Other message that may
display simultaneously: No/Low Water
Flow.
Failed primary boiler pump.
Blown primary pump fuse on the main
control board.
83
10.0 Troubleshooting
Diagnosis & Recommended
Troubleshooting
Output Limited (warning) - indicates that the
boiler is limiting/reducing water temperature
and/or vent temperature output.
Warning may appear if:
The Inlet/Outlet water temperature
differential exceeds the maximum
allowed.
The inlet water temperature is very close
to the max. outlet water temperature.
The vent temperature is too high.
If the warning persists, the status bar will display
a "Max deltaT Exceeded" alarm or "Vent High
Limit" alarm.
GV / Ign Module Gas valve or Ignition Module
(depending on software)
Check the ignition or the SIM module.
Check that the gas valve and gas valve
cable are functioning properly.
Interlock 1 Open / Interlock 2 Open
Jumper lead is loose or compromised. Replace
the jumper lead.
External safety is in an alarm state. External
safety wired to Interlock has tripped or
malfunctioned.
Inspect the external safety devices.
High/Low Press (Only EX models)
Indicates that the gas pressure entering the
boiler is too high or too low.
Reset the gas pressure switch.
Other errors:
“ Loop/Indoor Sensor”
“Insufficient Air Flow”
“Insufficient Water Pressure”
“Unknown Error”
The sensor plug is not engaged.
Check the P501 plug is fully engaged in the back
of the controller board (see Controller Board
Layout on page 93).
84
Section: Troubleshooting
10.4 Backing up (exporting) error logs
You may need to back up an error log onto a USB stick to send to IBC's Technical Support team for
troubleshooting.
1. To back up an error log, go to
> Error Logs > Select an error log (link) > Export > Insert
the SD card or USB stick into the side of the controller > Yes.
2. After the data is copied, remove the device from the controller > Close.
10.5 Deleting or clearing an error log
Deleting will delete all entries in an error log.
Go to
> Error Logs > Choose an error log (link) > Delete all > Yes to clear all entries in the
error log.
10.6 Resetting a boiler after a SIM module ignition lockout
If you are at the boiler when the boiler is locked out due to an ignition error, you can use the Module
Reset function to avoid having to wait the 5-minute lockout period. For example, use Module Reset to
clear the "Check SIM Module" error displayed on SL G3 models.
Go to
> SIM Menu> Module Reset > The message "The SIM module has been reset" is
displayed > Close.
10.7 Resetting a boiler after a LWCO lockout
A boiler that has been placed in a lockout condition due to a LWCO error will need to be reset in the
controller's SIM module.
1. Go to
> Clear Errors > Yes.
2. Check that there is enough water in the system.
3. To reset the SIM Module, go to
> SIM Menu> LWCO Test > Reset > Yes.
4. Run the boiler to ensure that the error has been cleared.
85
10.4 Backing up (exporting) error logs
5. If the error persists, test the LWCO. Go to
> SIM Menu> LWCO Test > Run the test
to check if the low water cutoff sensor is opening.
10.8 Resetting a boiler after a hi-limit temperature
lockout
A boiler that has been placed in a lockout condition due to a hi-limit temperature error will need to
be reset in the controller's SIM module.
1. Go to
> Clear Errors > Yes.
2. Check that there is no air trapped in the system.
3. To reset the SIM Module, go to
> SIM Menu> Hi-Limit Test > Reset > Yes.
4. Run the boiler to ensure that the error has been cleared.
5. If the error persists, perform a hi-limit test. Go to
> SIM Menu> Hi-Limit Test > Run
the test to see if the hi-limit switch is opening. You can also perform this test for gasket
blowouts.
86
Section: Troubleshooting
11.0 Definition of terms
Term
Definition
Add Level
(%)
Sets the relative ouput level at which an idle boiler fires up. This is a percent of the
maximum firing rate of the lead boiler – on a 40-399 G3, for instance, a value of 60
would correspond to an output of 399 x 60/100 = 239. Note that this value must be at
least 10 higher than the Drop Level (%), which will be adjusted to satisfy this if Add
Level (%) is changed.
Aquastat
Control
Device used in hydronic heating systems for controlling water temperature. Typically
used to manage domestic hot water temperature in an indirect water heater.
BACnet
A Data Communication Protocol for Building Automation and Control Networks - A
protocol that provides information about a boiler’s heating, ventilating, and air
conditioning control (HVAC), lighting control, access control, and fire detection.
Boiler Pump
Enables you to shut off the Boiler Pump (primary loop pump) while a load is running.
The load pump must be piped (series piping) to ensure adequate flow through the boiler
without needing the Boiler Pump to provide flow through the heat exchanger.
When you set the Boiler Pump to "Off" a warning message appears as a reminder. If
the load is a radiant floor, we strongly recommend using primary or secondary piping
and leaving the Boiler Pump set to "On".
Boiler Pump
Purge Time
(Site
Settings)
Adjustable independently of the four load pumps. Many installations use a primary
(boiler) loop. We recommend that the boiler pump operate for 3 – 5 minutes after all
calls for heat have been satisfied.
Boiler
Turndown
A ratio that compares the full maximum boiler heat output (high fire) to the minimum
level of heat output (low fire).
Call for Heat
A call for heat could be: The thermostat is indicating that room temperature is below
the thermostat setting. An Aquastat calling for DHW. The tank sensor calling for
DHW.
Classic-DDC
control
Involves separate dry-contact calls and throttle control signals to each boiler from
external DDC. (Not generally recommended.)
Cycles
Running tally of the number of calls for heat that a load has received in the last 24
hours. Fewer cycles per day = better efficiency.
Delta T
Difference between the supply water temperature and the return water temperature.
Drop Level
(%)
Sets the relative output level at which a firing boiler will be shut down as a percent of
the maximum firing rate of the master boiler. Note that this value must be at least 10
lower than Add Level (%), which will be adjusted to satisfy this when Drop Level (%) is
changed.
DSP
Daylight Standard Pacific - time zone update.
87
11.0 Definition of terms
Fail Safe Enable is available only in External Control and only if the "Burner On From"
is set to External Control. If this feature is active and the External Control voltage
drops below 0.25Vdc, the boiler automatically turns on the Boiler Pump (if set to "ON"),
the load pump, and operates the boiler to the Fail Safe Set Point temperature. This
temperature set point is adjustable.
Failsafe SP
Differential
The supply differential used by the subordinate boiler while in Failsafe SP mode. If the
supply temperature exceeds Failsafe SP + (Failsafe SP Differential) / 2, then the boiler
will enter Circulating until the supply temperature decreases to Failsafe SP – (Failsafe
SP Differential) / 2, at which point it will reignite and enter heating again.
Failsafe SP
Delay (min)
The delay in minutes of lost communication with the master, and the subordinate boiler
entering Failsafe SP mode.
Failsafe
Setpoint SP
When set to On, provides the ability to maintain a setpoint temperature in subordinate
boilers if communication with the master is lost.
Only available on subordinate boilers, it enables default setpoint operation. If a boiler
receives no communication from a master boiler for a period of time (how long?), it will
fire at the preset setpoint/differential until communication resumes.
Firing Order
Firing Order determines which boiler is shut down first. If FirstOn/FirstOff is selected,
the first boiler fired up will be shutdown first. If FirstOn/LastOff is selected, then the
most recently fired boiler will be shutdown first.
Fixed Lead
A boiler that is always the first to fire up. Appears as a field if Master, Primary Master,
or Secondary Master are set to "On". If Fixed Lead is set to "On", then the active
master will always attempt to fire first, before any other boilers. Otherwise, the boiler
with the lowest burner on time will attempt to fire first.
Fully
autonomous
mode
Designation of a master boiler that will receive all sensor and dry contact call-for-heat
signals, manage the secondary pump(s) and, via BoilerNet connection, coordinate
firing of all subordinate boilers. This fully autonomous approach uses IBC’s internal
heat regulation and boiler management software.
Group Add
Level (%)
Similar to Add Level (%) for master boilers, this is the relative output level at which the
Group Opt Out Lead will bring another boiler on to service the Group Opt Out load. Note
that this value must be at least 10 higher than Group Drop Level (%), which adjusts to
satisfy this if Group Add Level (%) is changed.
Group Drop
Level (%)
Similar to Drop Level (%) for master boilers, this is the relative output level at which the
Group Opt Out Lead will shut down a boiler that is currently servicing the Group Opt
Out load. Note that this value must be at least 10 lower than Group Add Level (%),
which adjusts to satisfy this if Group Drop Level (%) is changed.
Group Opt
Out Lead
This boiler is the Group Opt Out lead, and is the first to fire when a call for heat is
received on the Group Opt Out load. Makes the remaining Group Opt Out fields visible.
Group
Staging
Delay (min)
Similar to Staging Delay (min) for master boilers, this value determines the number of
minutes between boilers being fired up or shut down by the Group Opt Out Lead.
88
Section: Definition of terms
Summarized as the ratio at which the water temperature increases as the outdoor
temperature decreases.
Heating
Enabled
The boiler is powered and there is a Call for Heat, Heat is Required. The boiler will start
and enter the Heating Cycle unless it is in an error mode.
Heat pump
Uses electricity to draw heat out of a building in the summer (to cool the space) and
heat from the outside air to indoors in the winter time (to warm the space).
Heat
Required
Temperature sensors on the boiler indicate that water temperature is below the water
temperature target or setpoint.
Indoor ° From If an indoor temperature sensor is being used, the sensor will normally be connected to
the TB2 Indoor Sensor terminals on the controller board. Alternatively the TB2 2nd
Loop Sensor input terminals can be wired to the indoor temperature sensor. If using
TB2 2nd Loop Sensor, you must configure the Indoor ° From setting as Sec. Loop. Use
for shop or warehouse, but not for residential properties.
HVAC
Heating, ventilation and air conditioning system.
Master
Rotation
Rotates the role of active master between any boilers configured as Primary or
Secondary Masters on the network. This feature confirms that master redundancy is
functioning properly. The time between master rotations is 24 hours. The active master
will not attempt to pass the role of active master to a master currently in an Error or
Circulating state, or to a Secondary Master currently servicing an opt out load.
n/c
Not connected
NTP Server
Network Time Protocol
Opt out
A term used by IBC to describe a boiler that "opts out"or becomes unavailable to a
network to satisfy a request. Typically, opt out boilers are used and dedicated to
service DHW.
89
11.0 Definition of terms
Opt out types
Load 1-4
The Opt Out Type for each load dictates how the load is handled by the multi-boiler
algorithm.
None: Only for boilers configured as a master. This load is serviced by the
entire multi-boiler network (the master will not opt out to service the load, but
will use all boilers to service it).
Single:
A subordinate boiler will opt out of the main multi-boiler network to service
a load.
Master boilers with a load configured as Single will opt out to service that
load, but will continue to control the subordinates and run the highest
priority multi-boiler load.
Group: The boiler will opt out of the main multi-boiler network to service this
load if commanded by the Group Opt Out Lead. Mainly for DHW purposes, it
allows a subset of the main multi-boiler network to be configured to opt out from
the main network load as needed to service the DHW load.
Note: The same load (1-4) must be configured as Group Opt Out on each boiler
in the group. For example, if Load 2 is configured as Group Opt Out on Boiler #1,
and you want #2 and #3 to also be part of the opt out group, then Load 2 must be
configured as Group Opt Out on boilers #2 and #3 as well.
One boiler must be chosen as the Group Opt Out Lead – this is the only boiler
that needs a physical call for heat (such as a thermostat) wired into the
controller on the Group load.
Only one opt out group is permitted per network. Once one load is configured as
Group, it must be set back to Single or None before a different load can be
configured as Group.
Outdoor °
From
The Default setting is Outdoor. If an outdoor temperature sensor is being used the
sensor will normally be connected to the TB2 Outdoor Sensor terminals on the
controller board. Alternatively the TB2 2nd Loop Sensor or the DHW Sensor input
terminals can be wired to the outdoor temperature sensor. To support these alternate
wiring options the "Outdoor ° From" setting must be set to Sec. Loop or DHW to
correspond with the wiring.
Priority
A load has a priority value between 20 and 90. Note: The Priority Value has to be
different for each load. A higher numerical value means a higher priority. Consider
these values as minutes. The difference between two load priority values is the
number of minutes the higher priority load will be allowed to operate before switching
back to the lower priority load. For example, if DHW has a priority of 80 and the Set
Point load has a priority of 50, the DHW load will operate for (80-50) 30 minutes while
the Set Point load is temporarily turned off.
Pump Post
Purge (sec)
How long a load pump operates after the call for heat has ended. Each load pump can
90
Section: Definition of terms
be operated for a period of time after the call for heat has ended. This feature takes the
heat left-over in the heat exchanger and nearby boiler piping after the burner has turned
off and pumps it into the load. A good example of this is the indirect water heater DHW
load. After the tank has reached its target temperature, the boiler shuts down, but
allows the load pump to operate for a period of time to transfer heat that is stored in the
boiler’s heat exchanger into the hot water tank. You can adjust this feature in seconds
from 0 to 900 (15 min). If the load has zone valves that close off the flow to the load as
the boiler shuts down, this can be set to 0 sec. You can set each load independently to
provide maximum flexibility.
Ramp Speed How fast the boiler tries to raise the water temperature flowing through the heat
emitters. With a fin tube baseboard radiator, you may want the water temperature to
rise quickly to provide heat as quickly as possible. This type of heat emitter has very
little mass, so it can heat up quickly. When the call for heat is removed, it cools down
quickly. Generally this requires a higher (faster) ramp speed. A radiant floor, on the
other hand, has significant mass, and therefore takes a long time to heat up. When the
call for heat is removed, the floor is still warm and continues to add heat to the space
for a significant period of time. If the indoor temperature overshoots the desired indoor
temperature, we recommend reducing the Ramp Speed value. Generally this requires
a lower (slower) ramp speed. You can manually set the Ramp Speed by choosing a
value from 1 to 10. A setting of 1 will raise the water temperature very slowly and 10
will raise the water temperature very quickly.
Rotation
Rotation monitors the boilers on the network for a difference of more than 48 hours in
burner on time. If a boiler is currently firing, which has 48 hours or more of burner on
time than a currently idle boiler, the active master will tell the idle boiler to fire up.
Once the master detects that the rotated in boiler is in Heating mode, and has finished
its post ignition hold, it will tell the rotated out boiler to shut down. If the rotated in boiler
is in Error, Circulating, or does not complete its post ignition hold within 2 minutes, the
rotation will be declared a failure and the rotated out boiler will continue firing as before.
Rotation balances the amount of time each boiler spends firing. If a run time difference
of more than 48 hours is detected between the currently firing boiler with the most run
time and the idle boiler with the least run time, the running boiler will be shut down and
the idle boiler will be fired up.
Semi-
autonomous
mode
Involves a remote analogue signal to the master boiler’s External Control terminals.
This signal corresponds to a target set-point temperature, with the range scaled
according to the programmed min-max temperatures. IBC’s multi-boiler heat regulation
algorithm still determines which boiler fires, throttle levels etc., but to an externally
determined operating temperature. Call-for-heat to the Master can be conveyed via a
2.1+ VDC signal on the External Control terminal, or via a dry contact boiler enable
with the 0-10VDC input for target temperature.
Short Cycling A boiler’s burner turns on and off frequently. This leads to shorter component life,
reduced efficiency, and higher emissions. A cycle on/off time typically should be 10
minutes or longer.
91
11.0 Definition of terms
The number of minutes between boilers being fired up or shut down by the master, that
is, the length of time before the next boiler is brought online once the current firing
boiler has passed its add boiler firing rate level. It must be at minimum equal to time for
closed-loop water to complete one full circuit of system. For large mass systems,
allow for two or more loop times.
Water° From
The Default setting is Outlet. When set to Outlet, the controller determines the supply
water temperature from the outlet temperature sensor on the boiler. Alternatively the
2nd Loop Sensor or the DHW Sensor input terminals can be wired to a water
temperature sensor. To support these alternate wiring options the Water ° From setting
must be set to Sec. Loop on DHW to correspond with the wiring. Multi-boiler: Most
have an external sensor mounted on the building supply water.
92
Section: Definition of terms
This section includes the controller board diagram, internal wiring diagram, Opt out DHW wiring
diagram, and sequence of operation.
Controller Board Layout
Figure 20 Front and back of controller
93
Appendices
Internal wiring diagram VX series boilers
Figure 21 VX series - internal diagram
94
Section: Appendices
Sequence of Operation - VX series boilers
Figure 23 VX series - Sequence of Operation
96
Section: Appendices
air in boiler 71
domestic hot water
temperature 72
space heating
temperature 72
Advanced Setup menu 15
setting loads 52
temperature ranges and
defaults 32
AHU Comm. Enabled 60
air purge 71
B
Backing up or restoring boiler
configuration and
settings 74
backlight 14
BACnet
5-button controllers on
network 60
Boiler Information 9
C
calibrate touchscreen 16
CANBus Master 60
characterized heating
"curve" 21
Checking water flow 72
clean the screen 14
Clear errors
about error states 12
Combining loads
setting two loads using
full mode 56
D
Date & Time 14
setting 76
DHW
about 17
adjusting 72
opt-out boilers on
network 17
priority load 17
differential 29
Domestic hot water
(DHW) 17
E
Engineer options 16
Error
Clear errors 79
list of controller error
messages 79
major 11
97
minor 11
SIM Status 12
states 12
system faults 12
Error logs 11
backing up
(exporting) 85
deleting/clearing
entries 85
Ethernet switch device 44
External Control 23
control single boiler
water
temperature 54
setting 53
wiring 42
F
factory defaults
resetting to 75
fan calibration 71
fan operation testing 69
firing rate
adjusting 71
testing 70
fixed IP addresses,
assigning 59
Installer Options 16
Internet access
connecting boiler to IP
network 65
setup 65
Internet connectivity 44
L
Licensing
BACnet 15
Load combining
about 26
basic mode 26
combining two loads 55
example compatible
load 28
full mode 27
incompatible load
combining 29
setting two loads in basic
mode 55
load priority
setting 24
Load Status 9
lockout
resetting hi-limit
temperature 86
resetting low water
cutoff 85
resetting SIM module
ignition 85
LWCO error
resetting after lockout 85
M
manual pump purge 71
More menu
about 13
multi-boiler setup 57
multiboiler
assigning fixed IP
addresses 59
Multiboiler
advanced settings 57
checking programming 59
checklist for setup 57
configuring master
boiler 57
configuring subordinate
boilers 58
confirming boilers
available in
network 59
wiring 43
N
Network information 13
Network Settings 16
O
Overrides 14
setting 72
P
password
installer password 75
setting password
protection 75
user password 75
Power up sequence &
operating
states/cycles 7
R
replacement touchscreen
controller,
programming 78
Reset factory defaults 16
Reset heating
about 18
advanced mode 21
characterized heating
curve settings 22
standard mode 19
Reset heating curve
sending air handler data
to IBC boiler to
control reset
heating curve 60
Restart boiler 16
S
Sensors and channels 12
sequence of operation 7
Set Point
about 22
programming target
range 23