Machine passport
3
General information
4
Manufacturer’s details .............................................................................................................. 4
Details on the dryer ................................................................................................................... 4
About these operating instructions ........................................................................................... 5
For your own safety
6
General safety notes ................................................................................................................. 6
Intended use of the dryer .......................................................................................................... 7
Signs, instruction plates and danger zones at the dryer ........................................................... 8
Transportation, installation and storage
10
Information on transportation packaging ................................................................................ 10
What to do in the case of transport damage occurring? ........................................................ 10
Transporting and installing the dryer ....................................................................................... 11
Storing the dryer ..................................................................................................................... 13
Technical product description
14
Summary Drawing Standard Dryer* ........................................................................................ 14
Function description ............................................................................................................... 14
Available options ..................................................................................................................... 17
Installation
18
Preconditions for installation .................................................................................................. 18
Connect piping ....................................................................................................................... 19
Installing the electrical connection .......................................................................................... 20
Start-up
22
Requirements for initial start-up ............................................................................................. 22
Setting times of the operating phases .................................................................................... 23
Overview of operating and control elements .......................................................................... 23
Start up dryer .......................................................................................................................... 26
Changing cycle mode (optional) ............................................................................................. 28
Monitoring dryer operation
29
With dewpoint-sensing control (optional) ............................................................................... 29
Shutdown and restart dryer
30
Emergency shutdown ............................................................................................................ 30
Depressurising and shutting down the dryer .......................................................................... 30
If work is to be carried out on the electrical system ............................................................... 31
Restart .................................................................................................................................... 31
Maintenance and repair of the dryer
33
Notes on maintenance ............................................................................................................ 33
Regular maintenance intervals ................................................................................................ 34
Instructions for use of the dongle ........................................................................................... 35
Daily maintenance tasks ......................................................................................................... 36
Maintenance work to be completed every 12 months ............................................................ 37
Notes on further maintenance work ........................................................................................ 39
Identify and eliminate faults
40
Summary of faults ................................................................................................................... 40
Annex with technical documentation
44
EN | User Manual
2
BSP-MT 10-95/D3
Technical data ......................................................................................................................... 45
Replacement and wear part list .............................................................................................. 47
Tightening torque values ......................................................................................................... 49
Logic control diagram ............................................................................................................. 50
Flow diagram .......................................................................................................................... 52
Dimensional drawing .............................................................................................................. 53
EN | User Manual
Machine passport
BSP-MT 10-95/D3
3
Machine passport
It is the responsibility of the owner,
◊ to enter for the fi rst time any appliance data not stated above,
◊ to keep these appliance data up to date.
The above-stated appliance data provide for a clear identifi cation of the dryer and its compo-
nents, and signifi cantly facilitate any service measures.
Further important data on the dryer such as the details on the permissible operating pressure
and the electrical connection are found on the type plate (for position of the type plate see
page 8 )
EN | User Manual
General information
4
BSP-MT 10-95/D3
General information
Manufacturer’s details
Name and address
Parker Hannifi n Manufacturing S.r.l.
Sede Legale: Via Sebastiano Caboto 1, Palazzina “A” 20094 Corsico (MI) Italy
Sede Operativa: Gas Separation and Filtration Division EMEA - Strada Zona Industriale, 4
35020 S.Angelo di Piove (PD) Italy
tel +39 049 971 2111- fax +39 049 9701911
Web-site: www. parker.com/hzd
Details on the dryer
Standard equipment
Standard dryer*, consisting of
◊ 1 double-chamber hollow section vessel, fi llied with drying agent
◊ 1 single-chamber hollow section vessel, fi lled with purifying agent
◊ 2 upstream fi lter
◊ 1 downstream fi lter
◊ Muffl er
◊ Control system
Associated documents
◊ Operating instructions (present)
◊ Technical documentation (see annex)
◊ Circuit diagrams (see separate document)
◊ Operating manual for installed fi lters (separate document)
Notes on supplementary documents
Supplementary documents such as operating manuals for options or pertaining components
must always be heeded. They contain additional information, e.g. regarding maintenance,
and are therefore necessary for safe operation of the plant.
* Planned dryers may be equipped with special components
EN | User Manual
General information
BSP-MT 10-95/D3
5
About these operating instructions
These operating instructions contain basic information on the safe use of the dryer.
Characters and symbols used
Work steps that you have to carry out in the sequence stated are marked by black tri-
angles.
◊ Lists are marked by a small box
Note:
These notes provide you with hints and information on the safe and effi cient
handling of machines and devices.
Warning!
These safety notes warn against damage to property and help you to avoid
such damage.
Danger!
These danger notes with a grey background warn against personal injury and/
or danger to life and limb; danger notes help you to avoid serious or life-threa-
tening situations for yourself and/or third parties.
Target group of these operating instructions
These operating instructions are intended for all persons working on and using the dryer. We
assume that all such persons are specialist personnel according EN ISO 7396-1.
Operating instructions: handling
These operating instructions must be continuously available at the site where the adsorber is
used. We recommend to prepare a copy and to keep the same in a safe and freely accessible
place next to the adsorber. Keep the original document in a safe place.
EN | User Manual
For your own safety
6
BSP-MT 10-95/D3
For your own safety
The dryer has been built in accordance with the state of the art and the recognized technical
safety regulations. Nevertheless, there is a risk of personal injury and damage to property
when the dryer is used, if
◊ it is operated by non-qualifi ed personnel,
◊ not used within its intended design specifi cations,
◊ is repaired or maintained incorrectly.
Note:
For your own safety and to prevent machine damage, please note the informa-
tion and safety notes in these operating instructions when working with the
dryer.
General safety notes
Warning against sudden air ejection
When the hollow section vessels are depressurised, air fl ows suddenly out of
the sound absorber.
◊ This causes a sudden loud cracking noise.
◊ Due to particles carried in the air fl ow, there is a very considerable risk of
eye injury.
When working on the dryer, always wear eye and ear protection equipment.
Hazard due to a sudden release of pressure!
Never remove any parts of the dryer, or manipulate the same in any way, for
as long as the plant is still pressurised! A sudden escape of pressure may
cause serious injuries.
Before carrying out any work on the dryer, fi rst depressurise the plant.
Risk of injury due to voltage-carrying parts!
The electrical supply cable and external power lines are live even after the
dryer is switched off and, in the event of body contact, may cause serious
injury! Before carrying out any work on the electrical system, the electrical
supply cable and all external power lines must be made voltage-free!
Personnel qualifi cation
Only authorized and qualifi ed specialist personnel may be tasked with the work on the dryer
described in these operating instructions.
Conversions and modifi cations
Without prior approval by the manufacturer, no conversions and modifi cations must be made
to the dryer! Any non-approved modifi cations may restrict the operational safety of the dryer
and cause damage to property or personal injury.
Handling drying agents
The drying agents used do not pose any risk to health. However, when fi lling and emptying
the hollow section vessels with drying agents, increased dust generation may occur. Please
comply with the following instructions:
◊ When fi lling drying agents, wear a dust mask and eye protection!
◊ If a spillage occurs, any spilt drying agent must be taken up immediately. There is a risk of
skidding!
EN | User Manual
For your own safety
BSP-MT 10-95/D3
7
Disassembly and disposal
◊ Dispose all parts of the dryer, the drying agent, and all other operating materials in an envi-
ronmentally safe way and in accordance with all current statutory regulations.
Intended use of the dryer
The dryer is exclusively intended for drying compressed air. Depending on defi ned input
conditions, it dries compressed air for industrial use.
The dryer is designed for compressed air, which is free from aggressive water, oil, and solid
matter constituents.
As standard, the dryer is intended to be sited within a building and protected against the
weather.
The dryer may be operated only in accordance with the data on the type plate and in accord-
ance with the contractual conditions.
Suspected misuse
The dryer must not be misused as a climbing aid! Pipes, valves, and similar fi ttings have not
been designed for such loads. They could fracture, tear off, or become damaged in another
way.
EN | User Manual
For your own safety
8
BSP-MT 10-95/D3
Signs, instruction plates and danger zones at the dryer
Signs and instructions
Front view
Please note the above plates and instructions attached to the dryer. Ensure that they are not
removed and are always readable.
Type plate of
the upstream
fi lter
Type plate of
the dryer
Vessel plate
Type plate of
the down-
stream fi lter
EN | User Manual
For your own safety
BSP-MT 10-95/D3
9
Hazard areas on the dryer
Symbol
Hazard area
Warning against hazardous electrical voltage
Different parts of the dryer carry electrical current. These parts may be connected,
opened, and maintained by authorized specialist personnel only.
Warning against overpressure
The entire dryer is under pressure. Before commencing any work, the plant must
be depressurised.
Warning against sudden air ejection
When the vessels are depressurised, air fl ows suddenly out of the sound absorber:
◊ This causes a sudden loud cracking noise.
◊ Due to particles carried in the air fl ow, there is a very considerable risk of eye
injury.
When working on the dryer, always wear eye and ear protection equipment.
Skid risk
When emptying and fi lling the vessels with drying agent, there is a risk of skidding
caused by spilt drying agent.
Hazard caused by overpressure
Hazard caused by electrical voltage
Hazard caused by sudden air ejection
during expansion
Risk of damage to eyes
EN | User Manual
Transportation, installation and storage
10
BSP-MT 10-95/D3
Transportation, installation and storage
Danger due to incorrect transportation!
The dryer must be transported by authorized and qualifi ed specialist personnel
only. During transportation all applicable national regulations for accident pre-
vention must be complied with. Otherwise there is a risk of personal injury.
Always adhere to the stickers and notes on the packaging of the dryer!
◊ Only use suitable and technically perfect lifting gear with a suffi cient carrying capacity.
During transportation the dryer must be carefully secured against falling over.
The manufacturer will not be liable for any damage caused by incorrect storage or incorrect
transportation. Please note therefore the following instructions as well as the storage instruc-
tions on page 13.
Information on transportation packaging
Depending on the type of transportation, the dryer is delivered in different types of packag-
ing:
◊ All transportation types: the apertures of the dryer are closed off by means of plugs.
◊ In addition, when transportation is effected by air: the dryer is packaged in a wooden box.
◊ In addition, when transportation is effected by ship: the dryer is packaged in a fi lm material
and in a wooden box.
If the packaging is undamaged
The undamaged packaging should be removed only at the fi nal installation site, as it
offers protection against any weather infl uences.
What to do in the case of transport damage occurring?
Check whether only the packaging or the dryer itself were damaged.
Inform the haulier immediately in writing of any damages.
Contact the manufacturer urgently in order to report the damage.
Warning!
A damaged dryer must not be taken into operation! Damaged components may
lead to functional faults and possibly cause further damage.
EN | User Manual
Transportation, installation and storage
BSP-MT 10-95/D3
11
Transporting and installing the dryer
Requirements for the installation site
The conditions at the installation site have a large infl uence on the functional capability of the
dryer and the service life of the drying agent. In order to ensure a mode of operation, which is
as continuous as possible, and low maintenance, the installation site must meet the following
requirements:
◊ The installation site must be located within a building. Protect the dryer against moisture.
◊ The ambient temperature must not drop below +1,5 °C (34,7 °F).
◊ Heed the dryer’s noise emission when selecting the installation location.
◊ The installation area must be level, fi rm and vibration-proof. It must have the necessary car-
rying capacity for the weight of the dryer. The weight of the dryer is specifi ed in the technical
data section of the annex.
◊ The dryer should be installed with suffi cient
spacing at the top, sides, and rear, in order to
be able to carry out maintenance work and
change the drying agent without any hindranc-
es (see fi gure).
If in doubt, the installation site must be inspect-
ed by specialists. If you have any queries in this
regard, please contact the manufacturer (see
pag. 4
Necessary spacing at the top and sides
= min. 1 m
Transportation using lifting or forklift trucksr
Warning against damage to property!
The dryer is delivered standing on its side on a transportation pallet. Top and
sides have not been designed for mechanical loads. Therefore do not place any
load onto the top face. Do not stack.
Therefore, always transport the dryer on a lifting or forklift truck.
The dryer should only be transported in an upright position.
Secure the dryer on the lifting or forklift truck against sliding movements.
Transport the dryer to its installation site.
EN | User Manual
Transportation, installation and storage
12
BSP-MT 10-95/D3
Installing the dryer
Caution!
Always use the lifting lugs at the top of the tank to lift the dryer. Use a lifting
beam with a suitable spacing for this purpose. This will ensure the tanks can-
not come in contact with the upper pipe bridge and thus damage it.
Remove the packaging of the dryer.
Attach suitable lifting gear to the transport lugs of the vessels (see fi gure I).
Raise the dryer (see fi gure II) and remove the transportation pallet.
Place the dryer at its installation site.
I: Transport lugs on pressure vessel
II: Installing by crane
Anchoring the dryer
Use suitable attachment material to anchor the dryer to the fl oor.
In the case of vibrating fl oors: place the dryer on suitable vibration dampers.
EN | User Manual
Transportation, installation and storage
BSP-MT 10-95/D3
13
Storing the dryer
If the dryer is to be stored for an extended period of time, the storage location must meet the
following conditions:
◊ The dryer must not be stored in the open air.
◊ The storage room must be dry.
◊ The storage room must be free from dust or the dryer must be covered by a protective
sheet.
◊ The storage room must have an ambient temperature of at least +1 °C (33,8 °F).
In order to store the dryer proceed as follows:
Take dryer out of operation as described on page 30.
Ensure that the compressed air inlet valve installed by the owner, and the installed
compressed air outlet valve installed by the owner, are both closed, and that the dryer is
depressurised.
Disconnect dryer from the compressed air system.
Disconnect the dryer from the electrical power supply and all external lines.
Use fi lm material or similar to close the compressed air inlet apertures and compressed
air outlet apertures on the dryer in order to protect them against contamination.
If possible cover dryer with a protective sheet.
The dryer can now be stored for long periods.
Note:
If you wish to take the dryer back into service after an extended period of sto-
rage, please proceed as described for its fi rst commissioning and start-up (see
page 26).
Store drying and purifying agents
Do not store drying agents in the open air.
Protect drying and purifying agents against humidity.
EN | User Manual
Technical product description
14
BSP-MT 10-95/D3
Technical product description
Summary Drawing Standard Dryer*
Function description
The dryer dries and purifi es the compressed air supplied by the compressor and provides
medical breathing air.
The air is thereby dried alternately in one of the drying agent vessels. The dried air is subse-
quently purifi ed in the third vessel, whereby oil residue and other contaminants are removed.
Before the compressed air is fed into the dryer, it fl ows through upstream fi lters where dust,
dirt, oil and water droplets are removed. Thus, the installed upstream fi lter is also used for
extending the service life of the drying agent.
The installed downstream fi lters clean the compressed air from drying agent abrasions, be-
fore it is fed into the compressed air system.
The two vessels contain an extremely porous drying agent by means of which humidity is
removed from the compressed air and stored just as in a sponge. The stored humidity is then
removed again from the drying agent and re-introduced into the ambient environment.
To this end, the two vessels alternate between different operating modes. Whilst in one ves-
sel, compressed air is de-humidifi ed (adsorption), in the other vessel the humid drying agent
is prepared for another charge (regeneration). These two states, which run in parallel during
compressed air preparation, are described below.
Check valve block
Compressed air outlet
On/Off-Switch
Compressed air inlet
Upstream fi lter
Power supply connector
Downstream fi lter
Control cabinet
Muffl er
Discharge point
Vessel
Vessel pressure gauge
Pressure dew point
Transport lugs
Solenoid valve block
EN | User Manual
Technical product description
BSP-MT 10-95/D3
15
Adsorption
Via a compressor, humid compressed air is
supplied to the upstream fi lter. From here, the
compressed air fl ows upwards through the
absorption vessel, which is pressurised. In so
doing, the drying agent dehumidifi es the air.
The dried compressed air is supplied to the
pipe network via the purifying vessel and the
downstream fi lter.
Here, adsorption is shown in the left
vessel.
Regeneration (running in parallel to the adsorption)
At the same time the other chamber is prepared for a renewed take-up of humidity. This
process is called regeneration.
The regeneration is subdivided into three phases: expansion, dehumidifi cation, and pres-
sure build-up.
With the dewpoint-sensing control option, the regeneration phase is followed by a standby
phase.
Expansion phase
During the expansion phase the pressure in the
right chamber is released via the muffl er down
to ambient pressure within just a few seconds.
The outfl ow of the compressed air becomes
noticeable due to a sudden powerful fl ow noise
at the muffl er.
Dehumidifi cation phase
Prior to being released into the pipe network,
dried compressed air is bled by means of an
orifi ce plate. This separate regeneration air fl ow
is fed through the depressurised chamber. The
humidity stored in the drying agent is taken up
by the air fl ow and expelled into atmosphere via
the muffl er.
Here, regeneration is shown in the right
vessel.
EN | User Manual
Technical product description
16
BSP-MT 10-95/D3
Pressure build-up phase
After dehumidifi cation the pressure in the
regenerated hollow section vessel is built up to
operating pressure, so that the switchover from
regeneration to adsorption can take place at
operating pressure level.
Pressure build-up
Standby phase (only with the dewpoint-sensing control option)
When in standby phase, the fully regenerated vessel is ready for absorption operation. The
system is switched to this vessel, as soon as the measured dewpoint at the compressed air
outlet has reached the set dewpoint value for switchover.
Switchover
When the drying agent in the adsorbing chamber has taken up a suffi cient level of humidity,
then the switchover between the vessels will be effected between the vessels. Following
switchover, the above-described process is repeated, with the adsorption and regeneration
now taking place in the respective different vessel.
EN | User Manual
Technical product description
BSP-MT 10-95/D3
17
Available options
The following options are available for the dryer:
◊ Start-up device
◊ Signalling contacts of control system and compressor synchronisation
◊ Dewpoint-sensing control
◊ Fine fi lter muffl er
◊ Nozzle kit
Start-up device
A start-up device basically consists of a pressure holding device, which is located at the rear
of the dryer. The pressure holding device ensures that pressure can build up in the dryer and
adsorption take place.
It is always required when an empty compressed air reservoir or an empty compressed air
system must be fi lled downstream of the dryer (e.g. following weekend shutdowns and when
the pressure in the compressed air system can frequently drop below the stated operating
pressure).
Signalling contacts of the control system & compressor synchronisation
The control system is equipped with a digital input for the synchronised operation with a
compressor. This feature allows for synchronised and thus effi cient dryer operation with
discontinuous compressor operation.
Compressor synchronisation helps reduce energy costs, as the dryer can be operated inde-
pendently of the compressor.
The compressor synchronisation controller is a higher-level controller than the pressure dew
point controller (see below). When both options are in place, the compressor synchronisation
controller is treated as the prime controller.
The control system can also be equipped with an optional operation signalling contact with
which the dryer operation can be monitored from an external device. Dryers with the optional
dewpoint-sensing control are equipped with such a contact as standard. It is used for the
transmission of operating signals and for the output of dewpoint alarms.
Dewpoint-sensing control
With a dewpoint-sensing control system, you can operate the dryer in fi xed or variable
cycles. In the fi xed cycle, switchover is effected after a fi xed time period (usually after 5
minutes). In the variable cycle, the switchover is effected in relation to the dew point reached
and the charging of the drying agent . The adsorption time in the variable cycle amounts to
60 minutes maximum.
Fine fi lter muffl er
A fi ne fi lter muffl er is used to reduce the noise emission of the dryer to lower levels than the
standard muffl er can provide. If installed, the fi ne fi lter muffl er replaces the original installed
muffl er.
Nozzle kit
In the case that the operating pressure deviates from the standard design pressure (7bare)
it is possible that the amount of necessary regeneration air changes. This effect may have
a negative impact on the cost-effectiveness of the dryer. To prevent this, it is possible to
replace the built in regeneration air nozzle by a nozzle with a modifi ed bore. This replacement
optimizes the regeneration air consumption and therefore restores the energy effi ciency of
the dryer. To receive more information on this conversion, please contact the manufacturer.
EN | User Manual
Installation
18
BSP-MT 10-95/D3
Installation
Only authorized and qualifi ed specialist personnel may carry out work on pipes
and electrical systems.
As soon as the dryer has been set up at its installation location, you can install the com-
pressed air infeed and outlet lines make the electrical connections.
Preconditions for installation
For a correct installation the following preconditions must be met on the part of the owner.
◊ Connections and lines for the infeed and outfeed of compressed air must be provided.
◊ A compressed air inlet valve as well as a compressed air outlet valve must be installed by
the owner, so that the dryer can be installed and maintained in a depressurised condition
(see also the installation example on page 19).
◊ All pipes, couplings, and connections must have the correct diameter and match the oper-
ating pressure.
Hazard caused by exceeding the limit values!
A safety device must be provided in order to protect against the maximum
permissible operating pressure from being exceeded.
The safety device must be installed so that the dryer is reliably protected from
exceeding the maximum permitted operating pressure even when the tempera-
ture of the compressed gas increases.
The data required to meet these preconditions are contained in the technical documentation
attached in the annex.
Warning!
If the above preconditions are not complied with, a safe operation of the dryer
cannot be assured. Also, the functionality of the dryer may be detrimentally
affected.
EN | User Manual
Installation
BSP-MT 10-95/D3
19
Connect piping
In order to ensure that the dryer operates optimally, the dryer must be assembled into the
compressed air system free of all stresses.
Ensure before connection that all infeed and outfeed compressed air lines and valves are
clean and undamaged.
Check the bolt connections and retighten if necessary, as they could have worked loose
during transportation.
Remove plugs on the pressure inlet and outlet.
All piping must be free from any stress and tension whatever!
Pipes subject to stress may burst due to the load placed on them during opera-
tion. This may cause damage to property and personal injury.
Use steel pipes to connect the dryer to the compressed air system.
The following fi gure shows an installation example.
Compressed air system
Item.
Component
Example of an installation with bypass line
1
Entry, humid air
2
Compressed air inlet
valve, owner end
3
Upstream fi lter
4
Dryer
5
Downstream fi lter
6
Compressed air outlet
valve, owner end
7
Outlet, dry air
The connection lines for the upstream fi lter (3) are to be installed at a slight incline in the
direction of the upstream fi lter.
One shutdown valve each (2, 6) is to be installed at the compressed air inlet and outlet
ends of the dryer.
EN | User Manual
Installation
20
BSP-MT 10-95/D3
Installing the electrical connection
Warning against electrical voltage
Only qualifi ed specialist personnel may carry out work on the electrical system!
Installing the supply cable
The components of the dryer have been connected to the control cabinet at the factory. You
only need to connect the control cabinet to the electrical supply cable.
The switchbox is provided with a connector where electrical power must be connected.
Ensure that the cross-section of the electrical supply cable corresponds to the power
rating of the dryer and the electrical voltage provided by the customer.
Make the electrical supply cable to the dryer voltage-free.
Secure the electrical supply cable to the dryer against switch-on.
Undo bolt (1) on the connector and withdraw
connector with seal from the switchbox.
Use a suitable tool to remove the terminal
block from the connection box.
Undo the PG union and pull the cable th-
rough the aperture (3). The exposed phase ends
should not be longer than 35 mm max.
Now make the cable connection as follows:
— .. Earth to terminal PE
— ..L1 to terminal 1
— .. N to terminal 2
Terminal 3 is not used.
Fit terminal block into the connector and
use bolt to remount the connector with seal on
the switchbox.
Connect electrical cable to device
adapter
In all phases the dryer must be protected against short circuits by means of fuses.
In order to relief cable strain, re-tighten the PG union.
Connecting the external signalling lines
Note:
For the use of the dryer in redundant systems (according to the European Phar-
macopoeia) with imposed control, we recommend
-
operation of the dryer in synchronised compressor mode, and
-
operating intervals of minimum 24 hours,
in order to achieve the desired dewpoint and regular cycles.
EN | User Manual
Installation
BSP-MT 10-95/D3
21
For compressor synchronisation
The controller is fi tted as standard with a digital input which makes the dryer regeneration
dependent on operation of the compressor (switch S1 on the controller’s circuit board, see
also fi gure below).
If switch S1 is in the ON position, operation of the compressor and dryer regeneration run
synchronously: When the compressor is stopped, the dryer regeneration also stops. When
the compressor is restarted, regeneration also restarts.
If switch S1 is in the OFF position, any regeneration process which has been started, is
always continued until completed.
To install the external line, proceed as follows:
Connect the signalling line to the potential-free busbar connection of the compressor to
terminals 1 and 2 on the control board (see circuit diagram).
Hinweis:
The compressor synchronisation controller is a higher-level controller than the
pressure dew point controller. When both options are in place, the compressor
synchronisation controller is treated as the prime controller.
For operation monitoring system (optional)
Operators have the option to connect the dryer to a fault signalling system, connecting the
respective line to a potential-free operation signalling contact. With this option, the following
statuses and events can for example be transmitted to a remote control room:
◊ Dryer on (contact made)
◊ Power supply disconnected (no contact)
◊ Dewpoint alarm (only with dewpoint-sensing control option, no contact)
To install the external lines, proceed as follows:
Connect the lines of the fault signalling system to relay K5 (see circuit diagram).
Check bolt connections
Before the initial start-up:
Check all unions and bolt connections as well as the terminals in the control cabinet for
secure seating; re-tighten if necessary.
EN | User Manual
Start-up
22
BSP-MT 10-95/D3
Start-up
Warning!
The dryer must be taken into operation by trained personnel only! Untrained
personnel does not have the required knowledge. Such personnel might cause
serious faults.
Note:
You can order the initial commissioning and start-up from the manufacturer
and have your personnel trained by the manufacturer. For telephone number,
see page 4.
◊ Carry out all prescribed tests and checks.
◊ Before start-up, ensure that no tools or other foreign parts have been left lying in a part of
the dryer where they might pose a hazard to the dryer being started up.
Requirements for initial start-up
For the fi rst start-up the following preconditions must have been met:
◊ The pipe system is free from contaminations.
◊ All shutdown valves are closed.
◊ The dryer is correctly sited and installed.
Checks before start-up
Ensure that
◊ all pipe, cable and bolt connections on the dryer have been retightened,
◊ no pipes chafe against body edges,
◊ all mountings are perfectly secure,
◊ the needle valve of the oil indicator is closed,
◊ the electrical connections are in safe contact and in good condition,
◊ owner-end and pressurised parts such as safety valves or other devices are not blocked up
by dirt or paint,
◊ all compressed air system parts which are pressurised (valves, hoses etc.) are free from
wear symptoms and defects.
EN | User Manual
Start-up
BSP-MT 10-95/D3
23
Setting times of the operating phases
In its standard version the dryer is delivered with a time-dependent control system. The
phase sequence occurs in a fi xed cycle.
With the optional dewpoint-sensing control, the dryer can also be operated at variable cycles
(depending on the dewpoint).
The following table provides information on the duration of the individual phases
Phase duration
Fixed cycle
Variable cycle
Adsorption
5 min
10 min, max
Regeneration, total
5 min
5 min
- of which: expansion time
~ 0,2 min
~ 0,2 min
- of which: dehumidifi cation time
~ 4 min
~ 4 min
- of which: pressure build-up
~ 1 min
~ 1 min
Standby
--
~ 5 min, max.
Overview of operating and control elements
ON/OFF switch
The ON/OFF switch (2) is located to the side of the switchbox and above the mains plug (1,
see fi gure):
◊ If it is set to 0, the power supply is disconnected and the dryer is switched off. The main
valves are (V1, V2) are open, while the expansion valves (V3, V4) are closed. This means that
the air can circulate in the main processing direction, even if the dryer is switched off.
◊ If the switch is set to I, the dryer is switched
on and begins to operate in fi xed cycle mode
(i.e. time-controlled).
◊ If the switch is set to position II, the dryer is
switched on and begins to operate
— with compressor synchronisation
— in variable cycle mode (i.e. dew-point-cont-
rolled).
Position II is only relevant for operation with
the optional compressor synchronisation and/
or dewpoint-sensing control
Switchbox with ON/OFF switch
EN | User Manual
Start-up
24
BSP-MT 10-95/D3
Display panel
The display panel at the switchbox is equipped
with LEDs (light emitting diodes) and a digital
display, indicating the operating status of the
dryer:
Display panel at the switchbox
LED Power (1)
LED is on when dryer is switched on.
Flow diagram (2)
The current operating phases of the dryer are indicated by means of 4 LEDs:
Depending on the operating phase, the following LEDs might be on simultaneously:
Adsorption B1 and regeneration B2 or regeneration B1 and adsorption B2.
Vessel B1
Regeneration 1
Adsorption 1
Vessel B2
Regeneration 2
Adsorption 2
EN | User Manual
Start-up
BSP-MT 10-95/D3
25
Digital display (3)
The digital display shows the individual programme steps and the respective remaining time.
For details regarding the sequence of the individual processing steps and their duration,
please refer to the logic control diagram, page 50.
Display
Explanation
2
215
Default display: The fi gure to the left indicates the current processing step; the
fi gure to the right shows the remaining time in seconds.
In this example, step 2 is being completed, whereby there are 215 seconds
remaining.
SEr
After 8000 operating hours, “SEr.” (service) is displayed for periods of 1 minute,
alternating with the default display.
Notify the service personnel of the manufacturer, as a routine service is now
due.
-25
With the dewpoint-sensing control option, the display shows the currently
measured dewpoint instead of the default data. The range of display is 100 °C
(-148 °F) to +20 °C (68 °F).
If the measured dewpoint exceeds the preset alarm limit (5 °C (41 °F) above the
switchover value), the displayed dewpoint value is fl ashing.
With the optional dewpoint-sensing control, the following error messages might be dis-
played:
Display
Cause
+20
◊ Upper measuring range limit exceeded
999
◊ Dewpoint sensor defective.
sens
o
-999
◊ Dewpoint sensor not powered
◊ Cable defective or disconnected
◊ Sensor defective
LED Economy cycle (4)
This LED is only relevant in units that are equipped with the optional dewpoint-sensing
control. The diode lights up when the dryer is switched on and in the standby phase and no
regeneration air is required.
EN | User Manual
Start-up
26
BSP-MT 10-95/D3
Start up dryer
Warning against sudden air ejection!
During expansion the pressure is released suddenly through the muffl er:
◊ A loud cracking noise occurs which can injure your hearing.
◊ Particles carried in the air fl ow act like bullets and can injure your eyes or
skin.
Always wear eye and ear protection, therefore, when you are in the vicinity of
the dryer!
Hazard due to a sudden release of pressure!
Never remove any parts of the dryer, or manipulate the same in any way, for as
long as the plant is still pressurised! A sudden escape of pressure may cause
serious injuries.
Before carrying out any work on the dryer, fi rst depressurise the plant.
◊ The more powerful the dryer is, the more noise may be generated during operation. There-
fore, the operator must provide suitable protective equipment (e. g. ear protection).
◊ Only operate the dryer within the permissible limits. By operating the dryer in conditions for
which it has not been designed, functional faults may be caused.
◊ Depending on the size of the dryer and the compressed air network and the respective legal
requirements in your country, it may be necessary to perform initialisation according to the
directive for pressure equipment.
◊ Check the dryer regularly for externally visible damage and defects. Any changes, even in
its operating behaviour, must be reported immediately to the competent offi ce or person.
◊ In the event of an emergency or if a safety-relevant disruption occurs (e.g. escaping com-
pressed air, defective component), the dryer must be shut down immediately as described
in the section on page 30). The unit may only be restarted after all defects have been
eliminated.
Open compressed air supply and switch on dryer
For start-up, please proceed in the sequence shown here.
Ensure that the compressed air inlet and outlet valves installed by the owner are closed
(see installation example on page 19).
Ensure that the compressed air system upstream of the dryer is pressurised. If necessary,
pressurise (switch on compressor).
Slowly open compressed air inlet valve!
Avoid sudden pressure build-up in any circumstance! If pressure builds up too
fast, this may cause damage to the dryer. Therefore, the compressed air inlet
valve must always be opened quite slowly!
Slowly open the compressed air inlet valve, installed by the owner, upstream of the dryer.
Switch on dryer: to this end, set the ON/OFF switch to I
If the dryer is taken into operation for the fi rst time, or after a change of drying agent, the
following intermediate step is meaningful. In the case of a restart situation, the following
intermediate step can be skipped.
EN | User Manual
Start-up
BSP-MT 10-95/D3
27
Operating the dryer for the fi rst time (or after a change of drying agent) separately
Depending on the transportation and storage conditions, the drying agent in the chambers
can already be loaded with humidity from the environment. At each fi rst start-up it makes
sense therefore to operate the dryer from some time separately from the compressed air
system. This causes the drying agent in each chamber to be regenerated repeatedly and thus
to be prepared optimally for the take-up of humidity.
Note:
Depending on the pressure dew point to be achieved, we recommend to oper-
ate the dryer at fi rst start-up:
◊ for pressure dew point of –25 to –40 °C: without compressed air consump-
tion for at least 4 hours;
◊ for pressure dew point of –70 °C: without compressed air consumption for
1 day and then at a reduced nominal fl ow of 50% during the next 6 to7 days
without regard for the dew point.
If you wish to take the dryer into operation in accordance with our recommendation, proceed
as follows:
Ensure that the compressed air outlet valve installed by the owner is closed.
Keep the compressed air outlet valve closed for the time period recommended above.
Then the dryer can be taken into service in the compressed air system as described in the
following section:
Operate dryer immediately in the compressed air system
Ensure that the compressed air system downstream of the dryer is pressurised or that a
start-up device (option, see page 17) was installed into the compressed air system directly
downstream of the dryer.
The importance of this increases with the size of the compressed air system downstream of
the dryer. Smaller compressed air systems can be pressurised also by means of compressed
air fed through the dryer.
Slowly open compressed air outlet valve!
Avoid a sudden drop in pressure in any circumstance! If pressure drops too
fast, this may cause damage to the dryer. Therefore, the compressed air outlet
valve must always be opened quite slowly!
Slowly open the compressed air outlet valve installed by the owner. The pressure should
not drop below the operating pressure (if poss.). If necessary, keep the compressed air outlet
valve in a slightly open position until the compressed air system downstream of the dryer has
fi lled up completely; only then should the valve be opened fully.
The dryer has then be taken into operation within the compressed air system.
In the event of a fault
In the event of an emergency or if a safety-relevant disruption occurs (e.g. escaping com-
pressed air, defective component), immediately close the compressed air supply line and set
the ON/OFF switch of the dryer to 0 in order to disconnect it from the power supply. After-
wards depressurise the dryer (see also chapter , page 30).
Then proceed as follows:
Remedy fault:
Look up possible cause of the fault, and how to remedy the same, in the table on page
40.
Remedy fault.
Repeat the start-up procedure.
EN | User Manual
Start-up
28
BSP-MT 10-95/D3
Changing cycle mode (optional)
When can I change cycle mode?
If the dryer has been successfully commissioned and is equipped with one of the following
options:
◊ compressor synchronisation or
◊ dewpoint-sensing control
it can be set to economy cycle mode.
When should I change cycle mode?
Cycle changes should be made during the pressure build-up phase and prior to switchover;
during this phase, the pressure in both vessels is just below operating pressure so that a fast
pressure build-up is prevented when the vessels are switched.
During this period, only the adsorption LED is on in the diagram, and the digital display
shows step 4 or step 9 for the duration of 1 minute (see logic control diagram; not displayed
with dewpoint sensing).
Which cycle modes can I choose?
If the dryer is connected to a compressor synchronisation system and is equipped with the
dewpoint-sensing control option, these two optional devices can only started together. The
compressor synchronisation has thereby precedence over the dewpoint-sensing control.
With compressor synchronisation
If compressor synchronisation is enabled, the dryer can only be operated in conjunction with
the compressor. As soon as the compressor is switched off, the dryer is automatically set to
standby mode.
In standby mode, the control system remains on, and the dryer is ready for the next switcho-
ver, which is made as soon as the compressor is switched on.
Note:
The compressor synchronisation controller is a higher-level controller than the
pressure dew point controller. When both options are in place, the compressor
synchronisation controller is treated as the prime controller.
With dewpoint-sensing control
Dryers equipped with dewpoint-sensing control operated in variable cycle mode, based on
the measured dewpoint of the dried air at the compressed air outlet. As soon as a certain
dewpoint is reached, as the drying agent in the absorbing chamber is saturated, the cham-
bers are switched.
The dewpoint at which a switchover is made is preset at the factory.
How do I change cycle mode?
Wait until the dryer has reached the pressure build-up phase (phase prior to switchover).
One LED for Adsorption B1/B2 is on in the fl ow diagram.
Set the ON/OFF switch to position II.
The programme continues the cycle.
EN | User Manual
Monitoring dryer operation
BSP-MT 10-95/D3
29
Monitoring dryer operation
The dryer operates fully automatically. However, you should carry out the regular checks
described in the Chapter Maintenance and repair of the dryer.
Warning against sudden air ejection!
During expansion the pressure is released suddenly through the muffl er:
◊ A loud cracking noise occurs which can injure your hearing.
◊ Particles carried in the air fl ow act like bullets and can injure your eyes or
skin.
Always wear eye and ear protection, therefore, when you are in the vicinity of
the dryer!
With dewpoint-sensing control (optional)
Display of dewpoint
If the dryer is equipped with a dewpoint-sensing control system, the digital display at the
front of the switchbox shows the currently measured dewpoint. The range of display is –100
°C (-148 °F) to +20 °C (68 °F).
If the set dewpoint is exceeded, the system automatically completes a switchover between
the chambers. The dewpoint at which a switchover is made is preset at the factory.
After commissioning or extensive maintenance work, check the dewpoint display at the
dryer.
Under certain circumstances, the desired dewpoint is only reached after prolonged operation.
Error messages
If the measured dewpoint exceeds the preset alarm limit (5 °C (41 °F) above the switchover
value), the displayed dewpoint value is fl ashing. In addition, an error message can be issued
through the potential-free busbar.
Error codes and their causes:
Display
Cause
+20
◊ Upper measuring range limit exceeded
999
◊ Dewpoint sensor defective
sens
o
-999
◊ Dewpoint sensor not powered
◊ Cable defective
◊ Sensor defective
For instructions on how to eliminate faults, see chapter Identify and eliminate faults
EN | User Manual
Shutdown and restart dryer
30
BSP-MT 10-95/D3
Shutdown and restart dryer
In the following cases, the dryer must be fully shut down and depressurised:
◊ In the event of an emergency or malfunction
◊ For maintenance work
◊ For dismantling
Risk of injury from escaping compressed air!
Never remove any parts of the dryer, or manipulate the same in any way, as
long as the unit is pressurised! Suddenly escaping compressed air might cause
serious injuries.
Prior to any work, release all pressure from the unit.
Caution!
Risk of damage to the dryer, if it is switched off during the expansion or drying
phase.
During these phases, the pressure in the regenerating chamber is released
to ambient pressure: If the main valve is opened, as the dryer is switched off,
there is a sudden pressure build-up in the chamber. This might result in
◊ damage to the drying agent, and
◊ excessive abrasion, with negative impact on the regeneration capacity.
Before switching off the dryer, wait until it has reached the pressure build-up
phase or is in standby mode (before switchover).
Note:
If the unit is equipped with a compressor synchronisation system, fi rst switch
off the compressor and then wait until the dryer has reached the standby phase
before switching it off with the ON/OFF switch.
This ensures that the regeneration cycle is completed, and that the pressure in
both chambers is at the same level.
As soon as the dryer is switched on again, the programme continues the cycle
from the point at which it has been stopped.
Emergency shutdown
To emergency shut-down the dryer heed to the following instructions:
Close shut off valves upstream and downstream of the dryer (if applicable)
Disconnect the electrical power supply (i.e. by switching the On/Off switch to 0).
◊ The dryer is now off-line.
If applicable, depressurise the dryer now.
Before re-commissioning of the dryer ensure that the emergency situation has been solved
and that the dryer is not damaged.
Never commission a damaged dryer!
Depressurising and shutting down the dryer
Close compressed air feed line
Close the compressed air inlet valve (provided by the operator).
Disconnect voltage supply
Switch off the dryer by setting the ON/OFF switch to position 0.
Disconnect dryer from compressed air system
Close the compressed air outlet valve installed by the owner.
EN | User Manual
Shutdown and restart dryer
BSP-MT 10-95/D3
31
If available, open bypass line.
Depressurise dryer
Depressurise dryer, e.g. by opening the manual drain at the downstream fi lter.
If work is to be carried out on the electrical system
Depressurise and shut down the dryer, following the instructions in the above chapter.
Risk of injury due to voltage-carrying parts!
The electrical supply cable and external power lines are live even after the
dryer is switched off and, in the event of body contact, may cause serious
injury! Before carrying out any work on the electrical system, the electrical
supply cable and all external power lines must be made voltage-free!
Make the electrical supply cable to the dryer voltage-free.
Secure the electrical supply cable to the dryer against switch-on.
Restart
Depending on the fi ttings installed by the operator and the actual pressure conditions, the
unit might have to be restarted at operating pressure. The following general rules apply:
◊ When switched off, the dryer is open in main fl ow direction. With the optional start-up de-
vice , the set minimum pressure must however be reached prior to restart.
◊ If the dryer is equipped with a dewpoint-sensing control system, it is depressurised gradu-
ally, according to the read measuring current.
If compressed air system and dryer have remained at operating pressure
Ensure that the compressed air inlet valve (provided by the operator) is open.
Set ON/OFF switch to I. The programme continues the cycle from the point at which it
was interrupted.
Slowly open compressed air outlet valve!
Avoid a sudden drop in pressure in any circumstance! If pressure drops too
fast, this may cause damage to the dryer. Therefore, the compressed air outlet
valve must always be opened quite slowly!
Slowly open the compressed air outlet valve installed by the owner. The pressure should
not drop below the operating pressure (if poss.). If necessary, keep the compressed air outlet
valve in a slightly open position until the compressed air system downstream of the dryer has
fi lled up completely; only then should the valve be opened fully.
The dryer is now in operation again and operates fully automatically.
If compressed air system and dryer have not remained at operating pressure
If disconnected, reconnect the voltage supply of the dryer.
Ensure that the manual drain on the downstream fi lter is closed.
Pressurise and switch on the dryer as described in the section Open compressed air
supply and switch on dryer on page 26.
The dryer is now in operation again and operates fully automatically.
After the purifying agent has been replaced
The newly fi lled purifying agent contains minute dust particles that can block the downstream
fi lters. We therefore recommend to complete the following steps before you restart the dryer,
in order to protect your equipment:
Remove the housing base and the fi lter element from the downstream fi lter.
EN | User Manual
Shutdown and restart dryer
32
BSP-MT 10-95/D3
Wear eye protection and dust mask due to increased dust generation!
If the dryer is operated without downstream fi lter, there is a risk of increased
dust generation.
In order to avoid any eye irritations, wear protective goggles!
In order to avoid any dust inhalation, wear dust mask!
Restart the dryer:
Switch on the dryer and pressurise as described in section Open compressed air supply
and switch on dryer, page 26.
The compressed outlet valve must be closed and the downstream fi lter housing must be
open:
Operate the dryer for approx. thirty minutes, blowing the dust particles off from the down-
stream fi lter.
Shut down the dryer:
Close the compressed air inlet valve installed by the owner.
Switch off the dryer by setting the ON/OFF switch to position 0.
Reassemble the fi lter and commission the dryer (see the operating manual of the fi lter for the
reassembly).
Switch on the dryer and pressurise as described in section Open compressed air supply
and switch on dryer, page 26.
Check that the vessel and the downstream fi lter are leak tight.
EN | User Manual
Maintenance and repair of the dryer
BSP-MT 10-95/D3
33
Maintenance and repair of the dryer
In order to allow maintenance work on the dryer to be carried out effi ciently and without dan-
ger for maintenance personnel, you should comply with the following instructions.
Notes on maintenance
Danger!
There is a very considerable risk of personal injury, when carrying out work on
the activated and pressurised dryer.
Danger!
Before commencing any maintenance tasks always shut down the dryer as
described on page 30 !
Warning!
Maintenance tasks may be carried out only by authorized and qualifi ed spe-
cialist personnel, and only with the plant in a switched off and depressurised
condition.
Note:
In order to ensure perfect maintenance and reliable operation we recommend
that you conclude a maintenance contract.
When exchange or replacement parts are ordered, always state the dryer type
and the build no. of the dryer. These data are found on the type plate.
◊ Carry out all maintenance work only when the plant has been shut down and depressur-
ised!
◊ Bolt connections must be undone with care! Note ram pressure values! Otherwise emerging
media may cause personal injury.
◊ Do not modify the factory settings of the control system in any way without prior consulta-
tion with the manufacturer.
◊ Never carry out any manipulations on a hollow profi le vessel or modify the same in any
way!
◊ Following maintenance work, always check all fl ange and bolt connections for leakage and
secure seating.
◊ Never use pipes and fi ttings as steps or holding points! The components might fracture, or
the distortions which occur may cause internal damage on the dryer. There is a risk of injury
by slipping off the components, components breaking off, and expanding compressed air!
◊ Never leave tools, loose parts or cloths at or on the dryer.
◊ Only use replacement parts that are suitable for the relevant function and meet the techni-
cal requirements stipulated by the manufacturer. This is always the case, if you use original
replacement parts only.
EN | User Manual
Maintenance and repair of the dryer
34
BSP-MT 10-95/D3
Regular maintenance intervals
Note:
If a chamber has been depressurised, e.g. after completion of the ex-pansion
phase, and the pressure remains above 0 bar, the chamber is pressurised by
what is known as ram pressure. This might be due to
◊ blockage at the muffl er(s)
◊ contamination of the perforated plates
◊ spent drying agent
To prevent such malfunctions, regularly service the dryer as described below.
The table provides an overview of the maintenance work to be carried out. The following
pages describe some of these tasks. Maintenance work requiring the dryer to be largely
disassembled is not described. We recommend to have this work to be performed by author-
ised specialists.
Component
Maintenance task to be carried out
Maintenance
interval
daily
12 months
24 months
See page
Complete dryer
Carry out visual checks and function checks.
•
36
Vessel pressure gauge Check dam pressure. For a dam pressure exceeding
0.3 bar:
– Check muffl er.
– Check dust sieve.
– Check drying agent.
•
36
Air quality
Must be check.
•
37
muffl er
Replace muffl er after 1 year of operation and after
renewing the dessicant.
•
37
fi ne fi lter
muffl er-dämpfer
Replace silencer element annually and after each
desiccant change.
•
37
Dew point sensor
(with optional dew
point sensing-control)
Renew
•
38
Purifying agent
Renew.
If the fed compressed air is humid, the maintenance
interval is reduced to 6 months
•
39
drying agent
Renew
•
39
Pilot valves
Renew
•
39
Main valves V1/V2
Renew
•
39
Expansion valves
V3/V4
Renew
•
39
Check valves V5/V6
Renew
•
39
Solenoids
Renew
•
39
EN | User Manual
Maintenance and repair of the dryer
BSP-MT 10-95/D3
35
Upstream and down-
stream fi lter
Please see the enclosed operating instructions for the attached fi lters.
Maintenance work has to be carried out as specifi ed in this document.
When carrying out any maintenance work, comply with the following safety instructions:
Danger!
There is a very considerable risk of personal injury, when carrying out work on
the activated and pressurised dryer.
Danger!
Before commencing any maintenance tasks always shut down the dryer as
described on page 30 !
Warning against electrical voltage!
Only qualifi ed specialist personnel may carry out work on the electrical system!
Instructions for use of the dongle
If the message SEr, is displayed on the display of the Multitronic controller, the dryer is due
for servicing. The message appears, fl ashing every 60 seconds, once the preset number of
operating hours (e. g. 8000 oh) has been reached. After maintenance has been carried out,
you can use the dongle to reset the counter to 0 and delete the message from the display. A
dongle is enclosed with every service kit. Each dongle can only be used once.
Switch off the controller. Caution! The electric line is still live. Do not touch live parts!
Open the lid to the Multitronic controller. The circuit board in housed underneath it.
Slot the dongle into the dongle interface X9 PC.
Press and hold the reset key S3.
Switch on the controller. The following appears in the display:
for a short time 0.SET
then fl ashing OFF
The service counter is then reset to 0.
If the following appears in the display
for a short time FAIL
then fl ashing OFF
this means that the dongle has already been used once and cannot be used again.
Switch off the controller again and remove the dongle.
Dispose of the unusable dongle and use a new one.
EN | User Manual
Maintenance and repair of the dryer
36
BSP-MT 10-95/D3
Daily maintenance tasks
Carry out visual and function check on the complete dryer
Check dryer for external damage or unusual noise generation.
Duly eliminate any defects found.
If message SEr. is displayed, a routine service must be completed:
Contact the service department of the manufacturer.
Clean dryer
Remove any loose dust by means of a dry cloth, and, if required, also by means of a
moist and well wrung cloth.
Clean the surfaces with a moist well wrung cloth.
Check dam pressure
If, following depressurisation of a vessel, e.g. after the expansion phase, the overpressure
has not decreased to 0 bar, then there is a residual pressure, designated as dam pressure, in
the vessel.
Check for dam pressure: if the dryer functions correctly, the respective pressure gauge
indicates 0 bar. Then there is no dam pressure.
If the dam pressure is greater than 0.3 bar:
Depressurise the dryer and shut it down (see page 30).
Dam pressure can be caused by:
- a blocked muffl er,
- a blocked dust sieve or
- drying agent which is too old.
The respective necessary maintenance measures are described in the following sections.
EN | User Manual
Maintenance and repair of the dryer
BSP-MT 10-95/D3
37
Maintenance work to be completed every 12 months
Check air quality
Especially for critical applications, we recommend to annually check the quality of the pro-
cessed medical breathing air (this check should be carried out by a qualifi ed authority).
Renew muffl ers
The dryer is equipped with a muffl er. If the muffl er becomes blocked, a dam pressure is gen-
erated which in extreme cases may cause the muffl er to burst.
Hazard caused by blocked muffl er!
Blocked muffl ers can cause a dangerous overpressure to build up which may
cause the muffl ers to burst. Flying fragments may cause personal injury and
damage to property.
Therefore, the muffl ers must be replaced every 12 months and after each
change of desiccant.
Warning against sudden air ejection!
During expansion the pressure is released suddenly through the muffl er:
◊ A loud cracking noise occurs which can injure your hearing.
◊ Particles carried in the air fl ow act like bullets and can injure your eyes or
skin.
Always wear eye and ear protection, therefore, when you are in the vicinity of
the dryer!
Depressurise the dryer and shut it down
(see page 30 ).
Unscrew muffl er as shown in the opposite
fi gure.
Replace muffl er and secure it.
Restart dryer (see page 31).
Undo muffl er
Replace the element in the fi ne fi lter muffl er
Depressurise the dryer and shut it down
(see page 30 ).
Undo knurled screw on the lid cap and
remove cap.
Unscrew old fi lter element. Arrows on the
element bottom mark the direction of rotation.
Insert new fi lter element and screw on
tightly.
Renew muffl er element
Re-engage lid cap at the top section of the housing and fi x in position by means of the
knurled screw.
Restart dryer (see page 31 ).
EN | User Manual
Maintenance and repair of the dryer
38
BSP-MT 10-95/D3
Renew dewpoint sensor
To ensure precision dew point measurement,
it is recommended to replace the dew point
sensor every year. This period depends howev-
er on the actual application and might thus be
extended accordingly.
Dewpoint sensor (1)
Warning!
The dew point sensor is a sensitive measuring device. It can be damaged if
subjected to forceful vibrations or shocks. Therefore, please handle the dew
point sensor with great care at all times.
In order to limit the impact on the dryer operation to a minimum, we recommend that you
contact the manufacturer well in advance and order a new dewpoint sensor. After receipt of
the new pressure dewpoint sensor, replace the sensor as follows:
Hold the box of the dewpoint sensor ready.
Release pressure from dryer and shut down the unit (see page 30 )
Loosen the screw at the adapter (1) and disconnect signal cable with the adapter and
seal.
Remove dewpoint sensor from the sensor cell (3) by turning the nut (2).
Take the new dewpoint sensor (2) from the box, remove the protective caps (4, 5) and
screw it into the sensor chamber (3).
Place seal onto sealing face; connect adapter (1) and secure it by tightening the screw.
If no other maintenance work is to be carried out: Restart the dryer (see page 31 ).
Place the protective caps (4, 5) onto the old dew point sensor and dispose of it in accor-
dance with the applicable regulations.
EN | User Manual
Maintenance and repair of the dryer
BSP-MT 10-95/D3
39
Notes on further maintenance work
Note:
In accordance with national regulations, a pressure vessel inspection may be
prescribed to be carried out at regular intervals by an independent supervisory
offi ce.
For an inspection of the pressure vessel, the purifying- and drying agent must
be removed.
When inspecting the pressure vessel, it is recommended to check the conditi-
on of all fi ttings such as e.g. sieve bottom and dust sieve, including gaskets. If
necessary, these fi ttings must be cleaned or renewed.
In the event of comprehensive maintenance or repair tasks, contact the manu-
facturer.
Every 12 months
Replacing pilot valves
The pilot valves are part of every service kit and must be replaced every 12 months.
Renew purifying agent
Note:
To the layers of different purifying agent in chamber, you fi nd an overview of
technical data in annex.
The active surface of the purifying agent can be reduced by oil residue and other contami-
nants. The purifying agent must therefore be replaced once every 12 months (after approx.
8,500 operating hours). If the compressed air is insuffi ciently dried before it reaches the
adsorber (see technical data in the appendix), the service life of the purifying agent can be
considerably shortened. In this case, the agent must be replaced every 6 months (after ap-
prox. 4,000 operating hours).
Renew drying agent
The service life of the drying agent is usually approx. 3 to 5 years. However, in favourable
installation conditions, the change of drying agent may be carried out at a substantially later
date. The change interval depends very signifi cantly from the degree of contamination in the
compressed air (or the quality of the compressed air upstream fi lters). Oil, dust, and dirt parti-
cles cover the drying agent surface and reduce its effective surface, in part quite irreversibly.
Every 24 months
Replacing inlet valves (V1/V2) and check valves (V5/V6)
The inlet valves (main valves) and the check valves are part of the 24-month service kits.
Replace them every 2 years as a precautionary measure.
Expansion valves (V3/V4)
In addition to the inlet valves and the check valves, the expansion valves have to be re-
placed every 24 months as a precautionary measure.
Replacing solenoid coils
Solenoid coils come with the 24-month service kits. Replace them every 2 years.
EN | User Manual
Identify and eliminate faults
40
BSP-MT 10-95/D3
Identify and eliminate faults
The following table provides information on what designatory abbreviations are to be used for
the various components. These designations are also found in the technical documentation.
Used abbreviation
Component
PDI
Differential pressure gauge
V1–V2 (Y2–Y1)
Main valves (solenoid valves)
V3–V4 (Y3–Y4)
Expansion valves (solenoid valves)
RV1–RV2
Check valves
Summary of faults
There are different fault types. In the case of most electrically caused faults (e.g. short circuit,
defective fuse, etc.) the expansion valve closes and the regeneration is interrupted. In the
case of some process faults, the dryer will continue to operate for some time. Other faults on
the dryer become noticeable e.g. due to unusual noises and ran pressures.
The following table shows who is allowed to remedy a fault: the owner’s specialist personnel
or the manufacturer’s service engineer.
Table of possible faults
Fault
Possible cause
Remedy
Specialised
personnel
Service
technician
Excessive dam pres-
sure during regener-
ation
Muffl er or fi lter element of
the muffl er is contaminated.
Check muffl ers or fi lter
elements for contamination,
clean if nec., and poss.
renew.
•
•
Expansion valve V3/V4 does
not open correctly.
Check expansion valve for
contamination, if nec. clean/
renew.
•
•
Dust sieves are contami-
nated.
Clean or renew dust sieves.
•
•
Vessel pressure is too
low
Excessive differential pres-
sure on the upstream fi lter.
Check differential pressure
on the upstream fi lter, if.
nec. renew fi lter element.
•
No pressure build-up
The compressed air system
upstream of the dryer is not
pressurised.
Check whether the
compressed air system
upstream of the dryer is
pressurised. Remove any
faults.
•
Solenoid valve Y1/Y2 does
not open correctly.
Check supply voltage, ca-
ble, contacts and solenoid;
replace, if necessary.
•
•
Excessive compressed
air consumption
Leakage
Check condensate trap at
the upstream fi lter; clean, if
necessary.
•
•
EN | User Manual
Identify and eliminate faults
BSP-MT 10-95/D3
41
Fault
Possible cause
Remedy
Specialised
personnel
Service
technician
Dryer does not switch
over
Solenoid valve Y1/Y2 does
not open correctly.
Check supply voltage, ca-
ble, contacts and solenoid;
replace, if necessary.
•
•
Solenoid valve Y1/Y2 can-
not be opened properly
(audible humming sound or
valve fl apping).
Check supply voltage.
Check pilot valves; replace,
if necessary.
•
•
Control board defective.
Check fuse in supply line
and in the switchbox; re-
place, if necessary.
•
•
Power supply interrupted,
cable broken.
Reconnect the unit to the
power supply.
•
•
Compressor might be off.
Check compressor synchro-
nisation circuit.
•
Error in control programme. Restart programme.
•
No expansion
Solenoid valve Y3/Y4 can-
not be opened.
Check supply voltage, ca-
ble, contacts and solenoid;
replace, if necessary.
•
•
Solenoid valve Y3/Y4 can-
not be opened properly
(audible humming sound or
valve fl apping).
Check supply voltage.
Check spring and solenoid;
replace, if necessary. Check
solenoid valve for contam-
ination; clean or replace, if
necessary.
•
•
Dryer is continuously
bled
Solenoid valve Y3/Y4
cannot be closed properly
(audible humming sound or
valve fl apping).
Check supply voltage.
Check spring and solenoid;
replace, if necessary. Check
diaphragm; replace, if
necessary.
•
•
Main valve V1/V2 does not
open.
Check main valve, replace
if nec.
•
•
Dryer is excessively
bled
Solenoid valve Y1/Y2 can-
not be closed
Check solenoid and
diaphragm; replace, if
necessary.
•
•
Pressure dew point is
not reached
Operating pressure is too
low.
Increase operating pressure.
•
Compressed air volume fl ow
is too high.
Reduce compressed air
volume fl ow
•
EN | User Manual
Identify and eliminate faults
42
BSP-MT 10-95/D3
Fault
Possible cause
Remedy
Specialised
personnel
Service
technician
Pressure dew point is
not reached
Compressed air inlet tem-
perature is too high.
Reduce compressed air inlet
temperature or pre-connect
a compressed air cooler.
•
•
Control board is defective.
Check control board, if nec.
renew.
•
Differential pressure on the
upstream fi lter is too high.
Check differential pressure
on the upstream fi lter, if nec.
renew fi lter element.
•
Condensate trap on the up-
stream fi lter does not work.
Check function of the con-
densate trap, if nec. clean
or renew.
•
•
Drying agent is contaminat-
ed or too old.
Check upstream fi lter for
contamination, if nec. renew
element.
•
Check drying agent for
contamination, if nec. renew
drying agent.
•
•
Regeneration gas too low.
Check function of expansion
valve V3/V4 and muffl er, if
nec. renew muffl er or fi lter
element.
•
•
sensor is defective
Replace sensor
•
•
EN | User Manual
Identify and eliminate faults
BSP-MT 10-95/D3
43
With dewpoint-sensing control (optional)
Fault code
Description of
fault
Possible cause
Remedy
Specialised
personnel
Service
technician
+20
Upper measuring
range limit exceeded
Drying capacity
exceeded.
See instructions for
commissioning. If the
drying agent is wet,
replace it.
•
Error in programme.
Restart programme.
999
Dewpoint sensor
defective
Sensor defective or
irreversibly contam-
inated.
Replace sensor.
•
•
sens
o
–999
Sensor not powered,
or cable or sensor
defective
Sensor, sensor cable
or sensor adapter
defective.
Visual inspection; check
power supply (24 V
to terminals 4 and 6).
Replace defective com-
ponent(s).
•
•
SEr
Display for service
interval. Regular
maintenance tasks
must be carried out.
The display appears
after every 8000
operating hours.
Inform the manufactur-
er’s service staff and
order the appropriate
service kit. The package
includes a dongle with
which you can reset the
operating hours counter
after maintenance has
been carried out. For
instructions on how to
use the dongle see the
enclosed information
sheet (in the service kit).
•
•
EN | User Manual
Annex with technical documentation
44
BSP-MT 10-95/D3
Annex with technical documentation
This annex comprises the following information and technical documentation:
◊ Technical data
◊ Replacement and wear parts list
◊ Logic control diagram
◊ Flow diagram
◊ Dimensional drawing
EN | User Manual
Annex with technical documentation
BSP-MT 10-95/D3
45
Technical data
Operating Range
Site Selection
frost-free indoor installation in a
non-hazardous environment
Ambient temperature
1,5 to 50 °C (24,7 to 122 °F)
Compressed air inlet temperature
25 to 50 °C (68 to 122 °F)
Max. operating pressure
16 bare
Min. operating pressure
5 bare
Medium
Compressed air
Fluid group
2
Electrical connection
Mains voltage, standard
230 V, 50-60 Hz
Alternative voltage
115 V, 50-60 Hz and 24 V DC
Protection class
IP65
Please note type plate and attached electrical circuit diagram!
Performance details
Type
Volumetric
fl ow¹ in
m3/h
Nominal
pipe2
1. Upstream
fi lter
2. Upstream
fi lter
Downstream
fi lter
Nominal
Press. in
bare
Nominal
temper.
°C
BSP-MT 10
158
1
AOP025EGFI
AAP025EGMI AOP025EGMI
16
50
BSP-MT 15
210
1
AOP025EGFI
AAP025EGMI AOP025EGMI
16
50
BSP-MT 20
274
1
AOP025EGFI
AAP025EGMI AOP025EGMI
16
50
BSP-MT 25
371
1 1/2
AOP030GGFI AAP030GGMI AOP030GGMI
16
50
BSP-MT 35
484
1 1/2
AOP030GGFI AAP030GGMI AOP030GGMI
16
50
BSP-MT 45
589
1 1/2
AOP035GGFX AAP035GGMX AOP035GGMX
16
50
BSP-MT 60
839
2
AOP040HGMX AAP040HGFX AOP040HGMX
16
50
BSP-MT 75
1129
2
AOP040HGMX AAP040HGFX AOP040HGMX
16
50
BSP-MT 95
1371
2 ½
AOP045IGFX
AAP045IGFX AOP045IGMX
16
50
1 . m3/h, relating to 1 bara and 20 °C at the compressor suction capacity. Subsequently com-
pressed to 13 bare and 35°C inlet temperature to the dryer at 100 % relative humidity – for
pressure dewpoints of -25 °C and -40 °C.
2 . In accordance with DIN ISO 228 (BSP-P)
Noise emission
Noise level : +3 dB (A)1
65 – 95 dB(A)
1 .. relative to free fi eld measurement, 1 m surr. fi eld
Dimensions
Please heed to the dimensional drawings and the according table containing dimensions
and weight on page 53.
EN | User Manual
Annex with technical documentation
46
BSP-MT 10-95/D3
Drying agent
Chamber 1
100 % molecular sieve
Chamber 2
100 % molecular sieve
Chamber 3
down
middle
top
33 % activated carbon
33 % catalyst
33 % activated carbon
Limits for breathing air
Industrial breathing air
with
brating-
air unit
BSP-MT
Medical air
Europe
UK
USA
Australia
Europe
EN 12021
BS 4275
ANSI/CGA
AS 1715
Ph.European
Carbon
monoxide CO
< 15ppm
< 5ppm
< 10ppm
< 10ppm
< 2ppm
< 5ppm
Carbon
dioxidv CO2
< 500ppm < 500ppm < 1000ppm < 800 ppm
< 150ppm
< 500ppm
humidity H2O
< 5 °C *
< 5 °C *
< 10 °F *
<100mg/m3 < 15 ppm**
< 67 ppm
oxygen O2
21 (±1) %
20 – 23 %
21,5 %
–
20,8–21,1%
20,4 – 21,4 %
Oil quantity
< 0,5 mg/m3 < 0,5 mg/m3 < 0,5 mg/m3
< 1,0 mg/m3 < 0,003mg/m3
< 0,1 mg/m3
odoriferous / aro-
matic substance
Free
free
Free
Free
Free
free
Sufur dioxideSO2
–
–
–
–
< 0,1 ppm
< 1 ppm
mitrous gases
NO/NO2
–
–
–
–
< 1 ppm
< 2 ppm
* Pressure dewpoint below inlet temperature ; **Corresponding pressure dewpoint -50°C to
-45°C at 7 bare . .. All values refer to customary concentration levels present in the inlet air.
EN | User Manual
Annex with technical documentation
BSP-MT 10-95/D3
47
Replacement and wear part list
Note:
When exchange or replacement parts are ordered, always state the dryer type
and the build no. of the dryer. These data are found on the type plate.
Service-kits 12 and 36 months
For model
Mains
voltage
Order-ID.
Scope of delivery
BSP-MT 10 to
BSP-MT 20
115V, 230V
SKK10-K20/BP3/12
Reset-module, muffl er, fi lter
elements, pilot-valves
BSP-MT 25
115V, 230V
SKK25/BP3/12
BSP-MT 35
115V, 230V
SKK35/BP3/12
BSP-MT 45
115V, 230V
SKK45/BP3/12
BSP-MT 60 to
BSP-MT 75
115V, 230V
SKK60-K75/BP3/12
BSP-MT 95
115V, 230V
SKK95/BP3/12
Service-kits 24 and 48 months
For model
Mains
voltage
Order-ID.
Scope of delivery
BSP-MT 10 to
BSP-MT 20
115V
SKK10-K20/BP3/24/115
Reset-module, muffl er, fi lter
elements, inlet- expansion-
and check valves, solenoid
230 V
SKK10-K20/BP3/24
BSP-MT 25
115V
SKK25/BP3/24/115
230V
SKK25/BP3/24
BSP-MT 35
115V
SKK35/BP3/24/115
230 V
SKK35/BP3/24
BSP-MT 45
115V
SKK45/BP3/24/115
230V
SKK45/BP3/24
BSP-MT 60 to
BSP-MT 75
115V
SKK60-K75/BP3/24/115
230 V
SKK60-K75/BP3/24
BSP-MT 95
115V
SKK95/BP3/24/115
230V
SKK95/BP3/24
EN | User Manual
Annex with technical documentation
48
BSP-MT 10-95/D3
Additional spare parts
Order no.
Maintenance
interval
Quantity
Scope of delivery
ZHM100/450
12 months
1
Dewpoint sensor
LS5/ZR
12 months
1
Element fi ne fi lter muffl er
RK-MANO.063SR0219-1
12 months
1
Vessel pressure gauge
Dessicant and activated carbon packages
Order-ID.
BSP-MT 10
BSP-MT 15
BSP-MT 20
BSP-MT 25
BSP-MT 35
BSP-MT 45
BSP-MT 60
BSP-MT 75
BSP-MT 95
12 months – purifying agent
DESPAC3AK
2
3
1
2
2
DESPAC10AK
1
1
1
2
2
4
5
DESPAC1KTY
1
7
4
5
2
2
DESPAC4KTY
2
2
3
4
6
7
10
14
18
12 months – drying agent
DESPAC6EF
2
1
DESPAC20EF
1
2
2
3
4
5
7
9
12
Replacement Element fi lter : P - TYPE - GRADE
Sample: Filter AAP025EGFI (Element P025AA)
Filter AOP030GGMI (Element P030AO)
EN | User Manual
Annex with technical documentation
BSP-MT 10-95/D3
49
Tightening torque values
After the performance of maintenance activities, reconnect the aluminum elbows (indicated
in the images) to the valves’ blocks and to the vessels by applying to the screws a tightening
torque between 8 Nm (min) and 10 Nm (max)
EN | User Manual
Annex with technical documentation
50
BSP-MT 10-95/D3
Logic control diagram
Adsorption in B1 and regeneration in B2
EN | User Manual
Annex with technical documentation
BSP-MT 10-95/D3
51
Regeneration in B1 and adsorption in B2
EN | User Manual
Annex with technical documentation
52
BSP-MT 10-95/D3
Flow diagram
Pos.
Designation
Pos.
Designation
2
Dust sieve
200
Muffl er
50
Check valve block V5–V6
350
Control system
56
Regeneration gas orifi ce plate
65
Upstream fi lter
*
Optional devices:
70
Upstream fi lter
380
Dewpoint-sensing unit
80
Downstream fi lter
400
Start-up device
100
Solenoid valve block V1–V4
500
Regeneration gas return line
EN | User Manual
Annex with technical documentation
BSP-MT 10-95/D3
53
Dimensional drawing
BSP-MT 10 & BSP-MT 95
Type
connec-
tion
Dimensions [mm]
Weight
[kg]
A
A1
B
C
C1
C2
D
E
BSP-MT 10
G 1
1300
880
1420
490
400
60
1070
1070
165
BSP-MT 15
G 1
1300
880
1750
490
400
60
1320
1320
197
BSP-MT 20
G 1
1100
930
1530
490
400
60
1160
1160
197
BSP-MT 25
G 1½ 1100
930
1760
530
400
60
1320
1320
239
BSP-MT 35
G 1½
1390
1220
1810
585
400
60
1320
1320
288
BSP-MT 45
G 1½
1460
1250
1820
605
400
80
1320
1320
342
BSP-MT 60
G 2
1515
1290
1870
635
500
80
1320
1320
437
BSP-MT 75
G 2
1670
1440
2000
640
500
80
1515
1515
564
BSP-MT 95
G 2½
1715
1490
2020
670
500
80
1515
1515
707
Parker Hannifi n Manufacturing S.r.l.
Sede Legale:
Via Sebastiano Caboto 1, Palazzina “A” 20094 Corsico (MI) Italy
Sede Operativa:
Gas Separation and Filtration Division EMEA - Strada Zona Industriale, 4
35020 S.Angelo di Piove (PD) Italy
tel +39 049 971 2111- fax +39 049 9701911
Web-site: www. parker.com
A division of Parker Hannifi n Corporation