IBC EX Series Installation & Operating Manual
Read Online
Read the IBC EX Series Installation & Operating Manual online using the built-in PDF viewer.
Text of the manual
Commercial Condensing Boilers
EX 400
EX 500
EX 700
EX 850
WARNING
If the information in this manual is not followed exactly, a fire or explosion may result causing
property damage, personal injury, or loss of life.
Do not store or use gasoline or other flammable vapors and liquids or other combustible materials in
the vicinity of this or any other appliance.
If you smell gas:
Do not try to light any appliance.
Do not touch any electrical switch; do not use any phone in your building.
Immediately call your gas supplier from a nearby phone. Follow the gas supplier’s instructions.
If you cannot reach your gas supplier, call the fire department. Installation and service must
be performed by a qualified installer, service agency or the gas supplier.
Water quality has a significant impact on the lifetime and performance of a boiler's heat
exchanger.
Improperly prepared water in a heating circuit may cause damage to the heat exchanger
through fouling or corrosion. Repeated or uncontrolled water fills will increase the potential for
damage.
High levels of dissolved solids or minerals may precipitate out of the fluid onto the hottest part
of the heat exchanger, impairing heat transfer and resulting in overheating and premature
failure. The amount of solids that may form on the heat exchanger will depend on the degree of
hardness and the total water volume in the system. A high water volume system with a low
hardness count may cause as much damage as a system with less volume and higher
hardness, so it is recommended to treat water so as to remove all dissolved solids. Other water
chemistry allowable limits are as follows:
Acidity pH is to be between 6.6 and 8.5
Chloride is to be less than 125 mg/l
Iron is to be less than 0.3 mg/l
Cu less than 0.1 mg/l
Conductivity is to be less than 400μS/cm (at 77°F [25°C])
7 grains/ gal (120 ppm)
Important: Ensure that these limits are acceptable for the other water-side components in the
system.
Shipped with the boiler:
4 x anchor brackets (installed on pallet)
Condensate trap IBC # P-1221
Tridicator IBC # P-1234
Relief valve IBC # P-1205
2 x Inlet gas pressure test fittings, IBC part # 190-206
2 x spare air filters, IBC # P-381
Outdoor sensor, IBC part 240-025
Manual safety markings
5
Important safety instructions
5
Known contaminants
6
Specifications
7
Connection specifications
8
Cabinet dimensions
9
1.0 Introduction
11
1.1 Standard features and benefits
12
1.2 Warranty
12
2.0 Before installation
13
3.0 Installation
15
3.1 Code requirements
15
3.2 Determining location of the appliance
15
3.2.1 Factors to consider for best installation conditions
16
3.3 Unpacking a boiler
17
3.4 Installation clearances
18
3.5 Exhaust venting and air intake venting
18
3.5.1 Code
19
3.5.2 Applications
21
3.5.3 Exhaust vent material
21
3.5.4 Vent travel
22
3.5.5 Venting passage through ceiling and floor
24
3.5.6 Rooftop vent termination
25
3.5.7 Sidewall vent termination
27
3.5.8 Direct vent combustion air intake piping
32
3.5.9 Indoor air combustion air intake
35
3.5.10 Combustion air filtration system
36
3.6 Installing a condensate trap
37
3.7 Installing a condensate neutralizer
39
3.8 Water Piping
41
3.8.1 General piping best practices
43
3.8.2 System piping
44
3.9 Gas piping
53
3.9.1 Gas pressure
53
3.10 Electrical connections
54
3.10.1 Power quality and electrical protection
55
3.10.2 120VAC line-voltage hook-up
55
3.10.3 Other wiring
58
3.10.4 Thermostat / sensor wiring
58
3.10.5 Thermostat heat anticipator
59
4.0 About the boiler controller
61
4.1 Controller
61
4.2 Controller interface
62
5.0 Before operating the boiler
63
5.1 Important pre-ignition checks
63
5.1.1 Checklist for electrical conditions, ducting and water connections
63
6.0 Boiler operation
65
6.1 Lighting and shutting down the boiler
65
6.2 Testing the ignition safety shutoff
66
6.3 Commissioning
66
6.3.1 Checking a boiler's fuel source
66
6.3.2 Performing a fuel conversion
67
6.3.3 Measuring the inlet gas pressure
72
6.3.4 Adjusting the gas valve (EX 400, EX 500)
74
6.3.5 Adjusting the gas valve (EX 700, EX 850)
76
6.3.6 Resetting the gas high / low pressure switches
77
7.0 Service and maintenance
79
7.1 Maintenance checklists for heating contractor
79
7.1.1 Venting
80
7.1.2 Condensate trap
80
7.1.3 Burner
80
7.1.4 Heat exchanger
81
7.1.5 Pump
81
7.1.6 Gas piping
81
7.1.7 Touchscreen boiler controller
82
2
Section: Contents
7.1.9 Freeze protection
83
7.1.10 Boiler treatment
83
7.1.11 Relief valve - maintenance and testing
84
7.2 Replacing the fan, gas valve, and burner in EX 400 and EX 500 models
85
7.2.1 Replacing the fan on the EX 400 and EX 500 models
86
7.2.2 Replacing the gas valve in the EX 400 and EX 500 models
87
7.2.3 Replacing the burner in the EX 400 and 500 models
90
7.3 Replacing the fan, gas valve, and burner in EX 750 and EX 800 models
96
7.3.1 Replacing the fan on the EX 700 and EX 850 models
97
7.3.2 Replacing the gas valve in EX 700 and EX 850 models
98
7.3.3 Replacing the burner in the EX 700 and EX 850 models
100
7.4 Replacing the air filter
102
7.5 Cleaning a condensate trap
103
8.0 Troubleshooting
105
8.1 Preliminary checks
105
8.2 Electronic components
106
8.2.1 Temperature sensors
106
8.2.2 Fan
107
8.2.3 Air pressure sensor
107
8.2.4 Water pressure sensor
107
8.2.5 Gas pressure switches
108
8.2.6 Safety and Ignition Module (SIM)
108
8.3 Troubleshooting error messages
111
8.3.1 Touchscreen error messages
111
8.3.2 Maximum ignition trials error
112
8.3.3 Hi/Low gas pressure switch error
113
8.3.4 Hi Limit cut-off temperature error
113
8.3.5 Low Water Cut-off error
113
8.3.6 Aux. Interlock 1 or 2
113
8.4 Miscellaneous touchscreen controller errors
114
8.4.1 Ignition issues
115
8.4.2 Temperature issues
116
8.4.3 Miscellaneous issues
117
8.4.4 Cycling issues
118
3
Installation & Commissioning Report
123
Boiler parts diagram - EX 400 and EX 500
125
Boiler parts diagram - EX 700 and EX 850
129
Revision history
133
4
Section: Contents
Manual safety markings
Danger
Points out an immediate hazardous
situation that must be avoided to
prevent serious injury or death.
Warning
Points out a potential hazardous
situation that must be avoided to
prevent serious injury or death.
Caution
Points out a potential hazardous
situation that must be avoided to
prevent possible moderate injury
and/or property damage.
Note
Points out installation, maintenance and
operational notes to enhance efficiency,
longevity and proper operation of the
boiler.
Important safety instructions
Installation, start-up and servicing of IBC boilers must be performed by competent, qualified, licensed
and trained heating technicians.
Failure to read and comply with all instructions and applicable national and local codes may result in
hazardous conditions that could result in property damage and injury to occupants, and in extreme
cases to death. Keep instructions near the air handling appliance for future reference.
Danger
Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any
other appliance. If you smell gas vapors, do not try to operate any appliance - do not touch
any electrical switch or use any phone in the building. Immediately, call the gas supplier from
a phone located remotely. Follow the gas supplier’s instructions, or if the supplier is
unavailable, contact the fire department.
Warning
Improper installation, adjustment, alteration, service or maintenance can cause property
damage, personal injury, or loss of life. Read and understand the entire manual before
attempting installation, start-up, operation, or service. Installation and service must be
performed only by an experienced, skilled installer or service agency.
Failure to follow all instructions in the proper order can cause personal injury or death. Read
all instructions, including all those contained in component manufacturers’ manuals before
installing, starting up, operating, maintaining, or servicing the appliance.
Disconnect power supply before any wiring/service is performed. Failure to do so could
result in damage to appliance and/or electric shock.
Caution
The boiler must be installed so that electrical components are not exposed to water during
operation.
Known contaminants
Known Corrosive Contaminants to Avoid
Cements and glues
Refrigerant leaks from cracks in coils
Paint or varnish removers
Sodium chloride or potassium chloride used for
water softening
Adhesives used to fasten building products
and other similar products
Chemicals in perming solutions
Chlorinated waxes or cleaners
Chlorofluorocarbon chemicals found in spray cans
Chlorine-based swimming pool chemicals
Antistatic dryer sheets in clothes dryers
Hydrochloric acid or muriatic acid used in
household cleaning and stain removal
Chlorine-type bleaches, detergents, and cleaning
solvents found in household laundry rooms
Calcium chloride used for snow and ice
clearing
6
Section: Safety information
CSA Input (natural gas or propane) -
MBH
40-399
50-500
70 - 700
85 - 850
CSA Input (natural gas or propane) - kW
11.7 - 117
14.6 - 146.5
20.5 - 205
24.9 - 249
CSA Output - MBH
388
485
679
824.5
CSA Output - kW
114
142
199
241.6
Thermal Efficiency
97.9
97.5
97.0
97.0
Minimum gas supply pressure (natural
gas or propane) - inch w.c.
4
4
4
4
Maximum gas supply pressure (natural
gas or propane) - inch w.c.
14
14
14
14
Ambient temperature:
Low °F / °C
High °F / °C
32 / 0
122 / 50
32 / 0
122 / 50
32 / 0
122 / 50
32 / 0
122 / 50
Max. relative humidity (non-condensing)
90%
90%
90%
90%
Minimum water temp. °F / °C
34 / 1
34 / 1
34 / 1
34 / 1
Maximum water temp. (electronic hi-
limit) °F / °C
190 / 88
190 / 88
190 / 88
190 / 88
Max. ΔT - supply/return (electronic
fence) °F / °C
80 / 44
80 / 44
80 / 44
80 / 44
Max. Water Temperature Lockout Limit
°F / °C
201 / 94
201 / 94
201 / 94
201 / 94
Power use (120Vac/60Hz) @ full fire -
Watts (less pumps)
150
210
195
228
Weight (empty) - lbs/Kg
Approx. 414 /
188
Approx. 441 /
200
Approx. 486 /
220
Approx. 510 /
231
Heating surface area - ft2 / m2
55.3 / 5.14
72.9 / 6.77
84.6 / 7.86
99.88 / 9.28
Pressure vessel water content -
USG/Liters
13.5 / 51.1
12.4 / 46.9
17.5 / 66.3
16.4 / 62.0
Maximum boiler flow rate - USgpm
100
100
100
100
Minimum boiler flow rate - USgpm
10
12
18
21
Maximum operating water pressure* -
psig
160
160
160
160
Minimum water pressure - psig
8
8
8
8
Relief valve pressure (supplied) - psig*
50
50
50
50
Approved installation altitude - ASL
0 - 12,000'
0-12,000'
0 - 12,000'
0-12,000'
Maximum equivalent vent length each
side (vent & air intake) (natural gas or
propane)
Air intake options: either direct vent or
indoor supply
170'
170'
120'
120'
*These alternative relief valves can be purchased: 30, 100, 125 and 150.
Connection specifications
The following table displays the required connection specifications for each model.
EX 400, EX 500
EX 700, EX 850
Flue Outlet
4" Schedule 40
6" Schedule 40
Combustion Air Inlet
4" Schedule 40
4" Schedule 40 (See note
below)
Water Outlet
2" NPT-M
2½" NPT-M
Water Inlet
2" NPT-M
2½" NPT-M
Knock-outs (8)
½"
½"
Gas Inlet
1" NPT-F
1" NPT-F
Condensate Outlet
¾" Hose
¾" Hose
Table 1 Connections
Note
You must use a reducer to connect 6" vent piping to the 4" vent collar. See Figure 22 .
8
Section: Specifications
Figure 1 Frontal view - EX 400, EX 500
Figure 2 Back view - EX 400, EX 500
Figure 3 Top view - EX 400, EX 500
9
Cabinet dimensions
Figure 4 Frontal view - EX 700, EX 850
Figure 5 Back view - EX 700, EX 850
Figure 6 Top view - EX 700, EX 850
10
Section: Specifications
IBC's range of large commercial boilers is the solution for large-scale projects such as apartment
buildings, office buildings, big schools, hospitals, and hotels.
Figure 7 Front internal view
Figure 8 Back view of boiler
1.1 Standard features and benefits
High thermal efficiency
Built-in BACnet option
Turn-down ratio 10 to 1
Built-in 4-zone pump control
Multiple boilers: Up to 24 boilers can be connected without external controls
Maximum allowable ∆T=80 °F (44 °C)
50 psi relief valve (345 kPa)
Boiler pump control up to ¾ H.P. 120V or 208/240V
1.2 Warranty
IBC offers a 10-year-limited warranty on the EX series heat exchanger and a 2-year warranty on all
parts against defects in materials or workmanship and failures due to thermal shock.
For more information and to obtain the EX series warranty form, go to ibcboiler.com.
12
Section: Introduction
2.0 Before installation
Before installing the appliance, it is important to review and observe the following checklist of
precautions:
Precautions
Check
Care must be taken to properly size the boiler for its intended use.
Prolonged full fire run time, over-sizing or under-sizing, and incorrect flow rates through the
boiler can lead to increased maintenance costs, equipment stress and premature failure.
□
Ensure you install the boiler where the combustion air source is not subject to chemical
fouling or agricultural vapors.
Exposure to corrosive chemical fumes such as chlorinated and/or fluorinated hydrocarbons
can reduce the life of a boiler. Cleaners, bleaches, air fresheners, refrigerants, aerosol
propellants, dry-cleaning fluids, de-greasers and paint-removers all contain vapors that can
form corrosive acid compounds when burned in a gas flame. Airborne chlorides such as
those released with the use of laundry detergents are also to be avoided.
□
Locate the boiler where water leakage will not result in damage to the area.
If there is no suitable location, install a suitable drain pan under the boiler. Do not install
above carpeting.
□
At a new construction site, or during renovations, protect the boiler from drywall dust or other
construction related contaminants.
Draw combustion air from a clean source (e.g., outdoors) and isolate the boiler from interior
dust sources. Do not seal boiler case openings directly when firing - allow for air circulation
and ventilation in the immediate area.
□
Place the exhaust outlet 12" minimum above the down-turned intake to avoid exhaust re-
ingestion.
□
For sidewall venting options, place the inlet and exhaust terminations on the same side of
the building.
The elevation of both pipes can be raised in “periscope style” after passing through the wall
to gain required clearance above grade and snow level.
□
If using the indoor combustion air option, ensure combustion air openings to the boiler room
remain unblocked and free of obstructions.
□
Examine the condensate outlet to ensure proper disposal of condensate will occur during
operation. If condensates are to be discharged into building drain piping materials that are
subject to corrosion, a neutralization package must be used.
□
Ensure that the pressure relief valve is installed with no valves or other means of isolation
between its inlet and the boiler. Make sure the relief valve outlet is piped with unobstructed
piping (minimum 1" diameter) to a safe discharge location.
□
If the boiler is likely to be exposed to fluid temperatures below 34° F (1° C), a method of
protection to prevent freezing of condensate should be employed. Contact the factory for
further information.
□
When the boiler is in operation, assess the impact of the steam plume normally at the
exhaust terminal of a condensing boiler.
Generally, intake and exhaust pipes should terminate at a rooftop or sterile wall location.
Boiler condensate is corrosive. Protective measures must be taken to prevent corrosion
damage to metal roofs or other metal building components in contact with the condensate.
Keep exhaust plumes well away from all building air intakes including those of neighboring
properties.
□
Caution
Care must be taken to properly size the boiler for its intended use. Prolonged full fire run
time, over-sizing or under-sizing, and incorrect flow rates through the boiler can lead to
increased maintenance costs, equipment stress and premature failure.
14
Section: Before installation
The gas-fired modulating boilers are low pressure, fully condensing appliances having a variable input
range. Approved as “Category IV” vented appliances, the boilers use either Direct Vent (sealed
combustion) or indoor combustion air, providing a great degree of installation flexibility.
3.1 Code requirements
The boilers are tested and certified under CSA 4.9-2017 / ANSI Z21.13-2017. Below are the code
requirements for every installation.
Canada
US
Conform to local codes, or in the absence of
these, with the latest editions of CAN/CGA
B149.1 and the Canadian Electrical Code Part 1
CSA C22.2 No. 1.
Where required by jurisdiction, installation must
conform to the Standard for Controls and Safety
Devices for Automatically Fired Boilers,
ANSI/ASME CSD-1.
If there is any conflict, follow the more stringent
regulations.
Conform to the current National Fuel Gas Code
ANSI Z223.1 and the National Electrical Code
ANSI/NFPA 70.
Where required by jurisdiction, installation must
conform to the Standard for Controls and Safety
Devices for Automatically Fired Boilers,
ANSI/ASME CSD-1.
If there is any conflict, follow the more stringent
regulations.
Table 2 Code requirements by country
3.2 Determining location of the appliance
The boilers are designed and approved for indoor installation in areas such as an alcove, basement, or
utility room. These areas should have a surrounding temperature of 32 °F (0°C) to 122 °F (50 °C) and
less than 90% relative humidity.
Even though EX models are approved for installation on combustible floors, do not install them on
carpet.
Keep the area around a boiler clear of combustible materials, gasoline, and other
flammable vapors and liquids.
Ensure combustion air is not drawn from areas containing corrosive air such as
swimming pools or spas, including air directly next to outdoor pools and spas.
Ensure that a boiler is not exposed to water leaks from piping or components
located overhead, including condensation from uninsulated cold water lines
overhead.
Protect the gas ignition system components from water (dripping, spraying, rain,
etc.) during appliance operation and when servicing (pump replacement,
condensate trap servicing, control replacement, etc.).
Ensure that combustible materials do not make contact with exposed water
piping and associated components (relief valves, circulators, etc.). Check local
codes for required clearances and/or provide adequate insulation.
3.2.1 Factors to consider for best installation conditions
Install the boiler in areas where the combustion air source is not subject to chemical fouling
or agricultural vapors. Exposure to corrosive chemical fumes such as chlorinated and/or
fluorinated hydrocarbons can reduce the life of a boiler. See list of Known contaminants on
page 6. For this reason, do not use the indoor air venting option (using air surrounding the
boiler) in a laundry room. Similarly, ensure any direct vent air source is not near a clothes
dryer exhaust terminal. Avoid agricultural applications where the boiler and/or the intake air
source are affected by ammonia and/or dust.
Avoid installing a boiler where water leakage will cause damage; for example, above
carpeting. If unavoidable, install a suitable drain pan under the appliance.
Other factors to consider:
The minimum clearance requirements for combustible materials (see Table 3 ).
For adequate servicing, we recommend a minimum 30" clearance at the front and 12"
above the boiler. Check local codes for additional access and service clearance
requirements.
At a new construction site, or when renovating:
Protect the boiler from drywall dust or other construction related contaminants.
Ensure combustion air is drawn from a clean source (e.g., outdoors).
Isolate the boiler from interior dust sources.
16
Section: Installation
3.2.1.1 Anchoring the boiler
Boiler weight – without water and any effect of system piping and components – is approximately
500 lbs / 225 kg.
Use the brackets provided to secure the boiler to the floor.
3.3 Unpacking a boiler
The boiler is shipped bolted to a pallet with four (4) anchor brackets and 3/8" Hex head bolts. Once the
anchor brackets are removed they can be used to secure the boiler to the floor.
Figure 9 Boiler packaging dimensions (inches)
17
3.3 Unpacking a boiler
3.4 Installation clearances
Warning
Exposed water piping and associated components (relief valves, circulators, etc.,
should not be in contact with combustible materials. Check local codes for required
clearances and / or provide adequate insulation.
EX 400, EX 500, EX 700, EX 850
Surface
Minimum distance from
combustible surfaces
Recommended clearance for
installation and service
Front
2"
30"
Rear flue connection
2"
24"
Left side
1"
2"
Right side
1"
4"
Top
6"
12"
(required for filter replacement)
Bottom
0
0
Table 3 Clearance distances for boiler mounting sites
3.5 Exhaust venting and air intake venting
Warning
Venting, condensate drainage, and combustion air systems for all IBC boilers must be
installed in compliance with all applicable codes and with instructions provided in the
respective installation manuals.
Inspect finished vent and air piping thoroughly to ensure all are airtight, and comply with
the instructions provided as well as with the requirements of applicable codes. Failure to
comply will result in severe personal injury or death.
When planning a boiler's installation, consider the appropriate vent materials, travel and
termination.
18
Section: Installation
An important consideration is managing the impact of the steam plume normally at the exhaust
terminal of a condensing boiler. Generally, intake and exhaust pipes should terminate at a rooftop or
sterile wall location to maximize customer satisfaction. Keep exhaust plumes well away from all
building air intakes including those of neighboring properties.
Flue gas exhaust to outdoors
Figure 10 Flue gas venting
Danger
Do not common vent EX series modulating boilers with any other existing or new appliance.
3.5.1 Code
All venting must be installed in accordance with the requirements of the jurisdiction having authority:
in Canada, Part 8, Venting Systems of the B149.1-10 Code and any other local building codes are to
be followed. In the USA, the National Fuel Gas Code, ANSI 223.1, latest edition, prevails. Where
there is a discrepancy between the installation instructions provided, and the code requirements,
apply the more stringent.
Provisions for the combustion and air ventilation must be in accordance with the section “Air for
Combustion and Ventilation” of the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or Clause 8.2,
8.3 or 8.4 of the Natural Gas and Propane Installation Code, CAN/CSA B149.1, or applicable
provisions of the local building codes.
19
3.5.1 Code
3.5.1.1 Important considerations when removing an existing boiler
When an existing boiler is removed from a common venting system, the common venting
system is likely to be too large for proper venting of the appliances that remain connected to it.
When resizing any portion of the common venting system, use the minimum size according to
the appropriate tables in the National Fuel Gas Code, ANSI Z223.1 - latest edition. In Canada,
use the B149.1 Installation Code.
At the time of removal of an existing boiler the following steps shall be followed with each
appliance remaining connected to the common venting system placed in operation, while the
other appliances remaining connected to the common venting system are not in operation:
Seal any unused opening in the common venting system.
Visually inspect the venting system for proper size and horizontal pitch. Determine
that there is no blockage or restriction, leakage, corrosion and other deficiencies that
could cause an unsafe condition.
(Where practical) Close all building doors and windows such as doors adjacent to
appliances remaining connected to the common venting system and other spaces of
the building.
Turn on clothes dryers and any appliance not connected to the common venting
system.
Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they
will operate at maximum speed. Do not operate a summer exhaust fan.
Close fireplace dampers.
Place in operation the appliance being inspected.
Follow the lighting instructions.
Adjust the thermostat so that the appliance operates continuously.
After determining that each appliance remaining connected to the common venting
system properly vents when tested as outlined above, return doors, windows, exhaust
fans, fireplace dampers and any other gas-burning appliance to their previous
condition.
Any improper operation of the common venting system should be corrected, so the
installation conforms with the National Fuel Gas Code, ANSI Z223.1 - latest edition. In
Canada, all installations must conform with the current CAN/CGA - B149.1-10
Installation Code and/or local codes.
Warning
Covering non-metallic vent pipe and fittings with thermal insulation is prohibited.
20
Section: Installation
All EX series boilers are approved with alternative venting options: either 2-pipe direct vent or vent
pipe with indoor air. With the direct vent case, combustion air is piped directly to the boiler’s air
intake from outdoors (see Vent termination clearance on page 30 for air intake piping requirements).
Using the indoor air alternative, air for combustion is drawn from the indoor air surrounding the boiler.
Provided the maximum overall vent length limit is not exceeded, the boiler may be vented through
the wall, directly through the roof, or upward using an existing - but otherwise unused - chimney as a
vent raceway.
3.5.3 Exhaust vent material
Warning
Condensate can cause corrosion of metal roofing components and other roofing
materials. Check with the builder or roofing contractor to ensure that materials are
resistant to acidic condensate. pH levels can be as low as 3.0.
Exhaust vent material – CANADA
Use PVC, CPVC, Polypropylene (PPs), or Stainless Steel (SS) vent component systems approved
under ULC-S636 Standard for Type BH Gas Venting Systems, or stainless steel Type BH venting
systems*. The vent temperature is limited by the boiler controller with the use of a flue temperature
sensor to ensure the maximum temperature of the PVC venting material is not exceeded.
Exhaust vent material – USA
PVC, CPVC, PPs, or SS venting materials are approved for use with these boilers in most of the
USA. Check local codes to determine if any materials are prohibited. The vent temperature is
limited with the use of the flue temperature sensor and software to ensure that the maximum
temperature of the PVC venting material is not exceeded. PVC venting material shall be certified to
Sch. 40 ASTM D1785 or D2665. CPVC material shall be certified to Sch. 40/ASTM F441.
Exhaust vent material
Use of cellular core PVC (ASTM F891), cellular core CPVC, or Radel® (polyphenolsulfone) in
venting systems is prohibited.
Do not use ABS or any cellular core pipe for exhaust venting.
The exhaust fitting has a 6" PVC (schedule 40) connection. Use fittings to adapt to either PPs or SS
venting material. Insert exhaust venting directly into the 6" female stainless steel fitting, and secure
with the built-in clamp (see Figure 11 ).
21
3.5.2 Applications
For PPs material, use the 6" transition / adaptor fitting (Sch 40 to PPs) offered by the respective
PPs manufacturers Centrotherm / InnoflueTM (their part # ISAAL0606) or M&G Dura Vent /
PolyProTM (# 6PPS-06PVCM-6PPF [10004281]), (# 4PPs-AD). For PPs material exposed to
outdoor weather, follow the venting supplier’s recommendations on UV protection.
For SS material, use the 6" transition / adaptor fitting offered by the SS manufacturers M&G
Dura Vent (# FSA-6PVCM-6FNSF [300538]) or Heat Fab (Saf-T-Vent) 9601PVC.
Warning
Ensure that you lubricate the gasket with silicone grease before inserting the venting
material. Fully insert the approved venting material into the boiler's exhaust outlet,
and tighten clamp to ensure the venting connection is locked in place (as shown
below).
Figure 11 Securing the vent connection
Venting must be supported in accordance with the applicable code and instructions supplied by
the manufacturers.
Warning
Do not mix PPs venting materials from different manufacturers. These venting
materials are designed to be installed as part of a complete system. Failure to comply
may result in severe personal injury or death.
3.5.4 Vent travel
PVC/CPVC (Schedule 40), PPs (Rigid Single Wall), or SS approved piping are the standard
venting options that can be sited up to 120 equivalent feet from the vent termination.
22
Section: Installation
Follow all installation instructions supplied by the pipe and fitting manufacturer.
The actual vent travel allowance is reduced for fittings as shown in the following tables:
Exhaust / Fittings
EX 400, EX 500
EX 700, EX 850
4-inch rigid pipe
170 ft (max.) each side
Not allowed
6-inch rigid pipe
n/a
120 ft (max.) each side
90° vent elbow
allow 5 ft for each elbow
45° elbow
allow 3 ft for each elbow
PPs 87-90° elbows
allow 5 ft for each elbow
Table 4 Maximum Exhaust Venting Length for EX 400, 500, 700, and 850 models
For example, for an EX 850 using 6 x 90º CPVC vent elbows, the maximum lineal measure
of pipe allowed is 90 feet (120' – (6 x 5' = 30) = 90').
Note
Unused intake travel cannot be added to the exhaust. Unequal intake and exhaust piping
is allowed.
Exhaust venting must slope down towards the boiler with a
pitch of at least 1/4" per foot (PP vent: follow PP
manufacturer requirements for slope), so condensate runs
back towards the trap. Support should be provided for
intake and vent piping, particularly for horizontal runs (follow
local code
Figure 12 Pipe and fitting beveling
23
3.5.4 Vent travel
Check that material meets local codes including fire stopping requirements. Some local
jurisdictions require a minimum initial length of pipe be exposed or accessible for
inspection. Pipe clearances - no IBC requirements; follow local codes. All piping must be
liquid and pressure tight.
Ensure all venting components are clear of burrs/debris prior to assembly. Clear plastic
debris left in the combustion air piping to avoid intake into the fan.
Secure joints using appropriate solvent cement to bond the respective pipe material
(Canada: CPVC cement approved under ULC-S636, in accordance with its manufacturer
instructions; USA: PVC (ASTM D2564), or PVC/ABS (D2235) - Use transition glue
anywhere that PVC and CPVC are joined. Follow the cement manufacturer’s instructions
closely when joining various components. For PPs, connections shall be secured using
approved retainer clips supplied by the respective PPs manufacturer.
Check that vent connections are liquid and pressure tight. Prior to firing the boiler, and
before any of the venting run is concealed by the building construction, the installer must
test the exhaust joints under fan pressure with the vent blocked, using a soap and water
solution .the installer must fill the condensate trap prior to testing.
To drive the fan into manual high speed operation for vent leak testing, from the touchscreen
controller Main Menu go to Diagnostics>Test Operation>Set Vent Test to On. Paint all joints
with an approved leak test solution just as you would joints in a gas line, and make sure there are
no leaks. We suggest attaching a tag on the vent line near the condensate drain tee with the type
of test, the date and the installer’s name.
3.5.5 Venting passage through ceiling and floor
Confirm material meets local codes including fire stopping requirements.
Check the local jurisdiction on the minimum initial length of pipe that should be exposed
or accessible for inspection.
Follow the local codes for pipe clearances - no IBC requirements.
Ensure that piping is liquid and pressure tight.
24
Section: Installation
3.5.6 Rooftop vent termination
Warning
Condensate can cause corrosion of metal roofing components and other roofing
materials. Check with the builder or roofing contractor to ensure that materials are
resistant to acidic condensate. pH levels can be as low as 3.0.
a. Rooftop vents must terminate as follows:
The exhaust pipe can terminate in an open vertical orientation without concern about
rain infiltration; rain will drain away through the condensate trap.
Optional bird screen may be placed in a termination fitting. Leave unglued, and hold in
place with a short nipple. This permits easy access for cleaning.
Do not exhaust vent into a common venting system.
b. For rooftop direct vent systems:
Rooftop, two pipe, direct vent configurations, including typical clearance
requirements are shown below in the following images.
Figure 13 Rooftop vent terminal
configurations
Figure 14 Rooftop vent termination
with sidewall combustion air
25
3.5.6 Rooftop vent termination
Vent screen retainer
Exhaust
Vent screen
Inlet
Flashing
Figure 15 Rooftop vent terminal vent screen and retainer
The intake air pipe is not typically drained, so it must be terminated with a down-
turned elbow as shown.
The intake pipe does not need to penetrate the roof at the same elevation as the
exhaust (as shown); lower down on the roof is acceptable.
Best Practice: To reduce the possibility of expansion noise, allow a ¼"
gap around the exhaust and air intake piping.
26
Section: Installation
For roof top venting of multiple boiler sets, group all intake terminals together for a
common penetration through a custom cap. Alternatively, place close together using
commonly available pipe flashing. Similarly, group the exhaust pipes and place the
two separate groups of pipes at least 3' apart (the closest intake and exhaust pipes
shall be 36", or more, apart). Use the same 12" (minimum) vertical separation for all
termination options. For alternate group terminations, contact the IBC Factory for
written guidance.
Roof top termination kits are approved for use with the boiler model. Installation of the
vertical roof top termination must follow the installation instructions supplied with the
venting material manufacturer. Care must be taken to install the termination kit a
minimum horizontal distance of 10' (305 cm) away from any portion of the building and
a minimum of 2' (61 cm) above the roof line plus the anticipated snow line.
3.5.7 Sidewall vent termination
Caution
Vent termination clearances in this section are code minimum, or IBC recommended
minimum requirements, and may be inadequate for your installation. Building envelope
details must be examined carefully. Take action to avoid moisture entering building
structures. Serious structural damage may occur if adequate precautions and clearances
are not allowed for. These precautions apply to neighboring structures as well as to the
structure the boiler(s) are installed in.
Warning
Important!: Maintain at least the minimum separation of exhaust vent termination from
boiler intake air as illustrated in Figure 17 , Figure 18 , Figure 19 and Figure 20 . Failure to
do so can result in a dangerous situation where exhaust gases are re-ingested with
combustion air. Damage to the boiler can result from a failure to maintain these
separations. Do not use proprietary InnoFlue or PolyPro PPs terminals without specific
approval from IBC.
27
3.5.7 Sidewall vent termination
Figure 16 Minimum clearances from vent/air inlet terminations (see legend on adjacent page)
Description
US Installations11
Canadian
Installations 22
A
Clearance above grade, veranda, porch,
deck, or balcony
1' (30 cm)
1' (30 cm)
B
Clearance to window or door that may be
opened
4' (1.2 m) below or
to side of opening
3' (91 cm)
C
Clearance to permanently closed window
*
*
D
Vertical clearance to ventilated soffit located
above the terminal within a horizontal
distance of 2' (61 cm) from the center line of
the terminal
5' (1.5 m)
*
1In accordance with the current ANSI Z223.1/NFPA 54 National Fuel Gas Code.
2In accordance with the current CAN/CSA-B149 Installation Codes.
*Clearances in accordance with local installation codes and the requirements of the gas supplier.
28
Section: Installation
Clearance to unventilated soffit
*
*
F
Clearance to outside corner
6' (1.83 m)*
6' (1.83 m)*
G
Clearance to inside corner
6' (1.83 m)
6' (1.83 m)*
H
Clearance to each side of center line
extended above meter/regulator assembly
*
3' (91 cm) within a
height 15' above the
meter/ regulator
assembly
I
Clearance to service regulator vent outlet
*
6' (1.83 m)
J
Clearance to non-mechanical air supply inlet
to building or the combustion air inlet to any
other appliance
4' (1.2 m) below or
to side of opening;
1' (30 cm) above
opening
3' (91 cm)
K
Clearance to mechanical air supply inlet
*
6' (1.83 m)
L
Do not terminate above paved sidewalk or
paved driveway
Slip hazard due to
frozen condensate
Slip hazard due to
frozen condensate
M
Clearance under veranda, porch, deck or
balcony
*
12" (30 cm)3
Table 5 Vent/air inlet termination clearances
1In accordance with the current ANSI Z223.1/NFPA 54 National Fuel Gas Code.
2In accordance with the current CAN/CSA-B149 Installation Codes.
3Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor and top of terminal, and underside of
veranda, porch, deck or balcony is greater than 1' (30 cm).
29
3.5.7 Sidewall vent termination
Sidewall direct vent with separate vent and air pipes shall be terminated as follows:
Locate the intake air and exhaust vent terminations on the same plane (side) of the
building.
Place the exhaust vent termination, so that it reaches 12" minimum above the down-
turned intake to avoid exhaust re-ingestion.
(Optionally) Raise the elevation of both terminations in “periscope style” after passing
through the wall, then to gain the required clearance configure as shown in Figure 17 ,
Figure 18 , and Figure 19 .
Use a 45° elbow on the exhaust termination to launch the plume up and off the sidewall
(for protection of wall). A short piece of venting cut at 45° gives a horizontal termination
protected from wind loads (see Figure 17 , Figure 18 , and Figure 19 ).
Suggest use of a bird screen of ¼" stainless steel or plastic mesh (IPEX System 636
drain grate) to guard against foreign objects.
Figure 17 Vent termination clearance
Figure 18 Vent termination clearances
30
Section: Installation
Figure 19 Sidewall vent termination configuration option 1
Figure 20 Sidewall vent termination configuration option 2
31
3.5.7 Sidewall vent termination
In areas of high snowfall, users must be advised to check side wall vent and air
intake terminations on a regular basis to ensure blockage does not occur.
3.5.8 Direct vent combustion air intake piping
The direct vent option uses piping from the outside to supply combustion air directly to the
boiler’s combustion air connection. Combustion air piping - if used - is inserted directly into the 4"
PVC-sized fitting, and increased immediately to 6".
At a new construction site, or during renovations, action must be taken to protect the boiler from
drywall dust or other construction related contaminants; combustion air should be drawn from a
clean source (e.g. outdoors) and the boiler should be isolated from interior dust sources. Do not
seal boiler case openings directly when firing.
Known Corrosive Contaminants to Avoid
Cements and glues
Refrigerant leaks from cracks in coils
Paint or varnish removers
Sodium chloride or potassium chloride used for
water softening
Adhesives used to fasten building
products and other similar products
Chemicals in perming solutions
Chlorinated waxes or cleaners
Chlorofluorocarbon chemicals found in spray cans
Chlorine-based swimming pool chemicals
Antistatic dryer sheets in clothes dryers
Hydrochloric acid or muriatic acid used in
household cleaning and stain removal
Chlorine-type bleaches, detergents, and cleaning
solvents found in household laundry rooms
Calcium chloride used for snow and ice
clearing
Warnings
In addition to preventing ingestion of chemical contaminants, ensure air
intake terminals are not installed in locations where contamination might
occur due to ingestion of particulate foreign material (dust, dirt and debris).
Configure intake air openings, so that rain or other forms of moisture cannot
enter the air intake piping system. Otherwise serious damage to the boiler
may result.
32
Section: Installation
Do not use
bushing on EX
700 and EX 850
models
Flue gas exhaust to outdoors
(connection at rear of boiler)
Flue gas exhaust to outdoors
Combustion air from outdoors. "Direct
Vent" installation: check air intake
outside is clear of obstructions.
Combustion air from outdoors. Use reducing
coupling to transition from 4" connection to 6"
venting before first elbow.
Boiler supply
Boiler return
Figure 21 Direct vent combustion air intake
Figure 22 Combustion air intake - side view
33
3.5.8 Direct vent combustion air intake piping
Combustion air from outdoors
Flue gas exhaust to outdoors
Boiler supply connection at rear of boiler
Boiler return connection at rear of boiler
Figure 23 Rear view - combustion air intake
Notes
When installing air intake piping, ensure that a "trap" is not formed in the piping
causing a build-up of water and blockage of intake air. Such blockages will
cause a boiler safety shut-down.
Filters require checking and cleaning or replacing on a regular schedule based
on the severity of the problem.
34
Section: Installation
Intake / Fittings
EX 400, EX 500
EX 700, EX 850
4-inch rigid pipe
170 ft max. each side
Not allowed
6-inch rigid pipe
n/a
120 ft max. (See note below)
90° vent elbow
allow 5 ft for each elbow
45° elbow
allow 8 ft for each elbow
PPs 87-90° elbows
allow 3 ft for each elbow
Table 6 Maximum intake pipe venting length for EX 400, 500, 700, and 850
Note
You must use a reducer to connect 6" vent piping to the 4" vent collar. See Figure 22 .
For the inlet air – Schedule 40 PVC, CPVC, ABS, PPs or SS piping of any type is permitted.
Note
Unused intake travel cannot be added to the exhaust. Unequal intake and exhaust piping
is allowed.
Ensure that adequate separation is maintained between the air intake inlet and the vent terminal.
Refer to the vent terminal configuration drawings in the Vent Termination section above.
Use support for intake piping, particularly for horizontal runs (follow local codes).
3.5.9 Indoor air combustion air intake
An “Indoor Combustion Air installation” can be described as air for combustion that is taken from the
air surrounding the boiler.
Warning
When using indoor air options, supply adequate combustion air to the boiler room
according to the requirements of all applicable codes.
35
3.5.9 Indoor air combustion air intake
Flue gas exhaust to outdoors
Combustion air from boiler room. For indoor air installation, check air intake and boiler
room combustion air opening(s) to ensure they are clear of obstructions.
Figure 24 Indoor combustion air intake
To support combustion, an ample air supply is required. This may require direct openings in the
boiler room to the outside. If the boiler is not in a room adjacent to an outside wall, air may be
ducted from outside wall openings.
Provisions for combustion and ventilation air must be made as follows:
in the USA, in accordance with the National Fuel Gas Code, ANSI Z223.1 (latest edition),
or applicable provisions of the local building codes
in Canada, in compliance with B149.1 (latest edition).
3.5.10 Combustion air filtration system
A built-in combustion air filter system is supplied with the boiler, and is located at the top of the
appliance. The boilers use a 10" x 10" x 1" (MERV 8) filter.
End users will need to be instructed on how to maintain the filter in the boiler. For instructions on
how to replace the filter, see Replacing the air filter on page 102.
36
Section: Installation
Figure 25 Filter door - top view of boiler
3.6 Installing a condensate trap
IBC’s specified vent configuration promotes the safe drainage of moisture from the boiler and exhaust
venting without flowing liquids back through the heat exchanger (as done by some other condensing
boilers).
Reliable system operation requires:
1. Proper design and installation of exhaust venting to allow condensate to run back to the
drain/trap.
2. Acid neutralization as appropriate.
To achieve these:
Allow a minimum ¼" per foot slope back to the vent connection, with appropriate hangers to
maintain that gradient. For PPs venting, follow the manufacturer's requirements. This will
ensure proper drainage and prevent condensate from clogging.
Ensure the supplied trap is correctly installed and filled with water.
When required, add (and maintain in good condition) a neutralization tank. For information on
installing a condensate neutralizer, see Installing a condensate neutralizer on page 39.
The condensate trap must be installed on the drain connection at the base of the boiler. The
condensate drain must be piped to within 1" of a drain or connected to a condensate pump. The
drainage line must slope down to the drain at a pitch of ¼" per foot so condensate runs towards the
drain.
37
3.6 Installing a condensate trap
1. Slide the union nut onto the elbow. The
union nut must include an embedded O-
ring. Ensure that the O-ring seal is in
place on the heat exchanger's stainless
steel outlet tube.
2.
Attach the elbow and union nut firmly
to the boiler's outlet tube, making sure
that you rotate the elbow sideways.
3. Fill the condensate trap with water and
insert the trap into the hole of the metal
plate.
4. Rotate the elbow, and tighten the union
nut, so that the elbow and condensate
trap are secured. Ensure the union nut O-
ring is included. Check for leaks.
38
Section: Installation
Fill the trap with water before
initially firing the boiler to prevent
exhaust fumes from entering the
room. Never operate the boiler
unless the trap is filled with water.
Failure to comply will result in
severe personal injury or death.
3.7 Installing a
condensate neutralizer
If discharging condensate into building drain
piping materials that are subject to
corrosion, use a neutralization package.
Warning
After installing a condensate neutralization package, the pH of the condensate discharge
must be measured on a regular schedule to ensure the neutralizing agent is active and
effective.
39
3.7 Installing a condensate neutralizer
Figure 26 Condensate neutralization tank
Flue gas exhaust (connection at rear of boiler): condensate, and potentially rain water, flow
back from the venting system.
Air intake piping: Warning - Risk of damage to appliance. Ensure rain water is prevented
from entering.
Free flow of condensate from venting systems and the pressure vessel must be maintained
at all times. Trap and condensate drain piping must be accessible to allow regular
inspection and cleaning.
Condensate water line: Warning - Risk of damage to appliance. All condensate discharge
lines, including neutralization tank inlet, must be at a lower elevation than the condensate
water line of the appliance.
Condensate neutralizer: Drain materials subject to corrosion must be protected by acid
neutralization. Warning - Risk of injury. Tank fluid can be highly acidic. Do not use hands
to stir material. Refer to the neutralization instructions of the manufacturer. Access to the
discharge, before the drain, is necessary for proper maintenance in order to check the
effectiveness of the neutralizing agent. A simple pH test should be performed annually to
ensure neutralizing agent is still effective. If the pH falls below 6.5 the neutralizing material
should be replaced. The agent (limestone chips with a minimum calcium carbonate content
of 85%) can be purchased from a local supplier.
1" FPT inlet and outlet. Unions for ease of maintenance (ships with shown model NT-25,
IBC part 180-048).
40
Section: Installation
To drain. Confirm slope. Slope the condensate hose and drain piping toward the drain and
secure to prevent accidental dis-assembly.
Danger
The water in the condensate neutralizer can cause severe burns to the skin. Wear
protective gloves and eye wear when servicing the condensate neutralizer.
3.8 Water Piping
Warning
Water quality has a significant impact on the lifetime and performance of a boiler's heat
exchanger.
Improperly prepared water in a heating circuit may cause damage to the heat exchanger
through fouling or corrosion. Repeated or uncontrolled water fills will increase the potential
for damage.
High levels of dissolved solids or minerals may precipitate out of the fluid onto the hottest
part of the heat exchanger, impairing heat transfer and resulting in overheating and
premature failure. The amount of solids that may form on the heat exchanger will depend on
the degree of hardness and the total water volume in the system. A high water volume
system with a low hardness count may cause as much damage as a system with less
volume and higher hardness, so it is recommended to treat water so as to remove all
dissolved solids. Other water chemistry allowable limits are as follows:
Acidity pH is to be between 6.6 and 8.5
Chloride is to be less than 125 mg/l
Iron is to be less than 0.3 mg/l
Cu less than 0.1 mg/l
Conductivity is to be less than 400μS/cm (at 77°F [25°C])
7 grains/ gal (120 ppm)
Important: Ensure that these limits are acceptable for the other water-side components in
the system.
41
3.8 Water Piping
Boiler Head Loss - EX 400, EX 500
Flow rate (gpm)
20
30
40
50
60
70
80
90
100
Head @ flow (ft)
2.6
3.0
3.7
4.4
5.2
6.3
7.4
8.9
10.7
Table 7 Boiler Head Loss - EX 400, EX
Boiler Head Loss - EX 700, EX 850
Flow rate (gpm)
20
30
40
50
60
70
80
90
100
Head @ flow (ft)
2.6
2.9
3.2
3.7
4.2
4.8
5.5
6.4
7.2
Table 8 Boiler Head Loss - EX 700, EX 850
Ensure that the pump is rated for the design circulating water temperatures; some pumps have a
minimum water temperature rating above the low temperature potential of the boiler. Following
installation, confirm the actual performance by measuring Δ°T (under high and low flow conditions)
after establishing the correct firing rate.
To use legacy heat, we recommend water flow after burner shutdown. There can be significant
build-up of energy due to the volume of heated water in the system. Default load settings will run
the boiler’s primary pump for up to 5 minutes (300 seconds) after burner shutdown. Secondary
pumps can be set to run up to 15 minutes after burner shutdown (for the last calling load). As
shipped, the default settings will run the Load pump for 5 minutes to place the legacy heat where it
is useful. Any secondary pump can be set to run for 0 – 900 seconds in the heat purge mode. Guard
against deadheading pumps when all zone valves are closed by setting the load Pump Post Purge
(sec) to '0'.
The primary pump must be under the control of the boiler to allow pump purge after burner shut-
down.
Installers must conform to the piping design configurations provided to simplify the control
application, promote good loads and flow management.
Propylene glycol usage
Warning
Do not use automotive-type ethylene or other types of automotive glycol antifreeze, or
undiluted antifreeze of any kind. This may result in severe boiler damage. Installers
must ensure that glycol solutions are formulated to inhibit corrosion in hydronic heating
systems of mixed materials. Improper mixtures and chemical additives may cause
damage to ferrous and non-ferrous components as well as non-metallic, wetted
components, normally found in hydronic systems. Ethylene glycol is toxic, and may be
prohibited for use by codes applicable to your installation location. For environmental
and toxicity reasons, IBC recommends only using non-toxic propylene glycol.
42
Section: Installation
Propylene glycol solution is commonly used in a closed loop where freeze protection is required. Its
density is lower than that of water, resulting in lower thermal performance at a given flow and pressure.
Generally, a 50%:50% solution of propylene glycol and water requires an increased system circulation
rate (gpm up 10%), and system head (up 20%) to provide performance equivalent to straight water.
These boilers are designed for use within a closed loop, forced circulation, low pressure system. A 50
psi pressure relief valve (¾" NPT inlet, 1" NPT outlet) is supplied for field installation in the relief valve
fitting on top of the boiler. An optional relief valve, with a rating of up to 150 psi, can be used where
required on closed loop systems. Relief valve discharge piping must terminate between 6" (15 cm) and
12" (30 cm) above the floor or per local code.
Warning
During operation, the relief valve may discharge large amounts of steam and/or hot water.
To reduce the potential for bodily injury and property damage, install a discharge line that:
Is connected from the valve outlet with no intervening valve and directed downward
to a safe point of discharge.
Allows complete drainage of both the valve and the discharge line.
Is independently supported and securely anchored, so as to avoid applied stress on
the valve.
Is as short and straight as possible.
Terminates freely to atmosphere where any discharge will be clearly visible and is at
no risk of freezing. terminates with a plain end which is not threaded.
Is constructed of a material suitable for exposure to temperatures of 375° F or
greater.
Is, over its entire length, of a pipe size equal to or greater than that of the valve outlet
(1" NPT).
Do not cap, plug or obstruct the discharge pipe outlet.
3.8.1 General piping best practices
Primary/secondary piping, or the use of a hydraulic separator (such as the Caleffi 549 SEP4™ 4-in-
1 Magnetic Hydraulic Separators) is recommended for maximum flexibility in multi-load
applications. Piping loads in parallel is also encouraged in systems that only have two loads, or
when loads are operating simultaneously. The extremely low pressure drop through the heat
exchanger of the EX series affords more flexible options unavailable in other designs.
43
3.8.1 General piping best practices
Contact local water purveyors about the suitability of the supply for use in hydronic
heating systems.
If unsure about water quality, request testing and assessment (and treatment, if
required) from a local water treatment expert.
Alternatively, water or hydronic fluid of known quality can be brought to the site.
3.8.2 System piping
System piping is connected to the boiler using 2½" NPT-Male threaded fittings. To simplify
servicing, we recommend using unions or flanged fittings, gate or ball valves at the boiler's
supply and return water connections. You must install un-insulated hot water pipes with a
minimum ¼" clearance from combustible materials.
Fluid fill is most often accomplished by using a boiler regulator & fill valve set at 12 psig or more,
with the appropriate backflow prevention device as required by local code. This is acceptable in
areas where municipal water or well water has been treated and filtered to remove excessive
minerals and sediment, and water chemistry is known to be suitable for closed loop hydronic
systems. In areas where water quality is in question, or when chemical treatment or glycol is
required, other options should be considered. Follow the applicable codes and good piping
practice.
Warning
Close the fill valve after any addition of water to the system, to reduce risk of water
escapement.
There are a number of boiler feed and pressurization devices on the market today that may be a
better choice than a raw water fill from the mains. When regular maintenance requires relief
valve blow-off, the discharge may be directed back into the pressurization appliance for
recycling of boiler fluid and chemicals back into the system. In buildings that may be unoccupied
for long periods of time, pressurization appliances are useful to prevent flood damage should
leakage occur from any component in the system. An additional benefit is that backflow
prevention devices are not required when using these devices.
Do not place any water connections above the boiler; leaks can damage the fan and controls. If
needed, create a shield over the top of the cover, but allow clearance for airflow and service
access.
For best results, use a Primary/Secondary piping system, with a pumped boiler loop using 2½"
piping. Refer to Table 7 or to Table 8 for boiler head loss information.
44
Section: Installation
Example: In these EX models, the minimum flow rate required through the heat exchanger
is 18 or 21 gpm (depending on model) and a maximum of 100 gpm is allowed.
Primary/Secondary piping ensures adequate flow and de-couples Δ°T issues (boiler vs.
distribution). Aim for a 20° to 30° F Δ°T across the heat exchanger at high fire (there is a
boiler protection throttle fence limiting the Δ°T to 80°F).
Check valves or thermal traps should be used to isolate both the supply and return piping for each
load - to avoid thermal siphoning and reverse flow.
To ensure adequate water flow through the boiler under high-head / single zone space heating
conditions, a pressure activated bypass or other means of bypass must be used on any load where
the flow rate might drop below minimum requirements (18 or 21 gpm - depending on model).
For further information and details, consult our Concept Drawings – which provide detail on specific
single and multiple boiler applications “Piping”, “Wiring” and “Settings”. (available at
www.ibcboiler.com or from your IBC Representative).
Note
The piping drawings in this manual are simple schematic guides to a successful
installation. There are many necessary components not shown, and details such as
thermal traps are left out so the drawings have greater clarity. We require that our boilers
be installed by licensed and experienced trades people who are familiar with the
applicable local and national codes. System design is to be completed by an experienced
hydronic designer or Engineer. It is necessary to carefully read and follow these
installation instructions along with the application drawing that fits your system.
45
3.8.2 System piping
Low water cut-off (LWCO): the IBC EX series comes factory-equipped with an internally
mounted Certified Low Water Cut-Off. Sometimes an external device is required by local
jurisdiction. These devices have specific installation requirements not illustrated here.
Consult the IBC factory or the LWCO manufacturer for proper application of these
devices.
Pressure relief valve (ships with boiler): no isolation valve permitted between boiler and
relief valve.
Tridicator / external pressure and temperature gauge (ships with boiler).
Optional external water high limit (manual reset). The IBC EX series comes factory-
equipped with an internally mounted manual reset mechanical water temperature high
limit. It can be fitted with an external manual reset mechanical water temperature high
limit if required by local jurisdiction.
To supply manifold
From return manifold
Optional flow switch: follow manufacturer’s instructions. Typical requirements include
installing on a horizontal run, with at least five (5) pipe diameters of straight piping both
upstream and downstream of flow switch, and ensuring proper paddle engagement for
the piping size.
Integrated boiler drain
Figure 27 Trim for multiple boiler installations
46
Section: Installation
Pressure relief valve (shipped with boiler): no isolation valve is permitted between the boiler
and relief valve.
Tridicator or external pressure and temperature gauge (shipped with boiler).
Hydraulic separator (low-loss header) provides primary/secondary hydraulic separation, a
microbubble air eliminator and a dirt separator. Air eliminator is installed at the most
effective point, where the fluid is at the highest temperature and lowest pressure.
Secondary pumps to multiple loads or zones. All receive identical temperatures. Note
integrated check valves.
Return lines from loads.
Expansion tank connection (point of no pressure change) should be on the suction side of
the circulator.
Primary pump or boiler circulator into connection at rear of boiler.
Fill station with isolation valve closed, or fill tank.
Figure 28 Primary/Secondary piping concept with hydraulic separator
Pressure relief valve (field-supplied): no isolation valve is permitted between the boiler and
relief valve.
Tridicator or external pressure and temperature gauge (field-supplied).
Microbubble air eliminators are best installed where the fluid is at the highest temperature
and lowest pressure.
Expansion tank connection (point of no pressure change) should be on the suction side of
the circulator.
47
3.8.2 System piping
Primary pump or boiler circulator.
Closely-spaced tees to or from load 1.
Closely-spaced tees to or from load 2.
Fill station with isolation valve closed, or fill tank.
Dirt separator recommended.
Figure 29 Boiler trim options - single boiler
Closely-spaced tees: To avoid induced flow, install each set of tees with straight piping
a minimum of 8 pipe diameters upstream and 4 pipe diameters downstream. Avoid using
elbow or other component that may create turbulent flow. Position tees as close together
as possible (maximum 4 pipe diameters apart) and ensure that there are no restrictions
between the fittings that would result in a pressure drop.
48
Section: Installation
Heat migration: On secondary loops that extend vertically to a load that is above the
primary loop, steps must be taken such as fabricating a thermal trap in the return piping -
minimum 18" (46 cm) drop - to prevent thermal siphoning and heat migration to the load
when there is no demand for heat to that loop. Alternatively, use check valves on both
supply and return of secondary piping.
Figure 30 Important Primary/Secondary piping details with closely-spaced tees
DHW indirect tank
Air handler
Low temperature radiant protected by a mixing valve for simultaneous heating during higher
temperature air handler operation. Boiler can return to lower supply temperature when
radiant alone is operating.
Figure 31 Primary/Secondary piping concept with simultaneous heating calls
49
3.8.2 System piping
DHW indirect tank
Air handler
Check valves (may be integral to pumps - not shown)
Figure 32 Two pump, two load - parallel piping concept
50
Section: Installation
The boilers can supply multiple heating loads with compatible supply temperature requirements.
Always ensure that loads sensitive to high temperatures are protected using means such as mixing
valves.
Check valve (typical of each boiler - may be integral to pump).
Tridicator (shipped with boiler) typical of each boiler.
Pressure relief valve (shipped with boiler) typical of each boiler.
Boiler pump into rear connection (typical of each boiler).
Low-loss header / hydraulic separator (shown) or closely-spaced tees 'bridge' to load piping.
Figure 33 Multiple boiler piping
51
3.8.2 System piping
Pressure relief valve (shipped with boiler) typical of each boiler.
Tridicator (shipped with boiler) typical of each boiler.
Check valve (typical of each boiler)
Boiler pump into rear connection (typical of each boiler)
Low-loss header / hydraulic separator (shown) or closely-spaced tees 'bridge' to load
piping
Check valve for opt-out circuit.
Opt-out pump into rear side (opt-out boiler(s) only)
Opt-out load piping in reverse-return for balanced flows
Figure 34 Multiple boiler opt-out piping
52
Section: Installation
3.9 Gas piping
Note
Due to the precision of modern modulating boilers it is important to pay special attention to
gas pressure regulation.
Important: Check gas supply pressure to each boiler with a manometer or other high-
quality precision measuring device. Pressure should be monitored before firing the boiler,
during operation throughout the boiler's full modulation range, and after the call when the
regulator is in a "lock-up" condition.
Pay special attention to retrofit situations where existing regulators may have an over-sized
orifice and/or worn seats, causing pressure “creep” and high lock-up pressures.
A high quality regulator will maintain constant pressure above the boiler’s minimum
specification at all firing rates, and will not exceed the boiler’s maximum pressure rating
when locked-up with no load.
3.9.1 Gas pressure
The boilers require a minimum inlet gas supply pressure of 4.0" w.c. for natural gas or propane
during high fire operation. For either fuel, the inlet pressure shall be no greater than 14.0" w.c.
Confirm this pressure range is available with your local gas supplier.
The inlet gas connection to the boiler is 1" NPT (female).
The high gas pressure switch setpoint is set at 14" wc and the low gas pressure setpoint is set at
3.5" wc. To locate the switches on the boiler, see Figure 42 or Figure 43 .
Adequate gas supply piping must be installed with no smaller than 1¼" Schedule 40 (e.g. Iron Pipe
Size (IPS) and using a 1" w.c. pressure drop, in accordance with the following chart.
53
3.9 Gas piping
Maximum Gas Pipe Length (ft)
Model
1¼" IPS
1½" IPS
2" IPS
2½" IPS
EX 400 (Natural Gas)
150'
350'
1000'
>2000'
EX 400 (Propane)
400'
900'
>2000'
>2000'
EX 500 (Natural Gas)
100'
200'
700'
1800'
EX 500 (Propane)
250'
600'
2000'
>2000'
EX 700 (Natural Gas)
50'
100'
350'
800'
EX 700 (Propane)
150'
300'
900'
2000'
EX 850 (Natural Gas)
40'
80'
250'
600'
EX 850 (Propane)
100'
200'
700'
1600'
Table 9 Maximum Gas Pipe Length (ft)
Gas piping must have a sediment trap ahead of the boiler’s gas valve. A manual shutoff valve
must be located outside the boiler, in accordance with local codes or standards. All threaded
joints in gas piping should be made with an approved piping compound resistant to the action of
natural gas or propane. Use proper hangers to support gas supply piping as per applicable codes.
The boiler must be disconnected or otherwise isolated from the
gas supply during any pressure testing of the system at test
pressures in excess of ½ psig. Dissipate test pressure prior to
reconnecting. The boiler and its gas piping shall be leak tested
before being placed into operation.
The gas valve is provided with pressure taps to measure gas
pressure upstream (supply pressure) and downstream (manifold
pressure) of the gas valve (see Figure 42 or Figure 43 ). Note that
manifold pressure varies slightly in accordance with firing rates
with the modulating series boilers, but will always be close to 0"
wc. An adapter fitting is supplied with the boiler.
Figure 35 Typical gas piping
3.10 Electrical connections
All electrical wiring to the boiler (including grounding) must conform to local electrical codes and/or
to the National Electrical Code, ANS/NFPA No. 70 – latest edition, or to the Canadian Electrical
Code, C22.1 - Part 1.
54
Section: Installation
3.10.1 Power quality and electrical protection
In areas of unreliable power, appropriate surge protectors and or power conditioning equipment
should be installed in power supply wiring circuits.
Note
The IBC boiler (like any modern appliance that contains electronic equipment) must have
a “clean” power supply, and is susceptible to power surges and spikes, lightning strikes
and other forms of severe electrical “noise”. Power conditioning equipment (surge
protectors, APC or UPS devices) may be required in areas where power quality is
suspect.
3.10.2 120VAC line-voltage hook-up
Line-voltage wiring is done within the field-wiring box (see Wiring diagrams on page 119). Connect
the boiler to the grid power using a separate, fused circuit and on/off switch within sight of the boiler.
Use 14-gauge wire in BX cable or conduit properly anchored to the boiler case for mains supply and
pump circuits.
Figure 36 Line voltage load pump terminals
Caution
The on-board controller load pump relays are protected with 5 Amp fuses. The maximum
recommended load on each fuse is 4 Amps (80% of rating). The maximum combined
pump load is 10 Amps. Isolation relays or contactors must be used if the loads exceed
these maximums.
Connect a 120VAC / 15 amp supply to the "AC IN" tagged leads in the wiring box.
55
3.10.1 Power quality and electrical protection
3.10.2.1 Load pumps
The 120VAC power supply to the load pumps (P/V1, P/V2, P/V3, and P/V4) is factory installed
and connected to P/V-L and P/V-N for your convenience. If you use the P/V relay connections
for zone valves, you need to remove and cap off the 120VAC connections at P/V-L and P/V-N.
The 24VAC can then be applied using an external transformer to supply power to zone valves.
The upper 4 pairs of contacts on the connector strip are then powered to manage up to 4 load
pumps – the top pair for Load 1, the second pair for #2 etc. Once the controller is programmed
for the respective loads, the boiler manages all the loads without need of further relays (for
loads up to ⅓ HP; for more – use a protective relay).
3.10.2.2 Boiler pump
The boiler (primary) pump is powered by the yellow wire from the pair labeled "Boiler Pump".
Wire the pump's neutral to the white wire labeled "AC In". Do not attempt to connect the boiler
pump to the pump/zone valve terminal block along the controller’s right edge as this is reserved
for the secondary pumps and/or zone valves only.
Figure 37 Electrical box with boiler pump relay
- black and yellow wires - EX 400, EX 500
Figure 38 Electrical box with boiler pump relay
- black and yellow wires - EX 700, EX 850
Power in - black wire.
To boiler - yellow wire.
If the total boiler amperage drawn is less than 12 amps and the boiler pump is 120V, you can
connect the black wire from the relay to the line voltage mains supplied to the boiler. For 120
volt boiler pumps, the black wire can be connected to the line voltage mains and the yellow wire
connected to boiler pump. For 208/240 volt boiler pumps, the black wire can be one leg of the
208/240 voltage mains and the yellow wire connected to the boiler pump.
56
Section: Installation
The boiler pump relay may require connection to a second electrical circuit (amperage greater than
4 amps). The boiler pump relay is rated for a maximum amperage load of ¾ horsepower. A
disconnect switch should be installed to isolate the boiler pump and the boiler pump relay power
supply.
Pumps can be switched on/off using the touchscreen controller, so there is no need for temporary
pump wiring during system filling / air purging. If pumps are hard-wired to the panel during the
system fill/purge phase, re-wire the boiler pump to the primary pump leads inside the wiring box so
the primary pump purge function is active.
In a new construction application, use a construction thermostat, or jumper with an in-line on/off
switch – for on/off management of the boiler. Do not just turn off power from the appliance, or its
moisture management routine will be interrupted (fan turns at ultra low rpm for 90 minutes after
burner shutdown). Treat it like a computer, where you do not just pull the plug when done. If a "low
airflow / check vent" error signal shows, check for (and remove) any water in the clear vinyl air
reference tubes. This has been seen occasionally at construction sites where the boiler has been
repeatedly de-powered wet.
The combined current of all load pumps connected through the on-board pump relays should not
exceed 10 amps. The control circuit board is protected using on-board field replaceable fuses.
Each pump is fused with a separate 5 Amp fuse. The Alarm contact is fused with a 5 Amp fuse and
the 24VAC boiler control circuit is protected with a 2 Amp fuse.
3.10.2.3 Variable speed boiler pumps
Variable speed boiler pumps are for connecting and managing speed in pumps that accept 0-
10VDC on 4-20 mA input signal.
Figure 39 Electrical box with new variable
speed connection - EX 400, EX 500
Figure 40 Electrical box with new variable
speed connection - EX 700, EX 850
57
3.10.2 120VAC line-voltage hook-up
3.10.3 Other wiring
Danger
Do not connect sensors to “Therm” terminals. Overheating components can
result in serious personal injury and/or property damage.
Other optional low voltage connections to the control board include:
Two auxiliary Interlocks - for external safety devices as may be required by some
jurisdictions, such as an external low-water cutoff.
Contacts for indoor and outdoor temperatures sensors associated with reset
heating. A 10K ohm thermister (resistor dependent on temperature) for outdoor reset
sensing is supplied with the boiler for improved comfort and combustion efficiency.
One pair for a DHW tank sensor. Connect to "DHW S" (not the respective Therm.
1,2,3,4 location) and the boiler automatically detects and calls a smart DHW
routine.
One pair of contacts for remote secondary loop temperature control.
One pair (marked BoilerNet) for network connection – this is used for connecting
multiple IBC modulating appliances for autonomous staging.
The bottom pair of contacts (labeled 'External Control') receives a 0-10VDC
(default) or 4-20 mA signal from an external boiler controller for direct throttle control.
The boiler’s own sensors act as high limits only. The user must enter maximum and
minimum boiler supply temperatures.
Note
Sensors connected to any sensor input contacts must be of the NTC
Thermister type with a resistance of 10,000 ohms at 77°F (25°C) and β = 3892.
We do not recommend using 3rd party supplied sensors. Compatible water
temperature sensors and outdoor sensors can be supplied by your IBC
distributor.
3.10.4 Thermostat / sensor wiring
Each of the four loads has dry contacts for thermostats as marked on the lower connector
strip (e.g., "Therm 1"). Gang lines from a multiple-zoned load (e.g., off the end-switches for
each radiant floor zone) present a common thermostat signal to the controller. Ensure that
there are no disturbing influences on the call-for-heat lines - for example, that there are no
coils to switch an air handler motor. Most power stealing thermostats can be connected
directly to the Therm terminals. Consult the Controller manual for more detailed
instructions.
58
Section: Installation
3.10.5 Thermostat heat anticipator
IBC “Therm” contacts draw no power, so an anticipator setting for the thermostat is not
applicable with the EX modulating series boilers. For a heat load where zone valves are used
to manage thermostatically controlled zones, each room's thermostat heat anticipator should
be adjusted to the current draw of its associated zone valve.
Figure 41 Electrical wiring connections
59
3.10.5 Thermostat heat anticipator
4.0 About the boiler controller
This boiler is equipped with a touchscreen controller for programming the boiler. For detailed instructions
on using the controller, see the Touchscreen Controller manual.
Note
Use only a stylus or a clean finger to interact with the touchscreen. Using sharp or metallic
objects will cause damage.
The controller is equipped to provide:
Control of up to 5 pumps – 1 boiler pump + 4 separate load pumps
Outdoor Reset control
Set Point temperature regulation
Domestic Hot Water (DHW)
External control via 0-10VDC or 4-20mA signaling
Manual control of firing rate for gas valve calibration
Alarm dry contacts
Zoning - simultaneous operation of up to four pumps
Load Combining – simultaneous operation of two similar water temperature loads
Programmable setback / override schedule
The control can manage or operate in a network of up to 24 IBC boilers without additional
controller.
Some of the new features available in the touchscreen control include:
Express Setup Menu for simple, quick programming
Portal connectivity for remote monitoring and programming
Superior warning messages while setting up the control
Advanced Error messages with visual display on the Home Screen
Internet/LAN connectivity
BACnet (with activation)
4.1 Controller
When the boiler is first energized, the controller will go through a power up sequence that will take
approximately 90 seconds. During this time the controller is completing a self- diagnostic and loading
all previous settings. In the event of a power interruption the boiler will automatically resume operation
when power is restored with all the previously stored values.
The controller provides overall management of the boiler operations including:
Power-up, self-diagnostics, easy Load parameter adjustments
The boiler status bar indicates if the boiler is in a normal,
warning or alarm state. When no warning or alarm state is
present, the bar will be green and the time will be displayed
inside the green area. The bar can also be yellow or red
corresponding a warning or alarm state. Text inside the bar will
indicate the specific warning or alarm present. If more than one
alarm is present the text display will slowly change, rotating
though whatever alarms that are present.
Burner operation, safety management systems, Call for Heat
management and Load Priority
Real time boiler data
Temperature and throttle operation
Maintenance of operational and error service logs
2-way communication between other IBC boilers and controls
Internet connection and communication
Operational and historical data may be accessed at any time using the System Status and Load
Profiles sections of the control. Error logs are available in the Diagnostics section and the controller
is capable of recording any or all errors since original power-up complete with the date and time of
the error.
4.2 Controller interface
The control interface is provided through a 2¼ x 4 inch, color touchscreen display. The touchscreen
responds to a light finger touch on the screen. You can also use a stylus, pencil, or similar device to
operate the touch controls. Do not use a sharp or metallic object such as a screw driver to operate
the control as it could damage the touchscreen.
The controller display is divided into two areas, the screen active area and the boiler status bar. All
screens have an active area consisting of the screen title bar at the top and a border surrounding the
active area. At the bottom of the display there is space reserved for the boiler status bar.
Prior to any interaction with the touchscreen, the display shows the Home screen details of the
current boiler status. If the controller has been left on the Home screen long enough (user
adjustable, 10 minutes by default) the display will be dimmed to save power.
The control will automatically return to the home screen if left unattended. The screens will step
back one screen at a time in 10 minute increments if the touchscreen has not been touched. The
pop-up windows will also step back automatically in 2 minute intervals.
62
Section: About the boiler controller
5.0 Before operating the boiler
Danger
Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any
other appliance. If you smell gas vapors, do not try to operate any appliance - do not touch
any electrical switch or use any phone in the building. Immediately, call the gas supplier from
a phone located remotely. Follow the gas supplier’s instructions, or if the supplier is
unavailable, contact the fire department.
Do not use this boiler if any part has been under water. Immediately call a qualified service
technician to inspect the boiler and to replace any part of the control system and any gas
control that has been under water.
Should overheating occur or the gas supply fails to shut off, do not turn off or disconnect the
electrical supply to the pump. Instead shut off the gas supply at a location external to the
appliance.
5.1 Important pre-ignition checks
Once installation of the appliance is completed, and before operating the appliance, it is important to
review the following checklist of precautions:
5.1.1 Checklist for electrical conditions, ducting and water
connections
Checking electrical conditions
Check
Check all line voltage electrical connections to ensure all connections are correct and tight. □
Check thermostat connections.
□
Thermostat in a suitable location.
□
Checking piping connections
Check
Ensure venting system is complete and seal tested.
□
Confirm any common venting system at the installation site is isolated and independent of
the EX boiler.
□
Confirm that any holes left from the removal of a previous boiler have been sealed, and that
any resizing of the old flue has been done.
□
Checking piping connections
Check
Check that the water piping system is fully flushed and charged, and that all air has been
discharged through loosened bleed caps.
Note it is possible to switch all pumps on/off from the touchscreen – without a call for heat.
This simplifies system filling and air bleeding (go to Installer Setup > System Settings > Site
Settings > change Manual Pump Purge to "ON". Loads must be assigned. When complete,
return to "OFF", or this will automatically occur with a call for heat). Use a minimum water
pressure of 12 psig. And confirm that the pressure relief valve is installed and safely drained.
□
Check to see that adequate gas pressure is present at the inlet gas supply test port.
Open the test port by turning its center-screw one full turn counterclockwise, using a small
(1/8" or 3 mm) flat screwdriver. Connect a manometer and open the gas control valve.
Requirements are minimum 4" w.c and maximum 14" w.c.
□
Check that there are no gas leaks.
□
All connections are pressure tested and leak free.
□
All piping flushed to ensure all air is removed.
□
Check valve is installed and the external pump is flowing in the correct direction.
□
Checking vent connections
Check
All connections are pressure tested and leak free.
□
All vent pipe is sized correctly and joints are sealed.
□
Powering on the boiler
Check
Perform a final check of electrical wiring, and provide power to the boiler to initialize
operation.
□
Warning
Fill the condensate trap with water before you first fire the boiler to prevent exhaust fumes
from entering the room. Never operate the boiler unless the trap is filled with water.
Failure to comply will result in severe personal injury or death.
64
Section: Before operating the boiler
6.0 Boiler operation
Before operating the appliance, there are some important pre-igntion checks that need to be
performed. For more information, see Before operating the boiler on page 63. To understand the boiler
start-up process, see Sequence of Operation on page 122.
Start-up Checklist
Check
Followed lighting and shutting down procedure.
□
Tested the ignition safety shutoff function (see Testing the ignition safety shutoff on page
66).
□
Checked the appliance's fuel source, and if necessary, performed a fuel conversion using
the appropriate P-kit.
□
Performed gas pressure test by Measuring the inlet gas pressure on page 72.
□
Tested efficiency of the appliance and made necessary adjustments by Performing a
combustion test and adjustment.
□
6.1 Lighting and shutting down the boiler
6.2 Testing the ignition safety shutoff
To test the ignition system safety shutoff device:
1. With the boiler in operation, shut off the gas control valve directly outside the boiler case.
2. Ensure that the boiler has purged, attempted to re-light three times, has shut off and the
appropriate error information is displayed on the controller.
3. The error is displayed after testing the ignition safety shutoff.
4. To restart the boiler, reset the power or on the touchscreen
controller's Main Menu, tap Diagnostics>Advanced
Diagnostics>Clear Errors>Yes>OK.
6.3 Commissioning
The EX modulating boilers are factory calibrated to operate with
natural gas (or propane if desired) at sea level. The gas-air ratio or
zero-offset adjustment screw may need adjusting to attain optimum
combustion results. Note that only qualified technicians using
properly functioning and calibrated combustion analyzing equipment
should perform a mixture adjustment.
6.3.1 Checking a boiler's fuel source
This boiler model can burn either natural gas or propane if equipped with the correct fuel-air
metering device. Examine the rating plate of the boiler to ensure it is configured for the fuel you
are using. If the boiler is configured for natural gas, but needs to be converted to propane, use the
conversion kit (sold separately by IBC) to install the appropriate fitting(s) and adjust the gas
valve accordingly. See Table 10 for the required conversion kit.
The touchscreen controller will automatically detect the installation’s altitude and make the
appropriate adjustments to operate the boiler up to 4,500 feet in elevation without de-ration. The
boiler will automatically de-rate at altitudes above 4,500 feet.
66
Section: Boiler operation
6.3.2 Performing a fuel conversion
These boilers are factory fire-tested to operate with natural gas or propane as ordered. The rating
plate will be marked to indicate which fuel the particular boiler has been set up with. Firing a boiler
with a fuel other than what is listed on the rating plate is prohibited unless the conversion procedure
is completed by a qualified technician.
Danger
Operating any IBC boiler using a fuel other than the fuel listed on its rating plate is
prohibited. Failure to follow the instructions on converting to alternate fuels can result in a
fire or explosion, which may cause property damage, personal injury, or loss of life.
Check the rating plate of the boiler to ensure it is configured for the fuel you are using. If
the fuel is incorrect for the appliance, a conversion kit must be ordered from IBC and the
gas valve adjusted accordingly. Failure to perform the required fuel conversion can result
in an immediate hazard.
Fan
Shutoff valve
Manifold gas pressure test port
Inlet gas pressure test port
High pressure switch
67
6.3.2 Performing a fuel conversion
Low pressure switch
Low fire adjustment
Mixing device
Figure 42 Gas valve and fan components - EX 400, 500
Fan
Mixing device
Gas high pressure switch
Three- (3) wire Molex plug
Inlet gas pressure test port (location of)
Gas low pressure switch
Low fire adjustment (zero-offset)
High fire adjustment (on the side)
Manifold gas pressure test port
68
Section: Boiler operation
Figure 43 Gas valve and fan components - EX 700, 850
The High Fire (gas-air ratio) adjustment screw will have to be adjusted to attain optimum
combustion results whenever fuel conversion is undertaken, however, no mixture adjustment shall
be performed unless done by a qualified technician using properly functioning and calibrated
combustion analyzing equipment.
1. Ensure you are installing the correct fuel conversion kit for your boiler. Compare the boiler
model number with the Kit # found in Table 10 .
2. Carefully follow the procedures of the fuel conversion instructions on:
a. Fuel Conversion
b. Combustion Testing and Adjustment
c. Placing conversion labels associated with the new fuel onto the boiler.
Fuel conversion kit part numbers
Model Number
Natural Gas to Propane
Propane to Natural Gas
EX 400
P-1236
P-1235
EX 500
P-1238
P-1237
EX 700
P-1201
P-1200
EX 850
P-1203
P-1202
Table 10 Fuel Conversion Kits
6.3.2.1 Performing a fuel conversion on EX 400 and EX 500 appliances
The following steps document replacing the current orifice with the kit-supplied orifice. After
replacing the orifice, you will need to tune the gas valve.
1. Disconnect the power to the boiler, and close the gas shut-off valve.
2. Remove the front door and top cover from the boiler.
3. Remove the bolts of the elbow (mixer side) marked j(see image below).
4. Remove the bolts of the elbow (gas valve side) marked k (see image below).
69
6.3.2 Performing a fuel conversion
Figure 44 Fuel pipe assembly
5. Carefully lift off the fuel pipe assembly.
Figure 45 Removing the orifice
6. Remove the orifice.
7. Retain the two O-rings in the elbows for reassembly.
8. Install the kit-supplied orifice.
9. Secure the elbow with bolts on the gas valve side, ensuring that the O-ring is well seated
in the groove.
10. Secure the elbow with bolts on the mixer side, ensuring that the O-ring is well seated in
the groove.
11. Turn on the electric power and gas supply to the boiler.
12. Reset the gas low pressure switch by pressing the clear plastic cover above the Red
button.
13. Tune the gas valve. For instructions, see Adjusting the gas valve (EX 400, EX 500) on
page 74.
14. Check for gas leaks.
70
Section: Boiler operation
6.3.2.2 Performing a fuel conversion on EX 700 and EX 850 appliances
1. Turn off the power and shut off the gas supply at the external gas shut-off valve.
2. Remove the front door and top cover from the boiler.
3. Remove the four (4) 5/16" hex bolts from the gas inlet to the mixing device. Carefully
separate the two parts, remove and retain the O-ring for re-assembly. (See
in image
below).
Figure 46 Disconnecting the mixing device
4. Remove the four (4) ¼" hex bolts that connect the mixing device to the air filter box. The
gasket should remain attached to the air filter box. (See
on image above).
5. Use an Allen key to remove the Six (6) 6 mm screws connecting the mixing device to the
fan. (See
in image above). Carefully separate the two parts, remove and retain the O-
ring for re-assembly.
6. Remove the propane mixing device.
7. When Installing the new natural gas mixing device ensure that the O-ring is properly seated
in the groove of the fan.
Caution
Failure to position the O-ring as indicated will result in a gas leak, and affect
burner operation.
8. Re-assemble in the reverse order of steps provided.
9. Turn on the electric power and gas supply to the boiler.
10. Reset the gas low pressure switch by pressing the clear plastic cover above the Red
button.
71
6.3.2 Performing a fuel conversion
11. Tune the gas valve. For instructions, see Adjusting the gas valve (EX 700, EX 850) on
page 76.
12. Check for gas leaks.
6.3.3 Measuring the inlet gas pressure
To locate the inlet gas pressure test port on the EX 400 and the EX 500 models, see Figure 42 .
To locate the inlet gas pressure test port on the EX 700 and the EX 850 models, see Figure 43 .
6.3.3.1 Measuring the inlet gas pressure - EX 400 and EX 500
To perform a gas pressure test, you will need to use a flat head screwdriver and a digital
manometer. You will be measuring the inlet gas supply from the test port (see Figure 47 ). Do
not perform a test from the manifold gas pressure test port.
Ensure that you have a load configured (Reset Heating, Set Point, or DHW). This load should
be large enough to allow the boiler to operate at high fire for over 10 minutes.
1. Shut off the gas supply.
2. On the gas valve, loosen the inlet gas pressure test port screw counter-clockwise.
Figure 47 Location of inlet gas pressure test port
3. Attach the manometer to the inlet gas pressure test port.
4. Switch on the gas supply to measure the inlet gas pressure. The gas pressure for
natural gas should be around 7" wc at high fire and 11" wc for propane. If the gas
pressure dips below 3½" wc or exceeds 15" wc, the boiler will shut down. If this
occurs, you will need to reset the gas high or low pressure switch. For instructions,
see Resetting the gas high / low pressure switches on page 77.
5. After completing the inlet gas pressure test, switch off the gas supply.
6. Remove the manometer from the inlet gas pressure test port.
7. Tighten the bolt head using a flat head screwdriver.
72
Section: Boiler operation
6.3.3.2 Measuring the inlet gas pressure - EX 700 and EX 850
To perform a gas pressure test, you will need to use the inlet gas pressure test fitting (supplied
with the boiler to transition from ⅛" BSP to barbed for connection to a manometer), a 3 mm Allen
wrench, and a digital manometer. You will be measuring the inlet gas supply from the test port
located to the right of the gas valve (seem on Figure 43 ). Do not perform a test from the
manifold gas pressure test port.
Ensure that you have a load configured (Reset Heating, Set Point, or DHW). This load should be
large enough to allow the boiler to operate at high fire for over 10 minutes.
1.
Shut off the gas supply.
2.
Remove the bolt head using a 3mm
Allen wrench, and put aside.
3.
Screw the inlet gas pressure test
fitting into the inlet gas pressure test
port.
4.
Insert the tubing securely into the
inlet gas pressure test fitting.
73
6.3.3 Measuring the inlet gas pressure
Switch on the gas supply to measure the inlet gas pressure. The gas pressure for
natural gas should be around 7" wc at high fire and 11" wc for propane. If the gas
pressure dips below 3½" wc or exceeds 15" wc, the boiler will shut down. If this
occurs, you will need to reset the gas high or low pressure switch. For instructions,
see Resetting the gas high / low pressure switches on page 77.
6.
After completing the inlet gas pressure test, switch off the gas supply.
7.
Remove the inlet gas pressure test fitting and manometer from the inlet gas pressure
test port.
8.
Insert the bolt head and tighten using a 3 mm Allen wrench.
6.3.4 Adjusting the gas valve (EX 400, EX 500)
Danger
Making adjustments to the IBC gas valve without a properly calibrated gas
combustion analyzer and by persons who are not trained and experienced in its use is
forbidden. Failure to use an analyzer can result in an immediate hazard.
To help with the following procedure, see Figure 42 .
Performing a combustion test
1. Give the boiler a call for heat.
2. When the boiler reaches high fire, insert the combustion analyzer test probe into the flue
gas test port. Then verify that the CO2 reading is within the combustion test targets at
Table 11 values.
Figure 48 Flue gas test port
74
Section: Boiler operation
3. Set the heat-out value in manual mode to the minimum MBH for the boiler. To do this:
a. Go to Main Menu > Diagnostics > Test Operation.
b. Click inside the Fan Test: Heat Output box, and using the number pad, enter the
minimum MBH.
c. Select OK. The fan runs to the minimum MBH you have set. Select the Fan Test: Heat
Output box to change the heat out value.
4. Low fire adjustment - adjust the low fire according to see Table 11 using a Phillips head
screwdriver. Turn clockwise to raise the CO2% (to richen). Turn counter-clockwise to lower
CO2%. Start with ⅛ of a turn until you see the analyzer measure a change then only make
1/16 adjustments. If changing direction on this adjustment you may notice a significant
backlash.
5. Check the results and confirm the correct settings when you return the boiler to high fire, and
then to low fire.
Note
Clock the gas meter to confirm full maximum rating plate input.
6. To exit the Test Operation screen, select Back.
7. Remove call for heat.
8. Turn off the gas supply at the external gas shut-off valve.
9. Remove the analyzer probe, and install the test port plug.
10. Disconnect the manometer.
11. Tighten the inlet pressure port screw with a flat head screwdriver.
12. Turn on the gas supply shut off valve and test for gas leaks.
Fuel
High fire
Low fire
CO max
PPM
Range %
Target %
Range %
Target %
Natural Gas
9.0 - 10.0
9.5
8.2 - 9.2
8.7
<150
Propane
10.3 - 11.3
10.8
9.3 -10.3
9.8
< 250
Table 11 Combustion test target ranges - CO2 / Maximum CO
75
6.3.4 Adjusting the gas valve (EX 400, EX 500)
6.3.5 Adjusting the gas valve (EX 700, EX 850)
Danger
Making adjustments to the IBC gas valve without a properly calibrated gas
combustion analyzer and by persons who are not trained and experienced in its use is
forbidden. Failure to use an analyzer can result in an immediate hazard.
To help with the following procedure, see Figure 43 .
Performing a combustion test
1. After the boiler is lit and is at high fire, insert the combustion analyzer test probe into the
flue gas test port (see Figure 48 ). Then adjust the high fire (gas-air ratio) adjustment with
a small slot screwdriver according to Table 11 values. This adjustment screw is very
sensitive and will only need very small adjustments to fine tune the gas valve. Turn
counter-clockwise (in the direction of the '+' sign) to raise the CO2% (to richen). Turn
clockwise to lower CO2%.
2. Set the heat-out value in manual mode to the minimum MBH for the boiler (see Table 11 ).
To do this:
a. Go to Diagnostics > Test Operation.
b. Click inside the Fan Test: Heat Output box, and using the number pad, enter the
minimum MBH.
c. Select OK The fan runs to the minimum MBH you have set. Select the Fan Test:
Heat Output box to change the heat out value.
3. Low fire adjustment - adjust the low fire according to see Table 11 . Use a 2.5 mm Allen
key. Turn counter-clockwise (in the direction of the '+' sign) to raise to raise the CO2% (to
richen). Turn clockwise to lower CO2%. Start with 1/8 of a turn until you see the analyzer
measure a change then only make 1/16 adjustments. If changing direction on this
adjustment you will notice a significant backlash.
4. Return the boiler to high fire, and check the results to confirm correct settings.
Note
Clock the gas meter to confirm full maximum rating plate input.
5. Return the boiler to low fire, and check the results to confirm correct settings.
6. To exit the Test Operation screen, select Back.
7. Turn off the gas supply at the external gas shut-off valve.
8. Remove the analyzer probe and install the test port plug.
9. Disconnect the manometer.
10. Remove the adapter fitting and reinstall the inlet test port plug, tightening with a 3mm
76
Section: Boiler operation
Allen wrench. Keep the fitting with the boiler for future use.
11. Turn on the gas supply shut off valve and test for gas leaks.
6.3.6 Resetting the gas high / low pressure switches
The gas high and low pressure switches are used to verify that the gas pressure is within the
operating range (see images below). The gas low pressure switch responds to a drop in gas supply,
and will shut down the boiler at 3½" wc (factory set). Located at the back of the gas valve, the gas
high pressure switch is set to shut down the boiler at 15" wc.
After the gas to the boiler is connected and turned on, you must reset the gas low pressure switch.
High pressure switch
Low pressure switch
Figure 49 Gas low/high pressure switches -
EX 400 and EX 500
Figure 50 Gas low/high pressure switches - EX 700
and EX 850
If the gas high or low pressure switch trips, the boiler controller will show a Red bar at the bottom of
the controller screen. The white mark on the dial indicates when the gas pressure switch is set to
trip.
To "reset" either the gas low or high pressure switch, press on the clear plastic cover above the Red
button.
Warning
Do not attempt to adjust the gas high or low pressure switch in the field.
77
6.3.6 Resetting the gas high / low pressure switches
7.0 Service and maintenance
Inspection of the boiler is to be performed annually by a qualified service technician.
Caution
The owner is responsible for general care of the boiler. Improper maintenance of the boiler
may result in a hazardous condition.
Managers of EX series boilers should arrange follow-up inspections and simple maintenance
procedures according to IBC's suggested servicing guidelines below.
Maintenance Required for Venting
Frequency
Check
Check and replace filter as needed. Site conditions will determine how
often the filter will need to be replaced. For replacement instructions, see
Replacing the air filter on page 102
As needed
□
Inspect system for unusual noises. Call your local heating contractor for
service if needed
As needed
□
Keep vent terminals clear of obstructions (snow, dirt, etc.).
As needed
□
Inspection of the boiler is to be performed annually by a qualified service
technician.
Annually
□
7.1 Maintenance checklists for heating contractor
Caution
Label all wires prior to disconnection when servicing controls. Wiring errors can cause
improper and dangerous operation.
Maintenance Required
Check
Remove any obstructions (e.g. leaves, dust, other debris) from vent terminals
□
Check and clean or replace intake air filters or screens as required.
□
Check for holes or leaks in venting. Replace venting as needed.
□
Examine for any signs of moisture caused by sweating intake air pipes; insulate as
required.
□
Ensure proper resealing or re-installation of venting on each servicing.
□
Maintenance Required for Venting
Frequency
Check
Check and replace filter as needed. For replacement instructions, see
Replacing the air filter on page 102
Monthly
□
Have your local heating contractor inspect the appliance annually.
Annually
□
Inspect system for unusual noises. Call your local heating contractor for
service if needed
As needed
□
Keep vent terminals clear of obstructions (snow, dirt, etc.).
As needed
□
Inspection of the boiler is to be performed annually by a qualified service
technician.
Annually
□
7.1.2 Condensate trap
Maintenance Required for Condensate Trap
Frequency
Check
Examine to see if cleaning is necessary (see Cleaning a condensate
trap on page 103).
Ensure that the trap has been re-filled completely before firing boiler.
Annually
□
If condensate neutralization is used, check the pH level of condensate
discharge.
Annually
□
7.1.3 Burner
Maintenance Required for Burner
Frequency
Check
Remove the burner to inspect for extent of fouling (see Replacing the
burner in the EX 400 and 500 models on page 90 or Replacing the burner
in the EX 700 and EX 850 models on page 100).
1. Wash the burner from outside with a domestic water pressure,
and dry using compressed air.
2. Evaluate and establish a reasonable burner inspection and
cleaning schedule. Some boiler / locations may call for annual
service, others with clean burners needing attention every 2 – 5
years.
3. Reassemble. Visually inspect the burner through sight glass,
ensuring flame is stable, without excessive fluttering. Normal
flame pattern is evenly distributed over the burner surface.
Annually
□
80
Section: Service and maintenance
Maintenance Required for Burner
Frequency
Check
If the burner is operating improperly, remove and clean or replace. Use a
CO2 analyzer to determine proper combustion. See Combustion test
target ranges - CO2 / Maximum CO on page 75 for correct values.
Annually
□
Warning
When removing the burner for inspection or boiler servicing, examine the sealing gaskets
and replace if damaged. Upon re-assembly, test all sealing areas to ensure there is no
leakage of combustible gas/air premix.
7.1.4 Heat exchanger
Maintenance Required for Heat Exchanger
Frequency
Check
In areas of poor gas quality, there may be a build-up of black plaque
(typically sulfur). Other fouling agents include: airborne dust, debris and
volatiles.
With the burner removed, examine the heat exchanger for signs of
contamination and clean if necessary. Refer to instructions in Replacing
the burner in the EX 400 and 500 models on page 90 or Replacing the
burner in the EX 700 and EX 850 models on page 100 for access to the
combustion chamber and heat exchanger.
Annually
□
7.1.5 Pump
Maintenance Required for Pump
Frequency
Check
Check that the pump is on in normal operation and that the water Δ°T is
reasonable for a given firing rate.
Annually
□
7.1.6 Gas piping
Maintenance Required for Gas Piping
Frequency
Check
Check for damage or leaks and repair as needed.
Annually
□
81
7.1.4 Heat exchanger
7.1.7 Touchscreen boiler controller
Maintenance Required for Boiler Controller
Frequency
Check
Check that boiler operation is consistent with the steps in the
Touchscreen Boiler Controller Manual.
Annually
□
Check that water temperature targets and setpoint is satisfactory and
have not been adversely amended.
Annually
□
Check the operating history using the boilers Logs menu and Error Logs
menu.
The controller tracks the duty cycle of the boiler in each of the 4 loads
separately. This information can be used to adjust the water
temperatures of each load.
□
If a problem exists with the controller, see Troubleshooting on page 105.
7.1.8 Water
Checks for Water in the Boiler
Frequency
Check
Check water pressure and temperature.
There should be no noticeable change if boiler is functioning normally.
Check for any noise in the system.
Annually
□
Check water piping for damage or leaks and repair as needed.
Annually
□
Check the water pressure. Pressure should be stable when the boiler is
firing and the water temperature is rising.
If pressure rises sharply, consider replacement of expansion tank.
Annually
□
Check also for noise at high fire, which may signal water quality
problems.
Annually
□
Water chemistry shall be of a quality generally accepted as suitable for
hydronic applications.
Annually
□
Ensure any direct “city fill” water connections are left in the closed
position to minimize exposure to leaks and flooding.
Annually
□
82
Section: Service and maintenance
Installers should inquire of local water purveyors as to the suitability of their supply for use
in hydronic heating systems.
If water quality is questionable, a local water treatment expert must be consulted for testing,
assessment and, if required, treatment.
Alternatively, water or hydronic fluid of known quality can be brought to the site.
7.1.9 Freeze protection
Maintenance to prevent freezing
Frequency
Check
Check the freeze protection. Use only antifreeze made specifically for
hydronic systems. Inhibited propylene glycol is recommended. Antifreeze
volume must be between 25% and 50% of the total volume of water in the
system.
Annually
□
Warning
Do not use automotive-type ethylene or other types of automotive glycol antifreeze, or
undiluted antifreeze of any kind. This may result in severe boiler damage. It is the
responsibility of the Installer to ensure that glycol solutions are formulated to inhibit
corrosion in hydronic heating systems of mixed materials. Improper mixtures and chemical
additives may cause damage to ferrous and non-ferrous components as well as non-
metallic, wet components, normally found in hydronic systems. Ethylene glycol is toxic,
and may be prohibited for use by codes applicable to your installation location. For
environmental and toxicity reasons, IBC recommends only using non-toxic propylene
glycol.
7.1.10 Boiler treatment
Maintenance for Boiler Treatment
Frequency
Check
Check consistency of any boiler treatment used, for appropriate mixture.
Chemical inhibitors are consumed over time, lowering their density.
Annually
□
Verify proper operation after servicing.
Annually
□
83
7.1.9 Freeze protection
Installers should inquire of local water purveyors as to the suitability of their supply for
use in hydronic heating systems.
If water quality is questionable, a local water treatment expert must be consulted for
testing, assessment and, if required, treatment.
Alternatively, water or hydronic fluid of known quality can be brought to the site.
7.1.11 Relief valve - maintenance and testing
The relief valve manufacturer requires that under normal operating conditions a “try lever test” must
be performed every two months.
Under severe service conditions, or if corrosion and/or deposits are noticed within the valve body,
testing must be performed more often. A “try lever test” must also be performed at the end of any
non-service period.
Maintenance for Relief valve
Frequency
Check
Test at or near the maximum operating pressure by holding the test lever
fully open for at least 5 seconds to flush the valve seat free of sediment
and debris. Then release the lever and allow the valve to snap shut.
If the lever does not activate, or if there is no sign of discharge,
discontinue use of equipment immediately and contact a licensed
contractor or qualified service personnel.
If the relief valve does not completely seal, and fluid continues to leak
from the discharge pipe - perform the test again to try and flush any
debris that may be lodged in the valve. If repeated tries fail to stop the
leakage, contact a licensed contractor or qualified service personnel to
replace the valve.
While performing a "try lever test", a quantity of heat transfer fluid will be
discharged from the piping system and the system pressure will drop.
This fluid must be replaced. To refill and pressurize your system, we
recommend using a system pressurization appliance such as an Axiom
Industries model SF100 series. Capture the discharged fluid in a
container and recycle it by returning it to the system feeder appliance.
This is particularly important when your system contains treatment
chemicals or glycol solutions. If the system employs plain water, the
boiler auto fill valve must be turned on in order to recharge the lost fluid.
Annually
□
84
Section: Service and maintenance
7.2 Replacing the fan, gas valve, and burner in EX 400
and EX 500 models
This section documents the following maintenance procedures for EX 400 and EX 500 models:
Replacing the fan
Replacing the gas valve
Replacing the burner.
Fan
Shutoff valve
Manifold gas pressure test port
Inlet gas pressure test port
High pressure switch
Low pressure switch
85
7.2 Replacing the fan, gas valve, and burner in EX 400 and EX 500 models
Low fire adjustment
Mixing device
Figure 51 Gas valve and fan components - EX 400, 500
7.2.1 Replacing the fan on the EX 400 and EX 500 models
1. Turn off the electric power and gas supply to the boiler.
2. Ensure the boiler cools down to the surrounding temperature. Do not drain the boiler
unless freezing conditions are expected during this procedure.
3. Remove the front cover, and then remove the boiler's top panel by removing the Torx
screws on the top panel of the boiler.
A ladder or step may be required to have a clear vertical view of the work area. Do not
attempt to reach from the front without a clear view, as damage to connectors, screws or
refractory may occur.
4. Unplug the electrical connectors on the front and back of the fan.
5. Position the harnesses out of the way of the heat exchanger lid.
6. Pull away the air intake tube (can slide into the filter box) from the fuel mixer (see Figure
52 ).
Figure 52 Air intake tube
7. Use a 3mm Allen key to remove the three (3) screws connecting the mixing device to the
fan. (See Figure 53 ). Ensure that the fan O-ring stays seated in the fan groove during
reassembly.
86
Section: Service and maintenance
Figure 53 Location of screws securing mixing device to fan
8. Use a 7mm wrench to remove the four screws at the base of the fan (attaching the fan to the
heat exchanger lid). It may help to unplug the ignitor for easier access.
9. Lift off the fan, and replace with the new fan. Ensure that the fan O-ring stays seated in the
fan groove during reassembly.
10. Reinstall the components in reverse order. Upon reassembly, ensure that all O-rings and
gaskets are correctly positioned.
Warning
Ensure that the fan O-ring is seated in the groove of the fan when reassembling.
7.2.2 Replacing the gas valve in the EX 400 and EX 500 models
1. Turn off the electric power and gas supply to the boiler.
2. Ensure that the boiler cools down to the surrounding temperature.
3. Remove the front cover, and then remove the four Torx 20 head screws on the top panel of the
boiler.
A ladder or step may be required to have a clear vertical view of the work area. Do not attempt
to reach from the front without a clear view, as damage to the connectors or screws may
occur.
4. Disconnect the gas valve wiring, and pull out the connectors by gripping the plastic tip, rather
than the wire, to avoid breaking the connector (see j and �in Figure 54 ). Note the position of
the colored wires; do not cross the colored wires upon reconnection (e.g., blue on top).
87
7.2.2 Replacing the gas valve in the EX 400 and EX 500 models
Figure 54 Connector wires
5. Gently remove the silicone air pressure tube from the gas valve by gripping near its base,
and put aside.
Figure 55 Silicone air pressure tube
6. From the inlet side of the gas valve (see �on Figure 51 ), remove the four (4) screws using
a 4mm Allen key, and put aside.
Figure 56 Screws on gas valve inlet
88
Section: Service and maintenance
7. Remove the screws from the outlet side of the gas valve (see �on Figure 51 ) to separate the
gas valve from the appliance. To do this, ensure that you support the bottom of the gas valve
when you remove the bottom two (2) screws (see Figure 57 ) and then the top two (2) screws.
Figure 57 Gas valve outlet screws
8. Replace with the new gas valve following the steps in reverse order. Upon reassembly, ensure
that all O-rings are well seated in their grooves.
Tip: Lightly hand-tighten each screw before tightening all four screws fully on both the
outlet and inlet sides of the gas valve. To prevent gas leaks, ensure that the O-rings on
the outlet side and inlet side are well seated in their grooves.
9. Tune the gas valve. For instructions, see Adjusting the gas valve (EX 400, EX 500) on page
74.
10. Turn on the electric power and gas supply to the boiler.
11. Reset the low pressure switch. For instructions, see Resetting the gas high / low pressure
switches on page 77.
89
7.2.2 Replacing the gas valve in the EX 400 and EX 500 models
7.2.3 Replacing the burner in the EX 400 and 500 models
Warning
The IBC heat exchanger has a small amount of combustion chamber insulation
(refractory), which contains ceramic fibers.
When exposed to extremely high temperatures, the ceramic fibers that contain
crystalline silica can be converted into cristobalite, classified as a possible human
carcinogen.
Avoid disturbing or damaging the refractory. If damage occurs, contact the factory for
directions.
Avoid breathing and contact with skin and eyes and follow these precautions:
1. For conditions of frequent use or heavy exposure, respirator protection is
required. Refer to the “NIOSH Guide to the Selection and Use of Particulate
Respirators Certified under 42 CFR 84” for selection and use of respirators
certified by NIOSH.
For the most current information, NIOSH can be contacted at 1-800-356-4676 or
on the web at www.cdc.gov/niosh.
2. Wear long sleeved, loose fitting clothing, gloves and eyes protection.
3. Assure adequate ventilation.
4. Wash with soap and water after contact.
5. Wash potentially contaminated clothes separately from other laundry and rinse
washing machine thoroughly.
6. Discard used insulation in an air tight plastic bag.
NIOSH stated first aid:
Eye contact - Irrigate and wash immediately.
Breathing - Provide fresh air.
To remove the burner:
1. Turn off the electric power and gas supply to the boiler.
2. Remove the front cover, and then remove the boiler's top panel by removing the Torx head
screws.
3. Unplug the two electrical connectors from the front and back of the fan (see Figure 58 ).
90
Section: Service and maintenance
Figure 58 Fan connectors
4. Remove the Nylok nuts from the air intake clamp and gasket assembly.
Figure 59 Air intake clamp and gasket assembly
5. When loose, slide off the clamp and gasket assembly, and put aside with screws and Nylok
nuts for reassembly.
Figure 60 Removal of clamp and gasket assembly
6. Push the air intake tube into the filter box.
91
7.2.3 Replacing the burner in the EX 400 and 500 models
Figure 61 Removal of clamp and gasket assembly
7. Remove the silicone tube.
:
Figure 62 Removal of silicone tube
8. Disconnect the electrical connectors (seej andk on above image).
9. Remove the four (4) bolts from the right side of the gas valve.
10. Remove the four (4) bolts that attach the mixing device to the fan.
Figure 63 Removing bolts securing mixer to fan
11. Remove the mixer assembly, gas line and gas valve by pulling straight up.
92
Section: Service and maintenance
Figure 64 Removing mixer assembly, gas line and gas valve
12. Remove the air intake tube.
Figure 65 Removing air intake tube
13. Disconnect the ignitor electrical cable and green grounding wire.
14. Remove the nuts securing the fan to the lid.
15. Remove the fan.
Warning
Wear a suitable protective mask to avoid ingesting particles from the refractory.
16. Loosen the eight (8) bolts securing the lid to the heat exchanger using a 5 mm Allen key.
17. To help realign the heat exchanger lid with the heat exchanger upon reassembly, draw a
vertical line from the front of the lid down to the heat exchanger.
18. Carefully lift (straight up) the heat exchanger lid, and place in a clean dry area. Take care to
avoid damaging the refractory insulation.
93
7.2.3 Replacing the burner in the EX 400 and 500 models
Figure 66 Lifting heat exchanger lid with burner on underside
19. Carefully remove the 6 M8 bolts securing the burner to the heat exchanger lid.
Tip: to gain better access to the burner, carefully unscrew the ignitor from the lid and
place in a safe place.
20. Remove the burner and gasket. The burner gasket may be brittle and break in the process.
Replace if necessary.
Figure 67 Removing bolts securing burner to heat exchanger lid
To reinstall:
1. Install the new burner.
2. Ensure that you tighten each screw evenly by following the order indicated in the pattern
below.
94
Section: Service and maintenance
Figure 68 Example of cross-tightening of screws
3. Reinstall the lid and burner components.
4. Reinstall the fan gasket and fan. Replace gasket if necessary.
5. Reconnect the ignitor electrical cable and green grounding wire.
6. Insert the air intake tube into the air filter box.
7. Reinstall the mixer, gas line and gas valve assembly, ensuring that the mixer gasket is in
place.
8. Attach the mixing device to the fan with the bolts.
9. Replace the bolts on the right side of the gas valve.
Figure 69 Bolts on right side of gas valve
10. Reattach the electrical connectors to the gas valve.
11. Reattach the silicone tube.
12. Fit the air intake tube onto the mixing device.
13. Secure the air intake gasket and clamp components to the filter box.
14. Reattach the two electrical connectors to the front and back of the fan.
15. Reinstall the boiler's top panel and then the front cover.
95
7.2.3 Replacing the burner in the EX 400 and 500 models
16. Turn on the electric power and gas supply to the boiler.
17. Reset the low pressure switch. For instructions, see Resetting the gas high / low pressure
switches on page 77.
18. Tune the gas valve. For instructions, see Adjusting the gas valve (EX 400, EX 500) on page
74.
7.3 Replacing the fan, gas valve, and burner in EX 750
and EX 800 models
This section documents the following maintenance procedures for EX 700 and EX 850 models:
Replacing the fan
Replacing the gas valve
Replacing the burner.
Fan
Mixing device
High pressure switch
Three- (3) wire Molex plug
96
Section: Service and maintenance
Inlet gas pressure test port
Low pressure switch
Low fire adjustment (zero-offset)
High fire adjustment (on the side)
Manifold gas pressure test port
Shutoff valve
Figure 70 Gas valve and fan components - EX 700, 850
7.3.1 Replacing the fan on the EX 700 and EX 850 models
1. Turn off the electric power and gas supply to the boiler.
2. Ensure the boiler cools down to the surrounding temperature. Do not drain the boiler unless
freezing conditions are expected during this procedure.
3. Remove the front cover, and then remove the boiler's top panel by removing the Torx screws
on the top panel of the boiler.
A ladder or step may be required to have a clear vertical view of the work area. Do not attempt
to reach from the front without a clear view, as damage to connectors, screws or refractory
may occur.
4. Unplug both the front and back electrical connectors from the fan, and position them out of the
way of the fan.
5. To separate the mixing device from the fan, remove the 6 x 6mm bolts. Note how the mixing
device is positioned on the fan before separating it from the fan.
Note: When you disconnect the mixer from the fan, it is still attached to the filter box and gas
valve. This puts pressure on the fan, filter box and gas valve assembly, which have limited
support. When you swap out the fan, place some sort of support underneath the mixer.
6. Remove the four (4) bolts at the base of the fan, connecting the fan to the heat exchanger lid.
7. Carefully lift off the fan, by pulling straight up and ensuring that no wires are caught, and that
the gas line remains in place. Place the removed components in a clean, dry area.
8. Attach the new fan.
9. Ensure that the O-ring is in place on the fan before reattaching the mixer.
10. Re-install the components in reverse order. Upon reassembly, ensure that all gaskets are
included and correctly positioned.
97
7.3.1 Replacing the fan on the EX 700 and EX 850 models
7.3.2 Replacing the gas valve in EX 700 and EX 850 models
Four (4) bolts connecting gas valve and mixing device. Keep gasket and bolts for re-
assembly.
Location of high gas pressure switch.
Gas valve inlet: Four (4) bolts of the flange. Keep gasket and bolts for re-assembly.
Low gas pressure switch.
Gas valve electrical connector
Gas valve outlet: Four (4) bolts of the flange. Keep gasket and bolts for re-assembly.
Supporting bracket for gas valve
Black tubing
Figure 71 Accessing the gas valve - EX 700, 850
1. Turn off the electric power and gas supply to the boiler.
2. Ensure that the boiler cools down to the surrounding temperature. Do not drain the boiler
unless freezing conditions are expected during this procedure.
98
Section: Service and maintenance