Table�of�Contents�
Safety .............................................................................................................................. 2
1) Components ............................................................................................................... 4
2) Anchors & Base Plate ................................................................................................ 6
3) Tower Assembly ....................................................................................................... 12
4) Initial Tower Raising ................................................................................................. 19
5) Lowering the Tower .................................................................................................. 21
6) Installing the EXCEL1 Wind Turbine ........................................................................ 22
7) Final Tower Raising ................................................................................................. 29
8) Misc. Reference Material ......................................................................................... 31
9) Tilt Tower Packing Lists ........................................................................................... 37
Table�of�Figures�
Figure 1: Major Tower Components ............................................................................... 5
Figure 2: Anchor Layout ................................................................................................. 7
Figure 3: Base Plate Assembly .................................................................................... 10
Figure 4: Anchor Installation ......................................................................................... 11
Figure 5: Guy Wire Attachment .................................................................................... 15
Figure 6: Gin-pole Safety Wire Assembly ..................................................................... 16
Figure 7: Tower Tilt-up Sequence ................................................................................ 19
Figure 8: Major Components of the EXCEL 1 .............................................................. 22
Figure 9: EXCEL 1 Wiring Schematics ......................................................................... 23
Figure 10: Turbine Mounting ........................................................................................ 25
Figure 11: Blade and Spinner Fasteners ...................................................................... 26
Figure 12: Nut Tightening Order ................................................................................... 27
Figure 13: Tail Fin Attachment ..................................................................................... 27
Figure 14: Tail Boom Attachment ................................................................................. 28
Figure 15: Guy Wire Transfer Sequence ...................................................................... 29
Figure 16: Concrete Anchors ....................................................................................... 33
Table�of�Tables�
Table 1: Pull-up Force and Cable Travel ...................................................................... 17
Table 2: Recommended Wire Sizes for the EXCEL1 24V ............................................ 24
Table 3: Soil Classifications ......................................................................................... 32
This manual contains important information concerning the installation of your Bergey
Tilt Tower, EXCEL1 wind turbine, and PowerCenter controller. We strongly recommend
that you read and familiarize yourself with its contents.
At several points in this manual, items of special interest or significant impact are high-
lighted by one of the following symbols:
DANGER: Hazard or unsafe practice that could cause personal injury or death.
WARNING: Hazard or unsafe practice which could cause product damage.
NOTE:
Significant point of interest.
DANGER: Installation of this tower and turbine system should only be conducted
by qualified personnel. Installation by unqualified personnel could result in damage to
persons or property and may void the manufacturer’s warranty.
DANGER: Inadequate attention to proper rigging and procedures can lead to
destruction of the equipment and/or serious injury. DO NOT cut corners or get into a
hurry.
TOWER SAFETY NOTES
1. Never climb the tower.
2. All persons not directly involved in the installation should stay clear of the area when
the tower is being raised or lowered.
3. All persons near the tower should wear OSHA-approved hardhats.
4. Tower work should be done by trained personnel.
5. Tower should not be constructed near utility lines. Injury or death may result.
6. DO NOT use a tractor or other vehicle to erect the tower without exercising extreme
caution.
7. Stay clear of the tower in the presence or possibility of severe weather of any kind.
8. Thoroughly understand the tower erection procedure before beginning the installa-
tion.
TOP 10 REASONS FOR TOWER FAILURE
1. Improper torque on guy line grip clips & no yearly inspection
2. Improper guy line tensioning & no yearly inspection
3. Improper guy line radii
4. Improper anchor installation
5. Improper base installation
6. Construction of base pad above frost depth
7. Improper torque on tower connections
8. Improper height of installed guy lines
9. Stainless steel cotter pins not used
10. Improper installation in corrosive soil
The major components for the tower kits are shown in
Figure 1. The tower sections are 4.5” diameter thin-wall steel tubes that have been
swaged down at one end (except for end tubes) so they fit into each other. Every 20’ in
height (two 10’ tower sections) there is a guy bracket with four 3/16” diameter guy wires
attached. These guy wires go out to four earth anchors and are attached with malleable
clips. The top guy bracket attaches to the top tower tube mid-section.
The tower sections rest on a base plate assembly that often rests directly on the
ground. The base plate provides the pivot point for the tower and gin-pole. The gin-
pole is the lever arm used for raising and lowering the tower. It does not reach all the
way out to the earth anchor in its direction, so a transfer of guy wires is necessary dur-
ing raising and lowering. The lifting eyes on the guy wires are for connecting to the gin-
pole during lifting and before transferring to the permanent anchors. The gin-pole has a
teeter assembly at its end to accommodate the guy wires and the lifting line from the
winch used for raising and lowering.
Figure 1: Major Tower Components
XL.1 Wind Turbine
Guy Set, 75 ft. Level
Guy Set, 60 ft. Level
Guy Set, 40 ft. Level
Guy Set, 20 ft. Level
Tower Tube
Base Tube
Base Tube
Tower Tube
Gin-pole Top Tube
(with teeter brackets)
Earth Anchor
Base Plate
Lifting Guy-Wires
(with swaged-on
lifting eyes)
Malleable Clips
Guy Wires
80’ Tower
2) Anchors & Base Plate
Tools Required:
5-6 wood or metal stakes
Hammer
Sledge-hammer
100’ tape measure
6” Diameter x 5’ power auger
Chance/Hubbell #C302-0003 10’ Expanding & Tamping Tool
or 10’ long x 3” diameter heavy wall steel pipe
Shovel
9/16” box-end wrench
9/16” socket and ratchet drive or 12” crescent wrench
Procedure:
Step 1:
Mark the ground location for the tower base plate, guy anchors, and the lifting anchor
for the gin pole. The appropriate dimensions and ground layout are shown in Figure 2.
Make sure that you have sufficient room for the tower and turbine to tilt down. If you
plan to mount solar modules on the tower we recommend that the gin-pole be oriented
towards South in the Northern Hemisphere and North in the Southern Hemisphere. If
the site is not level, try to position the tower so that it will be lowered in the uphill direc-
tion. Check the diagonal distance between anchor points to ensure that they are
spaced in a squared pattern.
DANGER: The tower must not be erected near electric power lines. Most over-
head power lines are not insulated, so they pose a life-threatening
shock hazard.
NOTE: The side guy anchors and the base plate must be on a straight line to en-
sure adequate cable tension during raising or lowering operations. If ex-
act placement of an anchor point is not possible, it should be moved out-
ward from the base rather than inward. Try to keep the side anchors and
the base plate at approximately the same elevation.
At the four guy wire anchor stakes and the gin-pole anchor stake, auger 6” diameter
holes at a ~ 45 degree angle oriented so that the anchor eye ends will be closest to the
tower base (center). The holes should be deep enough that the anchor rod projects 4”
– 6” above the surface when placed in the hole (without the bell attached).
Attach the rod to the anchor bell and insert in hole. Make sure it goes all the way to the
bottom of the hole. Expand the bell anchor using the Chance Expanding & Tamping
Bar or a heavy pipe. Turn the Eye at the end of the rod so that it is oriented vertically so
that the guy wires will attach in a straight vertical line. Make sure that the bell is fully
expanded because its “bite” into virgin soil provides the primary strength of the anchor.
Refill the hole about 12” at a time, then carefully compacting the soil using a tamping
tool. The fill must be compacted to develop proper strength and to keep water from
seeping in and compromising the anchor strength.
For weak or problematic soils, it may be necessary to use concrete for the anchors or
use an alternate anchoring method. These topics are covered in Chapter 8, under An-
choring.
Step 3:
For most installations the base plate will sit directly on the ground. This is actually the
preferred configuration. A concrete base is only needed when the soil strength is very
low, such as sand or marsh.
Assemble the four piece base plate with the 3/8” x 1” stainless bolts, washers, and lock-
nuts supplied with the kit as shown in
Figure 3. To prevent galling, apply anti-seize compound to the bolt threads before
screwing on the nuts.
Install the base plate with its up-turned flanges aligned with the tower lay-down direc-
tion. Sink the down-turned edges into the soil. Pound the 8’ copper-clad grounding rod
into the ground through one of the two 7/8” holes in the base plate, using a sledgeham-
mer. Leave about 4” of rod above the Base Plate.
When using a concrete base for the tower we recommend a base that is roughly 26” x
26” x 12” deep, with several pieces of steel reinforcing bar placed horizontally. Assem-
ble the Base Plate. The Tilt Tower Base Plate must be secured to the concrete using
two 5/8” hex head bolts (not supplied) or concrete anchor bolts (not supplied) installed
through the ¾” holes normally used for the ground rods.
You can either cast hex bolts into the concrete or pour the concrete pad and install an-
chor bolts after the pad has cured. Drilling the pad for anchor bolts will generally require
the use of a hammer drill. For cast in bolts, we recommend two 6” long galvanized 5/8”
diameter bolts with about 2 ½” of the threaded end sticking up above the concrete. The
bolts should be centered on the pad and spaced 17.7” apart. Note the tower tilt align-
ment direction required in
Figure 3.
For non-concrete installations the channel plate that faces towards the gin-pole anchor
should be assembled in the extended position, as shown in
Figure 3. When being bolted to a concrete pad the channel plate should be assembled
in the retracted position. Securely bolt the Base Plate to the concrete pad. Install the
ground rods adjacent to the concrete pad.
Figure 3: Base Plate Assembly
Galvanized
bolts (6 places)
Top View
Side View
7/8“ holes for ground
rods or concrete
anchors
Move this
channel
in when
mounting
on concrete
Bolt hole for
tower tube
Bolt hole for
gin-pole tube
Tower tilt-
down
direction
Ginpole
direction
3) Tower Assembly
Tools Required:
1 1/4” box-end wrench or 18” crescent wrench
¾” box-end wrench
7/16” box-end wrench
18” crescent wrench
12” crescent wrench
7/16” nut driver or socket w/ratchet
Tape measure or rope
Electrical tape
Procedure:
Step 1:
Bolt the base tower section to the base plate using a 3/4” diameter x 6 1/2” long bolt and
nut through the hole drilled in the end of the base section. Use the lower hole in the cen-
ter of the long base plate, as shown in
Figure 3. Secure the ¾” nut with a ¾” pal-nut.
Note:
If the power leads are to be carried inside the tower, as is recommended,
they should be installed as the tower is being assembled. See Table 2 in
Section 6 for wire size recommendations.
Step 2:
Add one 10’ standard section to the base section for a total of 20’. Slide on the first guy
ring (Labeled “20 ft. Level”) over the top of the swedged (reduced) section of the tube,
with the spooled guy wire sets attached. Do not unspool the guy wires at this stage.
Slide the guy ring all the way down the swedged part of the tube to the “lip” where the
tubes join. The ring will rest against the lip of the tube and the next tower tube will press
against it. Make sure that the guy ring “ears” are facing towards the base plate.
Make sure that the guy wire spool with the free swedged thimble (lifting eye) is on the
top. This thimble will attach to the gin-pole, so it needs to be oriented towards where
the gin-pole will be assembled.
Step 3:
Add two more 10’ sections and slide on the 40’ level guys. Make sure that the guy ring
“ears” are facing towards the base plate. Slide the guy ring down the swedged end of
the tube to the lip where the tubes join. The ring will rest against the lip of the tube and
the next tower tube will press against it. Do not unspool the guy wires at this stage.
Make sure that the guy wire spool with the free swedged thimble (lifting eye) is on the
top.
Step 4:
On a 60’ tower, add one more 10’ section. Then loosely add the top section, which has
eight threaded holes at its mid-section and six turbine mounting holes at its top. The
turbine mounting holes must be at the top of the tower.
Add the Top Guy Bracket Collar, ensuring that the bracket ears face towards the base.
Make sure that the guy wire spool with the free swedged thimble is on the top. Do not
unspool the guy wires.
Attach the Collar to the top tube using six (6) ¼” x 1” stainless hex head bolts, after first
applying Loctite to each bolt. A small tube of Loctite is supplied in the tower kit. DO
NOT apply anti-seize. Torque these bolts to 45 ft-lbs.
Adjust the angular alignment of the top tube so that the guy bracket ear of the spool with
the free swedged thimble (lifting eye) is in line with the lower two brackets. Now the top
tower tube can be fully pressed on.
Step 4-A (80’ towers only):
On the 80’ tower add two more standard sections and a guy level, and then the top two
section as described in the previous paragraphs.
Step 4-B (100’ towers only):
On the 100’ tower, add four more 10’ sections, sliding on the 60’ and 80’ level guy rings
and wires. Make sure that the guy ring “ears” are facing towards the base plate. Slide
the guy rings all the way down the swedged part of the tube to the “lip” where the tubes
join at the 60’ and 80’ levels. Do not unspool the guy wires at this stage.
Make sure that the guy wire spool with the free swedged thimble (lifting eye) is on the
top.
Add one more standard section and then the top section as described in the previous
paragraphs.
Step 5:
Roll out the side guy wires to the side anchors. Use a screwdriver or small diameter rod
through the center of the wire spool to act as a hub. Let the wire unwind as you walk
out to the anchor point.
The guy wires with the lifting eyes must be on the upper side of the hori-
zontal tower sections. This eye is clipped to the top of the gin pole. These
guy wires will serve as the lifting wires until the tower is fully erected.
Note: Guy wires must be rolled out to the anchors, not let out from a coil held in
the hand or from the side of the spool. These latter two methods will allow
the wire to become severely twisted and stressed, making it very difficult
to handle.
Step 6:
When the guy wires are rolled out to all the anchors, check to ensure that the tower is at
a 90 degree angle to the line joining the side anchors and the base plate. If the anchors
were accurately placed the tower should lay close to the “uphill” anchor point (see Fig-
ure 2). If not, use a tape measure or a rope to check that the diagonal distances from
the tower top to each side anchor are approximately the same. Check also that the front
and rear anchors and the lifting anchor are in line with the tower.
WARNING: Extra care must be taken while raising the tower if the anchor place-
ment is not perpendicular (90 degrees) to the tower, or if the side an-
chors are not at the same elevation, or if the side anchors and base
plate are not in a straight line. Any of these conditions will affect the
guy wire tension as the tower is raised. Tension must be adjusted pe-
riodically as the tower is raised.
Step 7:
Assemble the 3/16” HD thimbles on the anchor rod eyes by twisting them open, press-
ing them on, and twisting them closed. Two crescent wrenches work well for this task.
There will be 3 thimbles per anchor on the 60’ tower, 4 thimbles per anchor on the 80’
tower, and 5 thimbles per anchor on the 100’ tower.
Slide three wire rope malleable clips (supplied in the guy set box) onto each guy wire
end. Place the wire rope clips on the wire so that the forged, grooved part cradles the
wire coming from the tower (the “tension side”) and the “U-bolt” part clamps down on
the end-most section of the wire. Thread the guy wire end through the anchor rod eye
and around a thimble, double back and slide through the first wire rope malleable clip.
The guy wires are wrapped around the anchor eye thimbles as shown on the anchor
detail in Figure 5. Leave a little slack in the guy wire. Snug up the wire rope malleable
clips using a 7/16” nut driver. Tighten two of the clips. Let the other clip remain loose
until the tower has been erected and leveled.
Figure 5: Guy Wire Attachment
Step 8:
Referring to
Figure 3, the gin-pole will attach to the base plate with a 3/4” diameter x 6 1/2” long bolt.
The gin-pole is assembled in the same direction as the tower itself, with the gin-pole
resting on top of the tower sections. Secure the ¾” nut with a ¾” pal-nut.
The following procedure integrates the assembly of the gin-pole safety wire (see Figure
6), which will keep the gin-pole from coming apart when the load direction changes dur-
ing tower raising:
1. Assemble gin-pole – align holes at each end
2. Slide safety wire inside gin pole.
3. Assemble gin-pole on top of tower.
4. When bolting gin-pole to base plate, pass bolt through loop in safety wire.
5. When assembling gin-pole brackets at the outer end of the gin pole, pass bolt
through loop in safety wire.
The 60’ tower uses a 20’ gin pole, made up of two 10’ sections. The 80’ and 100’ tow-
ers use a 30’ gin pole, made up of three 10’ sections.
The safety wire has three thimbles attached, one at each end and one 9’ from the end.
Use the two thimbles at the ends for the 80’ and 100’ towers. Use one end thimble and
the intermediate thimble for the 60’ tower.
Figure 6: Gin-pole Safety Wire Assembly
Make sure that the bracket bolt in the end section of the gin-pole is aligned as shown in
Figure 6. Bolt the gin-pole brackets to the end section with the ¾” bolt, making sure to
pass the bolt through the safety wire thimble. Secure the bolt with a ¾” nut and Pal-Nut.
Attach the snap link to the gin-pole bracket with a ½” bolt. A snap link is a heavy galva-
nized steel or stainless steel loop with a spring-loaded gate or opening side bar. Be
sure that the snap link opens down and away from the base plate. This will allow the
lifting guy wires to be clipped and unclipped in the correct order.
Step 9:
Roll out each level of the lifting guy wires and attach each of the swaged-on lifting eyes
to the snap links shackled to the bracket at the end of the gin pole. The top guy wire
attaches to the forward snap link. The lower guy(s) are clipped to the second snap link,
the lowest guy wire first. Make sure that the guy wires are not twisted. The free ends of
the remaining guy wires will be attached to the forward anchor after the tower is erect-
ed. Keep the wires well organized so this will be easy to do.
Step 10:
Attach the two yellow polypropylene ropes to the top of the gin pole. Run one of the
ropes to each of the side anchors. The ropes prevent the gin-pole from falling sideways
when vertical, and center it as the tower is being raised.
Step 11:
Attach the cable from the lifting device to the gin-pole tie top bracket with a shackle from
the hardware kit. Electric or hand winches may be used. The pull-up forces (including
the EXCEL1 turbine) and the pull-up cable lengths are given in Table 1:
Table 1: Pull-up Force and Cable Travel
Height
(ft)
Pull-up
Force
(lbs)
Pull-up
Cable
Travel (ft)
59
750
30
78
1,150
43
97
1,550
43
These loads are static loads. Bouncing or shock loading can cause higher momentary
loads. We recommend using at least 3/16” steel wire rope for the lifting. We also rec-
ommend a 2:1 pulley block arrangement to reduce the line tension for the 25 and 32
meter towers. A 2:1 pulley block will cut the pull-up force in half. The pulley block is at-
tached to the gin-pole shackle or snap-link. Please remember that using a 2:1 pulley
will double the pull-up cable travel to 86 ft on the taller towers.
WARNING: If a winch is used, we strongly recommend that a worm-gear type be
used and that a spur-gear type be avoided. A worm-gear winch is in-
herently self-locking and cannot free-spool like a spur-gear type
winch.
WARNING: If using a tractor or truck, extreme care must be exercised. Use a
pulley block at the lifting anchor. Never attach a cable from a truck or
tractor directly to the gin-pole end. Proceed slowly and smoothly.
Step 12:
Walk the gin-pole toward the vertical position while taking in the slack with the lifting de-
vice. When the gin-pole is nearly vertical, all the lifting wires should be tight. If using a
drum winch, try to guide the cable onto the drum so that it is distributed evenly across
the surface of the drum.
Step 13:
Use some tape to secure the tower electrical wiring at the top end of the tower so that it
will not slide down the tower when the tower is raised.
Step 14:
Lift the tower 4’ to 8’ above the ground to check the operation of the lifting device and
the security of the lifting and guy cables. The side guy wires must be tended to prevent
the tower from bowing or falling off to one side or the other. In addition to checking the
security and adjustment of the guy wires, check the lifting anchor for movement. If the
gin-pole anchor will not hold, the soil is too poor for this type of anchor or the depth of
the anchor was insufficient. The maximum lifting force is experienced when the tower is
first lifted from the ground.
WARNING: Do not work under or near the tower while it is being lifted. Do not
work under or near the tower when it is off the ground, unless it is
resting on blocks or is fully guyed.
Step 15:
Lower the tower and make any necessary adjustments to the guy wires or anchors.
Roll out the guy wires that will be attached to the back anchor located under the tower
pole. Attach the set of back guy wires to the back anchor. The back wires should be
walked over to the side anchors to get an approximate length prior to attachment.
4) Initial Tower Raising
At this stage, an initial tower raising without the wind turbine in place is recommended.
It will ensure that all the cables and anchors are secure, that the lifting procedure is sat-
isfactory, and will allow the back guy wires to be attached and adjusted. The sequence
is shown in Figure 7.
Tools Required:
7/16” nut driver
Procedure:
Step 1:
Start lifting the tower 10o to 20o at a time. Monitor the side guy wires and the yellow gin-
pole ropes carefully. They may become either loose or tight if the site and the anchor
points are not perfectly level. Although there must be some tension in the wires at all
times to provide side support for the tower, there must always be visible slack in the guy
wires. If no slack is visible, the tension is too great.
WARNING: Over-tension may cause failure of the wires, the anchors, or the tow-
er. For further information, refer to the section on SLACK at the end
of the instructions.
Failure to install the Ginpole
Safety Wire can lead to ginpole
separation !
Figure 7: Tower Tilt-up Sequence
Adjust the cable tension as required using the wire rope clips. Work slowly. Fast une-
ven movements tend to make the tower swing or waver. Try to work smoothly and en-
sure that those people tending the cables are able to follow along with the tower raising
process.
WARNING: Be sure that communication between all members of the lifting team
is clear and concise.
NOTE: The guy wires can be pulled in by one person when the winch is stopped.
Brute force is not required.
Step 2:
As the tower approaches vertical, it is important to maintain tension on the back guy
wire set. This should be done by standing to one side of the anchor, not directly under
the tower, pulling on ropes attached to the guy wires. All back guy wires should be
held, allowing the raising device to pull against the tension until the tower is vertical or
the gin-pole is on the ground.
Note: The tower will lift easily at this point. Very little force is required to lift the
tower into its final position.
Step 3:
Check the side guy wire tension for a moderate degree of slack, corresponding to a wire
pull of about 50 pounds. Check the security of the wire rope clips.
Maintaining tension on the lifting cables with the raising device, use a carpenter’s level
on the base tube to adjust the guy wires until the base tube is vertical. Ensure that the
tower is straight by sighting up the tower while the final guy adjustments are being
made.
For this initial lift, it will not be necessary to transfer the lifting guy wires from the gin-
pole to the forward anchor.
5) Lowering the Tower
The procedure for lowering the tower is the reverse of raising the tower, although cer-
tain precautions must be taken.
Step 1:
If the raising process has indicated that the tension of the side guy wires will vary as the
tower is being lowered, it is important that the side guy wires be tended to avoid exces-
sive tightening or slackening.
WARNING: At no time during the lowering operation should personnel, vehicles,
or other equipment be located where they could be hit by the tower or
the side guy wires. Determine the boundaries of the potentially dan-
gerous area and keep it clear.
Step 2:
Tension must be applied to the back guy wires to pull the tower away from the raising
device as it begins letting out cable. In order to clear the danger area, it will be neces-
sary to apply the tension through ropes attached to the guy wires. The ropes should be
attached above the back anchor and should be long enough to ensure that personnel
are located well beyond the point where the top of the tower will touch the ground when
lowered. Pull as required to keep tension on the guy wires.
As the tower is lowered and reaches an angle between 60o and 45o, it will no longer be
necessary to maintain tension on the guy wires opposite the winch.
Step 3:
Set the tower down on blocks placed about every 20’ along the tower.
Step 4:
Ground the tower base by installing the ground clamp to one of the ground rods and at-
taching one end of the bare copper grounding wire. Attach the other end of the ground-
ing wire, using a small loop, to one of the 3/8” tower base plate bolts.
6) Installing the EXCEL1 Wind Turbine
EXCEL1 Wind Turbine Components
The major components of the EXCEL1 wind turbine are shown in Figure 8. Installing
the turbine requires connecting it to electrical wiring to the PowerCenter controller and
then assembling the turbine at the top end of the tower.
Blades
Tail Boom
Tail Fin
Powerhead
Alternator
Tower
Mount
Spinner
Nacelle
Figure 8: Major Components of the EXCEL 1
Wiring
The basic electrical schematic for the BWC EXCEL1 24-volt and 48-volt systems is
shown in Figure 9.
Figure 9: EXCEL 1 Wiring Schematics
The wind turbine alternator produces a 3-phase AC, which is rectified into DC up in the
nacelle of the 24V model, and rectified in the PowerCenter of the 48V model. A two (2)-
conductor wire is needed between the wind turbine and the PowerCenter controller for
the 24V model. A three (3) conductor whire is required between the wind turbine and
PowerCenter for the 48V model. The 24V model does not require a fused-disconnect
switch at the base of the tower, while the 48V model does require the disconnect switch.
The recommended wire sizes for the 24 VDC EXCEL1 wind turbine are shown in Table
2. The listed distances include the height of the tower.
Maximum Current: 60 amps
WARNING: Installing wire sizes larger than those recommended will increase the
maximum current produced by the turbine.
Table 2: Recommended Wire Sizes for the EXCEL1 24V
WIRE SIZE
DISTANCE FROM TURBINE
TO POWERCENTER
MM^2
AWG
METERS
FEET
10
8 AWG
0 - 35
0 - 116
16
6 AWG
36 - 56
117 - 183
25
4 AWG
57 - 89
184 - 292
30
3 AWG
90 - 112
293 - 368
35
2 AWG
113 - 141
369 - 464
50
1 AWG
142 - 178
465 - 585
55
1/0 AWG
179 - 225
586 - 739
70
2/0 AWG
226 - 287
740 - 940
95
3/0 AWG
288 - 361
941 - 1185
120
4/0 AWG
362 - 455
1186 - 1494
NOTE: These wire sizes have been engineered to provide optimum rotor loading
for the BWC EXCEL1/24 wind turbine. Deviation from these recommen-
dations can result in decreased performance from your machine and / or
unnecessary additional wire-run costs. It may also cause the incidence
of nuisance breaker tripping. The use of a wire gage two sizes larger
than the recommended size is acceptable and is recommended if alumi-
num wire is used.
Turbine Installation
The fasteners on the EXCEL1 are all metric.
Tools Required:
17 mm box end wrench
17 mm socket and 12” ratchet drive
8 mm socket or wrench
pliers
crimpers for wiring terminals (U-shaped crimp preferred over straight crimp)
thread locking compound (like Locktite 242)
tape measure, 12’
torque wrench, set to 45 ft-lbs
Procedure:
Step 1:
Place the powerhead of the wind turbine near the top end of the tower.
The tower wiring is connected to the EXCEL1 wind turbine at the slip-ring using the two
small screws on the positive and negative slip ring terminals. The best way to do this is
with ring terminals chosen for your tower wire type. The polarity of the connections is
marked. If your conductors are color-coded we recommend making note of the colors
connected to positive and negative leads.
The slip ring assembly is not designed to support the weight of the down-tower wire. A
strain relieving installation is required, as shown in Figure 10. Use the two nylon cable
ties provided to secure the tower wiring to the tower adapter casting. After completing
the connections, pull on the tower wire to make sure that it is secure before mounting
the wind turbine on the tower.
Power
Cables
Nylon
Cable
Ties
Turbine
Mounting
Bolts
Figure 10: Turbine Mounting
Step 2:
Raise the tower about 3 ft off the ground to provide room to assemble the EXCEL1 tur-
bine. We recommend fashioning a temporary support stand to hold the tower up during
turbine assembly.
Step 3:
Mount the wind turbine tower adapter to the top of the tower using six M10-1.5 x 20mm
bolts and six flat washers. We require applying Loctite 242 (Thread Locking Com-
pound) to the threads prior to installation to reduce the likelihood of loosening due to vi-
bration. Use a torque wrench to achieve the proper fastener torque on the tower mount-
ing bolts. The required torque is 45 ft-lbs.
Step 4:
Complete the wiring to the PowerCenter before adding the blades. This is recommend-
ed so that you can test the DC polarity of the wiring by spinning the alternator by hand.
It is very important that the polarity [positive (+) and negative (-)] is correct when the tur-
bine is connected to the PowerCenter. The best way to ensure this is to complete the
wiring and then test the polarity with a Volt-Ohm-Meter. Turning the alternator by hand
will provide enough voltage to make this check. Carefully mark the positive and nega-
tive electrical leads for later reference.
Step 5:
Turn the EXCEL1 powerhead so that the alternator is facing up. Attach the blades as
shown in Figure 11 using the M10 hardware provided. Insert bolts and start all three
blade nuts. Then, partially tighten the nuts in the order shown in Figure 12. We rec-
ommend bolting one blade up solidly and leaving the other two somewhat loose while
you check the tip-to-tip blade distance. We recommend checking, and adjusting as
necessary, the blade tip spacing to ensure that the blade tips are equally spaced. This
step will help make the wind turbine as smooth running as possible, which will maximize
the operating life of the bearings and reduce vibration related noise. The blade tip-to-tip
distances should not differ by more than 1/2” for smooth operation. Finally, torque the
nuts (in order shown in Figure 12) to 45 ft-lbs each. Loctite is not necessary on the
blade fasteners because the nylon locking nuts provide adequate locking.
NOTE: For EXCEL 1’s shipped after September 2003, all of the blade bolts are
the same length.
Longer bolt
goes here
Blade Nuts &
Washers
Blade Bolts
Spinner
Fasteners
Figure 11: Blade and Spinner Fasteners
Figure 12: Nut Tightening Order
Step 6:
Attach the spinner (nose cone) using the three M5 bolts and lock washers provided, as
shown in Figure 11. We recommend applying Loctite to the bolt threads prior to as-
sembly.
Tail Fin Fasteners
Figure 13: Tail Fin Attachment
Step 7:
Bolt the tail fin to the tail boom using the eight M5 bolts and lock-washers provided, as
shown in Figure 13. We recommend applying Loctite to the bolt threads prior to as-
sembly.
Step 8:
Place the tail boom on the rear of the turbine powerhead and insert the 1/2” tail pivot pin
from the top. If the parts are aligned properly the pin should insert easily. Do not use a
hammer to pound the pin in place, as this may cause scoring of the bronze bushings.
Secure the tail pivot pin with two cotter pins, as shown in Figure 14. Failure to properly
install and secure both cotter pins will lead to loss of the tail boom.
Cotter
Pin
Cotter
Pin
Tail Pivot
Pin
Figure 14: Tail Boom Attachment
Step 9:
Check the EXCEL1 wind turbine carefully to make sure that the installation is complete.
We recommend the following checklist:
Blade fasteners are secure and properly torqued
Blade tips are evenly spaced
Spinner is secure
Tail fin is secure
Tail pivot pin is locked in place with both cotter pins.
Tower adapter bolts are secure
Wiring polarity is tested and marked
7) Final Tower Raising
Tools Required:
7/16” nut driver (several)
Procedure:
Step 1:
Short-circuit the EXCEL1 alternator by twisting or bolting the output wires together. This
will keep the wind turbine from spinning during the raising of the tower. If the Power-
Center connections have already been made, this can be easily done by moving the
positive lead over to the negative terminal.
Step 2:
Follow Steps 1 through 3 of the Initial Tower Raising instructions in Section 4.
Step 3:
Transfer the lifting guy wires one at a time from the gin-pole to the forward anchor, as
shown in Figure 15. Secure each wire with wire rope clips, being sure to maintain ten-
sion on each cable as it is transferred. Start with the top level and work down.
Figure 15: Guy Wire Transfer Sequence
Step 4:
Again, use a carpenter’s level on the base tube to check that the tower is vertical in all
directions. Make a final adjustment of all guys to ensure that the tower is straight. On
the taller towers this may take some time due to the number of wires involved.
Step 5:
Pull all guy wires tight by hand with approximately 100 pounds of tension. Tighten the
second and third wire rope clips on each guy wire. There will be a small amount of visi-
ble slack in all guy wires. This is normal.
Check the guy wires after 2 or 3 weeks and tighten as required. Depending on the soil
type, it may require one or more checks and adjustments before the tower and anchors
have fully settled.
Installation instructions for the PowerCenter controller are provided in the EXCEL1
Owner’s Manual.
8) Misc. Reference Material
Anchoring
For most installation sites the 6” diameter expanding anchors supplied with the Tilt
Tower kits will be perfectly adequate. In some cases the soil will either be too weak for
proper strength or too “hard” for augering the hole. In these cases, a subsurface con-
crete pad can usually be substituted. In the case of hard rock, however, special rock
anchors may be necessary. This reference section is designed to provide you with con-
siderations and recommendations that will ensure that you install adequate anchors.
The installation of guy wire anchors is a critical element in the installation of the tower.
The anchoring system must be able to withstand, without appreciable creep, the steady
and vibratory loads of the guy wires through all weather conditions for the life of the in-
stallation. Site conditions will dictate the type of anchoring system used. Soil type, wa-
ter level, freeze depth, and weather variations all have an effect on the holding capacity
of the anchors.
Soil Types & Conditions
Most anchoring systems are designed to work in a limited range of soil conditions. To
choose the proper anchoring system, it must be possible to identify these various soils.
The accompanying Table 3 shows a system of soil classification developed by the A. B.
Chance Company on the basis of the mechanical properties of the soil.
The presence of water reduces the holding strength of the anchors. Anchor creep can
be a problem in soils with large variations in moisture content. If this condition can oc-
cur, it is best to ensure that the bearing surface of the anchor be placed below the level
of periodic surface saturation.
If an anchor is located above the depth to which the ground freezes, it may experience
a phenomenon known as “freeze-throw” or “jacking”. This is the tendency of buried ob-
jects to be pushed toward the surface by the freeze-thaw cycles. To avoid this problem,
the bearing surface of the anchors must be placed below the level to which the ground
freezes. In areas of permafrost, the anchors should be below the permafrost line. Pro-
visions should be made to prevent solar energy from being transmitted down the rod. If
you must anchor within the permafrost zone we recommend using the services of a lo-
cal contractor with expertise in artic / cold climate anchoring.
Table 3: Soil Classifications
Class Common Soil-Type Description
Geological Soil Classification
0
Sound hard rock, unweathered
Granite, Basalt, Massive Limestone
1
Very dense and/or cemented sands;
coarse gravel and cobbles
Caliche, (Nitrate-bearing gravel/rock)
2
Dense fine sand; very hard silts and
clays (may be preloaded)
Basal till; boulder clay; caliche; weath-
ered laminated rock
3
Dense clays, sands and gravel; hard
silts and clays
Glacial till; weathered shales, schist,
gneiss, and sandstone
4
Medium dense sandy gravel; very
stiff to hard silts and clays
Glacial till; hardpan; marls
5
Medium dense course sand and
sandy gravels; stiff to very stiff silts
and clays
Saprolites, residual silts
6
Loose to medium dense fine to
course sand; firm to stiff clays and
silts
Dense hydraulic fill; compacted fill; re-
sidual soils
7
Loose fine sand; Alluvium; loess;
soft-firm clays; varied clays; fill
Flood plain soils; lake clays; adobe;
gumbo; fill
8
Peat, organic silts; inundated silts;
fly ash
Miscellaneous fill, swamp marsh
Used by permission of A. B. Chance Co.
Anchor Rods
All the anchoring systems described in the following sections use a galvanized steel rod
to connect the guy wire to the bearing surface of the anchor. The rod ends form an
“eye”, which provides an attachment point for the guy wires.
The anchor rods should be installed at an angle that will minimize the bending loads
acting on them. The angle for the BWC EXCEL1 towers should be approximately 45
degrees, with the eye of the anchor rod toward the tower.
Anchor Types and Their Installation
Three types of anchoring systems may be used to accommodate various soil types:
screw-in / expanding anchors, sub-surface concrete pads, and expanding or bonded
rock anchors.
Screw Anchors / Expanding Anchors
In most areas of the country, power-installed screw anchors have become the standard
anchoring system used by the utilities. Screw anchors were furnished as standard
equipment with earlier versions the BWC EXCEL1 towers. They were intended to be
installed manually with a stout bar through the eye or with a hand-held electric drive.
We have switched to Chance 8-Way Expanding Anchors because they can be used in a
broader range of soil conditions. The expanding anchors included with the tower are
suitable for installation in Soil Classes 3 - 6, and in some Class 7. If there is any doubt
about the quality of the soil, consider other anchoring options or consult the factory.
Concrete Anchors
A second option is to dig a hole about 2.5 ft square to a depth of at least 4 ft. You
should move the centerline of the hole you will dig back ~ 40” away from the center of
the tower to account for angle of the anchor rod.
Place the anchor as shown in Figure 16 (note: previous screw anchors are shown) and
fill the bottom of the hole with concrete to a depth of at least 0.3 meters (1 ft), covering
the bell and part of the rod. It is not necessary to expand the expanding anchors, but
you need to “shake” the anchor during the concrete pour to free trapped air. Reinforc-
ing rods should be incorporated in the concrete so as to provide adequate strength and
load distribution in the pad.
The backfilled earth should be tamped vigorously as it is returned to the hole.
~ 45 Degrees
~ 150 mm (6“)
300 mm
(12“)
750 mm (30“)
750 mm (30“)
1.14 m (45“)
for 19, 25, &
32 m Towers
0.91 m (36“)
for 9 & 13 m
Towers
Ground level
Top View
Screw-in Anchor
Towards Center Pad
Figure 16: Concrete Anchors
Other anchor rod configurations may be used with a concrete pad, but the size and
depth of the pad must be at least as large and as deep as shown. The anchor rod and
its attachment to the foot that is to be imbedded in the pad must have at least the
strength of the anchor supplied with the tower kit.
Rock Anchors
Expanding rock anchors or bonded rock anchors are the best choice for Class 0 and
Class 1 soil. Rock drilling is hard and tedious work. It requires special equipment, in-
cluding a compressor and air drill. When needed, rock anchors should be installed by,
or with the advice and assistance, of a local contractor familiar with this type of anchor.
In all cases, the recommendations of the anchor manufacturer should be followed. Ber-
gey Windpower can also provide advice on rock anchoring.
Customer-Supplied Anchor Rods
The oval eye anchors supplied by BWC allow guy wire thimbles to be installed, prevent-
ing sharp bends in the guy wires. Any alternative anchor rods should incorporate simi-
lar provisions.
Guy Wires
Guy Wire Slack
There must be visible slack in all guy wires during all phases of tower installation. It is
possible to have too much slack or too little slack. The following discussion is aimed at
defining these conditions.
Unless the anchors are placed precisely in their correct locations and the site is perfect-
ly level, some guy wires will tighten and some will loosen as the tower is raised or low-
ered. For this reason, all guy wires must be watched and adjusted as needed through-
out the tower raising or lowering process.
When a guy wire loses its slack and becomes tight, there is no easy or obvious way to
tell how much tension there is in the wire. A wire that becomes tight can quickly apply a
very large force on both the anchor and the tower to which it is attached. If the tower
lifting or lowering process is continued, the force may increase to the point at which the
tower will buckle, causing it to fall and endanger people, vehicles, or equipment nearby.
When the tower has been assembled and is first lifted slightly off the ground to test the
winch anchor, the lifting wires running from the top of the gin-pole to the tower should
be studied. They will all have a certain amount of droop or slack. Studying the tower’s
top lifting wire will give all members of the lifting crew a good idea of slack. Make sure
that the side guy wires have noticeably more slack than this reference wire. They
should not, however, appear sloppy. A droop greater than three or four feet should not
be allowed to develop during the raising/lowering procedure.
The tower should have no more than a gentle bend from base to top. If the bow be-
comes more than about one foot, the side guy wires or the lifting wires should be ad-
justed before proceeding further.
This sequence of observing, communicating observations, issuing commands to guy
tenders, adjusting guys, and retightening wire rope clips must be well understood by all
members of the team before lifting or lowering starts. It is a continuing process
throughout the lifting/lowering sequences. Particular care should be taken at sites
where guy wires might catch on tree limbs, roots, rocks, or other obstructions.
A guy wire will have about 50 pounds of tension when the tower is properly erected.
This amount of tension is a comfortable but hearty pull on the wire for an average crew
member. The uppermost guy wire will have one foot to two feet of droop with 50
pounds. Letting out just six inches of the top guy wire will add approximately two feet of
droop to the wire and will cause the tower to move over a few inches at the attachment
point.
Tower Lift Crew
The following is a suggested guide to forming an efficient and safe crew to erect a BWC
EXCEL1 tower.
Four members:
1. One member to operate the winch and serve as the key person or leader.
2. Two people to attend to and adjust each side guy anchor. These individuals must be
familiar with taking in and letting out guy wires.
3. One person free to assist in holding or pulling guy wires as required. This person
should also continuously observe the guy wires and the entire lifting operation for
any unusual or dangerous situations.
WARNINGS: The following warnings should be carefully observed as part of any
tower siting and raising or lowering operation. Some of the following
warnings or cautions have been highlighted in the appropriate sec-
tion of this manual.
1. Read and follow the TOWER INSTALLATION MANUAL
2. DO NOT climb the tower.
3. DO NOT erect the tower within 1 1/2 times the tower height of electric power
lines.
4. DO NOT place guy anchors near roads, driveways, or normal paths for vehicles.
5. DO NOT permit unauthorized persons on the tower site while the tower is being
raised or lowered.
6. DO NOT use a tractor or truck to erect the tower without exercising extreme cau-
tion.
7. DO determine the soil type at your site and install the correct anchors.
8. DO place tower anchors according to the anchor manufacturer’s recommenda-
tions.
9. DO properly ground the tower electrically.
10. DO thoroughly understand the tower erection procedure before beginning the in-
stallation.
YOU MUST BECOME FAMILIAR with all components of the tower, including hardware,
and how they function, before attempting to install the tower. Tall guyed towers can be
dangerous and you or members of your crew could be injured or killed.
9) Tilt Tower Packing Lists
BWC XL.1 Series
Packing List, HKGT4-60, Guyed Tilt-up Tower, 58.5 ft (18m)
Shipped to:
BWC
No.
Item
Part No.
Description
Qty
Packed
USAGE
1
6613
Top Tower Section
1
Section
2
6610
Standard Tower Section
4
Section
3
6611
Base Tower Section
1
Section
4
6611
Gin Pole Inner Section
1
Gin Pole
5
6620
Gin Pole Outer Section
1
Gin Pole
6
6616
Tower Base Channel
2
Base
7
6617-RH
Tower Base Bracket, Right Hand
1
Base
8
6617-LH
Tower Base Bracket, Left Hand
1
Base
9
6618
Gin Pole Cable Bracket
2
Gin Pole
10
6619-1
Guy Bracket & Guy Wire Assembly, 39'
1
Guys
11
6619-2
Guy Bracket & Guy Wire Assembly, 51'
1
Guys
12
6619-3
Top Guy Bracket & Guy Wire Assembly, 64'
1
Guys
13
HB4010
1/4" x 1" Hex Head Bolt
6
Guys
14
HW4001
1/4" Flat Washer
6
Guys
15
HB6002
3/8" x 1" Bolt
8
Base
16
HW6004
3/8" Washer, SS
16
Base
17
HN6008
3/8" Nylock Nut, SS
8
Base
18
HBB030
3/4" x 6 1/2" Bolt, Tower & Gin Pole Pivots
2
Tower & Gin Pole
19
HBB030
3/4" x 6 1/2" Bolt, Gin Pole Shackle
1
Gin Pole
20
HNB011
3/4" Nut, A536
3
Tower & Gin Pole
21
HNB008
3/4" Pal Nut
3
Tower & Gin Pole
22
HB8021
1/2" x 2 1/4" Bolt, Shackle to Snap Link
1
Gin Pole
23
HB8021
1/2" x 2 1/4" Bolt, Shackle to G.P. Anchor
1
Gin Pole
24
HN8007
1/2" Nylock Nut, SS
2
Gin Pole
25
6621
Gin Pole Safety Cable
1
Gin Pole
26
HM3002
3/16" Maleable Clip, HDG
36
Guys
27
HM3001
3/16" HD Thimble
12
Guys
28
HM0008
5/8" x 8' Grounding Rod
2
Grounding
29
HM0042
5/8" HD Ground Rod Clamp
2
Grounding
30
11471-2
Ground Cable Assembly
2
Grounding
31
HM0018
6" Dia. Expanding Anchor
5
Anchoring
32
HMA003
5/8" x 7' Anchor Rod
5
Anchoring
33
HO0006
Snap Link
1
Raising
34
6622
Nylon Guy Rope
1
Raising
35
SF0081
Loctite Compound
1
Guys
36
HM0040
Antisieze Compound
1
Base & Gin Pole
Packed By:
Latest Revision: 5/4/06
BWC XL.1 Series
Packing List, HKGT4-80, Guyed Tilt-up Tower, 77.5 ft (24m)
Shipped to:
BWC
No.
Item
Part No.
Description
Qty
Packed
USAGE
1
6613
Top Tower Section
1
Section
2
6610
Standard Tower Section
6
Section
3
6611
Base Tower Section
1
Section
4
6611
Gin Pole Inner Section
1
Gin Pole
5
6610
Gin Pole Standard Section
1
Gin Pole
6
6620
Gin Pole Outer Section
1
Gin Pole
7
6616
Tower Base Channel
2
Base
8
6617-RH
Tower Base Bracket, Right Hand
1
Base
9
6617-LH
Tower Base Bracket, Left Hand
1
Base
10
6618
Gin Pole Cable Bracket
2
Gin Pole
11
6619-4
Guy Bracket & Guy Wire Assembly, 47'
1
Guys
12
6619-5
Guy Bracket & Guy Wire Assembly, 58'
1
Guys
13
6619-6
Guy Bracket & Guy Wire Assembly, 73'
1
Guys
14
6619-7
Top Guy Bracket & Guy Wire Assembly, 86'
1
Guys
15
HB4010
1/4" x 1" Hex Head Bolt
6
Guys
16
HW4001
1/4" Flat Washer
6
Guys
17
HB6002
3/8" x 1" Bolt
8
Base
18
HW6004
3/8" Washer, SS
16
Base
19
HN6008
3/8" Nylock Nut, SS
8
Base
20
HBB030
3/4" x 6 1/2" Bolt, Tower & Gin Pole Pivots
2
Tower & Gin Pole
21
HBB030
3/4" x 6 1/2" Bolt, Gin Pole Shackle
1
Gin Pole
22
HNB011
3/4" Nut, A536
3
Tower & Gin Pole
23
HNB008
3/4" Pal Nut
3
Tower & Gin Pole
24
HB8021
1/2" x 2 1/4" Bolt, Shackle to Snap Link
1
Gin Pole
25
HB8021
1/2" x 2 1/4" Bolt, Shackle to G.P. Anchor
1
Gin Pole
26
HN8007
1/2" Nylock Nut, SS
2
Gin Pole
27
6621
Gin Pole Safety Cable
1
Gin Pole
28
HM3002
3/16" Maleable Clip, HDG
48
Guys
29
HM3001
3/16" HD Thimble
16
Guys
30
HM0008
5/8" x 8' Grounding Rod
2
Grounding
31
HM0042
5/8" HD Ground Rod Clamp
2
Grounding
32
11471-2
Ground Cable Assembly
2
Grounding
33
HM0018
6" Dia. Expanding Anchor
5
Anchoring
34
HMA003
5/8" x 7' Anchor Rod
5
Anchoring
35
HO0006
Snap Link
1
Raising
36
6622
Nylon Guy Rope
1
Raising
37
SF0081
Loctite Compound
1
Guys
38
HM0040
Antisieze Compound
1
Base & Gin Pole
Packed By:
Latest Revision: 5/4/06
BWC XL.1 Series
Packing List, HKGT4-100, Guyed Tilt-up Tower, 96.5 ft (29m)
Shipped to:
BWC
No.
Item
Part No.
Description
Qty
Packed
USAGE
1
6613
Top Tower Section
1
Section
2
6610
Standard Tower Section
8
Section
3
6611
Base Tower Section
1
Section
4
6611
Gin Pole Inner Section
1
Gin Pole
5
6610
Gin Pole Standard Section
1
Gin Pole
6
6620
Gin Pole Outer Section
1
Gin Pole
7
6616
Tower Base Channel
2
Base
8
6617-RH
Tower Base Bracket, Right Hand
1
Base
9
6617-LH
Tower Base Bracket, Left Hand
1
Base
10
6618
Gin Pole Cable Bracket
2
Gin Pole
11
6619-8
Guy Bracket & Guy Wire Assembly, 55'
1
Guys
12
6619-9
Guy Bracket & Guy Wire Assembly, 65'
1
Guys
13
6619-10
Guy Bracket & Guy Wire Assembly, 77'
1
Guys
14
6619-11
Guy Bracket & Guy Wire Assembly, 93'
1
Guys
15
6619-12
Top Guy Bracket & Guy Wire Assembly, 106
1
Guys
16
HB4010
1/4" x 1" Hex Head Bolt
6
Guys
17
HW4001
1/4" Flat Washer
6
Guys
18
HB6002
3/8" x 1" Bolt
8
Base
19
HW6004
3/8" Washer, SS
16
Base
20
HN6008
3/8" Nylock Nut, SS
8
Base
21
HBB030
3/4" x 6 1/2" Bolt, Tower & Gin Pole Pivots
2
Tower & Gin Pole
22
HBB030
3/4" x 6 1/2" Bolt, Gin Pole Shackle
1
Gin Pole
23
HNB011
3/4" Nut, A536
3
Tower & Gin Pole
24
HNB008
3/4" Pal Nut
3
Tower & Gin Pole
25
HB8021
1/2" x 2 1/4" Bolt, Shackle to Snap Link
1
Gin Pole
26
HB8021
1/2" x 2 1/4" Bolt, Shackle to G.P. Anchor
1
Gin Pole
27
HN8007
1/2" Nylock Nut, SS
2
Gin Pole
28
6621
Gin Pole Safety Cable
1
Gin Pole
29
HM3002
3/16" Maleable Clip, HDG
60
Guys
30
HM3001
3/16" HD Thimble
20
Guys
31
HM0008
5/8" x 8' Grounding Rod
2
Grounding
32
HM0042
5/8" HD Ground Rod Clamp
2
Grounding
33
11471-2
Ground Cable Assembly
2
Grounding
34
HM0018
6" Dia. Expanding Anchor
5
Anchoring
35
HMA003
5/8" x 7' Anchor Rod
5
Anchoring
36
HO0006
Snap Link
1
Raising
37
6622
Nylon Guy Rope
1
Raising
38
SF0081
Loctite Compound
1
Guys
39
HM0040
Antisieze Compound
1
Base & Gin Pole
Packed By: