EINHELL PSZ 250 A2 LB4 Manual
Text of the manual
Table of contents:
Page
1. Introduction .............................................................................8
2. Safety information...................................................................8
3. Layout and items supplied .....................................................8
4. Proper use ................................................
When using equipment, a few safety
precautions must be observed to avoid injuries
and damage. Please read the complete
operating manual with due care. Keep this
manual in a safe place, so that the information
is available at all times. If you give the
equipment to any other person, give them
these operating instructions as w
5. Technical data
Reach l:
Max. load:
l1 = 750 mm
m1 = 600 kg
l2 = 1100 mm
m2 = 300 kg
Swing range: max. 180°
6. Before putting the machine
into operation
�
The swing arm is designed to take a cable
winch.
�
To mount the swing arm, you need a round
steel bar with a diameter of Ø 48 mm; its
wall must be a minimum of 3 mm thick.
Ensure that the anch
test and a 180° left and right swing test
must each be performed twice with no load.
Then the cable winch must be loaded with
increasingly heavier loads up to the
maximum permissible load weight. Only
when the cable winch has passed these
tests are you allowed to use the equipment
for normal operations.
8. Cleaning, maintenance and
ordering of spare parts
8
10. GUARANTEE CERTIFICATE
Dear Customer,
All of our products undergo strict quality checks to ensure that they reach you in perfect condition. In the unlikely
event that your device develops a fault, please contact our service department at the address shown on this
guarantee card. Of course, if you would prefer to call us then we are also happy to off